City of Yelm Daily Inspection Form 4 Yelm Creek Storm Vault City of Yelm CONSTRUCTION PROGRESS AND INSPECTION REPORT Date: 9/27/06 Day: Wednesday Time: 8:30 a.m.  Project Name: Yelm Creek Project Number SUB-05-0239-YL  Project Description: Subdivision Contractor's Name: RGD Rainier General Development  1. Brief Weather Summary: (On earthwork jobs include soil conditions) Cool, cloudy, Soil conditions are Dirt and Rock  2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)  3. Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Contratractor placed 36” ADS Infiltration Gallery in Place. Connected to 48” Wet Vault, with 12” ADS. Infiltratin Gallery was put in place and back filled with washed rock and wrapped in geotextile fabric and backfilled with drain rock.  4. Summary of Field Testing (Note failing tests and any retests. Condition of material) Contractor Placed 36 “ Infiltration Gallery.  5. Sketch or Paste Pictures Below:    Date 9/27/06 Typed or Printed Name and Title Steve Harrington Signature