Loading...
cc-111704 Arnolds expansion M E M O R A N D U M City of Yelm Community Development Department Engineering Division   Pre-Application Meeting Date November 17, 2004 Civil Comments These comments are preliminary in nature and are not intended to represent final comments and or requirements for the City of Yelm. Until a complete application is made, the Community Development Department can only attempt to inform the applicant of general requirements as they appear in the form presented by the applicant at the time of pre-submission. Proponent: Arnolds Restaurant - Carey Miller Project: Outdoor Expansion - Patio Project Location: 707 Yelm Ave East Yelm, WA 98597 Water The proposed site is currently connected to the City of Yelm’s water system. When expanding a business, if the water usage is expected to increase the applicant will have to purchase additional water connections. Commercial water connections are based on a consumption rate of 240 gallons per day and are charged at a rate of $1,500 per a connection (fee subject to change) inside city limits. This existing building will be credited with its current average usage. Additional water fees are payable at building permit issuance. Sewer TC \l1 " The proposed site is currently connected to the City of Yelm’s STEP sewer system. A step sewer tank is located between the building and the parking lot that serves this site. At this time, it is not apparent if this tank will be large enough to support your intended expansion. A licensed civil engineer must verify the tank size. This tank location will have to be relocated. The step tank can not be located under the proposed patio expansion location. If additional sewer connections are required they will be based on a consumption rate of 240 gallons per day and are charged at a rate of $5,269 per a connection (fee subject to change) inside city limits. An inspection fee of $145.00 per a connection will also be required. This building will be credited with the current average use. Additional connection fees are payable a building permit issuance. Fire All projects need to have fire protection for the buildings. When reviewing proposals or projects for compliance with the International Fire Code (IFC) the following need to be addressed: Does the proposal have fire hydrant coverage? To meet this requirement the building must have coverage by fire hydrants. Another means of meeting fire code may be by installing a fire sprinkler system or utilizing fire lanes for fire truck access. This shall be reviewed by your architect and submitted to the City of Yelm Fire Marshal or his assigned for approval. Stormwater TC \l1 " Developments with over 5,000 square feet of impervious surface are required to provide stormwater facilities pursuant to the 1992 DOE Stormwater Manual. If stormwater mitigation is required the types of stormwater mitigation may be wet ponds, bioswales and filter strips. The stormwater disposal is 100% infiltration. There is 2 ways to accomplish this: open ponds and underground galleries. The open ponds are depressions that store stormwater and allow it to perk back into the underground aquifer. This project will be considered as a retrofit project and some stormwater controls may be required. The project engineer will have to address the stormwater facilities and submit appropriate information. Street Improvements TC \l1 " This proposal in located on SR 507. This roadway is classified as Urban Arterial. The project frontage improvements have been completed previously. The access points for this proposal will remain in the same location and operate the same as they have in the passed. ADA Requirements The American Disabilities Act required that facilities are ADA accessible. Facility improvements will have to meet current code. Review of these improvements will be determined upon further review of the civil and architectural plans.