Bldg Pacland presubBUILDING
Building Plan review, permitting and inspections will be based on the
City of Yelm’s Ordinance, adopting the 2003 IBC, IMC, UPC, IFC and the 2001 Washington State Energy Code. By resolution the City of Yelm readopted the 1997 UBC, UMC and UPC Fee schedules.
Building Plans may be submitted after Site Plan Review approval. Five(5) sets of plans, one of which may be half scale, two (2) sets of Engineering Calculations, Energy Calculations
and Specifications will be required. Due to the size of the Occupancy an integrated sprinkler and fire alarm system will be required. These plans may be submitted at a later date along
with any required kitchen suppression systems. All fire related items 5’ outside the building will be subject to civil review along with domestic water, waste and storm water.
Concurrently with Site Plan Review 2 sets of building and accessory building elevations will be submitted for Design Guidelines Chapter 4 review.
Please allow 4 to 6 weeks for Building Plan Review and 2 weeks for Design Guideline review.