Loading...
Project Rev & CorrespondenceCity of Yelm Community Development Department P.O. Boa 479 Yelm, WA 98597 (360)458-3835 (360) 458-3144 FAX Memorandum To: U.S. Department of Housing and Urban Development From: Tami Merriman, Assistant Planner Date: December 7, 2004 Re: Easthaven Villa - ALF 311 Cullens Road Yelm, WA 98597 68 UnitsBeds It is our understanding that the above-referenced applicant has applied for financing on this property. To meet the financing requirements, information regarding the property's compliance with local zoning ordinances is necessary. The zoning designation of the property is Commercial (C-1) which allows nursing homes, convalescent care facilities, and assisted living facilities as a Special Use under Chapters 17.26 and 17.66 of Yelm Municipal Code. The applicant has received a Conditional Use Permit, and is in compliance with current zoning regulations. Sincerely, Tami Merriman Assistant Planner (360) 458-8496 enc: Zoning map and zoning ordinance applicable to the site. 12503 S. E. Mill Plain Blvd Suite 205 Vancouver, WA 98684-4007 Tel: 360.944.1440 Fax: 360.944.0969 www.gmaccm.com December 2, 2004 City of Yelm Community Development Dept. Tami Merriman, Assistant Planner P.O. Box 479 Yelm, WA 98593 Ph: 360-458-3835 Re: Easthaven Villa - ALF 311 Cullens Rd Yelm, WA 98597 68 Units/Beds Dear Ms. Merriman, GMAC Commercial Mortgage AFC 0~ 1ppA We are processing a refinance loan transaction utilizing FHA Mortgage Insurance through the U.S. Department of Housing and Urban Development on the above referenced property. Please provide us with a letter from your department stating the zoning designation of this property and that the facility is permitted use under that designation. Additionally, please provide the definition of the zoning designation along with a copy of the zoning map applicable to the site, if available. Please use the attached letter for a reference on how to format the letter and it should be typed on your organization's letterhead. If there should be any requirements you have or further information you need please contact me at your earliest opportunity. Thanking you in advance for your assistance and cooperation. Very truly yours, GMAC COMMERCIAL MORTGAGE Brittany H~y~s Administrative Assistant ZONING COMPIANCE LETTER (TO BE TYPED ON THE ZONING COMMISSION'S LETTERHEAD) Date: To: U.S. Department of Housing and Urban Development GMAC Commercial Mortgage Corporation From: Re: Project Name: Address: City, State: Applicant: To Whom It May Concern: It is our understanding that the above-referenced applicant has applied for financing on this property. To meet the financing requirements, information regarding the property's compliance with local zoning ordinances is necessary. Please complete the following: (choose what appliee) The zoning designation of the property is ,which allows: Multifamily Assisted Living Skilled Nursing The property complies with current zoning requirements. The property does not comply with the current zoning requirements or restrictions for the following reasons: Very truly yours, (Name) (Title) Contact: Phone: Enc. Zoning Map and Zoning Ordinance applicable to the site, if available FAX TRANSMISSION CITY OF YELM COMMUNITY DEVELOPMENT DEPARTMENT PO BOX 479 -105 YELM AVE W YELM WA 98597 (360) 458-3835 FAX: (360) 458-3144 TO: Marvin Pratt FAX #: 503-992-8304 DATE: APRIL 9, 2003 PAGES: 1 , including this cover sheet. FROM: Tami Merriman, Assistant Planner SUBJECT: UFC Fire Lane Standards COMMENTS: Marvin: UFC 902.2.1 Required access: Fire apparatus access roads shall be provided in accordance with Sections 901 and 902.2 for every facility, building, or portion of a building hereafter constructed or moved into, or within the jurisdictions when any portion of the facility or any portion of an exterior wall of the first story of the building is located more than 150- feet from fire apparatus access as measured by an approved route around the exterior of the buildings. Exceptions: When access roads cannot be installed due to location on property, topography, waterways, nonnegotiable grades or other similar conditions, the chief is authorized to required additional fire protections as specified in Section 1001.9. The City interprets this to mean that a fire lane is always required. We can make an exceptions, such as yours, when there isn't room for a fire lane due to property restrictions. If there is room for a fire lane, then one is required. Tami * * IF YOU DO NOT RECEIVE ALL COPIES, OR ANY COPY IS NOT LEGIBLE, PLEASE CALL (360) 458-3835 As sooty As PossIRLE. G\Community Development\Projec[ Files\CUP Conditional Use Permit\8322 Fasthaven Villa II Addition\2nd rev plan fax.doc Apr 09 03 03:20p Marvin Pratt 503-992-8304 p.l Beehive CYJana~emenz Cxoup, lnc. 4110 Pacific Ave. #200 Forest Grove, OR 97116 (503)357-3793 FAX (503)992-8304 Forest Grove Beehive - 2122 Hawthorne St Forest Grove, OR 97116 (503)357-6409 Hawthorne House - 2635 21st Ave. Forest Grove, OR 97116 (503)359-5770 EasthavenVilla-311CullensRoad YeIm,WA98597 (503)458-2800 Westhaven Villa -1000 Anderson Dr. Aberdeen, WA 98520 (360)538-9983 Hearthside Manor - 3615 74~ Ave. West University Place, WA (256)460-3330 To: Tami Merriman From: Marvin Pratt City of Yelm, Community Devebpment Fax: 36058-3144 Pa®es: 1 Phase: 3605&3835 Date: 04/09/03 Re: UFC Fire Lane Standards CC: Tami: Thank you for your quids response. I don't have a copy of the UFC, but my understanding was that the "exception" was per the Code, given the other systems in place. Could you please provide me wfth the necessary UFC references that would show that this is not the case? for your help FAX TRANSMISSION CITY OF YELM COMMUNITY DEVELOPMENT DEPARTMENT PO BOX 479 -105 YELM AVE W YELM WA 98597 (360) 458-3835 FAX: (360) 458-3144 TO: Marvin Pratt FAX N: 503-992-8304 //~\ FROM: Tami Me i arty Assistant Planner SUBJECT: Change in civil plans for Easthaven COMMENTS: DATE: APRIL 9, 2003 PAGES: 1 including this cover sheet. Marvin: Your fax arrived in my office yesterday. I was out of the office yesterday, and apologize for [he delay in responding. In regards to the change in your plans. The Site Plan Review Committee (SPRC) reviewed the proposed changes to determine if the amendment was consistent with your Conditional Use Permit. The SPRC determined that the amendment was consistent with your permit, and the changes could be made without the need for amending the Conditional Use Permit. The 20-foot fire lane is a requirement of [he Uniform Fire Code. The City, and Fire Department worked very hard with you to assist you in meeting your needs in the conSned space. The 12-foot lane was an exception, or variance to the code, and allowed only because of additional fire protection, not in lieu of. The exception was granted because you did not have room on [he site fora 20-foot lane, without changing your building plans. If now you have the property available, you can increase your Ere lane to meet UFC Standards, without the need for an exception. The approved landscape plan shows a 7-foot buffer at the south access, and increasing to [he required 8-feet a short distance to the west. This was also an exception made to accommodate your needs without having to change your building plans. As long as the landscape plan is followed, there is no requirement for an increased landscape buffer. If you have any further questions, please feel free to give me a call. I can be reached at (360) 458-8496. Sincerely, Tami Merriman * * IF YOU DO NOT RECEIVE ALL COPIES, OR ANY COPY IS NOT LEGIBLE, PLEASE CALL (360) 458-3835 As sooty As Poss1BLE. G:\Community Development\Projec[ Files\CUP Conditional Use Permit\8322 Easthaven Villa II Addition\Rev plan fax to pratt.doc Rpr 08 03 09:04a Marvin Pratt 503-992-8304 p.l Beehive QJana~emenz CRO~p, lne. 4110 Pacific Ave. #200 Forest Grove, OR 97116 (503)357-3793 FAX (503)992-8304 Forest Grove Beehive - 2122 Hawthorne St Forest Grove, OR 97116 (503)357-6409 Hawthorne House - 2635 21st Ave. Forest Grove, OR 97718 (503)359-5770 Easthaven Villa - 311 Cullens Road Yelm, WA 98597 (503)458-2800 Westhaven Villa - 1000 Anderson Or. Aberdeen, WA 98520 (360)538-9983 Hearthside Manor-3615 74`"Ave. West University Place, WA (256)460-3330 -~. 4~ - -zav--. ni To: Tami Merriman From: Marvin Pratt Cily of Yelm, Community Development Fax: 360-458-3144 Payes: 1 Phone: 36056-3835 Date: 04/08/03 Re: Request for Statement of Fees CC: Tami: I received your letter today detailing what needs to be resubmitted for the proposed change in the stormwater retention and treatment facilities at Easthaven Villa. Items 1 and 2 of your list make sense. Item 3 (Provide a 20' Fire Lane) is confusing. Why would changing the onsite stormwater facilities require a change in fire protection systems (the addition of a 20' fire lane)? If the fire protection systems onsite have been designed per city standards, I am unclear why a requested change in the stormwater systems would require a change in the fire protection systems. We had discussed our situation in previous meetings and it was determined that since the building was fully sprinkled, there was no need for a fire lane circling the building. In addition, the hydrant placement was also redundant. We changed the design of the road to accommodate one way travel around the building, even for a fire truck, but my understanding was that this was not necessary. Could you please detail the reasoning behind this new requirement? Your quick response is important as the decision for us to proceed with the acquisition of the property needs to be made immediately. The added cost of a fire lane may outweigh the benefit of adding the property with the increased landscaping buffer and changing the stormwater systems. Marvin ~~ ~~_ Beehive Management Group LLC Marvin Pratt 4110 Pacific Avenue Suite 200 Forest Grove, OR 97116 City of Yelm ]O.i Yelm Avenue West P.O. Box 479 Yelm, Washington 98597 (360) 458-3244 Re: Amendment to Easthaven Villa Phase II Addition Site Plan Dear Mr. Pratt: The City has received and reviewed the proposed change to the Easthaven Villa Phase II addition. The proposed change is based on the acquisition of land to the South of the site. The City cannot approve plans for improvements located on this property until such time as the applicant becomes the legal owner of the property. Moving the stormwater facilities and landscaping to that site is consistent with the approved site plan, and is acceptable under the following conditions. 