Loading...
05-0023 MDNS SEPA NO: 05-0023 MITIGATED DETERMINATION OF NONSIGNIFICANCE Proponent: RE Paigen Construction Description of Proposal: Construction of a 6,955 sq. ft. commercial building. Location of the Proposal: Corner of Morris Road and Bald Hills Road Section/Township/Range: Tax Parcel number 64303300100, Sec. 29, Twnsp 17N, Range 2E. Threshold Determination: The City of Yelm as lead agency for this action has determined that this proposal does not have a probable significant adverse impact on the environment. Therefore, an environmental impact statement (EIS) will not be required under RCW 43.21C.030(2)(c). This decision was made after review of a completed environmental checklist and other information on file with the lead agency. This information is available to the public on request. Conditions/Mitigating Measures: SEE ATTACHED Lead agency: City of Yelm Responsible Official: Grant Beck, Community Development Director Date of Issue: May 2, 2005 Comment Deadline: May 16, 2005 at 5:00 P.M. Appeal Deadline: May 23, 2005 at 5:00 P.M. Grant Beck, Community Development Director This Mitigated Determination of NonSignificance (MDNS) is issued pursuant to Washington Administrative Code 197-11-340 (2). Comments must be submitted to Tami Merriman, Community Development Department, at City of Yelm, 105 Yelm Avenue West, P.O. Box 479, Yelm, WA 98597, by May 16, 2005, at 5:00 P.M. The City of Yelm will not act on this proposal prior May 23, 2005, at 5:00 P.M. You may appeal this determination to the Yelm Hearing Examiner, at above address, by submitting a written appeal no later than May 23, 2005, at 5:00 P.M. You should be prepared to make specific factual objections. Contact Grant Beck, Community Development Director, to learn more about the procedures for SEPA appeals. This MDNS is not a permit and does not by itself constitute project approval. The applicant must comply with all applicable requirements of the City of Yelm prior to receiving construction permits which may include but are not limited to the City of Yelm Comprehensive Plan, Zoning Code (Title 17 YMC), Critical Areas Code (Chapter 14.08 YMC), Storm water Drainage Design and Erosion Control Manual (DOE), Uniform Building Code, State Environmental Policy Act (SEPA) (Title 14 YMC), Road Design Standards, Platting and Subdivision Code (Title 16 YMC), and the Shoreline Master Program. ------------------------------------------------------ DO NOT PUBLISH BELOW THIS LINE Published: Nisqually Valley News, Friday, May 6, 2005 Posted in public areas: Tuesday, May 3, 2005 Copies to: All agencies/citizens on SEPA mailing list and adjacent property owners Dept. of Ecology w/checklist ATTACHMENT SEPA Case Number 05-0023 Findings of Fact 1. This Mitigated Determination of Non Significance is based on the project as proposed and the impacts and potential mitigation measures reflected in the following environmental documents: Environmental Checklist (dated January 2005, prepared by SCA Consulting Group) Preliminary Storm Drainage and Erosion Control Report (prepared by SCA Consulting Group) The City of Yelm has adopted a concurrency management system as required by the Growth Management Act. Chapter 15.40 YMC (Concurrency Management) is designed to ensure that the improvements required to support development are available at the time of development. A concurrency determination may be issued for a proposal as it relates to transportation issues when: the development provides on-site frontage improvements; the project makes off-site improvements as necessary to provide for the safe movement of traffic; and the project makes a contribution to projects identified the six year transportation improvement program in the form of a Transportation Facilities Charge. Chapter 15.40 Concurrency Management provides for mitigation measures for impacts to the City’s transportation system. Chapter 15.40.020(5)(a) states that “The project makes on-site, and frontage improvements, consistent with City standard for utilities, curbs, gutters, sidewalks, bicycle lanes where appropriate, and roads necessary to serve the proposed project consistent with safety and public interest. Frontage improvements are usually required for the entire property frontage. Mitigation Measures The developer shall mitigate transportation impacts based on the new P.M. peak hour trips generated by the project. The Transportation Facility Charge (TFC) shall be based on a miscellaneous retail use. Frontage improvements shall extend from the northern property line at Bald Hills Road to the new entrance into the development on the Morris Road Cul-de-sac. Any engine repair at this site shall require a hazardous spill containment plan approved by Thurston County.