Loading...
cc-011404 204 YAE Secret Garden M E M O R A N D U M City of Yelm Community Development Department Engineering Division   Pre-Application Meeting Date January 14, 2004 Civil Comments These comments are preliminary in nature and are not intended to represent final comments and or requirements for the City of Yelm. Until a complete application is made, the Community Development Department can only attempt to inform the applicant of general requirements as they appear in the form presented by the applicant at the time of pre-submission. Proponent: Dwayne Bockman Project: The Secret Garden – Hair Salon Project Location: 204 Yelm Ave E Yelm, WA 98597 Water  TC \l1 " The proposed site is currently connected to the City of Yelm’s water system. Your project has been credited with one water hook-up. Water hook-up fees are based on a consumption rate of 240 gallons per day and are charged at a rate of $1,500/240gpd (fee subject to change) inside city limits. At the time of application submittal you will be required to submit water usage calculations provided by a licensed civil engineer or current water records. The water fees will be calculated using the information provided. Irrigation Meter: An irrigation meter shall be installed for the purpose of irrigation. An approved backflow prevention device will be required for all landscape irrigation connections. Cross Connection Control: Washington State Department of Health, in WAC 246-290-490 states that all group A water systems with 1000 or more connections are required by the department of health to develop and implement a cross control connection program. This program requires all commercial buildings and irrigation systems to have a back flow prevention device installed on the water services. A list of approved devices can be located at the above referenced Washington Administrative Code. Sewer TC \l1 " The proposed site is currently connected to the City of Yelm’s STEP sewer system. Sewer hook-up fees are based on a consumption rate of 240 gallons per day and are charged at a rate of $5,269.00/240gpd (fee subject to change) inside city limits. At the time of application submittal you will be required to submit water usage calculations provided by a licensed civil engineer. The sewer fees will be calculated using the information provided by the engineer. It is unclear at this time if the existing septic tank will meet the requirements of the proposed usage. These fees are payable a building permit issuance.