1. Revise, and resubmit civil plan to the Community Development Department for review and approval. This includes a new landscape and irrigation plan as well. 2. Revise, and resubmit stormwater calculations to reflect the change in the stormwater facilities. 3. Provide fora 20-foot fire lane. Please keep in mind when revising your plans that bioswales must be located no closer than 5 feet from the property line, and stormwater ponds no closer than 10 feet from the property line. Engineer review fees will be applied. If you have any questions, please call me at (360) 458-8496. Sincerely, lip, ~,~ ~~.,/%~.'G~j~ Tami Merriman Assistant Planner cc: Jim Gibson, Development Services Engineer Gary Carlson, Building Official YELM WASHINGTON The City of Yelm is mi Equal OPporhntiti~ Provider i i i C~ THE p+4w~ Q~~ ~ a ~ Ci o helm 4 M 105 Yelm Avenue West YELM P•O. Box 479 WABNINUTON Yelm, Washington 98597 November 15, 2002 Beehive Management Group LLC Marvin Pratt Suite 200, 4110 Pacific Avenue Forest Grove, OR 971 16 RE: EASTHAVEN VILLA PHASE 11 ADDITION CUP-02-8322-YL Dear Applicant: Transmitted herewith is the Report and Decision of the City of Yelm Hearing Examiner relating to the above-entitled matter. Very truly yours, EP E . CAUSSEAU R. Hearing Examiner SKC/ca cc: Parties of Record CITY OF YELM -1- The City of Yelm is an Equal Opportunity Provider OFFICE OF THE HEARING EXAMINER CITY OF YELM REPORT AND DECISION CASE NO.: EASTHAVEN VILLA PHASE II ADDITION CUP-02-8322-YL APPLICANT: Beehive Management Group LLC Marvin Pratt Suite 200, 41 l0 Pacific Avenue Forest Grove, OR 971 16 SUMMARY OF REQUEST: The applicant is requesting a special use permit to constnact an additional building holding 20 assisted living units, plus laundry facilities, and an administrative office at Easthaven Villa. SUMMARY OF DECISION: Request granted, subject to conditions. PUBLIC HEARING: After reviewing Planning and Community Development Staff Report and examining available information on file with the application, the Examiner conducted a public hearing on the request as follows: The hearing was opened on November 4, 2002. Parties wishing to testify were sworn in by the Examiner. The following exhibits were submitted and made a part of the record as follows: EXHIBIT " 1 " - Planning and Community Development Staff Report and Attachments EXHIBIT " 2" - Aerial photograph EXHIBIT "3" - Site Plan TAMI MERRIMAN appeared and presented the Community Development Department Staff Report. The applicant proposes to expand an existing facility, and staff has identified no -2- environmental concerns. The project meets all parking and landscape requirements and will need to install road frontage improvements. The applicant will need to pay transportation improvement charges for traffic. The vanpool allows reduction in the required number of parking spaces from 12 to 9. They will provide these spaces at the rear of the existing facility. The applicant needs to provide the calculations for water usage for the new units which may be based upon water usage in the present facility. Storm water control will meet ordinance standards, and they will continue the same type of landscaping as in the existing facility. The code allows the applicant to use a trellis or other type of landscaping if they do not have sufficient width for the required landscaping. Staff recommends approval subject to conditions. In answer to the Examiner's question, the City requires the applicant to commence the project within three years of the effective date of the decision and complete it within five years with extensions possible. Appearing was MARVIN PRATT who testified that Beehive Management Group owns the Easthaven Villa LLC. They will build the project as soon as possible and may purchase an additional 20 feet on the southwest side which may eliminate the need for a special buffering hedge. No one spoke further in this matter and so the Examiner took the request under advisement. The hearing was concluded. NOTE: A complete record of this hearing is available in the City of Yelm Community Development Department. FINDINGS, CONCLUSIONS AND DECISION: FINDINGS: 1. The Hearing Examiner has admitted documentary evidence into the record, heard testimony, and taken this matter under advisement. 2. The City performed an environmental review, and issued a Determination of Nonsignificance on September l 3, 2002, with a comment deadline of September 27, 2002, and an appeal deadline of October 4, 2002. No appeals were filed. 3. Notice of this application was mailed to state and local agencies, and property owners within 300 feet of the project site on August 23, 2002. Public notice of the date and time of the public hearing was posted on the site, mailed to property owners within 300 feet of the project site on October 24, 2002, and advertised in the local newspaper. 4. The applicant has a possessory ownership interest in a rectangular, unimproved, 26,370 square foot parcel of property abutting the southwest property line of the -3- Easthaven Villa Phase !assisted living facility. The applicant, which owns Easthaven Villa Phase 1, requests a special use permit to allow construction of a new building housing 20 assisted living units and joined to the existing facility by a solarium/walkway. 5. The site is located within the Commercial (C-1) zone classification of the Yelm Municipal Code (YMC) which authorizes the special uses set forth in Section 17.66.020 YMC subject to obtaining a special use permit. Subsection A(5) authorizes nursing homes, convalescent care facilities, and congregate care facilities as special uses in the C-1 zone classification. 6. For the C-1 classification, Section 17.26.070 YMC requires a side yard setback of ten feet, a rear yard setback of 20 feet, and a front yard setback of 15 feet. Section 17.26.060(A) YMC requires a minimum lot size of 5,000 square feet, and Section 17.26.090 YMC allows a maximum building height of 40 feet. All proposed setbacks exceed the minimum requirement. The lot exceeds 5,000 square feet and the applicant proposes a one story building which will match the existing facility. The proposed use therefore meets all bulk regulations of the C-1 zone classification. 7. The property north of the existing facility is located in the R-6 residential zone classification and appears improved with amulti-family residential complex and a single family home. The vacant parcel to the west is zoned Commercial. Parcels to the south and southwest on both sides of Cullens Road NW are also located within the C-1 zone classification, but are improved with residential uses. Staff has recommended conditions requiring landscaping of the project to mitigate impacts on adjoining residential uses. 8. The project abuts the north side of Cullens Road for 90 feet, approximately 700 feet north of its intersection with Yelm Avenue. The City 2001 Comprehensive Transportation Plan Update provides methods for financing transportation projects and includes a policy that "requires impact mitigation payments, or seek voluntary contributions from developers". The City Concurrency Management Ordinance also requires mitigation of impacts to the City's transportation system by requiring projects to make contributions to the facilities identified in off-site comprehensive transportation planning in the form of a transportation facility charge. The ordinance lists the number of new p.m. peak trips generated by a congregate care/assisted living facility as .17 trips per dwelling unit. The transportation facility charge amounts to $ 750 per new p.m. peak trip. Conditions of approval require the payment of $2,550 to offset the transportation impacts to the City system as well as making on-site and frontage improvements on Cullens Road to neighborhood collector standards. 9. Section 17.72.030(D) YMC sets forth minimum parking requirements for various commercial uses to include "institutions, sanitariums and long term care facilities". Said uses require one parking space for each two beds plus one space per employee based -4- upon the greatest number of care employees on a single shift. The proposal adds 20 beds and two employees and therefore requires an additional 12 parking stalls. However, Section 17.72.090 authorizes a reduction of 25% from the minimum required when the applicant provides a private vanpool operation. Since the project will have a vanpool the City has agreed to reduce the number of parking stalls by 25% to a total of nine new stalls. 10. The City currently provides domestic water, fire flow, and sanitary sewer service to the site. The applicant must comply with current City standards and pay for both water and sewer based upon the water consumption rate (240 gallons per day per connection). Since the site is already connected to the City's sewer system, the applicant must purchase additional sewer equivalent residency units (ERU) based upon the water usage calculations. 