Loading...
Iverson planning notes City of Yelm Community Development Department 105 Yelm Avenue West P.O. Box 479 Yelm, WA 98597  Pre-Application Meeting December 15, 2004 These comments are preliminary in nature and are not intended to represent final comments and or requirements for the City of Yelm. Until a complete application is made, the Community Development Department can only attempt to inform the applicant of general requirements as they appear in the form presented by the applicant at the time of pre-submission. Proponent: Desmond Iverson Project Proposal: Construct a 40’ x 60’ indoor play area Project Location: 407 103rd Ave., Tax Parcel # 64303601800 Zoning and Setbacks The property is zoned Commercial (C-1), Chapter 17.26 YMC. This district allows a childcare center, subject to site plan review. Applications to develop, remodel or improve properties and structures within this zone shall require review and approval of a site plan in accordance with Chapter 17.84 YMC. Exemption from site plan review and approval shall be granted if there is no addition of square feet, or the expansion is for storage only. Parking The requirements for off-street parking and their design shall be regarded as the minimum; however, the owner, developer, or operator of the premises for which the parking facilities are intended shall be responsible for providing adequate amounts and arrangement of space for the particular premises even though such space is in excess of the minimum set forth. A minimum of 1 stall per employee based on the greatest number of employees on a single shift, plus a loading and unloading area with storage for 3 cars. City of Yelm Development Guidelines require that parking areas be paved and landscaped. Parking plan shall be submitted with Site Plan Review. Yelm Development Guidelines 4G.110 states; β€œin all commercial and industrial developments, parking areas shall be so arranged as to make it unnecessary for a vehicle to back out into any street or public right-of-way. Ingress/Egress Ingress and egress at the site shall be consistent with the Yelm Development Guidelines, section 4B.140. Existing vehicular access to the site is located on 103rd Ave. No additional access may be created. Landscaping: Chapter 17.80, Type II, III, IV &V Type II landscaping is intended to provide visual separation of uses from streets, and visual separation of compatible uses so as to soften the appearance of streets, parking areas, and building elevation. This landscaping is used around the perimeter of a site, and adjacent to buildings. Type II landscaping would be required along the perimeter of the site. Type II landscaping is characterized by an 8 foot landscape strip between uses and a 5 foot strip around buildings of any combination of evergreen and deciduous trees (with no more than 50 percent being deciduous), shrubs, earthen berms and related plant materials or design features may be selected; provided, that the resultant effect is to provide partial screening and buffering between uses and of softening the appearance of streets, parking and structures. Type III landscaping is intended to provide visual relief where clear sight is desired. This landscaping is utilized along pedestrian corridors and walks for separation of pedestrians from streets and parking areas. Type III landscaping would be required along 103rd Avenue. Type III landscaping is typified by a six foot landscaping strip with street trees for a large overstory canopy along streets and pedestrian corridors and grass or other approved vegetation for groundcover. Earthen berms with grass or other vegetative groundcover and other design features may be worked into landscaping provided the resultant effect of providing a pedestrian-friendly environment and visual relief where clear site is required can be achieved. Type IV landscaping is intended to provide visual relief and shade in parking areas. At least 24 square feet of landscape development for each parking stall proposed. Each area of landscaping must contain at least 100 square feet of area and must be at least six feet in any direction. Each planting area must contain at least one tree. Live groundcover shall be provided throughout each landscaping area. No parking stall shall be located more than 50 feet from a tree. Type V landscaping is required in storm water retention areas, if required. The floor and slopes of any stormwater retention/detention area shall be planted in vegetation that is suitable and will thrive in hydric soils. The landscaping of the stormwater facility shall be incorporated with all on-site landscaping. A conceptual landscaping plan is required with the application for site plan review. Final landscaping and irrigation plan is required as element of civil construction drawings, with installation prior to occupancy. The refuse area must be large enough to accommodate a dumpster and recycle bin. Refuse areas must be screened with an enclosure of a material and design compatible with the overall architectural theme. A six foot wall or fence shall enclose any outdoor refuse collection point. The fence shall be a solid material such as wood or masonry. Traffic The City has adopted a Transportation Facility Charge (TFC) of $750.00 per PM peak trip. The Code provides a default table that the applicant can use to determine new PM trips generated. For a childcare center, the trip generation rate is 11.67 per 1,000 square feet. To determine the projects impact and fee, use the following formula for the use proposed: ((Peak PM Trip Rate * Gross Floor