Loading...
TIA~~~ HEATH & ASSOCIATES, INC. Transportation and Civil Engineering JULSON PLAT RESIDENTIAL SUBDIVISION TRAFFIC IMPACT ANALYSIS YELM, WA Prepared for: Robert Benum Benum Enterprises P.O. Box 73130 Puyallup, WA 98373 JANUARY 2005 2214 Tacoma Road • Puyallup, WA 98371 • (253) 770-1401 • Fax (253) 770-1473 JULSON PLAT RESIDENTIAL SUBDIVISION TRAFFIC IMPACT ANALYSIS TABLE OF CONTENTS I. Introduction .................................................................................................................3 II. Project Description ......................................................................................................3 III. Existing Conditions .....................................................................................................3 IV. Future Traffic Demand ..............................................................................................10 V. Conclusions and Mitigation ......................................................................................16 Appendix LIST OF TABLES 1. Existing Level of Service ............................................................................................9 2. Trip Generation ................................................:........................................................10 3. Future Level of Service .................................................................................:...........12 LIST OF FIGURES 1. Vicinity Map & Roadway System ..............................................................................4 2. Site Plan -... - . ........................................5 3. Existing PM Peak Hour Volumes ...............................................................................7 4. Trip Distribution & Assignment ...............................................................................11 5. Pipeline Volumes ......................................................................................................13 6. 2007 PM Peak Hour Volumes Without Project ........................................................14 7. 2007 PM Peak Hour Volumes With Project .............................................................15 2 JULSON PLAT RESIDENTIAL SUBDIVISION TRAFFIC IMPACT ANALYSIS I. INTRODUCTION This study serves to investigate traffic impacts related to the proposed Julson Plat. The main goals of this study focus on the assessment of existing traffic conditions and intersection congestion, forecasts of newly generated project traffic, and estimations of future intersection delay. The first task includes the collection of general roadway information, road improvement information, entering sight distance data, and peak hour traffic counts. Next, a detailed level of service analysis of the existing volumes is made to determine the present degree of intersection congestion. Forecasts of future traffic and dispersion patterns on the street system are then determined using established trip generation and distribution techniques. Following this forecast, the future service levels for the key intersections are investigated. As a final step, appropriate conclusions and possible off-site mitigation measures are defined. II. PROJECT DESCRIPTION The proposed project is a residential subdivision comprised of 80 single family lots. The site is located to the northwest of the intersection of Wilkenson Road SE and Canal Road SE in the City of Yehn, WA. The north border of the project is the Centralia Power Canal. Access to the site is to be provided by three driveways that will connect to Canal Road, two of which will be interconnected by internal roads. Buildout of the project is roughly estimated by 2007. The year 2007 was therefore designated as the horizon year for traffic study purposes. Figure 1 shows the general site location and surrounding roadway system, while the site plan rng the overall lot-configuration and internal roadways is shown in Figure 2. III. EXISTING CONDITIONS A. Surrounding Roadway System Roadways serving the proposed site range from two lane major arterials to two-lane collector roads which vary in width, terrain, and posted speeds. These roadways vary in their overall function as part of the general network. The key streets near the site are described on page 6. 3 N ~ ~ ~ A PORTION OF THE. SE/4 SECTION 18, TI7N, RZE, W.M. ~~~ ,,,~~ _ _ I CITY OF YELM, THURSTON COUNTY, WASHINGTON »~ .- --- ~ \ s, ~ ,e ~ ~ -~~~ ..~°O~ I \NLSQ~i T.11.LY PINES r~~ \ ~/ ~ ~ i \~ tf rt' n:/ \~~~ / '~ ~ _ d _ ~~~ ~ \. ~" B ~/ ~ ~ tom, URBAN GROWT~i AREA LIGHT INDUSTRIAL 7ANING -CURRENT IIJDUSTRL9I~DISTRICf ZONING - FITIVRE v ~ ~~~ ~ ~ l_ ~~\~ ~' Z~ \ r ~ .g C a a -~~, a , - ~ .~ / - W \ \ ~ 4 ~ ~ 1 \ ~'\ I , ~ K x ~ ~ e - R-4 7ANWG ~, s s . ,, \ ` ~ t ~ MOUNTAIN - SUNRISE 4 J- @- ~_ ~ fit' ~~ ~w\~ ~~A ~ ^~N ~ -y. ~' w I\ • \ 1 #. S ~ N.l tiar ,'' ,\ g it i~_ V?~ P i s ~ ~\ ~ ~ Y 1 11 1 1 JULSON PLAT Ha AP Htat~ion andOC vilA Eng neering SITE PLAN FIGURE 2 Canal Road is a two-lane roadway that borders the west side of the site. The posted speed limit is 25 mph. Grades are mild. Wilkerson Road is a two-lane roadway which lies along the east side of the property. Lane widths are approximately 10 feet wide, while shoulders are minimal. The speed limit is 25 mph south of its intersection with N.P. Road and 35 mph north of the intersection. N.P. Road is a two-lane roadway which lies south of the property and runs in a southwesterly-northeasterly direction. Lanes are approximately 10 feet wide, while shoulders are gravel and minimal in cross-section. The speed limit along this road is posted at 35 mph. Rhoton Road is a two-lane roadway which lies west of the property and runs in a north- south direction. Lanes are also approximately 10 feet wide, while shoulders are minimal along this street. The speed limit is posted at 25 mph. South First Street is also State Route 507. This is a two lane road, with a left turn lane at the intersection with SR-510. The speed limit near the intersection is 25 mph, while to the south the speed limit is 55 mph. Shoulders are roughly 5 feet wide and consist of asphalt and grass or curb and sidewalk. Yelm Avenue is a two-lane roadway which lies south of the property and runs in a northwesterly-southeasterly direction. Lanes are 12 feet wide, while shoulders are roughly 4 feet wide and composed of asphalt/gravel or curb and sidewalk. Northwest of the intersection with the S First Street, Yehn Avenue is also State Route 510, while southeast of the intersection it is State Route 507. B. Existing Peak Hour Volumes Field data for this study was colleted from November of 2004 to January of 2005. Counts were taken during the evening peak period between the hours of 4 PM and 6 PM. This specific peak period is targeted for analysis purposes since it generally represents a worst case scenario for residential developments with respect to traffic conditions. This is primarily due to the common 8 AM to 5 PM work schedule and the greater number of recreation and shopping trips associated with the early evening period. Drivers often travel home after work at approximately the same time of day, typically between 4 PM and 6 PM, which translates to a natural peak in intersection and arterial traffic loads. Figure 3 on the following page shows the evening peak hour counts taken at the key intersections of Wilkerson Rd/Canal Rd, Wilkerson Rd/N P Rd, Rhoton Rd1N P Rd, Rhoton Rd/Railway Rd, and Yelm Ave/First St. Average daily traffic (ADT) volumes for State Routes are available from the Washington State Department of Transportation. 6 JULSON PLAT HEATH & ASSOCIATES, INC EXISTING PM PEAK HOURVOUJMES Transportation and Civil Engineering FIGURE 3 C. Level of Service Existing peak hour delays were determined through the use of the Highway Capacity Manual. Capacity analysis is used to determine level of service (LOS) which is an established measure of congestion for transportation facilities. LOS is defined for a variety of facilities including intersections, freeways, arterials, etc. A complete definition of level of service and related criteria can be found in the HCM. The methodology for determining the LOS at signalized intersections strives to determine the volume to capacity (v/c) ratios for the various intersection movements as well as the average control delay for those movements. Delay is generally used to measure the degree of driver discomfort, frustration, fuel consumption, and lost time. Control delay, in particular, includes movements at slower speeds and stops on intersection approaches as vehicles move up in queue position or slow down upstream of an intersection. Aside from the overall quantity of traffic, three specific factors influence signalized intersection LOS. These include the type of signal operation provided, the signal phasing pattern, and the specific allocation of green time. The methodology for determining the LOS at unsignalized intersections strives to determine the potential capacities for the various vehicle movements and ultimately determines the average total delay for each movement. Potential Capacity represents the number of additional vehicles that could effectively utilize a particular movement, which is essentially the equivalent of the difference between the