CV-021605 Mt View Pinedale
M E M O R A N D U M
City of Yelm
Community Development Department
Engineering Division
Pre-Application Meeting
Date February 16, 2005
Civil Comments
These comments are preliminary in nature and are not intended to represent final comments and or requirements for the City of Yelm. Until a complete application is made, the Community
Development Department can only attempt to inform the applicant of general requirements as they appear in the form presented by the applicant at the time of pre-submission.
Proponent: Land Shapes Northwest, Inc
Project: 16 Lot Subdivision
Project Location: Mountain View Road
Yelm, WA 98597
Water
The proposed site is currently located in the City of Yelm’s water system service area. An existing 10” water main is located in Mountain View Road. This project will be required connect
and to extend the water main along all new proposed roadways within the subdivision. Each lot will be required to have a water meter, water meter setter and water meter service.
Residential water connections are based on a consumption rate of 900 cubic feet a month and are charged at a rate of $1,500 per a residential connection (fee subject to change) inside
city limits. Each residential unit would be charged for one connection. This fee is payable at building permit issuance for each lot.
Water Latecomer Agreement:
This property has a water latecomer agreement attached to parcel. This fee is $8,083.26.
Irrigation Meter:
An irrigation meter shall be installed for the purpose of irrigation. An approved backflow prevention device will be required for all landscape irrigation connections.
Cross Connection Control:
Washington State Department of Health, in WAC 246-290-490 states that all group A water systems with 1000 or more connections are required by the department of health
to develop and implement a cross control connection program. This program requires all commercial buildings and irrigation systems to have a back flow prevention device installed on
the water services. A list of approved devices can be located at the above referenced Washington Administrative Code.
Sewer TC \l1 "
The proposed site is currently located in the City of Yelm’s STEP sewer system service area. There is an existing sewer main located in Mountain View Road. This project will be required
to install sewer main along all new proposed roadways within the subdivision. The sewer main sizes will be reviewed on the preliminary plat application. Each lot will be required to
have a step connection box and step sewer service.
Residential sewer connections are based on a consumption rate of 240 gallons per day and are charged at a rate of $5,417 per a residential connection (fee subject to change) inside city
limits. Each residential unit would be charged for one connection. An inspection fee of $145.00 per a STEP sewer system will also be required. These fees are payable a building permit
issuance.
Sewer Latecomer Agreement:
This property has a water latecomer agreement attached to parcel. This fee is $6,089.32.
Fire
All projects need to have fire protection for the buildings. To meet this requirement the building must have coverage by fire hydrants. All parts of the buildings must be within
300’ of a fire hydrant. Another means of meeting fire code may be by installing a fire sprinkler system.
Stormwater TC \l1 "
Developments with over 5,000 square feet of impervious surface are required to provide stormwater facilities pursuant to the 1992 DOE Stormwater Manual. If stormwater mitigation is
required the types of stormwater mitigation may be wet ponds, bioswales and filter strips. The stormwater disposal is 100% infiltration. There are 2 ways to accomplish this: open
ponds and underground galleries. The open ponds are depressions that store stormwater and allow it to perk back into the underground aquifer. All stormwater facilities will be located
in a separate tract that is owned by the homeowner’s association.
Street Improvements TC \l1 "
Frontage improvements shall be consistent with Yelm’s Development Guidelines. These improvements may consist of asphalt widening, curb and gutter, landscape planter, street trees, sidewalk
and street lighting.
Mountain View Road is classified as a “Neighborhood Collector.” This roadway requires a 16’ paved asphalt section, concrete curb and gutter, planter island, 5’ sidewalk and street lighting.
This street classification also does not allow on street parking.
Internal plat roads will be classified as a “Local Access Residential.” This roadway requires paved traffic lanes, paved parking lanes, concrete curb and gutter, planter islands, 5’
sidewalk and street lighting. This street classification allows on street parking. The required right of way to be dedicated for the local access roadways is 56’.
ADA Requirements
The American Disabilities Act required that facilities are ADA accessible. Facility improvements will have to meet current code. Review of these improvements will be determined upon
further review of the civil and architectural plans.