040200 Inspection Report 092506
City of Yelm
Community Development Department
105 Yelm Avenue West
P.O. Box 479
Yelm, WA 98597
December 9, 2004
Mr. Robert Bromberg
13224 83rd Ave. E
Puyallup, WA 98373
Re: Application for Site Plan Review for Discovery Counseling
Dear Mr. Bromberg:
On December 3, 2004, the City received your application for Site Plan Review and has found that the application is incomplete. The preliminary site plan drawings do not have the required
information, and the preliminary storm water report is missing.
I have included information for your assistance in completing the application requirements.
1. The Preliminary Site Plan must include the items that I have highlighted on the Site Plan Review Checklist.
2. The Preliminary Stormwater Report must meet the guidelines as stated in Section 3.1.1 of the 1994 Thurston County Drainage Design and Erosion Control Manual.
Please resubmit the items requested and we will proceed with the site plan review process.
If you have any questions, please give me a call. I can be reached at (360) 458-8496.
Sincerely,
Tami Merriman
Assistant Planner