Loading...
cc-101601 Yelm School Mill Pre-Application Meeting Civil Comments Date October 16, 2001 ***These comments are preliminary in nature and are not intended to represent final comments and or requirements for the City of Yelm. Until a complete application is made, the planning and/or public works department can only attempt to inform the applicant of general requirements as they appear in the form presented by the applicant at the time of pre-submission. Proponent: Yelm community Schools Project: Add one 64’x28’ Portable Classroom Project Loc: 10605 SE Mill Road Water: The proposed site is currently connected to the City’s water system. Any additional water usage will require water calculations to be submitted to the Community Development Department from a professional engineer registered in Washington. Water ERU’s (equivalent residential units) are based on a consumption rate of 240 gallons per day and are charged at a rate of $1,000.00/ERU (fee subject to change) inside the city limits. Sewer: The proposed site is currently connected to the City’s step sewer system. Any additional usage will require sewer calculations to be submitted to the Community Development Department from a professional engineer registered in Washington. Sewer ERU’s (equivalent residential units) are based on a consumption rate of 240 gallons per day and are charged at a rate of $4,850.00/ERU (fee subject to change) inside the city limits. Fire: Fire protection to the buildings must be provided per the Uniform Building Code. There may be existing fire hydrants on this site, however additional hydrants could be required to meet current standards. This will be determined upon further review of the civil plans. Stormwater: If the proposed improvements will create 5,000 square feet or more of impervious surface a stormwater plan will be required. Developments with over 5,000 sq ft of impervious surface are required to provide stormwater facilities per the DOE Stormwater Manual. Street Improvements: Street frontage improvements are not required for this project at this time. Street Lighting: As required per the City of Yelm “Development Guidelines”. ADA Requirements: The American Disabilities Act required that facilities are ADA accessible. Facility improvements will have to meet current code. Review of these improvements will be determined upon further review of the civil and architecture plans.