PL 101905 Long Berry Valley east side
City of Yelm
Community Development Department
105 Yelm Avenue West
P.O. Box 479
Yelm, WA 98597
Pre-Application Meeting
October 19, 2005
These comments are preliminary in nature and are not intended to represent final comments and or requirements for the City of Yelm. Until a complete application is made, the Community
Development Department can only attempt to inform the applicant of general requirements as they appear in the form presented by the applicant at the time of pre-submission.
Proponent: Pacific Frontier - Jack Long
Project Proposal: Subdivide 5 acres into 50 residential lots
Project Location: 14812 Berry Valley Road - 21724240400
Zoning and Setbacks
Approximately 2 acres is zoned Low Density Residential (R-4), Chapter 17.24 YMC. This district allows the residential subdivision of land at a density of up to 4 units per acre. Approximately
3 acres are zoned High Density Residential (R-14), Chapter 17.18. This district allows density at a minimum of 6 units per acre, and a maximum of 14 units per acre.
The Zoning Code does not establish minimum lot sizes, but each new lot must contain sufficient area to allow a residential structure while maintaining the following setbacks from property
lines:
R-4 zone setbacks:
Front - 15 feet to face of house
20 feet to face of garage
Side - 5 feet minimum, total of 12 feet between both yards
Rear - 25 feet
Flanking 15 feet
Maximum Height - 35 feet
R-14 zone setbacks:
Front - 15 feet to face of house
20 feet to face of garage
Side - 10 feet
Rear - 25 feet
Flanking 20 feet
Maximum Height - within 100 feet of a lower density residential zone 25 feet, all other residential buildings not to exceed 35 feet.
All lots must have a minimum 20 feet on road frontage built to city standards. Lots within a residential subdivision shall be designed so that lots adjacent to arterial and collector
streets are not allowed direct access.
Residential developments which contain 25 or more dwelling units shall provide more than one vehicular access from an arterial or collector street.
Parking
Two off-site parking spaces per residential lot.
Ingress/Egress
Ingress and egress at the site shall be consistent with the Yelm Development Guidelines, section 4B.140.
The subdivision code, Chapter 16.16.090 requires that the layout of streets shall provide for continuation of streets existing in adjoining subdivisions.
Landscaping: Chapter 17.80, Type II, III, & V
Type II landscaping is intended to provide visual separation of uses from streets, and visual separation of compatible uses so as to soften the appearance of streets, parking areas,
and building elevation. This landscaping is used around the perimeter of a site, and adjacent to buildings.
Type II landscaping is characterized by an 8 foot landscape strip between uses and a 5 foot strip around buildings of any combination of evergreen and deciduous trees (with no more than
50 percent being deciduous), shrubs, earthen berms and related plant materials or design features may be selected; provided, that the resultant effect is to provide partial screening
and buffering between uses and of softening the appearance of streets, parking and structures. A 6 foot tall board fence may be substituted for landscaping in residential subdivisions.
Type III landscaping is intended to provide visual relief where clear sight is desired. This landscaping is utilized along pedestrian corridors and walks for separation of pedestrians
from streets and parking areas. Type III landscaping is required for all new street frontages.
Type III landscaping is typified by a six foot landscaping strip with street trees for a large overstory canopy along streets and pedestrian corridors and grass or other approved vegetation
for groundcover. Earthen berms with grass or other vegetative groundcover and other design features may be worked into landscaping provided the resultant effect of providing a pedestrian-friendly
environment and visual relief where clear site is required can be achieved.
Type V landscaping is required in storm water retention areas.
The floor and slopes of any stormwater retention/detention area shall be planted in vegetation that is suitable and will thrive in hydric soils. The landscaping of the stormwater facility
shall be incorporated with all on-site landscaping.
A conceptual landscaping plan is required with the application for site plan review. Final landscaping and irrigation plan is required as element of civil construction drawings, with
installation prior to occupancy.
Traffic
The City has adopted a Transportation Facility Charge (TFC) of $750.00 per PM peak trip. The Code provides a default table that the applicant can use to determine new PM trips generated.
For a single family dwelling, the trip generation rate is 1.01 per unit. The TFC of $757.50 is due and payable at the time of building permit issuance.
A Transportation Impact analysis is required.
SEPA
An environmental checklist and a SEPA threshold determination is required.
Yelm Community Schools typically requires applicants to mitigate impacts to the District from residential growth through SEPA mitigation. The developer will be required to negotiate
an agreement with the District to mitigate school impacts. As of January 2005, mitigation fees per single family residential unit are $2,140.00 and are due and payable at building permit
issuance. The actual mitigation fee is established by contract with the District.
Open Space
All residential developments are required to provide 5% of the gross area in usable open space. All dedicated open space must have the following attributes and characteristics:
Open space shall be dedicated for one or more of the following uses:
1. Environmental interpretation or other education;
2. Park, recreational land, or athletic fields;
3. Off-road footpaths or bicycles trails;
4. Any other use found by the city to further the purposes of this chapter.
Above ground stormwater facilities cannot be counted as open space and corner entrances into the plat do not count as open space, unless improved by one of the 4 uses above.
Application and Process
Development of the site as a residential subdivision requires Preliminary and Final Plat Approval, and includes Environmental Review. Preliminary Plat approval requires a public
hearing and approval by the Hearing Examiner. The environmental determination and preliminary plat are reviewed concurrently and can be completed in 14 to 16 weeks. Preliminary Plat
approval is valid for 5 years.
Preliminary subdivision approval typically contains conditions of approval that the applicant must complete prior to receiving final subdivision approval or permits for construction.
Following land use approval the applicant is required to submit civil construction drawings to the Community Development Department for review and approval, and satisfy all conditions
of preliminary subdivision approval. Upon satisfactory completion, the applicant submits the final documentation for final plat approval. Final Plat approval takes approximately 6
to 8 weeks from the time the City receives a completed application packet.
Other
The Thurston County Health Department may review the application if any wells and/or septic systems are located on or within 100' of the property. All wells and septic systems on or
within 100’ of the property must be shown on preliminary plat drawings. Any existing wells and septic must be abandoned, and any water rights deeded to the City.
State and federal laws regulate the demolition of buildings containing asbestos and/or lead paint.
State law (Chapter 173-425 WAC) defines land clearing burning as outdoor burning of trees, stumps, shrubbery, or other natural vegetation from land clearing projects. Olympic Region
Clean Air Authority (ORCCA) issues land clearing permits for burning.