Applications and OriginalsCITY OF YELM
PO Box 479
Yelm WA 98597
360-458-3244
APPLICATION FOR
Site Plan Review
OFFICIAL USE ONLY
a~
Fee ''~ ~
Date R_'e~~e~~ived 1 ~/2`
By 'r11\
File No
~ - ~ ~--
S~ uz 3so
i ec.~ ~ ~__ 5._. v-
~laD
Site Plan Fee: PA'D
Mobile Home Parks: $250.00 plus $50.00 per mobile home space
Multi-Family Building/Condominium: $350.00 plus $50.00 per unit OCT 2 9 2003
Commercial Site Plan: $350.00 plus $50.00 per 1000 sq. ft of gross floor area
Industrial Site Plan: $350.00 plus $150 per acre
(In addition, any professional service charges per Resolution #358C~~ ®F' Y~~M
~~j/~
Site plan review is a process for reviewing the design of certain types of development. Site plan
approval is required for mobile home parks, duplexes, multi-family dwellings, commercial and industrial
uses, planned develo ment districts and for all land uses within the central business district.
NAME OF PROJECT Steve Bothwell -Dance Studio
APPLICANT Steve Bothwell
Mailing Address 1011 West Yelm Hwv
City, State and Zip Yelm, WA 98597
Telephone Home 458-7104
OWNER Same
Mailing Address
City, State and Zip
Telephone
ENG/NEER/ARCH/TECT/OTHER Bill Turner -= Contours & Concepts Engineering, LLC.
Mailing Address PO Box 476
City, State and Zip Tenino. WA 98589
Telephone
~ S - UZ
SUMMARY OF REQUEST Requesting to operate a dance studio within an existing structure.
PROPERTY DESCRIPTION
General Location The property is located on the south side of Hwv 510 lust east of Yelm
High School.
Site Address 1017 SE Yelm Highway Land Area (acres) 4.17Acres
Section 24 Township 17 Range 1 E
Assessor's Tax Parcel Number 21724130300
Full legal description of subject property (attach separate sheet if necessary)
See Attached
E-5
J~~
,~~ti
PLEASE ANSWER THE FOLLOWING QUESTIONS
ATTACH EXTRA PAGES IF NECESSARY
1. Does the design minimize conflicts with neighboring land uses? Explain. NO
2. Is the site within 300 feet of any "critical areas" such as wetlands or streams? NO
3. What provisions will be made for storm water and/or flood control? None
4. What provisions will be made for water supply and sewage disposal? Citv will supply water and
sewer service. A step tank with pressure pump will be installed for pressure main
connection.
5. What provisions will be made for electrical power, natural gas, telephone and other utilities?
Utilities are installed and connected to the existing structure and will be utilized for the
new structure.
6. What provisions will be made for streets, access, and/or buses? Driveway access will be off
of Yelm Highway. Parking will be in front of structure.
7. What provisions, if any, will be made for open space and/or recreation? None
8. What provisions will be made for schools and school children? None
I affirm that all answers, statements and information above and submitted with this application are complete and
accurate to the best of my knowledge. I also affirm that I am the owner of the subject site or am duly authorized by
the owner to act with respect to this application. Further, I grant permission from the owner to any and all
employees and representatives of the City of Yelm and other governmental agencies to enter upon and inspect
said property as reasonably necessary to process this application. I agree to pay all fees of the city that apply to
this application.
Signed tl'~-- Date_ ~ ~ ~ - ~~
E-6
o urs & Mailing Address: P.O. Box 476 Tenino WA 98589
o epts Physical Address: 4405 - 7th Ave. S.E. Suite 300 Lacey, WA
engineering Phone Number: 360-438-0301
E-Mail: Bill @ CandCengineering.com
October 13, 2003
To: The City of Yelm
PO Box 479 ~ ~~. (- ~•w 1 yvi
Yelm, WA 98597
360-458-3224 Q CT 10 2003
From: Bill Turner, P.E.
PO Box 476
Tenino, WA. 98589
RE: Steve Rothwell -Dance Studio
Dear City Planning,
Listed below are your requests, as delineate in the Design Guidelines followed by our
response:
I.A. (1) Relate development to pedestrian street frontage.