movement capacity and the existing movement volume. Total delay is described as the elapsed time from when a vehicle stops at the end of a queue until the vehicle departs from the stop line. Average total delay is simply the mean total delay over the entire stream. A number of factors influence potential capacity and total delay including the availability/usefulness of gaps. The range for intersection level of service is LOS A to LOS F with the former indicating the best operating conditions with low control delays and the latter indicating the worst conditions with heavy control delays. Existing LOS is shown in Table 1 on the following page. This analysis involved the Signa12000 and HCS-2000 programs which are based on Chaff 2 G and 17 procedt~-~s in the 2000 Highway Capacity Manual. _- ~~ As shown in Table 1, the highest delays are at the signalized intersection of Yelm Ave/First St with delays of LOS D overall. Other intersections are currently operating with delays of LOS A to LOS B. 8 TABLE 1 Existing Level of Service Delays given in seconds per vehicle Intersection Control Approach LOS Delay Wilkenson/Canal Stop Eastbound B 12.2 Northbound A 7.6 Wilkenson/N P Rd Stop Eastbound B 11.6 Northbound A 7.6 Rhoton/N P Rd Stop Westbound B 10.1 Southbound A 7.5 Rhoton/Railway Stop Westbound B 12.3 Southbound A 7.9 Yelm Ave/First St Signal Southbound D 40.6 Westbound D 49.3 Northbound D 44.0 Eastbound D 49.4 Overall D 44.7 D. Pedestrian and Bicycle Traffic Observations for pedestrian and bicycle activity were made during the vehicle count and during other visits to gather field information. Very little non-motorist activity was noted. Non-motorist volumes did not appear to have much influence on vehicle progression. E. Transit The nearest transit service available is on Yelm Avenue. Intercity Route 93 is a loop route h~-City of Yelm that provides service to Nisqually Plaza on SR-507. Route 93 _ runs on both Canal Rd and Wilkeson Rd, with service roughly from 8:30 AM to 6:30 PM. Some transit usage would likely be realized in the future with most project trips made via passenger car. No trip generation reductions were made for transit in order to have a conservative analysis. F. Sight Distance at Accesses Preliminary examinations of the proposed access locations onto Canal Road were made to determine whether or not adequate entering and stopping sight distance can be provided for inbound and outbound project traffic. Based on field reviews, it appears that the three accesses have sufficient available sight distance. No obstructions were noted which would affect exiting and entering the site. 9 IV. FUTURE TRAFFIC DEMAND A. Trip Generation Trip generation is used to determine the magnitude of project impacts on the surrounding street system. Data presented in this report was taken from the Institute of Transportation Engineer's publication Trip Generation, Seventh Edition. The designated land use for this project is defined by Single Family Detached Dwelling Units (LUC 210). Data for the 4 PM to 6 PM peak hour was used for future traffic estimations. Table 2 gives a summary of the estimated project trip generation. Included are the average weekday volume and the AM and PM peak hour volumes for the 80 proposed units. TABLE 2 Trip Generation Volumes 80 Single Family Dwelling Units Time Period Volume Average Weekday Traffic 847 vpd AM Peak Inbound 16 vph AM Peak Outbound 49 vph AM Peak Total 65 vph PM Peak Inbound 55 vph PM Peak Outbound 33 vph PM Peak Total 88 vph As shown in Table 2, approximately 25 percent fewer trips are expected for the AM peak hour versus the PM peak. This primarily results from the slightly greater number of personal and recreation trips. The overall peak in total traffic would most likely be realized during the evening peak period due to the~cornbination of heavy commuter traffic and larger evening project generated volumes. The anticipated inbound/outbound split for the critical PM peak is estimated at 63 percent entering and 37 percent exiting. B. Trip Distribution Pattern Trip distribution describes the process by which project generated trips are dispersed onto the street network surrounding the site. Site generated trips are expected to follow the trip pattern shown in Figure 4 on the following page. The direct access to the SR-507 corridor would draw most traffic in that direction with dispersing to the region from the intersection of 1st and Yelm. Some traffic would filter toward Tacoma and Pierce County via other roads not studied. As shown in Figure 4, the distribution is split with 20 percent southwesterly on SR-507, 30 percent easterly on SR-507, 10 percent contained within Yelm, and 40 percent northwesterly on SR-510. 10 / 0 0 o~ 40% 20% INBOUND: 55 VPH OUTBOUND: 33 VPH JULSON PLAT HEATH & ASSOCIATES, INC TRIP DISTRIBUTION -PROJECT TRAFFIC Transportation and Civil Engineering FIGURE 4 C. Peak Hour Volumes With and Without the Project Completion of this subdivision is expected by the year 2007, therefore, future traffic volumes for the 2007 horizon year were targeted and analyzed. Baseline 2007 peak hour volumes without the project were derived by applying a 3 percent growth rate per year to the existing volumes of Figure 3. The traffic from several pipeline projects (see Figure 5) were also added to the volume to reflect future 2007 traffic without the project The pipeline projects identified that will have an effect on the key intersections were Benum- Coyne Plat, 104th Avenue Plat, and Rhoton Industrial Plat. 2007 intersection volumes without the project (background growth plus pipeline volumes) are given in Figure 6, while 2007 volumes with the project are shown in Figure 7. D. Level of Service A level of service analysis was made of the future peak hour volumes with and without project generated trips added to the primary intersections and entrance nodes. Results for intersection delay conditions were determined again through the use of the HCM 2000 and Signa12000 programs. A summary of the analysis results is shown in Table 3. TABLE 3 Future 2007 Level of Service Delays given in seconds per vehicle Without Proiect With Proiect Intersection Control Geometry LOS Delay LOS Delay Wilkenson/Canal Stop Eastbound B 14.2 C 16.4 Northbound A 7.7 A 7.9 Wilkenson/NP Stop Eastbound B 13.9 C 16.3 Northbound A 7.8 A 7.9 Rhoton/NP Stop Westbound B 12.2 B 12.9 Southbound A 7.7 A 7.8 Rhoton/Railway Stop Westbound C 16.4 C 18.2 Southbound A 8.2 A 8.4 Yelm/First Signal Southbound D 44.9 D 46.4 Westbound E 59.0 E 65.6 Northbound D 49.3 D 49.1 Eastbound E 55.6 E 56.8 Overall D 50.8 D 52.6 CanaUEntrances Stop Southbound - - A 9.6 Eastbound - - A 7.4 The 2007 LOS analysis both with and without the project indicate some LOS D and LOS E delays for the Yelm Ave/First St intersection, with overall delays of LOS D. Other intersections are expected to be at LOS A to LOS C. Entrance delays should be LOS A. 12 JULSON PLAT HEATH & ASSOCIATES, INC Transportation and Civil Engineering PIPELINE VOLUMES FIGURE 5 / 17 198 65~ STOP 38~ JULSON PLAT HEATH & ASSOCIATES, INC 2007 PM PEAK HOUR VOLUMES WITHOUT PROJECT Transportation and Civil Engineering FIGURE 6 JULSON PLAT HEATH & ASSOCIATES, INC 2007 PM PEAKFIOURVOLUMESwITIiPROJECT Transportation and Civil Engineering FIGURE 7 E. Left Turn Lane Warrants Left turn lanes are a means of providing a necessary storage area for left turning vehicles at intersections. For atwo-lane or four-lane arterial with no left turn storage, delays are often created by vehicles waiting to complete the desired left turn movement. These turning vehicles typically block the heavier through movement, thereby causing some disruptions to traffic flow and subsequent congestion. Methods have been developed by various agencies to determine under what circumstances a left turn lane would be needed. For this impact study, procedures from the WSDOT Design Manual, Figure 910-8 would be used to ascertain storage requirements on Canal Road at the project entrances. Mild traffic presently exists on Canal Road and very little to no traffic for the project is expected to be coming from the north west into the plat. By inspection a left turn lane is not warranted on Canal Road at the project entrances. V. CONCL USIONS AND MITIGATION The Julson Plat project proposes to add 80 single-family residential lots. The site is located between Wilkenson Road and Canal Road in the City of Yelm. Access will be provided onto Canal Road. This project is expected to create an average of 847 residential trip movements during a typical weekday. An estimated 65 vehicle trips are associated with the AM peak hour and 88 trips with the PM peak hour. Several intersections were reviewed for LOS. Based on this review, some slight increases in delay maybe expected due to the addition of prof ect traffic. The high volume intersection of First StlYehn Ave would remain at LOS D overall. Sight distance at the project entrances appears to be adequate, based on a 25 mph speed limit but should meet city of Yelm requirements. A left turn lane is not warranted on Canal Road. Based on this analysis the following mitigation is identified: 1. Provide the city of Yelm mitigation fee for 88 PM peak hour trips. - - --- No other mitigation is identified. 