cc-112602 Autoglass repair tent Pre-Application Meeting Civil Comments Date November 26, 2002 ***These comments are preliminary in nature and are not intended to represent final comments and or requirements for the City of Yelm. Until a complete application is made, the Community Development department can only attempt to inform the applicant of general requirements as they appear in the form presented by the applicant at the time of pre-submission. Proponent: Henry Smith Project: Auto Glass Rock Chip Repair Tent Project Loc: 1506 Yelm Ave W Yelm, WA 98597 Water: The proposed site would not be required to connect to the City's water system. If you were to connect to the city water system the following would apply: Water connections are based on a consumption rate of 240 gallons per day and are charged at a rate of $1,500 per an ERU (fee subject to change) inside city limits. The 5/8” water meter cost is $300.00 for a pretapped and preplumbed installation. Irrigation Meter: An irrigation meter may be installed for the purpose of irrigation. A backflow prevention device will be required for all landscape irrigation connections. There is no meter hook up fee for the irrigation meter. The cost of the watermeter will be assessed based on the size of the meter. Sewer: The proposed site will not be required to connect to the City's sewer system. If you were to connect to the city sewer system the following would apply: Sewer connections are based on a consumption rate of 240 gallons per day and are charged at a rate of $4,986 per an ERU (fee subject to change) inside city limits. The city also charges an inspection fee for each step sewer system. This fee is $145.00. Fire: Fire protection must be provided per the Uniform Fire Code. These will be determined upon further review of the preliminary plans. Stormwater: If the proposed improvement has over 5,000 square feet of new impervious surface there are stormwater treatment and detention requirements per the 1992 D.O.E. Stormwater Manual (Manual subject to change). All of the stormwater facilities are required to be located outside of the right-of-way. At the time of Site Plan Review, you are required to submit a Preliminary Stormwater Plan and report. Street Improvements: There will be no frontage improvements required by this project. Any proposed parking areas would be required to be asphalt paved. Street Lighting: Street lighting will not be required. If you install onsite lighting this shall be installed as required per the City of Yelm’s “Development Guidelines”. The lighting plan will be reviewed prior to the lights being installed. ADA Requirements: The American Disabilities Act requires the improvements to be ADA accessible. Facility improvements will have to meet current code. Review of these improvements will be determined upon further review of the plans before installation.