Loading...
Yelm Creek Estates Sewer Department City Of Yelm Sewer Department March 9, 2006 Re: Review Yelm Creek Estates At the connection point to the existing 3” main on Crystal Springs Road, the existing Air Release Assembly can be removed (the 1” line to the main will need to be cut and capped) and relocated to the high point within the plat at Sta. # 6+84.4 as shown on the drawings. Construction note #1 indicates this connection on Crystal Springs Road to be accomplished with a “T’ and 2 valves. This can be done with a “Hot Tap Saddle (3”X2”) and installing one 2” gate valve on the plat side of the tap.