1 1. Construction of the building and associated parking and other impervious areas will increase storm water runoff from the site. Conditions of approval require that the storm water control system meet all City of Yelm development and design guidelines. 12. The Uniform Fire Code requires fire protection for the buildings to include fire hydrants, fire lanes, or sprinkler systems. 13. The applicant must satisfy the landscaping and screening requirements set forth in Chapter 17.80 YMC. Said chapter requires eight foot wide, Type 11 landscaping around the perimeter of the parcel. Five foot wide, Type I1 landscaping is required around the perimeter of the building. The applicant may continue the same landscape concept currently in use around the existing buildings. If the applicant cannot meet the width requirements for landscaping, Section 17.80.060 YMC authorizes alternative landscaping options to include a trellis. CONCLUSIONS: 1. The Hearing Examiner has jurisdiction to consider and decide the issues presented by this request. 2. Section 17.66.060 YMC authorizes the Examiner to grant a special use permit following a public hearing and review of all testimony and evidence submitted therein. Section l 7.66.100 requires the Examiner to impose conditions and safeguards as are necessary to secure adequate protection for the locality in which the use is to be permitted. Said section also requires the Examiner to establish a time limit within which the project must be started and completed. 3. The proposed addition to the Easthaven Villa satisfies all criteria set forth in the YMC for "nursing homes, convalescent care facilities, congregate care facilities" as well as all -5- standards for special use permits. Therefore, the special use permit should be granted subject to the following conditions: 1. The applicant shall mitigate transportation impacts based on the new p.m. peak hour trips generated by the project. The Transportation Facility Charge (TFC) shall be based on .17 new peak hour trips per dwelling. The applicant will be responsible for a TFC of $2,550.00 which is payable at time of building permit issuance. 2. The applicant shall provide for a minimum of nine parking stalls. 3. The applicant shall provide for handicap parking stalls as required by ADA. 4. Parking areas shall be landscaped consistent with Chapter 17.80, Landscaping and City of Yelm Development and Design Guidelines. 5. The applicant shall provide proposed water use calculations to the Community Development Department for review and approval. Water ERU's are based on a consumption rate of 240 gallons per day and are charged a current rate of $1,500 (fee subject to change) inside City limits. The number of ERU's required for this project shall be determined by calculations provided by the applicant, and approved by the Community Development Department. 6. Water connection fees shall be paid at building permit issuance. 7. The proposed site is connected to the City's STEP sewer system. The applicant is required to purchase Sewer ERU's based on the water calculations provided by the applicant, and reviewed and approved by the Community Development Department. Equivalent Residential Units (ERU's) are based on a discharge of 240 gallons per day. The current rate for one ERU is $4,986.00 (fee subject to change). 8. Sewer connection fees are payable at building permit issuance. 9. The applicant shall design and construct all stormwater facilities in accordance with the DOE Manual, as adopted by the City of Yelm. Best Management Practices are required during and post construction. 10. stormwater areas shall be landscaped consistent with Chapter 17.80, Landscaping and City of Yelm Development and Design Guidelines. l 1. The applicant shall submit a final stormwater report with civil plan application. -6- 12. The applicant shall submit a stormwater maintenance plan with civil plan application. 13. The applicant shall provide a blanket easement for maintenance of all utilities deeded to the City, and access to the stormwater facility. 14. An eight foot, Type II landscaping is required around the perimeter of the site and the new addition. The applicant may continue the same perimeter landscape concept as is currently being used around the site. A five foot, Type II landscaping is required around the perimeter of the building. The applicant may continue the same landscape concept as is currently being used around the buildings. A Type Ill landscaping is required as part of the frontage improvements. Type 1V landscaping is required in parking areas, and Type V landscaping is required in stormwater retention facilities. 15. The applicant shall submit a final landscape and irrigation plan, pursuant to Chapter 17.80, to the Community Development Department for review and approval. 16. Completed landscaping shall be approved by the Community Development Department prior to building occupancy. 17. The applicant shall commence construction of the project within three years of the effective date of the decision and shall complete construction within five years of the effective date of this decision; provided, however, that the applicant may request one year time extensions. DECISION: The request for a special use permit to authorize an additional 20 assisted living units at the Easthaven Villa located at 31 1 Cullens Road within the City of Yelm is hereby granted subject to the conditions contained in the conclusions above. ORDERED this 15th day of November, 2002. S N U SEA , JR. Hearing Examiner -~- TRANSMITTED this 15th day of November, 2002, to the following: APPLICANT: Beehive Management Group LLC Marvin Pratt Suite 200, 41 10 Pacific Avenue Forest Grove, OR 971 16 City of Yelm Tami Merriman 105 Yelm Avenue West P.O. Box 479 Yelm, Washington 98597 -s- CASE NO: EASTHAVEN VILLA PHASE II ADDITION CUP-02-8322-YL NOTICE 1. RECONSIDERATION: Any interested party or agency of record, oral or written, that disagrees with the decision of the hearing examiner may make a written request for reconsideration by the hearing examiner. Said request shall set forth specific errors relating to: A. Erroneous procedures; B. Errors of law objected to at the public hearing by the person requesting reconsideration; C. Incomplete record; D. An error in interpreting the comprehensive plan or other relevant material; or E. Newly discovered material evidence which was not available at the time of the hearing. The term "new evidence" shall mean only evidence discovered after the hearing held by the hearing examiner and shall not include evidence which was available or which could reasonably have been available and simply not presented at the hearing for whatever reason. The request must be filed no later than 4:30 p.m. on December 3, 2002 with the Community Development Department 105 Yelm Avenue West, Yelm, WA 98597. This request shall set forth the bases for reconsideration as limited by the above. The hearing examiner shall review said request in light of the record and take such further action as he deems proper. The hearing examiner may request further information which shall be provided within 10 days of the request. 2. APPEAL OF EXAMINER'S DECISION: The final decision by the Examiner -9- may be appealed to the city council, by any aggrieved person or agency of record, oral or written that disagrees with the decision of the hearing examiner, except threshold determinations (YMC 15.49.160) in accordance with Section 2.26.150 of the Yelm Municipal Code (YMC). NOTE: In an effort to avoid confusion at the time of filing a request for reconsideration, please attach this page to the request for reconsideration. -10- VISITOR SIGN IN SHEET Please sign in and indicate if you wish to speak at this meeting or to be added to the mailing list to receive future agendas and minutes. ALL CITY HEARING EXAMINER MEETINGS ARE AUDIO TAPED. FOR INFORMATION ON OBTAINING A COPY PLEASE CALL YELM COMMUNITY DEVELOPMENT DEPARTMENT AT 360-458-3835 MEETING: YELM HEARING EXAMINER DATE: NOVEMBER 4, 2002 TIME: 9:00 AM LOCATION: YELM CITY HALL, COUNCIL CHAMBERS Hearing: 1. Willow Glen Phase II, SUB-02-8317-YL 2. Easthaven Villa II, CUP-02-8322-YL NAME & ADDRESS MAILING LIST? /SPEAKER? (Indicate which public hearing by the assigned numbers above) r ~O~iv ~~y~ ,~ PE I. SDII~ CAc~ BI rd s~ a v\.