Loading...
City of Yelm Daily Inspection Form 1 Yelm Creek Ballast City of Yelm CONSTRUCTION PROGRESS AND INSPECTION REPORT Date: 9/15/06 Day: Friday Time: 10:20 a.m.  Project Name: Yelm Creek Project Number SUB-05-0239-YL  Project Description: Subdivision Contractor's Name: RGD Rainier General Development  1. Brief Weather Summary: (On earthwork jobs include soil conditions) Cool, clear, Soil conditions are Compacted crushed surfacing top rock.  2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)  3. Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Well compacted, Ballast. Proof rolled (Pass). Contratractor will have crushed surface top rock delivered. Prepping Crystal Springs Rd. for paving.  4. Summary of Field Testing (Note failing tests and any retests. Condition of material) Ballast is now complete at Yelm Creek Estates.  5. Sketch or Paste Pictures Below:    Date 9/15/06 Typed or Printed Name and Title Steve Harrington Signature