Loading...
cr-091703 Vancil 10 lot PlatPre-Submission Conference Civil Engineering Comments September 17, 2003 ***These comments are preliminary in nature and are not intended to represent final comments and or requirements for the City of Yelm. Until a complete application is made, the Community Development Department can only attempt to inform the applicant of general requirements as they appear in the form presented by the applicant at the time of pre-submission. Proponent: Airborne Properties – Brian Renyolds Project: 10 lot Subdivision Project Location: 10826 Vancil Rd Yelm WA 98597 Tax Parcel: 22730140700 Water The proposed site would be required to connect to the City's water system. There is an existing 10” water main located in Vancil Rd. If an internal road is proposed, the development’s internal roadways will be required to have 8” water main installed to serve fire hydrants and home services. Residential water connections are based on a consumption rate of 240 gallons per day and are charged at a rate of $1,500 per a residential connection (fee subject to change) inside city limits. Each residential unit would be charged for one connection. This is a one-time connection fee and is payable at building permit issuance. Also there is a water meter fee of $300.00 per a meter (5/8” residential meter size only). An irrigation meter may be installed for the purpose of irrigation. A backflow prevention device will be required for all landscape irrigation connections. Any irrigation system installed will need to have a back flow prevention device between the irrigation system and the city owned water meter. This also includes any private irrigation systems that may be located on each home lot. Sewer The proposed site would be required to connect to the City's S.T.E.P. sewer system. The existing sewer line is located in Vancil Rd and is 3” is size. This project will be required to tap the sewer main and extend the sewer within the project boundaries. Residential sewer connections are based on a consumption rate of 240 gallons per day and are charged at a rate of $5,125.00 per a residential connection (fee subject to change) inside city limits. Each residential unit would be charged for one connection. An inspection fee of $145.00/lot will be charged for S.T.E.P. sewer system. These fees are payable a building permit issuance and are one-time connection fees. Fire Fire protection must be provided per the Uniform Fire Code. There will be requirements for installation of fire hydrants, fire truck access and fire truck turn-around. These will be determined upon further review of the preliminary plans. Stormwater This project will require storm drainage treatment and disposal of all stormwater. The stormwater manual currently used is the 1992 Department of Ecology Stormwater Manual. The project area and all frontage improvements must have stormwater controls designed and installed. All of the stormwater facilities are required to be located outside of the right-of-way. At the time of preliminary subdivision application, you are required to submit a preliminary stormwater plan and report. Street Improvements Frontage improvements shall be consistent with Yelm’s Development Guidelines. Your project will be required to improve the frontage along Vancil Road. These improvements are classified as “half street” improvements where the roadway already exists. Vancil Road is classified as a Neighborhood Collector roadway. Any internal roadways will be classified as Local Access Residential streets. Street Lighting Street lighting shall be designed and installed as required per the City of Yelm’s Development Guidelines. The street lighting plan will be reviewed and approved at the time of civil engineering plan review. ADA Requirements The American Disabilities Act requires the improvements to be ADA accessible. Facility improvements will have to meet current code. Review of these improvements will be determined upon further review of the civil plans.