cc-071404 212 Yelm Ave Comm Office
M E M O R A N D U M
City of Yelm
Community Development Department
Engineering Division
Pre-Application Meeting
Date July 14, 2004
Civil Comments
These comments are preliminary in nature and are not intended to represent final comments and or requirements for the City of Yelm. Until a complete application is made, the Community
Development Department can only attempt to inform the applicant of general requirements as they appear in the form presented by the applicant at the time of pre-submission.
Proponent: Elizabeth Felix, Maia Glassy
Project: Commercial Office Space
Project Location: 212 Yelm Ave W
Yelm, WA 98597
Water
The proposed site is currently located in the City of Yelm’s water system service area. An existing water main is located in the alley behind the proposed project. This proposal will
be credited with one connection for the existing building. Additional connections will be required. The project engineer will be required to submit water use calculations used to determine
the connection fees. This use will have one master meter and service to supply domestic water.
The water connections are based on a consumption rate of 240 gallons per day and are charged at a rate of $1,500 per a connection (eru) (fee subject to change) inside city limits. This
fee is payable at building permit issuance.
Irrigation Meter:
An irrigation meter may be installed for the purpose of irrigation. An approved backflow prevention device will be required for all landscape irrigation connections.
Cross Connection Control:
Washington State Department of Health, in WAC 246-290-490 states that all group A water systems with 1000 or more connections are required by the department of health to develop and
implement a cross control connection program. This program requires all commercial buildings and irrigation systems to have a back flow prevention device
installed on the water services. A list of approved devices can be located at the above referenced Washington Administrative Code.
Sewer TC \l1 "
The proposed site is currently located in the City of Yelm’s STEP sewer system service area. There is an existing sewer main and step tank located in the alley behind this building.
This project will be credited with one sewer connection based on previous use. Note to consider, if you expand this building to the alley the step tank will have to be relocated and
or expanded.
Sewer connections are based on a consumption rate of 240 gallons per day and are charged at a rate of $5,269 per a residential connection (fee subject to change) inside city limits.
Each residential unit would be charged for one connection. An inspection fee of $145.00 per a STEP sewer system will also be required. These fees are payable a building permit issuance.
Fire
All projects need to have fire protection for the buildings. When reviewing proposals or projects for compliance with the International Fire Code (IFC) the following need to be addressed:
Does the proposal have fire hydrant coverage? To meet this requirement the building must have coverage by fire hydrants. All parts of the buildings must be within 150’ of a fire hydrant.
Another means of meeting fire code may be by installing a fire sprinkler system.
Stormwater TC \l1 "
Developments with over 5,000 square feet of impervious surface are required to provide stormwater facilities pursuant to the 1992 DOE Stormwater Manual. If stormwater mitigation is
required the types of stormwater mitigation may be wet ponds, bioswales and filter strips. The stormwater disposal is 100% infiltration. There is 2 ways to accomplish this: open ponds
and underground galleries. The open ponds are depressions that store stormwater and allow it to perk back into the underground aquifer. Note: This project may not trigger stormwater
improvements based on 5,000 square feet however all stormwater will be required to be contained on site.
Street Improvements TC \l1 "
Frontage improvements will be required for Yelm Ave West. Your project will be required to improve the section of Yelm Ave W that was not improved with the Edwards Street Improvements.
See the attached detail for Urban Arterial Roadway. This improvement may be deferred at the time of site plan review.
If access is going to be from the unimproved alley behind the project, improvements to the alley will be required. The alley will have to be paved with 2’ asphalt and min of 2” crushed
rock.
ADA Requirements
The American Disabilities Act required that facilities are ADA accessible. Facility improvements will have to meet current code. Review of these improvements will be determined upon
further review of the civil and architectural plans.