16 JULSON PLAT RESIDENTIAL SUBDIVISION TRAFFIC IMPACT ANALYSIS APPENDIX 17 LEVEL OF SERVICE The following are excerpts from the 2000 Highway Capacity Manual -Transportation Research Board Special Report 209. Quality of service requires quantitative measures to characterize operational conditions within a traffic stream. Level of service (LOS) is a quality measure describing operational conditions within a traffic stream, generally in terms of such service measures as speed and travel time, freedom to maneuver, traffic interruptions, and comfort and convenience. Six LOS are defined for each type of facility that has analysis procedures available. Letters designate each level, from A to F, with LOS A representing the best operating conditions and LOS F the worst. Each level of service represents a range of operating conditions and the driver's perception of those conditions. Level-of-Service definitions The following definitions generally define the various levels of service for arterials. Level of service A represents primarily free-flow operations at average travel speeds, usually about 90 percent of the free-flow speed for the arterial classification. Vehicles are seldom impeded in their ability to maneuver in the traffic stream. Delay at signalized intersections is minimal. Level of service B represents reasonably unimpeded operations at average travel speeds, usually about 70 percent of the free-flow speed for the arterial classification. The ability to maneuver in the traffic stream is only slightly restricted and delays are not bothersome. Level of service C repr~t~`stable operations; however, ability to maneuver and change lanes in midblock locations maybe more restricted than in LOS B, and longer queues, adverse signal coordination, or both may contribute to lower average travel speeds of about 50 percent of the average free-flow speed for the arterial classification. Level of service D borders on a range in which small increases in flow may cause substantial increases in approach delay and hence decreases in arterial speed. LOS D may be due to adverse signal progression, inappropriate signal timing, high volumes, or some combination of these. Average travel speeds are about 40 percent offree-flow speed. Level of service E is characterized by significant delays and average travel speeds of one- third the free-flow speed or less. Such operations are caused by some combination of adverse progression, high signal density, high volumes, extensive delays at critical intersections, and inappropriate signal timing. 18 Level of service F characterizes arterial flow at extremely low speeds, from less than one- third to one-quarter of the free-flow speed. Intersection congestion is likely at critical signalized locations, with long delays and extensive queuing. These definitions are general and conceptual in nature, and they apply primarily to uninterrupted flow. Levels of service for interrupted flow facilities vary widely in terms of both the user's perception of service quality and the operational variables used to describe them. For each type of facility, levels of service are defined based on one or more operational parameters that best describe operating quality for the subject facility type. While the concept of level of service attempts to address a wide range of operating conditions, limitations on data collection and availability make it impractical to treat the full range of operational parameters for every type of facility. The parameters selected to define levels of service for each facility type are called "measures of effectiveness" or "MOE's", and represent available measures that best describe the quality of operation on the subject facility type. Each level of service represents a range of conditions, as defined by a range in the parameters given. Thus, a level of service is not a discrete condition, but rather a range of conditions for which boundaries are established. The following tables describe levels of service for signalized and unsignalized intersections. Level of service for signalized intersections is defined in terms of average control delay. Delay is a measure of driver discomfort, fiustration, fuel consumption and lost travel time, as well as time from movements at slower speeds and stops on intersection approaches as vehicles move up in queue position or slow down upstream of an intersection. Level of service for unsignalized intersections is determined by the computed or measured control delay and is determined for each minor movement. Signalized Intersections -Level of Service Control Delay per Level of Service Vehicle (sect A <_ 10 B >l0and<_20 C > 20 and <_ 35 D > 35 and <_55 E > 55 and <_ 80 F > 80 19 Unsignalized Intersections -Level of Service Level of Service A B C D E F Average Total Delay per Vehicle (sec) <_10 >l0and<_15 >15and<_25 >25 and <_35 >35 and <_50 > 50 As described in the 2000 Highway Capacity Manual, level of service breakpoints for all- way stop controlled (AWSC) intersections are somewhat different than the criteria used for signalized intersections. The primary reason for this difference is that drivers expect different levels of performance from distinct kinds of transportation facilities. The expectation is that a signalized intersection is designed to carry higher traffic volumes than an AWSC intersection. Thus a higher level of control delay is acceptable at a signalized intersection for the same level of service. AWSC Intersections -Level of Service Level of Service A B C D E F Average Total Delay per Vehicle (sec) <_10 >l0and<_15 >15and<_25 > 25 and <_35 >35and<_50 > 50 20 Summary of Trip Generation Calculation For 80 Dwelling Units of Single Family Detached Housing January 04, 2005 Average Standard Adjustment Driveway Rate Deviation Factor Vo lume Avg. Weekday 2-Way Volume 10.59 0.00 1.00 847 7-9 AM Peak Hour Enter 0.20 0.00 1.00 16 7-9 AM Peak Hour Exit 0.61 0.00 1.00 49 7-9 AM Peak Hour Total 0.82 0.00 1.00 65 4-6 PM Peak Hour Enter 0.69 0.00 1.00 55 4-6 PM Peak Hour Exit 0.41 0.00 1.00 -32-33 4-6 PM Peak Hour Total 1.10 0.00 1.00 88 AM Pk Hr, Generator, Enter 0.22 0.00 1.00 18 AM Pk Hr, Generator, Exit 0.63 0.00 1.00 50 AM Pk Hr, Generator, Total 0.85 0.00 1.00 68 PM Pk Hr, Generator, Enter 0.73 0.00 1.00 58 PM Pk Hr, Generator, Exit 0.41 0.00 1.00 33 PM Pk Hr, Generator, Total 1.14 0.00 1.00 91 Saturday 2-Way Volume 10.67 0.00 1.00 853 Saturday Peak Hour Enter 0.55 0.00 1.00 44 Saturday Peak Hour Exit 0.47 0.00 1.00 38 Saturday Peak Hour Total 1.03 0.00 1.00 82 Sunday 2-Way Volume 8.71 0.00 1.00 697 Sunday Peak Hour Enter 0.51 0.00 1.00 41 Sunday Peak Hour Exit 0.45 0.00 1.00 36 Sunday Peak Hour Total 0.96 0.00 1.00 77 Note: A zero indicates no data ava ilable. The above rates were calcula ted from these equatio ns: 24-Hr. 2-Way Volume: LN(T) _ .92 LN(X) + 2.71, R^2 = 0.96 7-9 AM Peak Hr. Total: T = .7(X) + 9.43 R^2 = 0.89 0.25 Enter, 0.75 Exit 4-6 PM Peak Hr. Total: LN(T) _ .9LN(X) + .53 R^2 = 0.91 0.63 Enter, 0.37 Exit AM Gen Pk Hr. Total: T = .7 (X) + 12.05 R^2 = 0.89 0.26 Enter, 0.74 Exit PM Gen Pk Hr. Total: LN(T) _ .89 LN(X) + .61 R^2 = 0.91 0.64 Enter, 0.36 Exit Sat. 2-Way Volume: LN(T) _ .94 LN(X) + 2.63, R^2 = 0.93 Sat. Pk Hr. Total: T = .89(X) + 10.93 R^2 = 0.9 0.54 Enter, 0.46 Exit Sun. 2-Way Volume: T = 8.83(X) + -9.76, R^2 = 0.94 Sun. Pk Hr. Total: LN(T) _ .89 LN(X) + .44 R^2 = 0.88 0.53 Enter, 0.47 Exit Source: Institute of Transportation Engineers Trip Generation, 7th Edition, 2003. TRIP GENERATION BY MICROTRANS Heath & Associates Inc. Transportation Division 2214 Tacoma Road Puyallup, WA 98371 Groups Printed- Unshifted File Name : untitled3 Site Code :00002289 Start Date :01/04/2005 Page No : 1 WILKENSON RD SE WILKENSON RD SE __ CANAL RD _ - Southbound Northbound Eastbound Start Time Ri ht Thru Left Ri ht Thru Left Ri ht Thru Left Int. Total _ Factor 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 04:00 PM 6 40 0 0 66 5 3 0 11 131 04:15 PM 3 39 0 0 65 0 14 0 21 142 04:30 PM 3 37 0 0 57 3 6 0 18 124 04:45 PM 4 34 0 0 57 3 13 0 11 122 Total 16 150 0 0 245 11 36 0 61 519 05:00 PM 7 25 0 0 63 1 4 0 26 126 05:15 PM 1 40 0 0 61 0 3 0 22 127 05:30 PM 5 35 0 0 53 1 6 0 15 115 05:45 PM 4 32 0 0 54 1 2 0 12 105 Total 17 132 0 0 231 3 15 0 75 473 Grand Total 33 282 0 0 476 14 51 0 136 992 Apprch % 10.5 89.5 0.0 0.0 97.1 2.9 27.3 0.0 72.7 Total % 3.3 28.4 0.0 0.0 48.0 1.4 5.1 0.0 13.7 Out In Total 612 315 927 33 282 Right Thru ~ 1 M H °" ro ~ North o n D J ~ C O ~ - ~ /4/2005 4:00:00 PM Z ~n ~ /4/2005 5:45:00 PM ~ v Urutafted 0 I Left Thru 14 476 0 490 823 ~ Out In Total WILKENSON RD SE Heath & Associates Inc. Transportation Division 2214 Tacoma Road Puyallup, WA 98371 File Name : untitled3 Site Code :00002289 Start Date : 01 /04/2005 Page No : 2 Southbound Northbound Eastbound Start Time Right Thru Left App' Right Thru Left App' Right Thru Left APP' Int. Total ~ Total Total Total I Peak Hour From 04:00 PM to 05:45 PM -Peak 1 of 1 Intersection 04:00 PM Volume 16 150 0 166 0 245 11 256 36 0 61 97 519 Percent 9.6 90.4 0.0 0.0 95.7 4.3 37.1 0.0 62.9 04:15 Volume 3 39 0 42 0 65 0 65 14 0 21 35 142 Peak Factor ~ 0.914 High Int. 04:00 PM 04:00 PM 04:15 PM Volume 6 40 0 46 0 66 5 71 14 0 21 35 Peak Factor 0.902 0.901 0.693 Out In Total ® 