Area)/1,000) * $750.00 = TFC Example: 11.67 x 2,400 = 28,008 ÷ 1,000 = 28 x $750.00 = $21,006.00 If the applicant feels the proposed use would not generate the default number of trips as designated in the TFC Ordinance, and analysis prepared by a Washington State Licensed Engineer can be submitted to the City for review and consideration. SEPA An environmental checklist is not required provided the proposal does not create 4,000 sq. ft. or 20 or more parking stalls. Application and Process Site Plan Review, Chapter 17.84, is an administrative process. Minimum application requirements are located in Section 17.84.060 and are listed on the application form. A project of this size can expect completed review in approximately 12 to 14 weeks. Land use approval typically contains conditions of approval that the applicant must complete prior to receiving a building permit. Upon satisfactory completion of all conditions of land use approval, the applicant can submit building plans for approval. Other Design Guidelines - the attached checklist must be submitted at time of application, with written responses on how each guideline requirement is proposed to be met. DESIGN GUIDELINES - 407 103rd Ave. , Yelm WA 98597 Project Review Checklist  Guidelines Applicable  Guidelines Met   I.A.(1)  Relate development to pedestrian oriented street frontage.     I.A.(2)  Relate development to street fronts (other than pedestrian-oriented streets).  X    I.B.(1)  Minimize visibility and impacts of service areas.  X    I.C.(1)  Take advantage of special opportunities and mitigate impacts of large developments.     I.D.(1)  Reduce impact of service areas and mechanical equipment.  X    I.E.(1)  Integrate biofiltration swales and ponds into the overall site design.  X    I.F.(1)  Enhance the visual quality of development on corners.     I.F.(2)  Provide a paved pedestrian walkway from the street corner to the building entrance.     II.A.(1)  All pedestrian paths must correspond with federal, state and local codes for handicapped access, and the Americans with Disabilities Act.  X    II.A.(2)  Provide adequate lighting at the building entries and all walkways and paths through parking lots.  X    II.A.(3)  Develop an on-site pedestrian circulation concept.     II.B.(1)  Provide a pedestrian path at least 60" wide (preferably 96" wide) from the street sidewalk to the main entry.  X    II.B.(2)  Provide pedestrian paths or walkways connecting all businesses and the entries of multiple buildings on the same development site.     II.B.(3)  Provide pathways through parking lots  X    II.C.(1)  Where street ROW is insufficient to provide adequate sidewalks buildings and other site features must be set back from the public ROW to achieve at least minimum sidewalk widths.  X    II.C.(2)  Where new streets are developed, provide sidewalks according to minimum standards.     II.D.(1)  Provide, where feasible, pedestrian circulation routes to adjacent uses and transit.     II.D.(2)  Integrate nearby transit stops into the planning of adjacent site improvements.     II.D.(3)  Encourage pedestrian paths from all transit stops through commercial areas to residential areas within 1,200 feet     II.E.(1)  Enhance building entry access.     II.F.(1)  Provide pedestrian-oriented open space at key locations.     III.A.(1)  Provide access roads through large lots with more than one street frontage.     III.B.(1)  Minimize driveway impacts.     III.C.(1)  Meet requirements for location of parking lots on pedestrian-oriented streets.     III.C.(1)  Meet requirements for location of parking lots on pedestrian-oriented streets.     Continued DESIGN GUIDELINES - 407 103re Ave., Yelm WA 98597 Project Review Checklist  Guidelines Applicable  Guidelines Met   III.C.(2)  Meet requirements for parking lot design detail standards.  X    III.D.(1)  Minimize parking areas through joint use and management.     III.D.(2)  Encourage structured parking.     III.D.(3)  Reduce impacts of parking garages.     IV.A.(1)  Incorporate human-scale building elements.  X    IV.B.(1)  Reduce scale of large buildings.  X    IV.C.(1)  Architecturally accentuate building corners at street intersections.     IV.D.(1)  Enhance buildings with appropriate details.  X    IV.E.(1)  Retain original facades.     IV.E.(2)  Use compatible building materials. (See Building Material Summary Matrix, pg 59)  X    IV.F.(1)  Treat blank walls that are visible from the street parking or adjacent lot.  X    IV.G.(1)  Locate and/or screen roof-mounted mechanical equipment so as not to be visible from the street or from the ground-level of adjacent properties.  X    IV.G.(2)  Where practical, locate and/or screen utility meters, electrical conduit and other service and utilities apparatus so as not to be visible from the street.  X    V.F.(1)  Use plant materials that are approved for use in downtown Yelm. Proponents may use other plant materials approved by the City.     V.G.(1)  Develop a site landscape design concept.  X    V.H.(1)  Provide substantial site landscaping.     V.H.(2)  Protect and enhance natural features.     V.I.(1)  Screen all parking lots as required by Chapter 17.80, Landscaping.  X    V.I.(2)  An alternative to the required perimeter parking area landscaping plan may be submitted.  X    V.I.(3)  Provide internal parking lot landscaping.  X    V.J.(1)  Consider alternative building and parking siting strategies to preserve existing trees.     V.J.(2)  Consider the integration of pedestrian and bicycle paths with stands of mature trees where feasible to connect adjacent uses.