Loading...
8340 Eng Review Pond Response 021005 City of Yelm Community Development Department 105 Yelm Avenue West P.O. Box 479 Yelm, WA 98597   February 10, 2005 Grant Middleton Larson and Associates 4401 So 66th Tacoma, WA 98409 RE: Cherry Meadows - Civil Engineering Review Pond Response – Onsite Plans City of Yelm Project No. SUB-03-8340-YL Dear Grant: This letter is to follow up on the meeting we had on February 4, 2005 to discuss some of the comments from the October 2004 onsite comment letter. During the meeting you asked me to review the proposed stormwater ponds, associated walls and setbacks from the property lines/tract lines. I have prepared the following comments after reviewing sheets PND1, PND2 and PND3. The 10 foot setback from the lot line/property line/tract line will have to be met. The setback is there to provide a flat bench around the stormwater tract. The City is willing to consider allowing the bench to be divided by the retaining wall. The distance from the property line to the top of the wall may be 4 feet and distance from the toe of the wall to the top slope of the pond may be 6 feet. If this option is proposed the benches will need to be landscaped and the fence shall be located on the property line. This option is only allowed on the stormwater tract sides that do not have a joint utility easement fronting it. The joint utility easement frontage must be 10’ in width, flat and level with the roadway. Another concern is if you locate the wall at the edge of the utility easement how will the joint utility trench be installed? It appears that the equipment will be within the load bearing area of the wall. This is the south side of pond 1, the north, south and west sides of pond 2 and northwest side of pond 3. At least 25% of the pond perimeter needs to be a vegetated soil slope not greater than 3:1. After reviewing the civil plans, appears that the storm facility area was reduced during the plat amendment process. The plat amendment was submitted and approved to allow the configuration of the lots to revised. During this process 2 of the 3 stormwater area were reduced in size. The City of Yelm is willing to work with you in the review process however it appears that it may be necessary to increase the area of the stormwater facility to meet the development review requirements. I hope this letter will help you in the revision of the onsite plans. If you have any questions please do not hesitate to contact me at (360) 458-8438 or by email at jimg@ci.yelm.wa.us. Respectfully, Community Development Department Jim Gibson Development Review Engineer