166 472 16 150 Right Thru ~' 1 N O F ~ North ~ r `O a~i ~ C T J z ~ ~, /4/2005 4:00:00 PM Q M ~ /4/2005 4:45:00 PM U ~ j N Unshdted e L ft Thru 11 245 I 186 256 442 Out In Total WILKENSON RD SE Heath & Associates Inc. Transportation Division 2214 Tacoma Road Puyallup, WA 98371 Grnuns Printed- Unshifted File Name : untitled1 Site Code :00002289 Start Date :12/28/2004 Page No : 1 i WILKENSON RD SE WILKENSON RD SE N P RD SE 1 Southbound Northbound Eastbound Start Time Ri ht Thru Left Ri ht Thru Left Ri ht Thru Left Int. Total ~ Factor 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 _ _ _ 04:00 PM 17 24 0 0 39 1 1 0 21 103 04:15 PM 17 34 0 0 36 1 1 0 32 121 04:30 PM 12 27 0 0 32 0 0 0 18 89 04:45 PM 12 24 0 0 35 0 1 0 26 98 Total 58 109 0 0 142 2 3 0 97 411 05:00 PM 13 35 0 0 26 1 0 0 25 100 05:15 PM 13 19 0 0 33 0 1 0 23 89 05:30 PM 13 23 0 0 25 0 0 0 30 91 05:45 PM 16 23 0 0 33 1 0 0 24 97 Total 55 100 0 0 117 2 1 0 102 377 Grand Total 113 209 0 0 259 4 4 0 199 788 Apprch % 35.1 64.9 0.0 0.0 98.5 1.5 2.0 0.0 98.0 Total % 14.3 26.5 0.0 0.0 32.9 0.5 0.5 0.0 25.3 Out In Total 458 322 780 113 209 Right Thru ~' 1 N ~~ r °M ~ North w ~ ~ ~ O J ~ ~ `" 12/28/2004 4:00:00 PM a ~ ~ 12/28/2004 5:45:00 PM z ~ Unstdited o~ e L ft Thru 4 259 213 263 476 Out In Total WILKENSON RD SE Heath & Associates Inc. Transportation Division 2214 Tacoma Road Puyallup, WA 98371 File Name : untitled1 Site Code :00002289 Start Date :12/28/2004 Page No : 2 ' WILKENSON RD SE WILKENSON RD SE N P RD SE 1 Southbound Northbound Eastbound _ I -- Start Time Right Thru Left Right Thru Left Right Thru Left t Ini pa~ ~ A Total Total i T o rea~c Hour rrom u4:uu rnn to uo:4~ rnn - reaK ~ or ~ Intersection 04:00 PM Volume 58 109 0 167 Percent 34.7 65.3 0.0 04:15 Volume 17 34 0 51 Peak Factor High Int. 04:15 PM Volume 17 34 0 51 Peak Factor 0.819 0 142 2 0.0 98.6 1.4 0 36 1 04:00 PM 0 39 1 Total ' 144 3 0 97 100 411 3.0 0.0 97.0 37 1 0 32 33 121 0.849 04:15 PM 40 1 0 32 33 0.900 0.758 ~ Out In Total 239 167 406 58 109 Right Thrv ~' 1 0 `~ T W o ~ ~~ Nosh O C O J s ~,, ~, 12/28/2004 4:00:00 PM a ~ 2/28/2004 4:45:00 PM z ~ 5 ~ Urutuked O I Left Thru 2 142 112 144 256 Out In Total WILKENSON RD SE Heath & Associates Inc. Transportation Division 2214 Tacoma Road Puyallup, WA 98371 Grou s Printed- Unshifted File Name : untitled1 Site Code :00002289 Start Date :12/30/2004 Page No : 1 RHOTON RD N P RD SE RHOTON RD Southbound Westbound Northbound Start Time Ri ht Thru Left Ri ht Thru Left Ri ht Thru Left Int. Total ' Factor 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 _ 04:00 PM 0 12 0 0 0 16 20 9 0 _ 57 04:15 PM 0 15 1 0 0 23 22 11 0 72 04:30 PM 0 16 0 1 0 18 22 18 0 75 04:45 PM 0 17 2 0 0 20 24 8 0 71 Total 0 60 3 1 0 77 88 46 0 275 05:00 PM 0 8 0 0 0 20 21 15 0 64 05:15 PM 0 3 0 0 0 17 31 12 0 63 05:30 PM 0 10 0 1 0 15 21 17 0 64 05:45 PM 0 11 0 0 0 27 35 14 0 87 Total 0 32 0 1 0 79 108 58 0 ~ 278 Grand Total 0 92 3 2 0 156 196 104 0 553 Apprch % 0.0 96.8 3.2 1.3 0.0 98.7 65.3 34.7 0.0 Total % 0.0 16.6 0.5 0.4 0.0 28.2 35.4 18.8 0.0 Out In Total 106 95 201 92 3 Thru Left 1 '~ ~ C T North 'O .• Z .Jw _ ~ 2/30/2004 4:00:00 PM N N ~ o 2/30/2004 5:45:00 PM r °o ~x ~ m Unshifted ~ 0 N V - T r Thru Ri ht 104 196 248 300 Out In Total RH TON RD Heath & Associates Inc. Transportation Division 2214 Tacoma Road Puyallup, WA 98371 File Name : untitled1 Site Code :00002289 Start Date :12/30/2004 Page No : 2 RHOTON RD Southbound N P RD SE Westbound RHOTON RD Northbound ' Start Time Right Thru Left T ta Right Thru Left ota Right Thru Left Int. Total l o T l Total - ak Hour From 04:00 PM to 05:45 PM -Peak 1 of 1 - -_ . _ _ Intersection 04:15 PM I Volume 0 56 3 59 1 0 81 82 89 52 0 141 282 Percent 0.0 94.9 5.1 1.2 0.0 98.8 63.1 36.9 0.0 04:30 Volume 0 16 0 16 1 0 18 19 22 18 0 40 75 Peak Factor 0.940 High Int. 04:45 PM 04:15 PM 04:30 PM ~ Volume 0 17 2 19 0 0 23 23 22 18 0 40 Peak Factor 0.776 0.891 0.881 Out In Total 53 59 112 56 3 Thru Left 1 '~ T N.. North * ~ ~' z s v 2/30/2004 4:15:00 PM ~ ~ o 2/30/2004 5:00:00 PM m N ~ ,fix m Unshifted ,i 0 ~ lu A Thru Ri ht 52 89 137 141 278 Out In Total RHOTON RD Heath & Associates Inc. Transportation Division 2214 Tacoma Road Puyallup, WA 98371 (;rnnns Printari- l lnshiffart File Name : untitled2 Site Code :00002289 Start Date : 01 /03/2005 Page No : 1 RHOTON RD RAILWAY RD SE 1ST ST NE Southbound Westbound Northbound Start Time Ri ht Thru Left Ri ht Thru Left Ri ht Thru Left Int. Total Factor 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 04:00 PM 0 29 1 2 0 19 22 30 0 103 04:15 PM 0 32 4 2 0 20 12 33 0 103 04:30 PM 0 39 4 0 0 11 19 26 0 I 99 04:45 PM 0 44 0 2 0 14 14_ __ ___ 38 __ __ 0 i _ _ __ _ _ 1_12 _ Total 0 _ 144 9 6 0 64 67 127 0 ~ 417 05:00 PM 0 20 4 1 0 8 25 50 0' 108 05:15 PM 0 21 1 2 0 11 18 37 0 90 05:30 PM 0 20 1 1 0 9 15 33 0 79 05:45 PM 0 18 3 1 0 15 17 36 0 90 Total 0 79 9 5 0 43 75 156 0 367 Grand Total 0 223 18 11 0 107 142 283 0 784 Apprch % 0.0 92.5 7.5 9.3 0.0 90.7 33.4 66.6 0.0 Total % 0.0 28.4 2.3 1.4 0.0 13.6 18.1 36.1 0.0 Out In Total ® 241 535 223 18 Thru Left 1 ~ ~~ T North ° ~ ~ ~~ ~ /3/2005 4:00:00 PM -~ S D /3/2005 5:45:00 PM m , ~ ~x ~ v Urutafted ~ 0 V tit OD - Thru Ri ht 283 142 ® 425 755 Out In Total 1 T T NE Heath & Associates Inc. Transportation Division 2214 Tacoma Road Puyallup, WA 98371 File Name : untitled2 Site Code :00002289 Start Date : 01 /03/2005 Page No : 2 RHOTON RD RAILWAY RD SE 1ST ST NE -, Southbound Westbound Northbound Start Time Right Thru Left Right Thru Left T ta Right Thru Left Int. Total ' Total o l . Total reaK rlour rrom u4:uu rnn ro u5:4o rnn - reaK ~ or ~ Intersection 04:15 PM Volume 0 135 12 147 5 0 53 58 70 147 0 2171 422 Percent 0.0 91.8 8.2 8.6 0.0 91.4 32.3 67.7 0.0 04:45 Volume 0 44 0 44 2 0 14 16 14 38 0 52 112 Peak Factor 10.942 High Int. 04:45 PM 04:15 PM 05:00 PM Volume 0 44 0 44 2 0 20 22 25 50 0 75 Peak Factor 0.835 0.659 0.723 Out In Total 152 147 299 135 12 Ttxu Left 1 '~ N~ N ~ s " "' /3/2005 4:15:00 PM N g { /3/2005 5:00:00 PM r m ~ ~~ W ~ Urutufted m o c A pl O _ TMu Ri ht 147 70 188 217 405 Out In Total 1ST ST NE Heath & Associates Inc. Transportation Division 2214 Tacoma Road Puyallup, WA 98371 Grouns Printed- Unshifted File Name : untitled1 Site Code :00002289 Start Date : 11 /10/2004 Page No : 1 YELM AVE 1 ST AVE SE YELM AVE T 1ST AVE SE Southbound Westbound Northbound Eastbound Start Time Ri ht Thru Left Ri ht Thru Left Ri ht Thru Left l Ri ht Thru Left , Factor 1.0 1.0 1.0 1.0 1.0 1.0 1.0 I 1.0 1.0 _ _1.0 _ _1.0 1.0 __ - . _ 04:00 PM 11 124 23 26 15 20 8 116 50 44 16 44 04:15 PM 20 131 29 22 19 12 8 129 49 44 24 36 04:30 PM 9 123 24 21 14 10 4 125 42 46 17 52 0 4 :45 PM 11 132 17 25 21 15 8 _ 126 44 42 15 __ _ 55 ___ _ _ Total 51 510 93 94 _ 69 57 28 496 185 176 72 187 05:00 PM 11 116 49 20 12 15 7 118 38 ' 45 27 50 05:15 PM 12 127 23 25 13 21 3 132 56 50 10 43 05:30 PM 11 136 25 16 9 15 ~ 13 118 39 49 26 48 :4 5 PM 0 5 17 125 29 12 15 18 9 128 45 54 17 49 _ _ __ _ Total 51 504 126 73 49 69 32 496 178 198 80 190 3rand Total 102 1014 219 167 118 126 60 992 363 374 152 377; Apprch % 7.6 76.0 16.4 40.6 28.7 30.7 4.2 70.1 25.7 41.4 16.8 41.7 Total % 2.5 25.0 5.4 4.1 2.9 3.1 1.5 24.4 8.9 9.2 3.7 9.3 ' Out In Total 1536 1335 2871 102 1014 219 Right Thru Left ~' 1 ~- o "~' ~~ North t a m w O T w ,. ~ ~ °i ~ r- 11/10/20044:00:00 PM ~~ ~, _ __ ~ g ~ ~ ~ 11/10/2004 5:45:00 PM ~ m ~ ~ m o ~ M ~ Unshifted ~ ~ ~ ~ ~~ I I Left Thru Ri ht 363 992 60 1514 1415 2929 Out In Total YELM AVE Int. Total 497 523 487 511 2018 508 515 505 518 2046 4064 Heath & Associates Inc. Transportation Division 2214 Tacoma Road Puyallup, WA 98371 File Name : untitled1 Site Code :00002289 Start Date : 11 /10/2004 Page No : 2 YELM AVE 1ST AVE SE YELM AVE ; 1ST AVE SE Southbound Westbound Northbound ' Eastbo tart Time ~ Ri ht g - hru eft otal I ht g hru _ eft Total 'g RI ht hru eft otal g ~ Ri ht Thru ~ ~ Left App. Total Int. Total Peak Hour From 04:00 PM to 05:45 PM -Peak 1 of 1 _ __-- --- -- ___ - - _ Intersection 05:00 PM Volume 51 504 126 681 73 49 69 191 32 496 178 7061 198 80 190 468 2046 Percent 7.5 74.0 18.5 38.2 25.7 36.1 4.5 70.3 25.2 42.3 17.1 40.6 05:45 Volume 17 125 29 171 12 15 18 45 9 128 45 1821 54 17 49 120 518 Peak Factor I 0.987 High Int. 05:00 PM 05:15 PM 05:15 PM 05:30 PM Volume 11 116 49 176 25 13 21 59 3 132 56 191 49 26 48 123 Peak Factor 0.967 0.809 0.924 0.951 Out In Total 759 681 1440 51 504 126 Right Thru Left '~ 1 ~' ~a o~ t O w ~ North ~ ~ 0D .. ~, j c a ro L- 11/10/2004 5:00:00 PM ~--~ ~ D ~ ~ ~ 11/10/2004 5:45:00 PM 2 ~ ~ m ao O N ~ ~ Uruhiked ,~~ rn ~ m 0 fD N 6{ f0 - I '-1 T r Left Thru Ri ht 178 496 32 i ' 771 706 1477 Out In Total YELM AVE TWO-WAY STOP CONTROL SUMMARY eneral Information ite Information nalyst gency/Co. Date Performed nal sis Time Period Intersection urisdiction nalysis Year ~Ikenson Rd & Canal Rd Pro'ect Descri tion EXISTING PM PEAK HOUR VOLUMES East/West Street: Canal Road North/South Street: Wilkenson Road SE Intersection Orientation: North-South tud Period hrs : 0.25 ehicle Volumes and Ad'ustments a'or Street Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R olume 11 245 0 0 150 16 Peak-Hour Factor, PHF 0.90 0.90 1.00 1.00 0.90 0.90 Hourly Flow Rate, HFR 12 272 0 0 166 17 Percent Heavy Vehicles 1 -- -- 0 -- -- Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 onfiguration LT TR U stream Si nal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R olume 0 0 0 61 0 36 Peak-Hour Factor, PHF 1.00 1.00 1.00 0.69 1.00 0.69 Hourly Flow Rate, HFR 0 0 0 88 0 52 Percent Heavy Vehicles 0 0 0 1 0 1 Percent Grade (%) 0 0 Flared Approach N N torage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 onfiguration LR Dela Queue Len th, and Level of Service proach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 12 140 (m)(vph) 1398 637 lc 0.01 0.22 5% queue length 0.03 0.83 ontrol Delay 7.6 12.2 LOS A B proach Delay -- -- 12.2 pproach LOS -- -- 8 Rights Reserved HCSJ000~~~ Copyright r 2003 University of Florida, All Rights Reserved Version 41d Version 4.Id TWO-WAY STOP CONTROL SUMMARY eneral Information ite Information nalyst gency/Co. Date Performed nal sis Time Period Intersection urisdiction nalysis Year ~Ikenson Rd & Canal Rd Pro'ect Descri tion 2007 PM PEAK HOUR VOLUMES WITHOUT PROJECT East/West Street: Canal Road North/South Street: Wilkenson Road SE Intersection Orientation: North-South tud Period hrs : 0.25 ehicle Volumes and Ad'ustments a'or Street Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R olume 12 330 0 0 198 17 Peak-Hour Factor, PHF 0.90 0.90 1.00 1.00 0.90 0.90 Hourly Flow Rate, HFR 13 366 0 0 220 18 Percent Heavy Vehicles 1 -- -- 0 -- -- Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 onfiguration LT TR U stream Si nal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R olume 0 0 0 65 0 38 Peak-Hour Factor, PHF 1.00 1.00 1.00 0.69 1.00 0.69 Hourly Flow Rate, HFR 0 0 0 94 0 55 Percent Heavy Vehicles 0 0 0 1 0 1 Percent Grade (%) 0 0 Flared Approach N N torage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 onfiguration LR Dela Queue Len th and Level of Service proach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 13 149 (m)(vph) 1335 538 lc 0.01 0.28 5% queue length 0.03 1.12 ontrol Delay 7.7 14.2 LOS A 8 pproach Delay -- -- 14.2 pproach LOS -- -- 8 HCSI000~>~ Copyright ,z 2003 University of Florida, All Rights Reserved Version 4.Id TWO-WAY STOP CONTROL SUMMARY eneral Information ite Information nalyst gency/Co. Date Performed al sis Time Period Intersection urisdiction nalysis Year Wlkenson Rd & Canal Rd Pro'ect Descri tion 2007 PM PEAK HOUR VOLUMES WITH PROJECT East/West Street: Canal Road orthJSouth Street: Wilkenson Road SE Intersection Orientation: North-South tud Period hrs : 0.25 ehicle Volumes and Ad'ustments Ma'or Street Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R olume 67 330 0 0 198 17 Peak-Hour Factor, PHF 0.90 0.90 1.00 1.00 0.90 0.90 ourly Flow Rate, HFR 74 366 0 0 220 18 Percent Heavy Vehicles 1 -- -- 0 -- -- Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 onfiguration LT TR U stream Si nal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R olume 0 0 0 65 0 71 Peak-Hour Factor, PHF 1.00 1.00 1.00 0.69 1.00 0.69 Hourly Flow Rate, HFR 0 0 0 94 0 102 Percent Heavy Vehicles 0 0 0 1 0 1 Percent Grade (%) 0 0 Flared Approach N N forage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 onfiguration LR Dela Queue Len th and Level of Service pproach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 74 196 (m)(vph) 1335 510 /c 0.06 0.38 5% queue length 0.18 1.79 ontrol Delay 7.9 16.4 LOS A C pproach Delay -- -- 16.4 pproach LOS -- -- C HCS?000~~~ Copyright c 2003 University of Florida, All Rights Reserved Version 4.Id TWO-WAY STOP CONTROL SUMMARY General Information Site Information nalyst gency/Co. Date Performed al sis Time Period Intersection urisdiction nalysis Year Wilkenson Rd & NP Rd Pro ect Descri lion EXISTING PM PEAK HOUR VOLUMES East/West Street: N P Road SE North/South Street: Wilkenson Road SE Intersection Orientation: North-South tud Period hrs : 0.25 ehicle Volumes and Ad'ustments Ma'or Street Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R olume 2 142 93 7 109 58 Peak-Hour Factor, PHF 0.90 0.90 1.00 1.00 0.82 0.82 Hourly Flow Rate, HFR 2 157 0 0 132 70 Percent Heavy Vehicles 1 -- -- -- -- Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 onfiguration LT TR U stream Si nal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R olume 0 0 0 97 0 3 Peak-Hour Factor, PHF 1.00 1.00 1.00 0.76 1.00 0.76 Hourly Flow Rate, HFR 0 0 0 127 0 3 Percent Heavy Vehicles 1 1 Percent Grade (%) 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 onfiguration LR Dela Queue Len th and Level of Service pproach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 2 130 (m)(vph) 1376 671 /c 0.00 0.19 5% queue length 0.00 0.71 ontrol Delay 7.6 11.6 LOS A 8 pproach Delay -- -- 11.6 pproach LOS -- -- 8 HCS'OOOr>~ Copyright c 2003 University of Florida, All Rights Reserved Version 4 Id TWO-WAY STOP CONTROL SUMMARY General Information Site Information nalyst gency/Co. Date Performed al sis Time Period Intersection urisdiction nalysis Year ~Ikenson Rd & NP Rd Pro'ect Descri tion 2007 PM PEAK HOUR VOLUMES WITHOUT PROJECT East/West Street: N P Road SE North/South Street: Wilkenson Road SE Intersection Orientation: North-South tud Period hrs : 0.25 ehicle Volumes and Ad'ustments Ma'or Street Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R olume 2 172 93 7 128 89 Peak-Hour Factor, PHF 0.90 0.90 1.00 1.00 0.82 0.82 Hourly Flow Rate, HFR 2 191 0 0 156 108 Percent Heavy Vehicles 1 -- -- -- -- Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 onfiguration LT TR U stream Si nal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R olume 0 0 0 152 0 3 eak-Hour Factor, PHF 1.00 1.00 1.00 0.76 1.00 0.76 Hourly Flow Rate, HFR 0 0 0 200 0 3 Percent Heavy Vehicles 1 1 Percent Grade (%) 0 0 Flared Approach N N torage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 onfiguration LR Dela Queue Len th and Level of Service pproach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 2 203 (m)(vph) 1306 605 lc 0.00 0.34 5% queue length 0.00 1.47 ontrol Delay 7.8 13.9 LOS A 8 pproach Delay -- -- 13.9 pproach LOS -- -- 8 Rights Reserved HCS1000~T~ Copyright c 2003 University of Florida, All Rights Reserved Version 4.Id Version 4.Id TWO-WAY STOP CONTROL SUMMARY eneral Information ite Information nalyst gency/Co. Date Performed nal sis Time Period Intersection urisdiction nalysis Year Wlkenson Rd & NP Rd Pro'ect Descri tion 2007 PM PEAK HOUR VOLUMES WITH PROJECT East/West Street: N P Road SE North/South Street: Wilkenson Road SE Intersection Orientation: North-South tud Period hrs : 0.25 ehicle Volumes and Ad'ustments a'or Street Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R olume 2 188 93 7 138 112 Peak-Hour Factor, PHF 0.90 0.90 1.00 1.00 0.82 0.82 Hourly Flow Rate, HFR 2 208 0 0 168 136 Percent Heavy Vehicles 1 -- -- -- -- Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 onfiguration LT TR U stream Si nal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R olume 0 0 0 191 0 3 Peak-Hour Factor, PHF 1.00 1.00 1.00 0.76 1.00 0.76 Hourly Flow Rate, HFR 0 0 0 251 0 3 Percent Heavy Vehicles 1 1 Percent Grade (%) 0 0 Flared Approach N N torage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 onfiguration LR Dela ,Queue Len th and Level of Service proach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 2 254 (m)(vph) 1263 571 lc 0.00 0.44 5% queue length 0.00 2.27 ontrol Delay 7.9 16.3 LOS A C pproach Delay -- -- 16.3 pproach LOS -- -- C Rights Reserved HCS7000~>~ Copyright r 2003 University of Florida, All Rights Reserved Version 4.Id Version 4.Id TWO-WAY STOP CONTROL SUMMARY eneral Information rte Information nalyst gency/Co. Date Performed nal sis Time Period Intersection urisdiction nalysis Year Rhoton Rd & NP Rd Pro'ect Descri lion EXISTING PM PEAK HOUR VOLUMES East/West Street: N P Road SE North/South Street: Rhoton Road Intersection Orientation: North-South tud Period hrs : 0.25 ehicle Volumes and Ad'ustments Ma'or Street Northbound Southbound ovement 1 2 3 4 5 6 L T R L T R olume 0 52 89 3 56 0 Peak-Hour Factor, PHF 1.00 0.88 0.88 0.78 0.78 1.00 Hourly Flow Rate, HFR 0 59 101 3 71 0 Percent Heavy Vehicles 0 -- -- 1 -- -- Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 onfiguration TR LT U stream Si nal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R olume 81 0 1 0 0 0 Peak-Hour Factor, PHF 0.89 1.00 0.89 1.00 1.00 1.00 Hourly Flow Rate, HFR 91 0 1 0 0 0 Percent Heavy Vehicles 1 0 1 0 0 0 ercent Grade (%) 0 0 Flared Approach N N torage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 nfiguration LR Dela Queue Len th and Level of Service proach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 3 92 (m)(vph) 1425 803 lc 0.00 0.11 5% queue length 0.01 0.39 ontrol Delay 7.5 10.1 LOS A 8 pproach Delay -- -- 10.1 pproach LOS -- -- 8 Rights Reserved HCS?000~~~ Copyright C. 200} University of Florida, All Rights Reserved Version 4.Id Version 4.Id TWO-WAY STOP CONTROL SUMMARY eneral Information Site Information nalyst gency/Co. Date Performed nal sis Time Period Intersection urisdiction nalysis Year Rhoton Rd & NP Rd Pro'ect Descri tion 2007 PM PEAK HOUR VOLUMES WITHOUT PROJECT East/V1/est Street: N P Road SE North/South Street: Rhoton Road Intersection Orientation: North-South tud Period hrs : 0.25 ehicle Volumes and Ad'ustments Ma'or Street Northbound Southbound Movement 1 2 3 4 5 g L T R L T R olume 0 81 143 3 154 0 Peak-Hour Factor, PHF 1.00 0.88 0.88 0.78 0.78 1.00 Hourly Flow Rate, HFR 0 92 162 3 197 p Percent Heavy Vehicles 0 -- __ 1 __ __ Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 onfiguration TR LT U stream Si nal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R olume 113 0 1 0 0 0 Peak-Hour Factor, PHF 0.89 1.00 0.89 1.00 1.00 1.00 Hourly Flow Rate, HFR 126 0 1 0 0 0 Percent Heavy Vehicles 1 0 1 0 0 0 Percent Grade (%) 0 0 Flared Approach N N torage p 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 onfiguration LR Dela Queue Len th and Level of Service proach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vPh) 3 127 (m)(vPh) 1317 627 lc 0.00 0.20 5% queue length 0.01 0.75 ontrol Delay 7.7 12.2 LOS A 8 pproach Delay -- __ 12 2 pproach LOS -- __ g r.