~ l ~~ ~~ ~~ 1t~ I/ ~F THE A~P~ a~ ~- Ci o Yelnz a M ty 105 Yelm Avenue West YELM P•O. Box 479 WASHINGTON Yelm, Washington 98597 (360) 458-3244 NOTICE OF PUBLIC HEARING YELM HEARING EXAMINER DATE: Monday, November 4, 2002, 9:00 a.m. PLACE: City Hall Council Chambers, 105 Yelm Ave W., Yelm WA PURPOSE: Public Hearing to receive comments regarding the proposed addition of 20 units to the existing Easthaven Villa Assisted Living Facility. Case #CUP-02-8322-YL APPLICANT: Beehive Management Group L.L.C. PROJECT LOCATION: 311 Cullens Road, Yelm, WA 98597 The Yelm Hearing Examiner will hold a public hearing to receive comments on a proposed 20-unit addition to the existing Easthaven Villa Assisted Living Facility. The Hearing Examiner will make a decision on the matter within 10 days after the hearing. Testimony may be given at the hearing or through any written comments on the proposal, received by the close of the public hearing on November 4, 2002. Such written comments may be submitted to the City of Yelm at the address shown above, or mailed to the City of Yelm Community Development Department, PO Box 479, Yelm WA 98597. Any related documents are available for public review during normal business hours at the City of Yelm, 105 Yelm Ave W., Yelm, WA. For additional information, please contact Tami Merriman at (360) 458-3835. The City of Yelm provides reasonable accommodations to persons with disabilities. If you need special accommodations to attend or participate in this hearing, please call the City Clerk, Agnes Bennick, at (360) 458-8404, at least 4 days before the meeting. ATTEST: City of Yelm A~rfes Bennick, City Clerk DO NOT PUBLISH BELOW THIS LINE Published in the Nisqually Valley News: Friday, October 2.5, 2002. Mailed to Adjacent Property Owners and Posted in Public Places: October 24, 2002. The City of Yelm is an Equal Opportunity Provider ~pf TfiF p~~ I•~~ ~ Ci o Yelm ty 105 Yelm Avenue West YELM P.O. Box 479 WASMINOTON Yelm, Washington 98597 (360) 458-3244 AGENDA CITY OF YELM HEARING EXAMINER MONDAY, NOVEMBER 4, 2002 9:00 A.M. YELM CITY HALL COUNCIL CHAMBERS, 105 YELM AVE. W. Call to Order 2. Public Hearings SUB-02-8317-YL Willow Glen -Phase II Yelm Property Development An application to subdivide 8.89 acres into 46 single family lots on Middle Road. CUP-02-8322-YL Easthaven Villa -Phase II Beehive Management Group, L.L.C. An application to construct an additional building with 20 assisted living units at the site of the Easthaven Villa facility on Cullins Road. 3. Adjourn It is the City of Yelm's policy to provide reasonable accommodations for people with disabilities. If you are a person with a disability in need of accommodations to conduct business, or to participate in government processes or activities, please contact Agnes Bennick, at 360-458-8404 at least four (4) working days prior to the scheduled event. All Hearing Examiner meetings are audio taped. For information on obtaining a copy, please call the Community Development Department at (360) 458-3835. The City of Yelm is an Equal Opportunity Provider / ~~ THE p•Q~ ~. V/ \~I YELM WASHIN3TON Date: October 24, 2002 City of Yelm 105 Yelm Avenue West P.O. Box 479 Yelm, Washington 98597 (360) 458-3244 To: Stephen Causseaux, Jr., Hearing Examiner From: Tami Merriman, Planning Technician Re: Easthaven Villa Phase II Addition, CUP-02-8322-YL LIST OF EXHIBITS: Exhibit I: Site Plan Exhibit ll: Notice of Application Exhibit III: Determination of Non-Significance Exhibit IV: Public Hearing Notice Applicant: . Marvin Pratt Suite 200, 4110 Pacific Ave. Forest Grove, OR 97116 Proposal: The applicant is applying for a Special Use Permit to construct an additional building, holding 20-assisted living units, plus laundry facilities, and an administrative office. The new building will be connected to the existing building by a covered solarium/walkway. Construction includes new facilities, infrastructure, frontage improvements, parking, landscaping and stormwater facilities. Prior land use approval for this facility did not include the construction of these units. Notice of this application was mailed to state and local agencies, and property owners within 300 feet of the project site on August 23, 2002. Public Notice of the date and time of the Public Hearing was posted on the project site, mailed to property owners within 300 feet of the project site on October 24, 2002 and advertised in the local newspaper. The City has performed an environmental review, and issued a Determination of Nonsignificance on September 13, 2002, with a comment deadline of September 27, 2002, and an appeal deadline of October 4, 2002. Summary: Staff recommends approval of the proposal, subject to the conditions listed in this report. 17ie Cify of Yelrn is an Equal Opportunity Provider 1. Existing Land Use and Zoning. Findin The site is zoned Commercial (C-1 ), Yelm Municipal Code (YMC) Chapter 17.26, and contains one existing building that includes assisted living facilities, kitchen, dining area, and related utility and administrative support. In the C-1 zone, Special Uses are allowed as provided for in Chapter 17.66, Special Uses. Conclusion A nursing home, convalescent care and congregate care facility is classified as a special use and is allowed, provided any unique impacts resulting from the proposal can be mitigated. 2. Lot Size and Setbacks: Finding: The current building has been in place since 1998. The proposal is to add another building with 20 assisted living units, joined by a solarium/walkway. Setbacks for the C-1 zone are 10 feet on side yards, 20-feet on rear yards, and 15-feet from front property lines. The maximum height of buildings shall be 40 feet. Conclusion: The site and the projected addition meet current minimum setbacks and lot size requirements. 3. Adjacent Land Uses and Zoning. Finding: The project site is immediately south of the existing assisted living facility. The buildings shall be joined in the center by a solarium/walkway. The property to the north of the existing building is zoned R-6 Residential. The property to the west is zoned commercial, and is vacant. The property to the south is zoned C-1 Commercial, however, it is currently used as residential. Conclusion: The existing special use is currently approved. The proposed addition will require landscape conditions to mitigate impacts to adjoining residential uses. Landscaping requirements are addressed later in this document. 4. Transportation and Site Access. Finding: Yelm is a small compact community most directly affected by two state highways which bisect the community. The two state highways are used by local residents for transportation throughout the city and for access to commercial and residential areas throughout the community. In lieu of widening existing streets, the City has elect to create certain alternatives, Y-1, Y-2, Y-3 which will avoid the need to significantly widen existing streets, and particularly Yelm Avenue. New developments do in fact burden the city's central streets, and unless the bypass alternatives are accomplished, the City would have to require developers to pay the cost of the internal street widening. The CUP-02-5322-YL Staff Report 2 city plans show, and the City finds that adequate facilities will be accomplished better and in a timely fashion by bypass facilities as a substitute for the widening of existing facilities. As a result, the City finds that the regional plans in fact benefit projects in all areas on the City and will accomplish the goal of providing adequate facilities to City standards within a reasonable time to serve the demands created by the proposed project. Finding: The project fronts on Cullens Road, approximately 700 feet from Yelm Ave. The previous land use approval for the facility required road frontage improvements on Cullens Road. As part of that land use approval, the City provided. for and constructed the realignment of the Cullens/Coates intersection. Fin. ding: The City of Yelm 2001 Comprehensive Transportation Plan Update lists Goals and Policies relating to transportation impacts. #30. Funding Sources Policy provides methods for financing transportation projects, and includes a policy that "requires impact mitigation payments, or seek voluntary contributions from developers". Finding: The City of Yelm Concurrency Management ordinance also describes mitigation measures for impacts to the City's transportation system by requiring the project to make a contribution to the facilities identified in off-site comprehensive transportation plan, in the form of a transportation facility charge. The ordinance lists the number of new pm peak trips generated by a Congregate Care/Assisted Living Facility to be 0.17 trips per dwelling. The Transportation Facility Charge is currently $750.00 per new pm peak trip. Finding: Chapter 15.40 Concurrency Management provides for mitigation measures for impacts to the City's transportation system. Chapter 15.40.020(5)(a) states that "The project makes on-site and frontage improvements, consistent with City standard for utilities, curbs, gutters, sidewalks, bicycle lanes where appropriate, and roads necessary to serve the proposed project consistent with safety and public interest. Conclusion: The construction of this project will create impacts to the existing traffic system. The City of Yelm has created mitigation measures through its Municipal Code, Comprehensive Transportation Plan, and Development Guidelines. Conditions of Approval: a. The applicant shall mitigate transportation impacts based on the new p.m. peak hour trips generated by the project. The Transportation Facility Charge (TFC) shall be based on .17 new peak hour trips per dwelling. The applicant will be responsible for a TFC of $2,550.00 which is payable at time of building permit issuance. CUP-02-3332-YL StafF Rcport 3 b. The applicant shall make on-site and frontage improvements consistent with City standards. Improvements for Cullens Road shall be consistent with the City of Yelm Development Guidelines fora "Neighborhood Collector". 5. Parking. Findin :Chapter 17.72, Off-Street Parking and Loading provide guidelines for parking requirements. Guidelines for the proposed addition require one parking stall for each two beds, plus one per employee, based on the greatest number of employees on a single shift. The proposal adds 20 beds, and approximately 2 employees. ADA stalls shall be provided. Number of additional parking stalls required is 12. Findin The facility has it's own transportation van for residents. Chapter 17.72.090, Incentives for reducing the number of parking stalls, allows fora 25% reduction in parking stall requirements when a private vanpool operation is provided by the development. Conclusion: Off-street parking shall be provided on site. Number of stalls may be reduced by 25%. Conditions of Approval: a. The applicant shall provide for a minimum of 9 additional parking stalls. b. The applicant shall provide for handicap parking stalls as required by ADA. c. Parking areas shall be landscaped consistent with Chapter 17.80, Landscaping, and City of Yelm Development and Design Guidelines. 