cc-080702 Springer-resturant
Pre-Application Meeting
Civil Comments
Date August 7, 2002
***These comments are preliminary in nature and are not intended to represent final comments and or requirements for the City of Yelm. Until a complete application is made, the Community
Development Department can only attempt to inform the applicant of general requirements as they appear in the form presented by the applicant at the time of pre-submission.
Proponent: Kim and Jeff Springer
Project: Convert Existing House to Restaurant and continue using Barber Shop
Project Loc: 214 East Yelm Ave. Yelm, WA 98597
Water: TC \l1 "
The proposed site is currently connected to the City of Yelm’s water system. Your project has been credited with one water hook-up. Water hook-up fees are based on a consumption
rate of 240 gallons per day and are charged at a rate of $1,500/240gpd (fee subject to change) inside city limits. At the time of application submittal you will be required to submit
water usage calculations provided by a licensed civil engineer. The water fees will be calculated using the information provided by the engineer.
This project will be required to install a Double Detector Check Valve between the water meter and the building. TC \l1 "
Sewer: TC \l1 "
The proposed site is currently connected to the City of Yelm’s STEP sewer system. Sewer hook-up fees are based on a consumption rate of 240 gallons per day and are charged at a rate
of $4,986/240gpd (fee subject to change) inside city limits. At the time of application submittal you will be required to submit water usage calculations provided by a licensed civil
engineer. The sewer fees will be calculated using the information provided by the engineer. TC \l1 "
This project will be required to install a grease trap between the building and the existing step tank. This tank will need to be at least 1,500 gallons capacity.
Fire: TC \l1 "
Fire protection to the buildings must be provided per the Uniform Building Code. There may be existing fire hydrants on this site; however, additional hydrants may be required to meet
current standards. This will be determined upon further review of the civil plans. TC \l1 "
Stormwater: TC \l1 "
Developments with over 5,000 sq ft of impervious surface are required to provide stormwater facilities per the DOE Stormwater Manual. Preliminary Stormwater Report and conceptual
plan must be submitted with site plan review application. TC \l1 "
Street Improvements: TC \l1 "
Frontage improvements are not required for this project at this time. However these improvements may be required if your building improvements are greater then 60% of the assessed building
value.
Street Lighting: TC \l1 "
Nothing to report.
ADA Requirements:
The American Disabilities Act required that facilities are ADA accessible. Facility improvements will have to meet current code. Review of these improvements will be determined upon
further review of the civil and architecture plans.