~~nw nwct vcti NCSI000~>~ Copyright :c 2003 University of Florida, All Rights Reserved Version 4. I d Version 4.Id TWO-WAY STOP CONTROL SUMMARY General Information ite Information nalyst gency/Co. Date Performed nal sis Time Period Intersection urisdiction nalysis Year Rhoton Rd 8 NP Rd Pro'ect Descri tion 2007 PM PEAK HOUR VOLUMES WITH PROJECT East/West Street: N P Road SE orth/South Street: Rhoton Road Intersection Orientation: North-South tud Period hrs : 0.25 ehicle Volumes and Ad'ustments Ma'or Street Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R olume 0 81 182 3 154 0 Peak-Hour Factor, PHF 1.00 0.88 0.88 0.78 0.78 1.00 Hourly Flow Rate, HFR 0 92 206 3 197 0 Percent Heavy Vehicles 0 -- -- 1 -- -- Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 onfiguration TR LT U stream Si nal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R olume 136 0 1 0 0 0 Peak-Hour Factor, PHF 0.89 1.00 0.89 1.00 1.00 1.00 Hourly Flow Rate, HFR 152 0 1 0 0 0 Percent Heavy Vehicles 1 0 1 0 0 0 Percent Grade (%) 0 0 Flared Approach N N torage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 onfiguration LR Dela Queue Len th, and Level of Service proach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 3 153 (m)(vph) 1269 609 lc 0.00 0.25 5% queue length 0.01 0.99 ontrol Delay 7.8 12.9 LOS A 8 pproach Delay -- -- 12.9 pproach LOS -- -- 8 HCS'000~*~ Copyright ~~ 2003 University of Florida, All Rights Reserved Version 4. 1 d TWO-WAY STOP CONTROL SUMMARY General Information ite Information nalyst gency/Co. Date Performed nal sis Time Period Intersection urisdiction nalysis Year Rhoton Rd & Railway Rd Pro~ect Descri tion EXISTING PM PEAK HOUR VOLUMES East/West Street: Railwa Road North/South Street: Rhoton Road/S First Street Intersection Orientation: North-South tud Period hrs : 0.25 ehicle Volumes and Ad'ustments Ma'or Street Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R olume 0 147 70 12 135 0 Peak-Hour Factor, PHF 0.90 0.72 0.72 0.84 0.84 0.90 Hourly Flow Rate, HFR 0 204 97 14 160 0 Percent Heavy Vehicles 0 -- -- 2 -- -- Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 onfiguration TR LT U stream Si nal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R olume 53 0 5 0 0 0 Peak-Hour Factor, PHF 0.66 0.90 0.66 0.90 0.90 0.90 Hourly Flow Rate, HFR 80 0 7 0 0 0 Percent Heavy Vehicles 2 0 2 0 0 0 Percent Grade (%) 0 0 Flared Approach N N Storage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 onfiguration LR Dela Queue Len th and Level of Service proach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 14 87 (m)(vph) 1260 581 lc 0.01 0.15 5% queue length 0.03 0.52 ontrol Delay 7.9 12.3 LOS A B pproach Delay -- -- 12.3 pproach LOS -- -- B 1/CS'000~>~ Copyright :C 2003 University o(Florida, All Rights Reserved Version 4.Id TWO-WAY STOP CONTROL SUMMARY General Information Site Information nalyst gency/Co. Date Performed al sis Time Period Intersection urisdiction nalysis Year Rhoton Rd & Railway Rd Pro'ect Descri tion 2007 PM PEAK HOUR VOLUMES WITHOUT PROJECT East/West Street: Railwa Road North/South Street: Rhoton Road/S First Street Intersection Orientation: North-South tud Period hrs : 0.25 ehicle Volumes and Ad'ustments Ma'or Street Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R olume 0 231 74 13 265 0 Peak-Hour Factor, PHF 0.90 0.72 0.72 0.84 0.84 0.90 Hourly Flow Rate, HFR 0 320 102 15 315 0 Percent Heavy Vehicles 0 -- -- 2 -- -- Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 onfiguration TR LT U stream Si nal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R olume 56 0 5 0 0 0 Peak-Hour Factor, PHF 0.66 0.90 0.66 0.90 0.90 0.90 Hourly Flow Rate, HFR 84 0 7 0 0 0 Percent Heavy Vehicles 2 0 2 0 0 0 Percent Grade (%) 0 0 Flared Approach N N torage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 onfiguration LR Dela Queue Len th and Level of Service pproach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 15 91 (m)(vph) 1137 405 lc 0.01 0.22 5% queue length 0.04 0.85 ontrol Delay 8.2 16.4 LOS A C pproach Delay -- -- 16.4 pproach LOS -- -- C HCS'000~>~ Copyright r 2003 University of Florida, All Rights Reserved Version 4 I d TWO-WAY STOP CONTROL SUMMARY eneral Information Site Information nalyst gency/Co. Date Performed nal sis Time Period Intersection urisdiction nalysis Year Rhoton Rd & Railway Rd Pro'ect Descri tion 2007 PM PEAK HOUR VOLUMES WITH PROJECT East/West Street: Railwa Road North/South Street: Rhoton Road/S First Street Intersection Orientation: North-South tud Period hrs : 0.25 ehicle Volumes and Ad'ustments Ma'or Street Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R olume 0 270 74 13 288 0 Peak-Hour Factor, PHF 0.90 0.72 0.72 0.84 0.84 0.90 Hourly Flow Rate, HFR 0 374 102 15 342 0 Percent Heavy Vehicles 0 -- -- 2 -- -- Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 onfiguration TR LT U stream Si nal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R olume 56 0 5 0 0 0 Peak-Hour Factor, PHF 0.66 0.90 0.66 0.90 0.90 0.90 Hourly Flow Rate, HFR 84 0 7 0 0 0 Percent Heavy Vehicles 2 0 2 0 0 0 Percent Grade (%) 0 0 Flared Approach N N torage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 onfiguration LR Dela Queue Len th and Level of Service proach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration ~ LT LR (vph) 15 91 (m)(vph) 1086 363 lc 0.01 0.25 5% queue length 0.04 0.98 ontrol Delay 8.4 18.2 LOS A C pproach Delay -- -- 18.2 pproach LOS -- -- C HCS7000~~~ Copyright S 2003 University of Florida, All Rights Reserved Version 4.Id JULSON PLAT YELM AVE & SR-507 EXISTING PM PEAK HOUR VOLUMES 01/05/05 13:08:49 SIGNAL2000/TEAPAC[Ver 1.10.10] - HCM Input Worksheet Intersection # 0 - Area Location Type: NONCBD I I I II I 51 I 504 I 126 II 112.0 112.0 112.0 II I 1 1 1 1 1 II I I I II \ ------------- / I \ 190 12.0 1 / 80 12.0 1 -- ---------- 198 ---------- ------ 0.0 ------ --- 0 --- \ - I I I RT + / I Key: VOLUMES -- > I I WIDTHS I v LANES -------------------- --73 0.0 0 --------------- /I\ 49 12.0 1 i ------------------- I 69 12.0 1 North ___--______=_____= I \ I / II 178 I 496 I 32 ( Phasing: SEQUENCE 46 II 12.0 112.0 112.0 I PERMSV N N N N I I 1 1 1 1 1 1 OVERLP N N N N II I I I LEADLAG LD LD SB WB NB EB TH LT RT TH LT RT TH LT RT TH LT Heavy veh, ~HV 1.0 1.0 1.0 Pk-hr fact, PHF .97 .97 .97 Pretimed or Act A A A Strtup lost, 11 2.0 2.0 2.0 Ext eff grn, a 2.0 2.0 2.0 Arrival typ, AT --------------- 3 ----- 3 ----- 3 ---- Ped vol, vped 0 Bike vol, vbic 0 Parking locates NO Park mnvrs, Nm 0 Bus stops, NB 0 Grade, ~G .0 1.0 1.0 1.0 .81 .81 .81 A A A 2.0 2.0 2.0 2.0 2.0 2.0 3 3 3 ----- ----- 0 ---- 0 NO 0 0 .0 1.0 1.0 1.0 .92 .92 .92 A A A 2.0 2.0 2.0 2.0 2.0 2.0 3 3 3 -------------- 0 0 .....~,0 0 0 .0 2.0 2.0 2.0 .95 .95 .95 A A A 2.0 2.0 2.0 2.0 2.0 2.0 3 3 3 ------ ---- 0 ---- 0 ..._ . NO 0 0 .0 ------------------------------------------------------------------------- Sq 46 I Phase 1 1 Phase 2 1 Phase 3 1 Phase 4 1 Phase 5 1 Phase 6 1 I + I++ I I I I 1 • I + I++ I I I ++++I I I I I v I **** I I i I I I I I++++ v I**** I I I North I <* I *+>I I++++> I****> I I I I * I *+ I I++++ I**** I I I * I *+ I I v I v I I ------------------------------------------------------------------------- C=120"I G= 20.7" I G= 42.3" I G= 12.1" I G= 4.8" I G= 20.1" I G= 0.0" ( I Y+R= 4.0" I Y+R= 4.0" I Y+R= 4.0" I Y+R= 4.0" ( Y+R= 4.0" I Y+R= 0.0" I ------------------------------------------------------------------------- JULSON PLAT YELM AVE & SR-507 EXISTING PM PEAK HOUR VOLUMES SIGNAL2000/TEAPAC[Ver 1.10.10] - HCM Volume Adjust & Satflow Worksheet Volume Adjustment Volume, V Pk-hr fact, PHF Adj my flow, vp --------------- Lane group, LG Adj LG flow, v Prop LT, PLT Prop RT, PRT --------------- Saturation Flow Rate Base satflo, so Number lanes, N Lane width, fW Heavy veh, fHV Grade, fg Parking, fp Bus block, fbb Area type, fa Lane util, fLU Left-turn, fLT Right-turn, fRT PedBike LT,fLpb PedBike RT,fRpb Local adjustmnt Adj satflow, s SB RT TH LT 51 504 126 .97 .97 .97 53 520 130 -------------- RT TH LT 53 520 130 .000 .000 1.00 1.000 .000 .000 -------------- SB RT TH LT 1900 1 1.000 .990 1.000 1.000 1.000 1.000 1.000 1.000 .850 1.000 1.000 1.000 1599 1900 1900 1 1 1.00 1.00 .990 .990 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 .950 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1881 1787 WB NB RT TH LT RT TH LT 73 49 69 32 496 178 .81 .81 .81 .92 .92 .92 90 ---- 60 ------ 85 ---- 35 ----- 539 ----- 193 RT+TH LT RT TH ---- LT 150 85 35 539 193 .000 1.00 .000 .000 1.00 ---- .600 ------ .000 ---- 1.000 ----- .000 ----- .000 ---- WB RT TH 1900 1 1.000 .990 1.000 1.000 1.000 1.000 1.000 1.000 .910 1.000 1.000 1.000 1712 SIGNAL2000/TEAPAC[Ver 1.10.10] - HCM Capacity and LOS Worksheet Capacity Analysis Lane group, LG Adj Flow, v Satflow, s Lost time, tL Effect green, g Grn ratio, g/C LG capacity, c v/c ratio, X Flow ratio, v/s Crit lane group --------------- Sum Grit v/s,Yc Crit v/c, Xc SB RT TH LT RT TH LT 53 520 130 1599 1881 1787 4.0 4.0 4.0 42.3 42.3 20.7 .352 .352 .172 563 663 308 .094 .784 .422 .033 .276 .073 -------------- 0.618 .713 WB RT TH RT+T1 150 1712 4.0 20.1 .168 287 .523 .088 -------------- -------------- Total lost, L 16.0 LT 1900 1 1.00 .990 1.00 1..00 1.00 1.00 1.00 .950 1.00 1.00 1.00 1.00 1787 LT LT 85 1787 4.0 12.1 .101 180 .472 .048 RT 1900 1 1.000 .990 1.000 1.000 1.000 1.000 1.000 1.000 .850 1.000 1.000 1.000 1599 RT RT 35 1599 4.0 42.3 .352 563 .062 .022 NB TH LT 1900 1900 1 1 1.00 1.00 .990 .990 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 .950 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1881 1787 NB TH LT TH LT 539 193 1881 1787 4.0 4.0 42.3 20.7 .352 .172 663 308 .813 .627 .287 .108 01/05/05 13:08:49 EB RT TH LT 198 80 190 .95 .95 .95 208 ---- 84 ------ 200 RT+TH ---- LT 292 200 .000 1.00 ----- .712 ----- .000 ---- EB RT TH LT 1900 1900 1 1 1.000 1.00 .980 .980 1.000 1.00 1.000 1.00 1.000 1.00 1.000 1.00 1.000 1.00 1.000 .950 .893 1.00 1.000 1.00 1.000 1.00 1.000 1.00 1664 1770 EB RT TH LT RT+TH LT 292 200 1664 1770 4.0 4.0 29.0 20.9 .241 .174 401 309 .728 .647 .176 .113 JULSON PLAT YELM AVE & SR-507 EXISTING PM PEAK HOUR VOLUMES SIGNAL2000/TEAPAC[Ver 1.10.10] - HCM Capacity and LOS Worksheet Delay and LOS Lane group, LG Adj Flow, v LG capacity, c v/c ratio, X Grn ratio, g/C Unif delay, dl Incr calib, k Incr delay, d2 Queue Delay, d3 Unif delay, dl* Prog factor, PF Contrl delay, d Lane group LOS Final Queue,Qbi --------------- Appr delay, dA Approach LOS Appr flow, vA SB RT TH LT RT TH LT 53 520 130 563 663 308 .094 .784 .422 .352 .352 .172 26.0 34.8 44.3 .11 .33 .11 .1 6.2 .9 .0 .0 .0 .0 .0 .0 1.00 1.00 1.00 26.1 40.9 45.3 C+ D+ D 0 ----- 0 0 ----- 40.6 ---- D+ 703 WB RT TH LT RT+TH LT 150 85 287 180 .523 .472 .168 .101 45.6 50.9 .13 .11 1.7 2.0 .0 .0 .0 .0 1.00 1.00 47.3 52.9 D D 0 ---- 0 ------ 49.3 ---- D 235 NB RT TH LT RT TH LT 35 539 193 563 663 308 .062 .813 .627 .352 .352 .172 25.7 35.3 46.1 .11 .35 .21 .0 7.7 4.0 .0 .0 .0 .0 .0 .0 1.00 1.00 1.00 25.8 42.9 50.1 C+ D+ D 0 ----- 0 - 0 ---- 44.0 ---- D+ 767 01/05/05 13:08:49 EB RT TH LT RT+TH LT 292 200 401 309 .728 .647 .241 .174 41.9 46.1 .29 .22 6.6 4.7 .0 .0 .0 .0 1.00 1.00 48.5 50.8 D D 0 -------- 0 -- 49.4 ---- D 4 92 Intersection: Delay 44.7 LOS D+ JULSON PLAT 01/05/05 YELM AVE & SR-507 13:08:49 EXISTING PM PEAK HOUR VOLUI~S SIGNAL2000/TEAPAC[Ver 1.10.10] - Evaluation of Intersection Performance ------------------------------------------------------------- Sq 46 I Phase 1 1 Phase 2 1 Phase 3 1 Phase 4 1 Phase 5 1 I + I++ I I I I I + I++ I i I ++++I I I I v I **** I I I I I I I++++ v I**** I I North I <* I *+>I I++++> I****> I I I * I *+ I I++++ I**** I I * I *+ I I v i v I ------------------------------------------------------------- I G/C=0.172 I G/C=0.352 I G/C=0.101 I G/C=0.040 I G/C=0.168 I I G= 20.7" I G= 42.3" I G= 12.1" I G= 4.8" I G= 20.1" I I Y+R= 4.0" I Y+R= 4.0" I Y+R= 4.0" I Y+R= 4.0" I Y+R= 4.0" I I OFF= 0.0~ I OFF=20.6 I OFE'=59.1 I OFF=72.5$ I OFF=79.9 I ------------------------------------------------------------- C=120 sec G=100.0 sec = 83.3 Y=20.0 sec = 16.7~s Ped= 0.0 sec = 0.0~ MVMT TOTALS SB Approach WB Approach NB Approach EB Approach Int Param:Units RT TH LT RT TH LT RT TH LT RT TH LT Total -- -------------- ----- AdjVol: vph 53 520 130 90 60 85 35 539 193 208 84 200 2197 Wid/Ln:ft/# 12/1 12/1 12/1 0/0 12/1 12/1 12/1 12/1 12/1 0/0 12/1 12/1 g/C Rqd@C:~ 25 38 27 0 27 26 25 39 28 0 32 29 q/C Used: ~ 35 35 17 0 17 10 35 35 17 0 24 17 SV @E: vph 563 663 283 0 262 150 563 663 283 0 386 285 4101 ----------- -------------- -------------- -------------- -------------- ----- Svc Lv1:LO5 C+ D+ D D D C+ D+ D D D D+ Deq Sat:v/c 0.09 0.78 0.42 0.00 0.52 0.47 0.06 0.81 0.63 0.00 0.73 0.65 0.68 HCM Delis/v 26.1 40.9 45.3 0.0 47.3 52.9 25.8 42.9 50.1 0.0 48.5 50.8 44.7 Tot Del:mn ~-.<n.~ 89 25 _... -.-0 30 19 4 96 40 0 59 42 410 # Stops:veh 9 116 29 0 34 20 6 122 45 0 67 47 495 ----------- -------------- -------------- -------------- -------------- ----- Queue l:veh 2 28 7 0 9 5 1 29 11 0 17 12 29 Queue 1: ft 56 693 180 0 214 129 36 733 281 0 421 294 733 APPR TOTALS Int Param:Units SB Approach WB Approach NB Approach EB Approach Total -------------- -------------- ----- AdjVol: vph 703 235 767 492 2197 ----------- -------------- -------------- -------------- -------------- ----- Svc Lv1:LO5 D+ D D+ D D+ Deg Sat:v/c 0.67 0.50 0.73 0.69 0.68 HCM Delis/v 40.6 49.3 44.0 49.4 44.7 Tot Del:min 120 49 140 101 410 # Stops:veh 154 54 173 114 495 ----------- -------------- -------------- -------------- -------------- ----- Queue l:veh 28 9 29 17 29 Queue 1: ft 693 214 733 421 733 JULSON PLAT YELM AVE & SR-507 2007 PM PEAK HOUR VOLUMES WITHOUT PROJECT SIGNAL2000/TEAPAC[Ver 1.10.10] - HCM Input Worksheet Intersection # 0 - I I I II I 64 I 535 I 176 II 112.0 112.0 112.0 II I 1 1 1 1 1 II I I i II \ ------------- / I \ 208 12.0 1 / ---------- 103 ------ 12.0 --- 1 -- ---------- 213 ---------- ------ 0.0 ------ --- 0 --- \ - I I I Heavy veh, $HV Pk-hr fact, PHF Pretimed or Act Strtup lost, 11 Ext eff grn, e Arrival typ, AT --------------- Ped vol, vped Bike vol, vbic Parking locatns Park mnvrs, Nm Bus stops, NB Grade, ~G + / 01/05/05 13:15:16 Area Location Type: NONCBD I Key: VOLUMES -- > I I WIDTHS I v LANES -------------------- 147 0.0 0 ------------------- /I\ 70 12.0 1 I ------------------- I 107 12.0 1 North ___________________ I \ I / II 194 I 526 I 49 I Phasing: SEQUENCE 46 II 12.0 112.0 112.0 I PERMSV N N N N I I 1 1 1 1 1 1 OVERLP N N N N II I I I LEADLAG LD LD ss RT TH LT 1.0 1.0 1.0 .97 .97 .97 A A A 2.0 2.0 2.0 2.0 2.0 2.0 3 3 3 ----- ----- 0 ---- 0 NO 0 0 .0 wB RT TH LT 1.0 1.0 1.0 .81 .81 .81 A A A 2.0 2.0 2.0 2.0 2.0 2.0 3 3 3 ----- ----- 0 ---- 0 NO -~- 0 0 .0 NB RT TH LT 1.0 1.0 1.0 .92 .92 .92 A A A 2.0 2.0 2.0 2.0 2.0 2.0 3 ----- 3 -- - 3 - - 0 ---- 0 _ ~.._ NO ~,.- 0 0 .0 EB RT TH LT 2.0 2.0 2.0 .95 .95 .95 A A A 2.0 2.0 2.0 2.0 2.0 2.0 3 - 3 3 ---- ----- 0 ---- 0 NO 0 0 .0 ------------------------------------------------------------------------- Sq 46 I Phase 1 1 Phase 2 1 Phase 3 1 Phase 4 1 Phase 5 1 Phase 6 1 I + I++ I I I I I . I + I++ I i I ****I I I I I v I ****I I I I I I i I++++ v I**** I I I North I <* I * +>I I++++> I++++> I I I I * I *+ I I++++ I++++ I I I * I *+ I I v I v I I ------------------------------------------------------------------------- C=120"I G= 18.7" I G= 42.3" I G= 12.6" I G= 2.3" I G= 24.1" ( G= 0.0" I I Y+R= 4.0" I Y+R= 4.0" I Y+R= 4.0" I Y+R= 4.0" ( Y+R= 4.0" I Y+R= 0.0" I ------------------------------------------------------------------------- JULSON PLAT YELM AVE & SR-507 2007 PM PEAK HOUR VOLUMES WITHOUT PROJECT SIGNAL2000/TEAPAC[Ver 1.10.10] - HCM Volume Adjust & Satflow Worksheet Volume Adjustment Volume, V Pk-hr fact, PHF Adj my flow, vp --------------- Lane group, LG Adj LG flow, v Prop LT, PLT Prop RT, PRT --------------- Saturation Flow Rate Base satflo, so Number lanes, N Lane width , f W Heavy veh, fHV Grade , f g Parking, fp Bus block, fbb Area type , fa Lane util, fLU Left-turn, fLT Right-turn, fRT PedBike LT,fLpb PedBike RT,fRpb Local adjustmnt Adj satflow, s SB RT TH LT 64 535 176 .97 .97 .97 66 552 181 -------------- RT TH LT 66 552 181 .000 .000 1.00 1.000 .000 .000 -------------- SB RT TH LT 1900 1 1.000 .990 1.000 1.000 1.000 1.000 1.000 1.000 .850 1.000 1.000 1.000 1599 1900 1900 1 1 1.00 1.00 .990 .990 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 .950 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1881 1787 WB RT TH 147 70 .81 .81 181 86 RT+TI 267 .000 .678 WB RT TH LT RT 107 49 .81 .92 132 53 3 LT RT 132 53 1.00 .000 .000 1.000 LT RT NB TH LT 526 194 .92 .92 572 211 TH LT 572 211 .000 1.00 .000 .000 NB TH LT 1900 1900 1900 1900 1900 1 1 1 1 1 1.000 1.00 1.000 1.00 1.00 .990 .990 .990 .990 .990 1.000 1.00 1.000 1.00 1.00 1.000 1.00 1.000 1.00 1.00 1.000 1.00 1.000 1.00 1.00 1.000 1.00 1.000 1.00 1.00 1.000 1.00 1.000 1.00 1.00 1.000 .950 1.000 1.00 .950 .898 1.00 .850 1.00 1.00 1.000 1.00 1.000 1.00 1.00 1.000 1.00 1.000 1.00 1.00 1.000 1.00 1.000 1.00 1.00 1690 1787 1599 1881 1787 SIGNAL2000/TEAPAC[Ver 1.10.10] - HCM Capacity and LOS Worksheet Capacity Analysis Lane group, LG Adj Flow, v Satflow, s Lost time, tL Effect green, g Grn ratio, g/C LG capacity, c v/c ratio, X Flow ratio, v/s Crit lane group --------------- Sum crit v/s,Yc Crit v/c, Xc SB RT TH LT RT TH LT 66 552 181 1599 1881 1787 4.0 4.0 4.0 42.3 42.3 18.7 .353 .353 .156 564 663 278 .117 .833 .651 .041 .293 .101 -------------- 0.704 .812 WB RT TH LT RT+TH LT 267 132 1690 1787 4.0 4.0 24.1 12.6 .201 .105 340 188 .785 .702 .158 .074 -------------- Total lost, L NB RT TH LT RT TH LT 53 572 211 1599 1881 1787 4.0 4.0 4.0 42.3 42.3 18.7 .353 .353 .156 564 663 278 .094 .863 .759 .033 .304 .118 -------------- 16.0 01/05/05 13:15:16 EB RT TH LT 213 103 208 .95 .95 .95 224 108 