6. Water Supply. Findin The City's Water Comprehensive Plan identifies a portion of the City area for service. The City is pursuing additional land areas for approval and the extension of facilities. Completion of such activities is dependent on grant and developer funding, as well as planned bonding and existing public funds. The status of such plans and funding sources must be considered in any review of concurrency. Developer extensions and or dedications, latecomer agreements, oversizing agreements, and the creation of local improvement districts may all be considered. In the event of a new funding source, however, concurrency is not found until the funding source is in fact in pace - e.g. award of a grant, a binding letter commitment for third parting funding, or the successful formation of a local improvement district. Any necessary water rights are considered, only after approved for municipal use by the Washington State Department of Ecology, or appropriate appeals board, and the time for appeal or challenge has expired. Findin There is an existing city water connection at this site. Connection charges are based on water consumption. One connection is based on a consumption rate of 240 gallons per day. This connection is referred to as an "ERU". CUP-02-8322-YL Staff Report 4 Conclusion: The additional development to this site creates an increased impact on the City's water system. Conditions of Approval: a. The applicant shall provide proposed water use calculations to the Community Development Department for review and approval. Water ERU's are based on a consumption rate of 240 gallons per day and are charged a current rate of $1,500 (fee subject to change) inside City limits. The number of ERU's required for this project shall be determined by calculations provided by the applicant, and approved by the Community Development Department. b. Water connection fees shall be paid at building permit issuance. 7. Wastewater. Finding: The city's Sewer Comprehensive Plan identifies a portion of the City area for service. The City is pursuing additional land areas or approval and the extension of facilities. Completion of such activities is dependent on grand and developer funding, as well as planned bonding and existing public funds. The status of such plans and funding sources must be considered in any review of concurrency. Developer extensions and or dedications, latecomer agreements, oversizing agreements, and the creation of local improvement districts may all be considered. In the event of a new funding source, however; concurrency is not found until the funding source is in fact in place - e.g. award of a grant, a binding letter commitment for third parting funding, or the successful formation of a local improvement district. Finding: The site is currently connected to the City sewer system. Sewer ERU's are based on water consumption. The additional development on this site creates an additional impact on the City's sewer system, and may require an additional STEP tank or increased size. Conclusion: The additional development to this site creates an additional impact on the City's sewer system. Conditions of Approval: a. The proposed site is connected to the City's STEP sewer system. The applicant is required to purchase Sewer ERU's based on the on the water calculations provided by the applicant, and reviewed and approved by the Community Development Department. Equivalent Residential Units (ERU's) are based on a discharge of 240 gallons per day. The current rate for one ERU is $4,986.00 (fee subject to change). b. Sewer connection fees are payable at building permit issuance. CURD?-33?2-YL Staff RcpoR 5 8. Drainage/Stormwater: Findin The completed project will increase the amount of impervious surtace on the site, and on the adjacent streets. Impervious surfaces create Stormwater runoff. Uncontrolled and untreated Stormwater runoff can create health and safety hazards. YMC requires all development to comply with the City Stormwater Manual. Conditions of Approval: a. The applicant shall design and construct all stormwater facilities in accordance with the DOE Manual, as adopted by the City of Yelm. Best Management Practices are required during and post construction. b. Stormwater areas shall be landscaped consistent with Chapter 17.80, Landscaping, and City of Yelm Development and Design Guidelines. c. The applicant shall submit a final stormwater report with civil plan application. d. The applicant shall submit a stormwater maintenance plan with civil plan application. e. The applicant shall provide a blanket easement for maintenance of all utilities deeded to the City, and access to the stormwater facility. 9. Fire Findin Fire protection to the buildings must be provided per the Uniform Fire Code. Requirements for installation of fire hydrants, fire lanes, or sprinkler systems will be determined in civil plan, and building permit review. Conclusion: Fire protection will be reviewed and approved through civil plan, and building permit review. 10 Landscapina Development Guidelines and Design Guidelines. Findin Landscaping and screening are necessary to promote safety, to provide screening between compatible land uses, to safeguard privacy and to protect the aesthetic assets of the City. YMC, Chapter 17.80 requires all development to provide on site landscaping. Findin YMC, Development Guidelines, and Design Guidelines provide regulations regarding street trees, parking lot landscaping, perimeter and interior landscaping. YMC Chapter 17.80 describes the different landscaping regulations by "Type". Conditions of Approval: a. An 8-foot, Type II landscaping is required around the perimeter of the site of the new addition. The applicant may continue the same perimeter landscape concept as is currently being used around the site. A 5-foot Type II landscaping is required around the perimeter of the building. The applicant may continue the CUP-02-3322-YL StafC Report same landscape concept as is currently being used around the buildings. A Type III landscaping is required as part of the frontage improvements. Type IV landscaping is required in parking areas, and Type V landscaping is required in stormwater retention facilities. b. The applicant shall submit a final landscape and irrigation plan, pursuant to Chapter 17.80, to the Community Development Department for review and approval. c. Completed landscaping shall be approved by the Community Development Department prior to building occupancy. 11. Refuse: Finding: The proponent is not proposing to add any additional refuse areas. The current refuse area is located at the rear of the building, and meets current design guideline requirements. Refuse collection areas shalt be designed to contain all refuse generated on site and deposited between collections. Conclusion: The current refuse area must meet current code standards. Staff Analysis and Conclusion. Based on the conceptual plan as proposed by the applicant, and the analysis and conditions described above, staff finds that the project: Adequately provides for the public health, safety and general welfare, and for drainage ways, streets, potable water supplies, sanitary wastes; and The project is in conformance with The Yelm-Thurston County Joint Comprehensive Plan, the City Zoning Ordinance, the City's Development Guidelines and the City Design Guidelines. Staff Recommendation: Based on the Analysis, Findings, and Conditions of Approval, staff finds that project, as conditioned, meets the City's minimum requirements and standards. Staff recommends that the Hearing Examiner approve CUP-02-8322-YL, as proposed and conditioned herein. CUP-02-8322-YL Staff Report -~ CITY OF YELM EXHIBIT I Site Plan CUP-02-8322-YL SITE PLAN -~ ~ ~ ~ ~ ~ ®~, ~~ ~'~~ ~3 t ~ ~ ~~ ~ . - - - .~ •: -~. - ~ ~ g e0 Ae ' Q.~.~~c -fig •ae _ _~-, ~ L~ ~ , r, s' ~ ~ E - ~Li ~ ~ ~ _ N ~ - R4 g , ~ . . W ~ f L ~ $ ~ y'am'- T_ ~ ' O ~ _ M I ~ $ ~ }_. ~~ o- ~, - - - -- ~ ~ - .. ~ r - €' gg ~3 800 ~~ ~ p~ ~ I _ i z ~ - l ~ ~ 9 / 'E s ¢ / .~~ ~ / '"cASSISTED CARE LIVING/SPECIAL CARE BUILDING ADDITION r +~ ~.~o~^_ EASTHAVENp'ILIA ~ ~ T~ ~~ n R f ""°` DAVID E. F~LTL'R, ARCHITE CP _ ]>]q V:t~em MM N~ ~ O ~~ib ' rr.v~_ _I`ul lHa::v[nw nmc Iwl r~-rxia ii l~ sr-e.a~ Exhibit I Date: October 24, 2002 CITY OF YELM EXHIBIT Il NOTICE OF APPLICATION C U P-02-8322-YL NOTICE OFAPPLICATION ~~~~~ ~~ FY~~ "~-' CITY OF YELM f~ PO Box 479 ~ Yelm WA 98597 360-458-3244 vyT+13 tY~~N~NGT'QN NOTICE OF APPLICATION Mailed on: August 23, 2002 PROJECT NAME AND LOCATION: Easthaven Villa II, 311 Cullens Road SE, Yelm, WA 98597 LAND USE CASE: CUP-02-8322-YL An application submitted by Beehive Management Group L.L.C., for the above referenced project was received by the City of Yelm on August 13, 2002. The City has determined the application to be complete on August 22, 2002. The application and any related documents are available for public review during normal business hours at the City of Yelm, 105 Yelm Avenue W., Yelm WA. For additional information, please contact Tami Merriman, at the Community Development Department (360) 458-3835. PROJECT DESCRIPTION: Construction of additional 20 units to the existing 48 units at the assisted living facility located at 311 Cullens Road SE. ENVIRONMENTAL and OTHER DOCUMENTS SUBMITTED WITH THE APPLICATION: An environmental checklist, preliminary drainage and erosion control report, structural calculations, and project manual was submitted with the project application. Additional Information or Project Studies Requested by the City: The City has not requested any further information at