cr-121802 Vancil PRD
Pre-Application Meeting
Civil Comments
Date December 18, 2002
***These comments are preliminary in nature and are not intended to represent final comments and or requirements for the City of Yelm. Until a complete application is made, the Community
Development Department can only attempt to inform the applicant of general requirements as they appear in the form presented by the applicant at the time of pre-submission.
Proponent: Evergreen Quality Building
Project: Planned Residential Development
Project Loc: 10826 Vancil Road, Yelm WA 98597
Water:
The proposed site would be required to connect to the City's water system. There is an existing 10” water line located in Vancil Road, west of your project. You will be required to
install an 8” waterline into your subdivision to connect future fire hydrant(s) and water meters. You may have a water latecomers agreement for the 10” water connection. Construction
of this waterline is currently underway.
Residential water connections are based on a consumption rate of 240 gallons per day and are charged at a rate of $1,500 per a residential connection (fee subject to change) inside city
limits. Each residential unit would be charged for one connection. This fee is payable at building permit issuance. Each water meter is $300.00 dollars, also payable at building permit.
Irrigation Meter:
An irrigation meter may be installed for the purpose of irrigation. A backflow prevention device will be required for all landscape irrigation connections.
Sewer:
The proposed site will be required to connect to the City's sewer system. There is a 3” sewer line located in Vancil Road to the west of your project. You may be required to install
a 2” sewer main into your development to connect all residences.
Residential sewer connections are based on a consumption rate of 240 gallons per day and are charged at a rate of $5,125 per a residential connection (fee subject to change) inside city
limits. Each residential unit would be charged for one connection. This fee is payable at building permit issuance.
Fire:
Fire protection must be provided per the Uniform Fire Code. There will be requirements for installation of fire hydrants, fire truck access and fire truck turn-around. These will be
determined upon further review of the preliminary plans.
Stormwater:
If the proposed improvement is over 5,000 square feet of impervious surface there are stormwater treatment and retention requirements per the D.O.E. Stormwater Manual. All of the stormwater
facilities are required to be located outside of the right-of-way and in there own dedicated tract. At the time of Preliminary Plat Application, you are required to submit a Preliminary
Stormwater Plan and report.
Street Improvements:
Frontage improvements shall be consistent with Yelm’s Development Guidelines. Your project will be required to improve the your frontage along Vancil Road. These improvements are
classified as “half street” improvements. This mean you are required to improve the street from the center of the right-of-way to your property line. The required improvements shall
be consistent with the “neighborhood collector” roadway section per the city’s development guidelines. The interior road shall be consistent with the city’s “private access section”
section per the city’s development guidelines. This section is 30’ wide asphalt roadway and 4’ wide sidewalk. It will be accessed from Vancil Road by a 24’ wide driveway apron.
Street Lighting:
Street lighting shall be installed as required per the City of Yelm’s “Development Guidelines”. The street lighting plan will be reviewed at the time of civil engineering plan review.
ADA Requirements:
The American Disabilities Act requires the improvements to be ADA accessible. Facility improvements will have to meet current code. Review of these improvements will be determined
upon further review of the civil plans.