City of Yelm Daily Inspection Form 3 Yelm Creek Top Rock & Paving City of Yelm CONSTRUCTION PROGRESS AND INSPECTION REPORT Date: 9/26/06 Day: Tuesday Time: 3:30 p.m.  Project Name: Yelm Creek Project Number SUB-05-0239-YL  Project Description: Subdivision Contractor's Name: RGD Rainier General Development  1. Brief Weather Summary: (On earthwork jobs include soil conditions) Cool, cloudy, Soil conditions are Dirt and Rock  2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)  3. Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Contratractor placed 48” Wet Vault in Place. Connected to C.B with 12” Roger had a question on the end of sidewalk temp asphalt ramp. He would like to concrete it. I informed him it must be 5’ and put in per plans. He also talked to me about the solid pipe on the storm vault being 10’ shorter than plan calls for, as approved by Jim Gibson ? I will ask jim about this. I called Tony Bloom to let him know that I was not called for a top rock inspection and I just happened to show up on site before Lakeside and had a proof roll done and made comments as to the results of proof roll. Top rock was not completely ready and needed to be rolled and compacted again. I would recommend we get an extended warranty on this road. Yelm Creek getting 2” of asphalt. Crystal Springs half street improvements are getting 3” to 4” of Asphalt. Lakeside completed paving at Yelm Creek and Crystal Springs Rd. crossing and de-mobed around 2:50 p.m. Tony Bloom on site, we talked briefly on how the project was going. I told him I do have some concern on the roadway loose rock, he said “yea, I hope it don’t fail”. I said I hope not. I will monitor the roadway time to time and document any changes if it happens.  4. Summary of Field Testing (Note failing tests and any retests. Condition of material) Contractor re-rolled and compacted top course on Yelm Creek, due to loose rock.  5. Sketch or Paste Pictures Below:     Date 9/19/06 Typed or Printed Name and Title Steve Harrington Signature