this time. No preliminary determination of consistency with City development regulations has been made. At minimum, this project will be subject to the following plans and regulations: City of Yelm Comprehensive Plan, Zoning Title (17), Critical Areas Ordinance (14.08), Storm Water Drainage Design and Erosion Control Manual (DOE), Uniform Building Code, State Environmental Policy Act (SEPA) Title (14), Road Design Standards, Platting and Subdivision Title (16), and the Shoreline Master Program. The City of Yelm invites your comments early in the review of this proposal. Comments should be directed to The Community Development Department, P.O. Box 479, Yelm WA 98597. THE 15-DAY PUBLIC COMMENT PERIOD ENDS AT 5:00 PM ON SEPTEMBER 9, 2002 This notice has been provided to appropriate local and state agencies, and property owners within 300 feet of the project site. These recipients, and any others who submit a written request to be placed on the mailing list, will also receive the following items when available or if applicable: Environmental Threshold Determination, Notice of Public Hearing and Notice of Final Decision. If the proposed project requires a City Council decision, it will be mailed to all chose who participate in the public hearing and to anyone else requesting the decision in writing. Additionally, there will be a 14-day public comment period when the environmental determination is issued. Opportunities for appeal occur within twenty one (21) days after the date the environmental determination is issued. City Council decision can be appealed through Superior Court. Exhibit II, Page 1 Date: October 24, 2002 CITY OF YELM NOTICE OF APPLICATION EXHIBIT II CUP-02-8322-YL NOTICE OF APPLICATION ~-~ ~ . } ~N ~~ m r D Z I~ ~5 al' s~~ ~< a ~ y . ~, ~' ~' ~ is ~~. s ar` S i '"`ASSISTED CARS LIVING/SPECIAL CARE BUILDING AC01710N q~ J ,IJ EASTH A~ EN VILLA ... DAVfp E. PALTER, AP.CIIIT6CT ~' ~ ~ ~ 1 f ..~, ~~...,. ann~i :i r w Exhibit II, Page 2 Date: October 24, 2002 CITY OF YELM DETERMINATION OF NONSIGNIFICANCE EXHIBIT lli CUP-02-8322-YL SEPA NO: 8322 DETERMINATION OF NONSIGNIFICANCE Proponent: Easthaven Villa I( Description of Proposal: Request for a Conditional Use Permit, to allow the construction of an additional 20 assisted living units, and associated facilities addition to the existing permitted assisted living facility. Location of the Proposal: 311 Cullens Road, Yelm, WA 98597 Section/Township/Range: NE'/<, Section 24, Township 17N, Range 1 E, W.M., Lot 1 of SS-0427 Threshold Determination: The City of Yelm as lead agency for this action has determined .that this proposal does not have a probable significant adverse impact on the environment. Therefore, an environmental impact statement (EIS) will not be required under RCW 43.21C.030(2)(c). This decision was made after review of a completed environmental checklist and other information on file with the lead agency. This information is available to the public on request. Conditions/Mitigating Measures: None Required Lead agency: City of Yelm Responsible Official: Grant Beck, Community Development Director Date of Issue: September 13, 2002 ~' Comment Deadline: 5:00 p.m., September 2702 f - Grant eck, Commune elo~ment Director This Determination of NonSignificance (DNS) is issued pursuant to Washington Administrative Code 197-11-340(2). Comments must be submitted to Tami Merriman, Community Development Department, at City of Yelm, 105 Yelm Ave. W., P.O. Box 479, Yelm, WA 98597, by 5:00 p.m., September 27, 2002. You may appeal this determination to the Yelm City Council, at above address, by submitting a written appeal no later than 5:00 p.m., October 4, 2002. You should be prepared to make specific factual objections. Contact Grant Beck, Community Development Director, to learn more about the procedures for SEPA appeals. This DNS is not a permit and does not by itself constitute project approval. The applicant must comply with all applicable requirements of the City of Yelm prior to receiving construction permits which may include but are not limited to the City of Yelm Comprehensive Plan, Zoning Title (17), Critical Areas Ordinance (14.08), Storm water Drainage Design and Erosion Control Manual (DOE), Uniform Building Code, State Environmental Policy Act (SEPA) Title (14), Road Design Standards, Platting and Subdivision Title (16), and the Shoreline Master Program. DO NOT PUBLISH BELOW THIS LINE Published: Nisqually Valley News, Friday, September 20, 2002 Posted in public areas: Friday, September 13, 2002 Copies to: All agencies/citizens on SEPA mailing list and adjacent property owners, Friday, September 13, 2002 Dept. of Ecology w/checklist, September 13, 2002. Exhibit III, Page 1 Date: October 24, 2002 CITY OF YELM PUBLIC HEARING NOTICE EXHIBIT IV CUP-02-8322-YL ~I,•o~v ~9~,II a M Cl~ ® ~Gl9Y ~ - _~~ ~. ; =~~- - ,~.,~. 10~ Yelm Avenue West ^ ~~YELM P.O. Box 479 WASHINGTON Yelm, Washington 98.197 (360) 4~8-3244 NOTICE OF PUBLIC HEARING YELM HEARING EXAMINER DATE: Monday, November 4, 2002, 9:00 a.m. PLACE: City Hall Council Chambers, 105 Yelm Ave W., Yelm WA PURPOSE: Public Hearing to receive comments regarding the proposed addition of 20 units to the existing Easthaven Villa Assisted Living Facility. Case #CUP-02-8322-YL APPLICANT: Beehive Management Group L.L.C. PROJECT LOCATION: 311 Cullens Road, Yelm, WA 98597 The Yelm Hearing Examiner will hold a public hearing to receive comments on a proposed 20-unit addition to the existing Easthaven Villa Assisted Living Facility. The Hearing Examiner will make a decision on the matter within 10 days after the hearing. Testimony may be given at the hearing or through any written comments on the proposal, received by the close of the public hearing on November 4, 2002. Such written comments maybe submitted to the City of Yelm at the address shown above, or mailed to the City of Yelm Community Development Department, PO Box 479, Yelm WA 98597. Any related documents are available for public review during normal business hours at the City of Yelm, 105 Yelm Ave W., Yelm, WA. For additional~information, please contact Tami Merriman at (360) 458-3835. The City of Yelm provides reasonable accommodations to persons with disabilities. If you need special accommodations to attend or participate in this hearing, please call the City Clerk, Agnes Bennick, at (360) 458-8404, at least 4 days before the meeting. ATTEST: City of Yelm / ~' ~:'l.u , ~~ /LiiL A~es Bennick, City Clerk DO NOT PUBLISH BELOW THIS LINE Published in the Nisqually Valley News: Friday, Ociober 2.5, 2002. ~~tailad to P.djaceni Proper~l O~:mers and Posted in Public Places: Octcber 24, 2002. 77u Cih/ of Yc•Im is n~i (.qurtl OE~~Inrt rrnih~ 1'roi~i~lr~ Exhibit IV, Page 1 Date; October 24, 2002 m Y9-0-LSB (09f) ~%Vd 09£L-SOL (09f) 3NOHd 20596 VM YIdWAlO MN 3AW0 OOOMIS3M LfLZ ,L~~ZIH~~ `2I~,L'IF~3 '~ QIA~Q ~,~e o3avd3aa i NVId 3dtl~SONtlI ~SLN3LN00 133HS N019NIHSVM 'ff13A 3s ovoa sN3r~rb of ~d"1~IA N3AVH1SV3 N0111aa11 JNlall(18 32lVO "iV103dS/~JNIAII 3at/O 431SISSV:3uu 3 V O N O a~ ~W ~~aU~•o~ ~ ][ WOO ~ y~ Z O p v=i ~ J W o N / !.U ~ V ~. O U `r „y s c~ N ~ ~ ~ ~ /I /~' ~ ~ -~ _- / ~~ ~~s ,, ~ ~ s g o oe ~~ ~ ~ r .d ~ ,'. ~ - ~ .t ,v `~ ~ ~~' ~ N ~ ~. ~ ~ ~ ~Y `.~=. ~ ~ yr x n ~ ~ ,n ~ ~ ~ ~ ~ o`~ 8 3 r•! . •'a ~ ~ ~ ~~ d ~ ; .t ~ Y,.0. z • F ~., . -n~--Fr3° 'f ee~ ~ r q_ ~ e h. ~~~ • Ts r r r r ~2 ~ ~ ~ # r 0 i .iii:^~,'.t ~ •'. ~~i:; ` -7 T 3 °ti. V ~> Q 0 3 t. ~ ~ ~~~ ~ ~ ~~ ,~ s ;•00 :; •• ~' x:,66 ~.. . ' ,` ':.~. ~ x ~ °`" ~ ~ o ..4i ..Y:~l/1/~ •"Y'.1: !:S': ~l:•~: 1.'.. 1TR1' :a•• :J :i l,: r'~r ;.:v. ~ ~ ~ ~ ~ ~ J ~; ~ ? ~ ~ r "*, ~ $gIi1~J~'1H 'TTM. M9170S }~AQ~( ~~'~Y//rn///~,j~{' • ~ +'~ `' ~ Y A F ~~ ~~ b9b0-C99 (09C) Xtl3 09£L-SOL (U9£) ~3NOHd ZOS96 tlM 'tlIdNA'10 MN 3AIH0 OOOML53M LfLZ ,L~~,LIH~2I~' '2I~,L'IV,3 '~ QIA~Q ~Ag 03tltld3Nd x Oblo i 4 _~'~ ! O} Wu < V )-- _----- '~~: y_.~ ~.1 .__ _. ,, r ti Q J a w N ~.Ir ~ ~ ~ ch, n ~, _~ -~,, `_ ,~_f ~_ , - _-- ~ ~~ ~~ s o.,C m -sro-csfe (oe£) xvd os£c-sot (oe£) ~3NONa 50586 VM YIdPUIIO ,~, MN 3AR10 OOOML53M L£LS sa~sixax~ `~~sZV~ •~ Q~nda ~ ~A8 038Vd38d Ntlld 3115 51N3LNJ~ 133H5 N019NiSVM 'P(IIl 35 OVOTI SN3TIfq tl£ V'IIIA N3AdH1SV3 NOI1ta4V JNlallfl8 3aV0 1V103dS/~JNIAiI 3aV0 Q3ISISSV:auu ~ct 8~ ~° ~ °o r ~]C WO tTS _ G^ ~, p p ~Z N ° ~ Q t • ak k ~ ' 8 ~~ W ~ S~ ~•, ~~ _ o ., ~ ~ W cam.. ., ~~ = W ~ //' 6 ~~I i ,~~ i i ~ i ., / - ~' i i ,, -/ ~ ~ i ,~ i i ~/ i ~ i - - i ~' i ,.. = ~ i / ;S' r___ ______________~ _t ~ a j ~~ $ ' y -- - - -- I '•' ~i I g~i ~ :~ ~ j ' i ~ 3 ~. - I i~- I i ~ I ,,, ., ,, ,~ ~ - i .. I ------------------------ ----- i ----- - I ' ' :I - i ~'~ ~ v7 ~` i I y! ~----------- I e ,, I I i ;` I i------------------------- Q ---- - - ---- i i J ~ a - ~' i ~ i I ~~ I ~ I ~ - --- - - ~ r I ~ I I i ~~ ~ ~ `i ~ ~ ~~ I ~" ~ i ~ i%~m m m~~~i ~ ~ ~ i ,. ., ,. ., -- -- ---- -- ----- -- - - - -- - ~ i ~ ~ i l i i ~ i - _ , _, - ~ i ~--/~ ^ / / 1 , ~d-~---------~-~L~( , i / ///(u\\ ///U~\\ \ ~ ~/, // \\ // \\ \~ I I - - ~ - - - - - a I 1 N, --~----~---•~-~-~~ 3.Bi YSOSS ~-~ Q~ ~~~~ ~~ CITY OF YELM ~,~ ~ PO Box 479 ..e Yelm WA 98597 360-458-3244 ~~z~ WASNINC7QN NOTICE OF APPLICATION Mailed on: August 23, 2002 PROJECT NAME AND LOCATION: Easthaven Villa II, 311 Cullens Road SE, Yelm, WA 98597 LAND USE CASE: CUP-02-8322-YL An application submitted by Beehive Management Group L.L.C., for the above referenced project was received by the City of Yelm on August 13, 2002. The City has determined the application to be complete on August 22, 2002. The application and any related documents are available for public review during normal business hours at the City of Yelm, 105 Yelm Avenue W., Yelm WA. For additional information, please contact Tami