cr-011503 Grove Rd
Pre-Application Meeting
Civil Comments
Date January 15, 2003
***These comments are preliminary in nature and are not intended to represent final comments and or requirements for the City of Yelm. Until a complete application is made, the Community
Development Department can only attempt to inform the applicant of general requirements as they appear in the form presented by the applicant at the time of pre-submission.
Proponent: Manny Baker
Project: 4 Ex. Single Family Home Lots
Project Loc: 10434 Grove Rd, Yelm WA 98597
Water:
Currently this location is not connected to City of Yelm’s water system. You will be required to connect to this system. There is a 6” watermain located in Grove Road. Your project
will be required to connect 4 water meters to the water main. I have attached a copy of the water meter detail and the road restoration detail for your connection. You will need
to make the tap to the watermain, install the waterline to the water meter setter, and set the setter and water meter box. The water meters will be located in the right of way of Grove
Road or the 10’ utility easement along the right of way. These connections will be at your expense.
Residential water connections are based on a consumption rate of 240 gallons per day and are charged at a rate of $1,500 per a residential connection (fee subject to change) inside city
limits. The water meter fee is $300.00 per a water meter. This fee is for a pretapped and preplumbed installation. These fees are payable a building permit issuance.
Sewer:
The proposed site will not be required to connect to the City's sewer system if used as single-family building lots. You will be required to install an approved on-site wastewater system.
This system will be permitted through Thurston County Permit Center and submitted to the City of Yelm for review and approval.
Fire:
Fire protection must be provided per the Uniform Fire Code.
Stormwater:
If the proposed improvements have a significant amount of impervious surfaces stormwater treatment and retention will be required per the 1992 D.O.E. Stormwater Manual.
Street Improvements:
No street improvements will be required for the single-family home sites. When an existing home is converted to commercial, frontage improvements will be required. These improvements
will include widen the roadway, adding
curb and gutter, street trees and a planter strip. See attached roadway section.
Street Lighting:
No street lighting will be required for this project, as it has been submitted. (single-family use only)