Loading...
8329 tori wilkenson 092904Fax Transmission CITY OF YELM COMMUNITY DEVELOPMENT DEPARTMENT PO BOX 479 – 105 YELM AVE W YELM WA 98597 (360) 458-8438 FAX: (360) 458-3144 TO: Tori DATE: AUGUST 17, 2004         FAX #: 253-922-2676 PAGES: 1, including this cover sheet.        FROM: Jim Gibson, Development Review Engineer           SUBJECT: Wilkensen Road Signage           COMMENTS:        I just wanted to follow up on the phone conversation we had today. After discussing the single lane closure on Wilkensen with public works we would like to have the signage installed at least 3 days before the roadway work begins. We have no way to notify all the residents that will be affected by this construction. In place of the notification the "closure information" signs will do that. The signs should have dates and times the roadway will be effected. All other signage will be per the MUTCD. If you can get them posted by Friday than construction can begin on Monday.