Merriman, at the Community Development Department (360) 458-3835. PROJECT DESCRIPTION: Construction of additional 20 units to the existing 48 units at the assisted living facility located at 311 Cullens Road SE. ENVIRONMENTAL and OTHER DOCUMENTS SUBMITTED WITH THE APPLICATION: An environmental checklist, preliminary drainage and erosion control report, structural calculations, and project manual was submitted with the project application. Additional Information or Project Studies Requested by the City: The City has not requested any further information at this time. No preliminary determination of consistency with City development regulations has been made. At minimum, this project will be subject to the following plans and regulations: City of Yelm Comprehensive Plan, Zoning Title (17), Critical Areas Ordinance (14.08), Storm Water Drainage Design and Erosion Control Manual (DOE), Uniform Building Code, State Environmental Policy Act (SEPA) Title (14), Road Design Standards, Platting and Subdivision Title (16), and the Shoreline Master Program. The City of Yelm invites your comments early in the review of this proposal. Comments should be directed to The Community Development Department, P.O. Box 479, Yelm WA 98597. THE 15-DAY PUBLIC COMMENT PERIOD ENDS AT 5:00 PM ON SEPTEMBER 9, 2002 This notice has been provided to appropriate local and state agencies, and property owners within 300 feet of the project site. These recipients, and any others who submit a written request to be placed on the mailing list, will also receive the following items when available or if applicable: Environmental Threshold Determination, Notice of Public Hearing and Notice of Final Decision. If the proposed project requires a City Council decision, it will be mailed to all those who participate in the public hearing and to anyone else requesting the decision in writing. Additionally, there will be a 14-day public comment period when the environmental determination is issued. Opportunities for appeal occur within twenty one (21) days after the date the environmental determination is issued. City Council decision can be appealed through Superior Court. --------------~s~.a~ e~ ~ ~~/% ,~ . ~~ _IN '1m r D Z °9 l} I ~~ 1 ~Z i- >; ` S~ '- ~ ;. / ~ ~ ~' ~ ~ ~`~ ~~ r ~ w ,- ~~ ~ ~ m ~~ay I °1L'ASSISTED CARE LIVING/SPECIAL CARE BUILDING ADDITION ~*~ er d - ~& "$ EAS~H~ N~V~ILLA DAVID E. PALTER, .ARCHITECT rm restvnoo omE xr ~ ~e ~ E ~£ °3 9Ql tartNlS ~41E PLAN PI101C (~ MS- ~~ f~(]60) 6W-0164 ~ ~ ~ ~ ~ -_ -_ _~ MC SQUARED, INC. 1235 East 4th Ave., Suite 101 Olympia, Washington 98506 (360) 754-9339 • FAX 352-2044 To C,7y eF 7(;LNi AUG 13 2001 ~~ M v N ~ T'1 1~c~c-co PM~~r~- ~?o..Sax ¢ ~ 9 yam, wA ~~~ ~r~~~~a ors ~aQa~~a~~a~ DATE ~_ ~` D ~ JOB NO.^~ G ATTENTION RE: ~~5~ /7/'~VL`' V V~ C.-C.a Q %~/~TI(l~' S-(il3M. Tq ~ WE ARE SENDING YOU I~ Attached ^ Under separate cover via the following items: ^ Shop drawings ^ Prints ^ Plans ^ Samples ^ Specifications ^ Copy of letter ^ Change order 1~ STaRMGvA~j~L ~/~C.l~+iiv~y 2~°oQr COPIES DATE NO. DESCRIPTION ~~P Jvc. i~ o /~/2EG~M~NgR -~U2~'~ti~~R hEi~a2T'S THESE ARE TRANSMITTED as checked below: ^ For approval ^ Approved as submitted For your use ^ Approved as noted ^ As requested ^ Returned for corrections ^ For review ^ ^ Resubmit copies for aproval ^ Submit copies for distribution ^ Return corrected prints ^ FOR BIDS DUE 20 REMARKS ^ PRINTS RETURNED AFTER LOAN TO US /D~/~S~ Gau r-v~ rn Q v~ST~ o~S . . ~Q~ COPY TO ~~ ~ SIGNED: ~~ CF THE p~~ a r ~~' YELM WASHINGTON CITY OF YELM PO Box 479 Yelm WA 98597 360-458-3244 Presubmission Meeting Request Form Fee: None OFFICIAL USE ONLY Fee N/A Date Received i' 0 By ~.ci•- File No. A presubmission conference is an opportunity for applicants, developer(s) and/or consultants to meet with city staff to discuss preliminary studies or sketches of a proposed project. At the conference the staff will make available information relating to the proposed development. The intent is to identify and eliminate as many potential problems as possible in order for the project to be processed without delay. The conference should take place prior to detailed work by an engineer or surveyor, however a site drawing must be submitted that has sufficient information to allow for evaluation. Discussion topics will include such things as Yelm's Comprehensive Plan, street design, storm runoff and retention, Shoreline Master Program, zoning, availability of sewer and water, development concepts, other requirements and permits, and the environmental impact. Staff notes are prepared and available to review. There is no charge for this meeting. Meetings are held each Wednesday. This request form should be . submitted by 5:00 p.m. at least one week before the preferred meeting date. MEETING DATE REQUESTED n (a Wednesd ~ Time (aftem on only) APPLICANT l./~a LL y 1 raft OWNER R ~ ~y~ ~ ciao ~.~Z`G~t" ADDRESS~_~{S 1+1t.• Y~ec~~ &/, ~PYti~aLF_ Cl,1~i. ADDRESS TELEPHONE_~Ga-.3Ai~-G,L~~ `18z'~8 TELEPHONE /r~S~l -Z~~3 ~R5~~7 REPRESENTATIVE (if any) f~[~A OCCUPATION ADDRESS TELEPHONE Gneneral location of the project e~~ nr~1 L1 -r» ~~o.~e~l~ala (~tY.,Fnext 7~ Y"a'~ / ~,{/j ~[~~ ~ fLSS/SfP..et .Liut~~f nh f''tw LLes,K .~~• Section 2~ Township_,/~ !Y Range / - E; I,r/. M. Assessor's Tax Parcel Number a~7z~/09o0 ~.•,~. ~ i ~.zSf.'o so 1 Type of Project (Subdivision, Annexation, Zone Change, etc..) ~ b«,L.J 7a ~h;t .~zs~~'te~ ~w~~ Total acreage ~ , ~ 7 Proposed Density 7 d Re sad e ~t s Proposed Land Use: Single-family Duplex Multi-family Mobile Home Park Commercial Industrial Brief descripti ~ of project Q~~r ~~~~. ~ ~ ~~ ~ `~ ~ ~l'c - - ~'• ' . ~ _ %~ ,t ~',~ -~< ~%~~ ~~ Z~ ~„~~ ~ ~ ,C 1~.-LC ,~ %~ , ~ IV ~~ Please attach five copies of a site plan drawing not larger than 11" X 17" and forward to Yelm City Hall. CITY OF YELM dslc:bffice~plandept. ccrapps~presub. app 0 N ~- -- - C '~ ~ ~- ~..1.~ 1't 0 C,t~ Sweet -- - ;~ .~ f g !_ ... y ,. 1 I N ~ ~ .Z ,- 8. ~~ ~ ~ ~ , a~ II ~~ 1 ~ c}n ~ W ~ ~ ~1 ~ ! ~ ~ ~ 297.5 - ,_. - -. ~X/Stint _ - _- Driveway _ 7C ~tad~ - - - - - q' -- C I~-~ ^ ~ ~ ~~ I ~ ~ '~ ~ ~ ~ Q ., ~ ` j' ~ ~~ y I ~ Q C ~ ~ c ~m a W u ~ - - - __.__.. ___ _--- ~- ~----:- a ~ ~ .. - - y ~ - .~~ u oo ~:' ~ °~ G ~~~ ~ m~] ~t~ x 34 ;, ~ ~ i ~ d o, Q •_• -- :- ~ ~n ~ ~ ~~ v~~ ('a,~~ nG r a ~~ ~ ~~' ,'r ~2 ~ za' 220 ~ i ~~YK l h S~d~i 5 to to ~ ~ U~11') ~M~A~~p~~AN ~y~ifj NN .-~X~O~N~^~p~xU~NX~mXPCaN ~ ~~ :~=~' ~~ ~~: .o ;~ - -.~.-N .N 8 ~~ i ~ ~ ~ .~~~ > ~~~'~~~ E ~ 1~-----___..__ __ -_ _ _ _ _ __ - - _ _ _. Pre-Application Meeting January 16, 2002 ***These comments are preliminary in nature and are not intended to represent final comments and or requirements for the City of Yelm. Until a complete application is made, the planning and/or public works department can only attempt to inform the applicant of general requirements as they appear in the form presented by the applicant at the time of pre-submission. Proponent: Beehive Management Group Representative: Wally Pratt Project Proposal: Expansion of Easthaven Villa for new 72 unit assisted living residence and boundary line adjustment. The boundary line adjustment includes 3 original parcels with the end result of 2 parcels. Project Location: Adjacent and to the south of 311 Cullens Rd. Zoning: Commercial (C-1 ), Chapter 17.26, identifies a residential care facility as a special use and is subject to the development standards of both Chapter 17.26 and 17.66. Please refer to for minimum requirements for site development. Minimum Lot Size - 5,000 sq. ft. Setbacks: .Front yard - 15' from R-O-W Rear Yard - 20' Side yard - 10' Parking: Chapter 17.72. 1 stall for each 2 beds, plus one per employee based on the greatest number of care employees on a single shift. ;,~~ ~ v ~%;~~ ~. L._-~; ~.-~- -;-,, ,'' Section 17.72.060 for off-street loading requirements -one loading area of =~c':~' adequate size and with to accommodate a vehicle forty-five-feet in lent, twelve feet in width and fourteen feet in height. ADA requirements - Landscaping: Chapter 17.80, Type II, III, IV and V. Type II landscaping is used to provide visual separation of compatible uses. Type II landscaping is required around the perimeter of a site, which has compatible zoning and adjacent to buildings to provide visual separation of compatible use and soften the appearance of streets, parking areas and building elevation. Type III landscaping provides visual relief where clear sight is desired. This landscaping includes street trees and vegetation required with frontage improvements and along pedestrian walks for separation of pedestrians from streets and parking areas. Type IV landscaping is needed to provide visual relief and shade in parking areas. Type V landscaping is required for all storm water facilities. A conceptual landscaping plan is required with application for Site Plan Review and Special Use. Final landscaping and irrigation plan is required as element of civil drawings. Traffic: The City has adopted a Transportation Facility Charge (TFC) of $750.00 per pm peak trip. The Ordinance provides a default table that the applicant can use to determine new pm trips generated. To determine the projects impact and fee use the following formula for each use proposed: New Trip Rate x number of dwellings(beds) x $750.00 =TFC 0.17 x 72 x $750.00 = $9180.00 The TFC is payable at issuance of a building permit. If the applicant feels the proposed use would not generate the default number of trips as designated in the TFC Ordinance an analysis prepared by a Washington State Licensed Engineer can be submitted to the City for review and consideration. SEPA: Environmental checklist required for all buildings in excess of 4,000 sq. ft. or more than 20 parking stalls associated with the building. A Traffic Impact Analysis (TIA) is not required per the Yelm Comprehensive Transportation Plan. Application and Process: Boundary Line Adjustment, Chapter 16.28, and Special Use, Chapter 17.66. Both applications shall be reviewed concurrently. Special Use requires a public hearing and decision by the Hearing Examiner. Minimum application requirements are located in Section 17.84.060 and Section 17.66.070. Please refer to the application form supplied by the City for a detailed list of contents. Project review including the public hearing takes approximately 90 -120 days. Land use approval will contain conditions of approval that the applicant must complete prior to receiving a building permit. Following land use approval the applicant is required to submit civil construction drawings to the Community Development Department for review and approval and satisfy all conditions of approval. Upon satisfactory completion of all conditions the applicant can submit building plans for approval. Other: Design Guidelines -attached checklist ,,, DESIGN GUIDELINES - Cullens Rd. Guidelines Guidelines Project Review Checklist - Village Retail Applicable Met I.A.