Loading...
Incomplete pkg ltr City of Yelm Community Development Department 105 Yelm Avenue West P.O. Box 479 Yelm, WA 98597   March 8, 2004 Mr. Doug Huntington 3820 S Pine Street Tacoma, WA 98409 Re: Application for Site Plan Review for Horizon Mortgage Dear Mr. Huntington: On February 24, 2004, the City received your application for Site Plan Review and has found that the application is incomplete. The preliminary site plan drawings do not have the required information, the design checklist was not addressed, and the preliminary storm water report is missing. I have included information for your assistance in completing the application requirements. 1. The Preliminary Site Plan must include the items that I have highlighted on the Site Plan Review Checklist. 2. A written response is required to show how each of the Design Guidelines Checklist requirements are proposed to be met. 3. The Preliminary Stormwater Report must meet the guidelines as stated in Section 3.1.1 of the 1994 Thurston County Drainage Design and Erosion Control Manual. Please resubmit the items requested and we will proceed with the site plan review process. If you have any questions, please give me a call. I can be reached at (360) 458-8496. Sincerely, Tami Merriman Assistant Planner