cc-012104 Napa Expansion
M E M O R A N D U M
City of Yelm
Community Development Department
Engineering Division
Pre-Application Meeting
Date January 21, 2004
Civil Comments
These comments are preliminary in nature and are not intended to represent final comments and or requirements for the City of Yelm. Until a complete application is made, the Community
Development Department can only attempt to inform the applicant of general requirements as they appear in the form presented by the applicant at the time of pre-submission.
Proponent: Lori Wright
Project: Napa Auto Parts Expansion
Project Location: 509 East Yelm AvenueYelm, WA 98597Tax Parcel Number 22719342901
Water
TC \l1 "
The proposed site is currently connected to the City of Yelm’s water system. The property has been credited with the existing water usage. The existing average usage is 304 cubic feet
a month or 1 eru. Additional water connection fees are based on a consumption rate of 240 gallons per day and are charged at a rate of $1,500/240 gpd (fee subject to change) inside
the City limits. At the time of application submittal you will be required to submit water usage calculations provided by a licensed civil engineer and the water fees will be calculated
using the information provided by the engineer.
Sewer TC \l1 "
The proposed site is currently not connected to the City of Yelm’s S.T.E.P. sewer system. Sewer connection fees are based on the water consumption rate of 240 gallons per day and are
charged at a rate of $5,269/240 gpd (fee subject to change) inside the City limits. At the time of application submittal you will be required to submit water usage calculations provided
by a licensed civil engineer and the sewer connection charges will be calculated using the information provided by the engineer.
It is possible that this facility may trigger the need for a grease trap(s) to be installed as part of the sewer system. At the time of application the building uses will be reviewed
by the Community Development Department in order to determine if a grease trap is required. TC \l1 "
Fire
Fire protection to the buildings must be provided per the Uniform Building Code. There is an existing fire hydrant at the Northwest corner of the property on Yelm Avenue East, however
its location will not allow complete fire hydrant coverage for the building(s) and additional hydrants will likely be required to meet current standards.
Stormwater TC \l1 "
Developments with over 5,000 square feet of impervious surface are required to provide stormwater facilities pursuant to the DOE Stormwater Manual. If a site plan review is required
and the parking lot is required to be paved, a preliminary stormwater report and conceptual plan must be submitted with the site plan review application. TC \l1 "
Street Improvements TC \l1 "
Frontage improvements will be required for this project. This project will be required to complete the frontage improvements along Clark Road to the property line. Frontage improvements
along Clark Road would be to a Neighborhood Collector standard, copy attached.
Street Lighting TC \l1 "
Street lighting will be reviewed upon project submittal.
ADA Requirements
The American Disabilities Act required that facilities are ADA accessible. Facility improvements will have to meet current code. Review of these improvements will be determined upon
further review of the civil and architectural plans.