cr-100803 Cullens 185 lot Subdivision
Pre-Application Meeting
Civil Comments
Date January 8, 2003
***These comments are preliminary in nature and are not intended to represent final comments and or requirements for the City of Yelm. Until a complete application is made, the Community
Development Department can only attempt to inform the applicant of general requirements as they appear in the form presented by the applicant at the time of pre-submission.
Proponent: D & D Associates LLC, Don Findlay
Project: 185 lot Subdivision
Project Loc: Killion/Cullens Road, Yelm WA 98597
Tax Parcel: 21713440000, 0100, 0200, and 0300
Water:
The proposed site would be required to connect to the City's water system. There is an existing 10” watermain located at the south property line of 9405 Cullens Road. This watermain
will need to be extended to the north edge of your property line or the end of the frontage improvements. A second watermain will have to be extended from the intersection of Yelm Ave
West and Killion Road. This watermain will also have to be 10” in size.
The development’s internal roadways will be required to have 8” watermain installed to serve fire hydrants and home services. This project will be required to have one of the internal
watermain upsized to 10” for water system continuity.
Residential water connections are based on a consumption rate of 240 gallons per day and are charged at a rate of $1,500 per a residential connection (fee subject to change) inside city
limits. Each residential unit would be charged for one connection. This is a one-time connection fee and is payable a building permit issuance. Also there is a water meter fee of
$300.00 per a meter. (5/8” residential meter size only)
Irrigation Meter:
An irrigation meter may be installed for the purpose of irrigation. A backflow prevention device will be required for all landscape irrigation connections.
Sewer:
The proposed site would be required to connect to the City's STEP sewer system. There is an existing 4” sewermain located at the south property line of 9405 Cullens Road. This sewermain
will need to be extended to the north edge of your property line or the end of the frontage improvements. A second sewermain will have to be extended from the intersection of Yelm Ave
West and Killion Road. This sewermain will also have to be 4” in size.
The development’s internal roadways will be required to have sewermain installed to serve all home services. This sewer main will be sized according to serve the proposed lots and provide
system continuity.
Residential sewer connections are based on a consumption rate of 240 gallons per day and are charged at a rate of $5,125.00 per a residential connection (fee subject to change) inside
city limits. Each residential unit would be charged for one connection. An inspection fee of $145.00/lot will be charged for STEP sewer system. These fees are payable a building permit
issuance and are one-time connection fees.
Fire:
Fire protection must be provided per the Uniform Fire Code. There will be requirements for installation of fire hydrants, fire truck access and fire truck turn-around. These will be
determined upon further review of the preliminary plans.
Stormwater:
This project will require storm drainage treatment and disposal of all stormwater. The stormwater manual currently used is the 1992 Department of Ecology Stormwater Manual. The project
area and all frontage improvements must have stormwater controls designed and installed. All of the stormwater facilities are required to be located outside of the right-of-way. At
the time of Preliminary Plat application, you are required to submit a Preliminary Stormwater Plan and report.
Street Improvements:
Frontage improvements shall be consistent with Yelm’s Development Guidelines. Your project will be required to improve the frontage along Cullens Road and Killion Road. These improvements
are classified as “half street” improvements where the roadway already exists. If the roadway is not constructed the project will be required in complete the half street improvements
on the project side and core road improvements on the opposite side. Cullens and Killion Road are both classified as a Neighborhood Collector roadways.
All internal roadways will be classified as either Neighborhood Collectors or Local Access Residential streets. See attached roadway sections for specific details about these requirements.
Street Lighting:
Street lighting shall be designed and installed as required per the City of Yelm’s Development Guidelines. The street lighting plan will be reviewed and approved at the time of civil
engineering plan review.
ADA Requirements:
The American Disabilities Act requires the improvements to be ADA accessible. Facility improvements will have to meet current code. Review of these improvements will be determined
upon further review of the civil plans.