Loading...
8329 Tucci 010505 City of Yelm Community Development Department 105 Yelm Avenue West P.O. Box 479 Yelm, WA 98597   January 5, 2004 Torrey Johnson Tucci and Sons 4224 Waller Road Tacoma, Washington 98443 RE: Mountain Sunrise - City of Yelm Project No. SUB-03-8329-YL Wilkensen Road Construction Dear Mr. Johnson: The City of Yelm has reviewed your request for Wilkensen Road traffic control. The City of Yelm will allow your construction proposal and schedule of Wilkensen Road under the following conditions: You will provide a full time TCS and flaggers to control the road, temporary signage, and traffic control devices.  If this does not adequately control the traffic to the expectations of the City of Yelm, traffic revisions will be required during the construction. At the end of each day the temporary crushed rock lane will be graded and rolled for smooth travel. 5/8” minus crushed rock will be required to provide a smooth driving surface for the temporary lane until paving is completed. This surfacing does not take the place of the required structural section of the roadway. The structural section of Wilkensen and Canal Roadway is 3” class B asphalt, 2” crushed rock and 8” of gravel base. No substitutions or approved equals will be allowed in these roadways. Please provide a name and phone number of the responsible person for maintenance of the roadway and traffic control. This person should be accessible during all times the roadway is detoured. Please contact the following agencies to notify them of the construction delays and detours. City of Yelm Public Works, City of Yelm Police Department, Yelm Fire District, Thurston County Sheriff Department, CAPCOM, and Yelm School District. If you have any questions or concerns you can contact me at (360) 458-8438 or email at jimg@ci.yelm.wa.us. Respectfully, Community Development Department Jim Gibson Development Review Engineer C: Bob Benum fax 253-539-8061 Tucci fax 253-922-2676