Loading...
Top Line DevPre-Application Meeting February 11, 2004 ***These comments are preliminary in nature and are not intended to represent final comments and or requirements for the City of Yelm. Until a complete application is made, the Community Development Department can only attempt to inform the applicant of general requirements as they appear in the form presented by the applicant at the time of pre-submission. Proponent: Mike Kempinsky Project Proposal: Construct two duplexes on 2 lots Project Location: 210 Yelm Ave. West, Yelm WA 98597 Zoning and Central Business District (CBD), Chapter 17.24 Setbacks: Minimum Lot Size - None Residential development allowed provided it occurs on existing lots of record, one acre or less, and subject to the R-14 development standards Front Yard Setback on Arterials: 35 feet Side Yard Setback: Minimum 10 feet Rear Yard Setback: 25 feet. Building Maximum Height: 35 feet Parking: Chapter 17.72 Requirements for off-street parking for a duplex is 2 per dwelling unit. Ingress/Egress: Ingress and egress at the site shall be consistent with the Yelm Development Guidelines 4B.140. The building fronts on Yelm Avenue, access to the back by alley requires that the alley be paved from Edwards Street to the eastern property line. Landscaping: Chapter 17.80, Type II Type II landscaping is intended to provide visual separation of uses from streets, and visual separation of compatible uses so as to soften the appearance of parking areas, and building elevation. This landscaping is used around the perimeter of a site, and adjacent to buildings. Application and Process: Civil plans may be required for the paving of the alleyway.