Loading...
City of Yelm Daily Inspection Form 9 Yelm Creek Septic Tank Pumping and Decomissioning City of Yelm CONSTRUCTION PROGRESS AND INSPECTION REPORT Date: 10/20/06 Day: Friday Time: 1:45 p.m.  Project Name: Yelm Creek Project Number SUB-05-0239-YL  Project Description: Subdivision Contractor's Name: Rainier General Development / Rocklan Pumping Service, Inc.  1. Brief Weather Summary: (On earthwork jobs include soil conditions) Cool, cloudy, Soil conditions are Dirt and Rock  2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)  3. Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities, curb and gutter, sidewalk, etc.) Contratractor finishing had sub-contractor Rocklan Septic Service, Inc. Pump out existing septic tank. RGD has decomiisioned the old septic by means of emploding and backfilling with sand and native material, then compact area.  4. Summary of Field Testing (Note failing tests and any retests. Condition of material) Concrete, sand and dirt.  5. Sketch or Paste Pictures Below:    Date 10/20/06 Typed or Printed Name and Title Steve Harrington Signature