The following letter is the clearing and grading approval for the above reference project. This notice serves as the conditions of the approval. This permit has been granted as shown
on the attached site plan. The following conditions must be followed and adhered by during the clearing of the parcel.
Clearing and grading of the land is limited to the highlighted area shown on the attached site plan. All property lines must be clearly staked before construction can begin.
All clearing and grading shall be no closer than 50’ to the Olympic Pipeline easement.
At this time, no grading or excavation will be allowed in the stormwater area.
The clearing and grubbing material may be temporally stockpiled on site, but may have to be covered depending on the weather.
The contractor will have to maintain erosion control measures. This will be discussed during the preconstruction meeting before the clearing begins.
This approval is not limited to the above referenced conditions. Due to the nature of the project and unknown weather conditions, additional requirements may be required by the inspector
or assigned.
If you have any questions or concerns please do not hesitate to call me at (360) 458-8438 or contact me by email at jimgibson@ywave.com.