City of Yelm Daily Inspection Form 1 Yelm Creek Ballast
City of Yelm
CONSTRUCTION PROGRESS AND INSPECTION REPORT
Date: 9/15/06
Day: Friday
Time: 10:20 a.m.
Project Name:
Yelm Creek
Project Number
SUB-05-0239-YL
Project Description:
Subdivision
Contractor's Name:
RGD Rainier General Development
1. Brief Weather Summary: (On earthwork jobs include soil conditions)
Cool, clear, Soil conditions are Compacted crushed surfacing top rock.
2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)
3. Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.)
Well compacted, Ballast. Proof rolled (Pass). Contratractor will have crushed surface top rock delivered.
Prepping Crystal Springs Rd. for paving.
4. Summary of Field Testing (Note failing tests and any retests. Condition of
material)
Ballast is now complete at Yelm Creek Estates.
5. Sketch or Paste Pictures Below:
Date
9/15/06
Typed or Printed Name and Title
Steve Harrington
Signature