Frontage improvements are not required for project. The existing structure does not front
the main street and because of the existing landscaping cannot be viewed from the public
roadway.
LE. (1) Integrate biofiltration swales and ponds into the overall site design
There will be no bioswales on this project and there is an existing infiltration area within
the project limit at this time.
ILA. (1) All pedestrian paths must correspond with federal, state, and local codes for
handicapped access, and the Americans with Disabilities Act.
The handicapped access meets all local codes and the American with Disabilities Act.
ILA. (2) Provide adequate lighting at the building entries and all walk ways and paths
through parking lots.
Adequate lighting will be provided at the building entrance.
ILB. (1) Provide a pedestrian path at least 60" wide (preferably 96" wide) from the
street sidewalk to the main entry.
A pathway from the street to the main entrance of the structure has not been provided for
the following reasons:
• There are no sidewalks along the frontage road and frontage improvements are
not required for this project. Without a connection point for the pathway, it
would lead pedestrian into an unsafe condition along Yelm Highway.
• The dance studio is a private business and not open to the public.
C
II. C. (1) Where street ROW is insuj~cient to provide adequate sidewalks buildings and
other site features must be set back from the public ROW to achieve at least minimum
sidewalk widths.
A proposed right-of-way line has been placed on the plan drawings indicating the width
that will be required to install the required roadway section.
IL C. (2) Where new streets are developed, provide sidewalks according to minimum
standards.
Frontage improvements are not required on this project.
ILD. (3) Encourage pedestrian paths from all transit stops through commercial areas to
residential areas within1,200 feet.
Does not apply to this project at this time.
ILE. (1) Enhance building entry access.
Lighting and landscaping has been provided to enhance the building entry.
III.B. (1) Minimize driveway impacts.
There will be one entrance into the dance studio which will be shared with a residence
that is on the same parcel.
IILC. (2) Meet requirements for parking lot design detail standards.
Parking lot is not visible from the street. Park lot will have lighting directed from the
building entrance. Parking shall be stripped and landscaped.
IILD. (2) Encourage structured parking.
Structured parking may not apply to this project.
IV.A. (1) Incorporate human-scale building elements.
The structure shall have 2 human scaling elements such as: individual windows < 32 sq.
ft. per pane with 6 in molding separation from other windows, a porch or covered entry.
IV.D. (1) Enhance buildings with appropriate details.
The structure shall have Decorative Treatment of doors and windows: such as a
decorative molding or framing details around all ground floor windows and doors located
on facades facing or adjacent to public streets or parks or decorative glazing or door
designs.
IV.E. (2) Use compatible building materials. (See Building Material Summary Matrix,
Pg. 59)
The existing building is not visible from the street and the building material and color of
the new structure shall match the facade with the existing building.
IV.F. (1) Treat blank walls that are visible form the street parking or adjacent lot.
The dance studio will not be visible from the street and landscaping will be provided
where visibility if from an adjacent lot.
IV. G. (2) Where practical, locate and/or screen utility meters, electrical conduit and
other service and utilities apparatus so as not to be visible from the street.
All utility meters and apparatus are located away from the street and are not visible.
V.G. (1) Develop a site landscape design concept.
A landscaping plan shall be provided.
V.H. (2) Protect and enhance natural features.
The natural landscape between adjacent property owners shall remain and will be
enhance through additional landscaping.
V.I. (1) Screen all parking lots as required by Chapter 17.80, Landscaping.
The existing parking lot is screen by landscape and fencing.
V.I. (2) An alternative to the required perimeter parking area landscaping plan may be
submitted.
Does not apply to this project at this time.
V.I. (3) Provide internal parking lot landscaping
Internal parking lot landscape plan shall be provided.
This completes the Design Guidelines Project Review Checklist as identified by the City of
Yelm. If you have any questions or need more information, please call me at (360) 438-
0301.
Respectfully,
~~~~
Bill Turner, P.E.
Principal Engineer,
Contours & Concepts Engineering, LLC.
cc: file
Steve Rothwell
fie.