City of Yelm Daily Inspection Form 8 Yelm Creek Sidewalk, Ramp & Domes City of Yelm CONSTRUCTION PROGRESS AND INSPECTION REPORT Date: 10/02/06 Day: Monday Time: 11:30 a.m.  Project Name: Yelm Creek Project Number SUB-05-0239-YL  Project Description: Subdivision Contractor's Name: RGD Rainier General Development  1. Brief Weather Summary: (On earthwork jobs include soil conditions) Cool, cloudy, Soil conditions are Dirt and Rock  2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)  3. Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Contratractor finishing sections of sidewalk, wheel chair ramps and trunacated domes on ramps at the intersection of Crystal Springs St. and View Dr.  4. Summary of Field Testing (Note failing tests and any retests. Condition of material) Sidewalk, wheel chair ramps with trunacated domes put in place per plan.  5. Sketch or Paste Pictures Below:    Date 10/10/06 Typed or Printed Name and Title Steve Harrington Signature