cc-020404 Mtn Lumber Addition
M E M O R A N D U M
City of Yelm
Community Development Department
Engineering Division
Pre-Application Meeting
Date February 4, 2004
Civil Comments
These comments are preliminary in nature and are not intended to represent final comments and or requirements for the City of Yelm. Until a complete application is made, the Community
Development Department can only attempt to inform the applicant of general requirements as they appear in the form presented by the applicant at the time of pre-submission.
Proponent: B and H Builders
Project: Mountain Lumber Storage Addition (7500 sf)
Project Location: 10430 Creek Street
Yelm, WA 98597
Water
All new construction on existing businesses is required to retrofit the existing water meter with a back flow prevention devise.
Cross Connection Control:
Washington State Department of Health, in WAC 246-290-490 states that all group A water systems with 1000 or more connections are required by the department of health to develop and
implement a cross control connection program. This program requires all commercial buildings and irrigation systems to have a back flow prevention device installed on the water services.
A list of approved devices can be located at the above referenced Washington Administrative Code.
Sewer TC \l1 "
No sewer system improvements will be required as the project is proposed.
Fire
All projects need to have fire protection for the buildings. When reviewing proposals or projects for compliance with the 1997 Uniform Fire Code (UFC) the following need to be addressed:
Does the proposal have fire hydrant coverage? To meet this requirement the building must have coverage by fire hydrants. All parts of the buildings must be within 150’ of a fire hydrant.
Another means of meeting fire code may be by installing a fire sprinkler system in each residence.
Stormwater TC \l1 "
All building roof runoff will need to be routed to underground drywells.
Street Improvements TC \l1 "
No street improvements will be required as the project is proposed.
ADA Requirements
Any requirements for ADA will be reviewed at building permit application.