Loading...
City of Yelm Daily Inspection Form 7 Yelm Creek Sidewalk Grading & Prep City of Yelm CONSTRUCTION PROGRESS AND INSPECTION REPORT Date: 10/02/06 Day: Monday Time: 11:30 a.m.  Project Name: Yelm Creek Project Number SUB-05-0239-YL  Project Description: Subdivision Contractor's Name: RGD Rainier General Development  1. Brief Weather Summary: (On earthwork jobs include soil conditions) Cool, cloudy, Soil conditions are Dirt and Rock  2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)  3. Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Contratractor grading and prepping for more sidewalk, placing 5/8 crushed rock for sidewalk. Part of sidewalk poured on Friday September 29, 2006.  4. Summary of Field Testing (Note failing tests and any retests. Condition of material) 5/8 Crushed Rock being placed and compacted for sidewalk.  5. Sketch or Paste Pictures Below:    Date 10/02/06 Typed or Printed Name and Title Steve Harrington Signature