(1) Relate development to pedestrian oriented street frontage. I.A.(2) Relate development to street fronts (other than pedestrian-oriented X streets). I.B.(1) Minimize visibility and impacts of service areas. X I.C.(1) Take advantage of special opportunities and mitigate impacts of large X developments. I.D.(1) Reduce impact of service areas and mechanical equipment. X I.E.(1) Integrate biofiltration swales and ponds into the overall site design. X I.F.(1) Enhance the visual quality of development on corners. I.F.(2) Provide a paved pedestrian walkway from the street corner to the X building entrance. II.A.(1) All pedestrian paths must correspond with federal; state and local codes X for handicapped access, and the Americans with Disabilities Act. II.A.(2) Provide adequate lighting at the building entries and all walkways and X paths through parking lots. II.A.(3) Develop an on-site pedestrian circulation concept. X II.B.(1) Provide a pedestrian path at least 60" wide (preferably 96" wide) from X the street sidewalk to the main entry. II.B.(2) Provide pedestrian paths or walkways connecting all businesses and the X entries of multiple buildings on the same development site. II.B.(3) Provide parking through parking lots X II.C.(1) Where street ROW is insufficient to provide adequate sidewalks X buildings and other site features must be set back from the public ROW to achieve at least minimum sidewalk widths. II.C.(2) Where new streets are developed, provide sidewalks according to X minimum standards. II.D.(1) Provide, where feasible, pedestrian circulation routes to adjacent uses X and transit. II.D.(2) Integrate nearby transit stops into the planning of adjacent site improvements. II.D.(3) Encourage pedestrian paths from all transit stops through commercial X areas to residential areas within 1200 feet II.E.(1) Enhance building entry access. X II.F.(1) Provide pedestrian-oriented open space at key locations. III.A.(1) Provide access roads through large lots with more than on street y frontage. IILB.(1) Minimize driveway impacts. X IILC.(1) Meet requirements for location of parking lots on pedestrian-oriented streets. DESIGN GUIDELINES Project Review Checklist Guidelines Applicable Guidelines Met III.C.(2) Meet requirements for parking lot design detail standards. X III.D.(1) Minimize parking areas through joint use and management. X IILD.(2) Encourage structured parking. X III:D.(3) Reduce impacts of parking garages.. X IV.A.(1) Incorporate human-scale building elements. X IV.B.(1) Reduce scale of large buildings. X IV.C.(1) Architecturally accentuate building corners at street intersections. X IV.D.(1) Enhance buildings with appropriate details. X IV.E.(1) Retain original facades. IV.E.(2) Use compatible building materials. (See Building Material Summary Matrix, pg 59) X IV.F.(1) Treat blank walls that are visible from the street parking or adjacent lot.. X IV.G.(1) Locate and/or screen roof-mounted mechanical equipment so as not to be visible from the street or from the ground-level of adjacent properties. X IV.G.(2) Where practical, locate and/or screen utility meters, electrical conduit and other service and utilities apparatus so as not to be visible from the street. X V.F.(1) Use plant materials that are approved for use in downtown Yelm. Proponents may use other plant materials approved by the City. V.G.(1) Develop a site landscape design concept. X V.H.(1) Provide substantial site landscaping. X V.H.(2) Protect and enhance natural features. X V.I.(1) Screen all parking lots as required by Chapter 17.80, Landscaping. X V.I.(2) An alternative to the required perimeter parking area landscaping plan may be submitted. X V.I.(3) Provide internal parking lot landscaping. X V.J.(1) Consider alternative building and parking siting strategies to preserve existing trees. X V.J.(2) Consider the integration of pedestrian and bicycle paths with stands of mature trees where feasible to connect adjacent uses. X Pre-Application Meeting Civil Comments Date January 16, 2002 ***These comments are preliminary in nature and are not intended to represent final comments and or requirements for the City of Yelm. Until a complete application is made, the planning and/or public works department can only attempt to inform the applicant of general requirements as they appear in the form presented by the applicant at the time of pre-submission. Proponent: Wally Pratt Project: Assisted Living Building for Easthaven Villa Project Loc: 211 Cullens Rd, Yelm WA 98597 Water: Sewer: Fire: The proposed site would be required to connect to the City's water system. There is an existing 8" water line located on Cullens Road. There is also a 6" water main loop depicted around your existing structure. At this time it is not known wither the existing 6" fire loop will be adequate for your future supply. Your civil engineer will be required to submit water usage calculations and fire flow requirements. It appears that an additional "looped" watermain will be required around the proposed building to provide adequate fire flows. Water ERU's (equivalent residential units) are based on a consumption rate of 900 cubic feet per month and are charged at a rate of $1,500/ERU (fee subject to change) inside city limits. The number of ERU's will be calculated using the information submitted by your civil engineer. Irrigation Meter: An irrigation meter may be installed for the purpose of irrigation. A backflow prevention device will be required for all landscape irrigation connections. The proposed site will be required to connect to the City's sewer system. There is a 2" step sewer main available on Cullens Road. At this time it is unclear what will be required for step tank sizes, locations and number of step tanks. The pump tank(s) will be required to have a triplex pumping system. This system will need to be designed and submitted for approval to the City of Yelm. The design must be provided by a civil engineer licensed in the state of Washington. The total number of sewer ERU's required for this project is dependent on the type of development that occurs. The number of ERU's will be calculated using the information submitted by your civil engineer. The sewer ERU's (equivalent residential units) are based on discharge of 900 cubic feet per month and are charged at a current rate of ~4,986/ERU payable at building permit issuance. Fire protection to the buildings must be provided per the Uniform Fire Code. There ~niill be requirements for installation of fire hydrants, fire truck access G: C„mmuni~c f)evclnpmcnf Wcckly S('12'Prc~uh civiP,fi;is(havcnVilla-civil Ul I~iO~.d~~c and fire truck turn-around. These will be determined upon further review of plans. Stormwater: If the proposed improvement is over 5,000 square feet of impervious surface there are stormwater treatment requirements per the 1992 Department of Ecology Stormwater Manual. At the time of Site Plan Review submittal a Preliminary Stormwater Plan and report will be required. Street Improvements: Frontage improvements shall be consistent with Yelm's Development Guidelines. Your project will be required to improve the your frontage alone Cullens Road. The required improvements shall be consistent with the "neighborhood collector" roadway section per the city's development guidelines. The interior drive isles and parking shall be consistent with the city's parking details in the development guidelines. -, Stree rrnprovernents ynot be~limited to above ref ces. The required TIA ~ay al o rye ,uire ddi,~ion~ i~nprov, me s t ullens Roa~tfie intersectio ~ C ns Ro~ti"and~~si~-Yelm ve. ~~ Street Lighting: Street lighting shall be installed as required per the City of Yelm's "Development Guidelines". The on-site parking lot lighting will be reviewed at the time of civil engineering plan review. ADA Requirements: The American Disabilities Act requires the facilities are ADA accessible. Facility improvements will have to meet current code. Review of these improvements will be determined upon further review of the civil and architecture plans. (~: Cnmtnunilc Uc•.clnEirncnl ~Vcckl} ~I'R Prctiuh ~ivil,i:a~th~i~cnViUa-civil f)I IhO.`'..~1uc ANU C,ZJ I ILK GEtiE,~AL NOicS: NO 'CN ST;?S~i PARKING PE~tMII IGJ. ~. ~==-= TC ~~_~vAN T s~crlcNS GF r :~ DE~~_OPMENT GUICEI!NES FGR ACCITIGNAL INr OR4{ATiCN CN STGR~A DRAINAGE. S i EST LIGn TiNG, PAVE!riENT STRUCTURE, ECT. C17Y OF YELM DEPT. OF PUBLIC WORKS ~;~ G~-iBORH00D CO~~ ~ CTOR APFROV~") DWG. N0. ~-- 5 I DwN. ~ CrCD. I DA ~c