219 RT+TH LT 332 219 .000 1.00 .675 .000 EB RT TH LT 1900 1900 1 1 1.000 1.00 .980 .980 1.000 1.00 1.000 1.00 1.000 1.00 1.000 1.00 1.000 1.00 1.000 .950 .899 1.00 1.000 1.00 1.000 1.00 1.000 1.00 1674 1770 EB RT TH LT RT+TH LT 332 219 1674 1770 4.0 4.0 30.4 18.9 .253 .157 424 278 .783 .788 .198 .124 JULSON PLAT YELM AVE & SR-507 2007 PM PEAK HOUR VOLUMES WITHOUT PROJECT SIGNAL2000/TEAPAC[Ver 1.10.10] - HCM Capacity and LOS Worksheet Delay and LOS Lane group, LG Adj Flow, v LG capacity, c v/c ratio, X Grn ratio, g/C Unif delay, dl Incr calib, k Incr delay, d2 Queue Delay, d3 Unif delay, dl* Prog factor, PF Contrl delay, d Lane group LOS Final Queue,Qbi --------------- Appr delay, dA Approach LOS Appr flow, vA SB RT TH LT RT TH LT 66 552 181 564 663 278 .117 .833 .651 .353 .353 .156 26.2 35.6 47.6 .11 .37 .23 .1 8.9 5.3 .0 .0 .0 .0 .0 .0 1.00 1.00 1.00 26.3 44.5 52.9 C+ D+ D 0 - 0 0 - --- ----- 44.9 ---- D+ 799 WB RT TH LT RT+TH LT 267 132 340 188 .785 .702 .201 .105 45.5 51.9 .33 .27 11.5 11.2 .0 .0 .0 .0 1.00 1.00 57.0 63.0 E+ E+ 0 0 -------------- 59.0 E+ 399 NB RT TH LT RT TH LT 53 572 211 564 663 278 .094 .863 .759 .353 .353 .156 26.0 36.1 48.5 .11 .39 .31 .1 11.3 11.5 .0 .0 .0 .0 .0 .0 1.00 1.00 1.00 26.1 47.5 60.0 C+ D E+ 0 ---- 0 - 0 ----- 49.3 ---- D ---- 836 ------ ---- 01/05/05 13:15:16 EB RT TH LT RT+TH LT 332 219 424 278 .783 .788 .253 .157 41.7 48.6 .33 .33 9.3 14.0 .0 .0 .0 .0 1.00 1.00 51.0 62.7 D E+ 0 0 -------------- 55.6 E+ 551 -------------- Intersection: Delay 50.8 LOS D JULSON PLAT 01/05/05 YELM AVE & SR-507 13:15:16 2007 PM PEAK HOUR VOLUMES WITHOUT PROJECT SIGNAL2000/TEAPAC[Ver 1.10.10] - Evaluation of Intersection Performance ------------------------------------------------------------- Sq 46 I Phase 1 1 Phase 2 1 Phase 3 1 Phase 4 1 Phase 5 1 I + I++ I I I I - I + I++ I I I ****I I I I v i **** I I I I I I I++++ v I**** I I North I <* i * +>I I++++> I++++> I I I * I *+ I I++++ I++++ I I * I *+ I I v I v I ------------------------------------------------------------- I G/C=0.156 I G/C=0.353 I G/C=0.105 I G/C=0.019 I G/C=0.201 I I G= 18.7" I G= 42.3" I G= 12.6" I G= 2.3" I G= 24.1" I I Y+R= 4.0" I Y+R= 4.0" I Y+R= 4.0" I Y+R= 4.0" I Y+R= 4.0" I I OFF= 0.0~ I OFF=18.9 I OFF=57.5 I OFF=71.3 I OFF=76.5 I ------------------------------------------------------------- C=120 sec G=100.0 sec = 83.3 Y=20.0 sec = 16.7 Ped= 0.0 sec = 0.0$ MVMT TOTALS SB Approach WB Approach NB Approach EB Approach Int Param:Units RT TH LT RT TH LT RT TH LT RT TH LT Total AdjVol: vph 66 552 181 181 86 132 53 572 211 224 108 219 2585 Wid/Ln:ft/# 12/1 12/1 12/1 0/0 12/1 12/1 12/1 12/1 12/1 0/0 12/1 12/1 g/C Rqd@C:$ 25 40 28 0 31 27 25 40 29 0 33 29 g/C Used: $ 35 35 16 0 20 11 35 35 16 0 25 16 SV @E: vph 564 663 252 0 319 158 564 663 252 0 412 252 4099 ----------- -------------- -------------- -------------- -------------- ----- Svc Lv1:LOS C+ D+ D E+ E+ C+ D E+ D E+ D Deg Sat:v/c 0.12 0.83 0.65 0.00 0.79 0.70 0.09 0.86 0.76 0.00 0.78 0.79 0.77 HCM Delis/v 26.3 44.5 52.9 0.0 57.0 63.0 26.1 47.5 60.0 0.0 51.0 62.7 50.8 Tot D~~w~n 7 1~J2. 40 0 63 35 6 113 53 0 71 57, _..>a..~.7 # Stops:veh 11 126 43 0 63 32 9 133 50 0 77 53 597 ----------- -------------- -------------- -------------- -------------- ----- Queue l:veh 3 30 11 0 16 8 2 32 13 0 19 14 32 Queue 1: ft 70 762 270 0 406 211 56 810 328 0 487 347 810 APPR TOTALS Int Param:Units SB Approach WB Approach NB Approach EB Approach Total -------- -------------- ----- AdjVol: vph 799 399 836 551 2585 ----------- -------------- -------------- -------------- -------------- ----- Svc Lv1:LOS D+ E+ D E+ D Deg Sat:v/c 0.73 0.76 0.79 0.79 0.77 HCM Delis/v 44.9 59.0 49.3 55.6 50.8 Tot Del:min 149 98 172 128 547 # Stops:veh 180 95 192 130 597 ----------- -------------- -------------- -------------- -------------- ----- Queue l:veh 30 16 32 19 32 Queue 1: ft 762 406 810 487 810 JULSON PLAT YELM AVE & SR-507 2007 PM PEAK HOUR VOLUMES WITH PROJECT SIGNAL2000/TEAPAC[Ver 1.10.10] - HCM Input Worksheet Intersection # 0 - I I I II I 64 I 535 I 198 II 112.0 112.0 112.0 II I 1 1 1 1 1 II I I I II \ ------------- / I \ 208 12.0 1 /. 114 12.0 1 -- ---------- 213 ---------- ------ 0.0 ------ --- 0 --- \ - I I I RT + / 01/05/05 13:17:29 Area Location Type: NONCBD I Key : VOLUME S - - > I I WIDTHS ( v LANES -------------------- 160 0.0 0 ------------------- /I\ 77 12.0 1 I ------------------- I 110 12.0 1 North _______ ___________ I \ I / II 194 I 526 I 55 I Phasing: SEQUENCE 46 II 12.0 112.0 112.0 I PERMSV N N N N I I 1 1 1 1 1 1 OVERLP N N N N II I ( I LEADLAG LD LD SB WB NB EB TH LT RT TH LT RT TH LT RT TH LT Heavy veh, $HV 1.0 1.0 1.0 Pk-hr fact, PHF .97 .97 .97 Pretimed or Act A A A Strtup lost, 11 2.0 2.0 2.0 Ext eff grn, a 2.0 2.0 2.0 Arrival typ, AT --------------- 3 ----- 3 ----- 3 ---- Ped vol, vped 0 Bike vol, vbic 0 Parking locatns NO Park mnvrs, Nm 0 Bus stops, NB 0 Grade, ~G .0 1.0 1.0 1.0 .81 .81 .81 A A A 2.0 2.0 2.0 2.0 2.0 2.0 3 3 3 - ----- ----- 0 --- 0 0 0 .0 1.0 1.0 1.0 .92 .92 .92 A A A 2.0 2.0 2.0 2.0 2.0 2.0 3 ----- 3 - 3 - --- 0 ---- 0 ..... NO 0 0 .0 2.0 2.0 2.0 .95 .95 .95 A A A 2.0 2.0 2.0 2.0 2.0 2.0 3 ---- 3 3 - ----- 0 ---- 0 NO 0 0 ----- ----- .0 ----- ----- ---- ---- ------------------------------------------------------------------------- Sq 46 I Phase 1( Phase 2 1 Phase 3 1 Phase 4 1 Phase 5 1 Phase 6 1 I + i++ I I I I I . I + i++ I I I ****I I I I I v I **** I I I I I I I I++++ v I**** I I I North I <* I * +>) I++++> I++++> I I I I * I *+ I I++++ I++++ I I I * I *+ I I v I v I I ------------------------------------------------------------------------- C=120"i G= 18.7" I G= 42.3" I G= 12.6" I G= 2.3" I G= 24.1" I G= 0.0" I I Y+R= 4.0" I Y+R= 4.0" I Y+R= 4.0" I Y+R= 4.0" I Y+R= 4.0" I Y+R= 0.0" I ------------------------------------------------------------------------- JULSON PLAT YELM AVE & SR-507 2007 PM PEAK HOUR VOLUMES WITH PROJECT SIGNAL2000/TEAPAC[Ver 1.10.10] - HCM Volume Adjust & Satflow Worksheet Volume Adjustment Volume, V Pk-hr fact, PHF Adj my flow, vp --------------- Lane group, LG Adj LG flow, v Prop LT, PLT Prop RT, PRT --------------- Saturation Flow Rate Base satflo, so Number lanes, N Lane width , f W Heavy veh, fHV Grade, fg Parking, fp Bus block, fbb Area type , fa Lane util, fLU Left-turn, fLT Right-turn, fRT PedBike LT , fLpb PedBike RT , fRpb Local adjustmnt Adj satflow, s SB RT TH LT 64 535 198 .97 .97 .97 66 552 204 -------------- RT TH LT 66 552 204 .000 .000 1.00 1.000 .000 .000 -------------- RT 1900 1 1.000 .990 1.000 1.000 1.000 1.000 1.000 1.000 .850 1.000 1.000 1.000 1599 SB TH LT 1900 1900 1 1 1.00 1.00 .990 .990 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 .950 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1881 1787 WB NB RT TH LT RT TH LT 160 77 110 55 526 194 .81 .81 .81 .92 .92 .92 198 ---- 95 ------ 136 ---- 60 ----- 572 ----- 211 ---- RT+TH LT RT TH LT 293 136 60 572 211 .000 1.00 .000 .000 1.00 ---- .676 ------ ..000 ---- 1.000 ----- .000 ----- .000 ---- WB NB RT TH LT RT TH LT 1900 1900 1900 1900 1900 1 1 1 1 1 1.000 1.00 1.000 1.00 1.00 .990 .990 .990 .990 .990 1.000 1.00 1.000 1.00 1.00 1.000 1,...00 1.000 1.00 1.00 1.000 1.00 1.000 1.00 1.00 1.000 1.00 1.000 1.00 1.00 1.000 1.00 1.000 1.00 1.00 1.000 .950 1.000 1.00 .950 .899 1.00 .850 1.00 1.00 1.000 1.00 1.000 1.00 1.00 1.000 1.00 1.000 1.00 1.00 1.000 1.00 1.000 1.00 1.00 1691 1787 1599 1881 1787 SIGNAL2000/TEAPAC[Ver 1.10.10] - HCM Capacity and LOS Worksheet Capacity Analysis Lane group, LG Adj Flow, v Satflow, s Lost time, tL Effect green, g Grn ratio, g/C LG capacity, c v/c ratio, X Flow ratio, v/s Crit lane group --------------- Sum Grit v/s,Yc Crit v/c, Xc --------------- SB RT TH LT RT TH LT 66 552 204 1599 1881 1787 4.0 4.0 4.0 42.3 42.3 18.7 .353 .353 .156 564 663 278 .117 .833 .734 .041 .293 .114 -------------- 0.719 .830 -------------- WB RT TH LT RT+TH LT 293 136 1691 1787 4.0 4.0 24.1 12.6 .201 .105 340 188 .862 .723 .173 .076 NB RT TH LT 01/05/05 13:17:29 EB RT TH LT 213 114 208 .95 .95 .95 224 120 ---------- 219 ---- RT+TH LT 344 219 .000 1.00 .651 ---------- .000 ---- EB RT TH LT 1900 1900 1 1 1.000 1.00 .980 .980 1.000 1.00 1.000 1.00 1.000 1.00 1.000 1.00 1.000 1.00 1.000 .950 .902 1.00 1.000 1.00 1.000 1.00 1.000 1.00 1681 1770 EB RT TH LT RT TH LT 60 572 211 1599 1881 1787 4.0 4.0 4.0 42.3 42.3 18.7 .353 .353 .156 564 663 278 .106 .863 .759 .038 .304 .118 -------------- -------------- Total lost, L 16.0 RT+TH LT 344 219 1681 1770 4.0 4.0 30.4 18.9 .253 .157 426 278 .808 .788 .205 .124 JULSON PLAT YELM AVE & SR-507 2007 PM PEAK HOUR VOLUMES WITH PROJECT SIGNAL2000/TEAPAC[Ver 1.10.10] - HCM Capacity and LOS Worksheet Delay and LOS --------------- Lane group, LG Adj Flow, v LG capacity, c v/c ratio, X Grn ratio, g/C Unif delay, dl Incr calib, k Incr delay, d2 Queue Delay, d3 Unif delay, dl* Prog factor, PF Contrl delay, d Lane group LOS Final Queue,Qbi Appr delay, dA Approach LOS Appr flow, vA SB RT TH LT RT TH LT 66 552 204 564 663 278 .117 .833 .734 .353 .353 .156 26.2 35.6 48.3 .11 .37 .29 .l 8.9 9.7 .0 .0 .0 .0 .0 .0 1.00 1.00 1.00 26.3 44.5 57.9 C+ D+ E+ 0 0 0 46.4 D 822 -------------- Delay 52.6 WB RT TH LT RT+TH LT 293 136 340 188 .862 .723 .201 .105 46.3 52.0 .39 .28 19.7 12.9 .0 .0 .0 .0 1.00 1.00 66.0 64.9 E+ E+ 0 0 65.6 E+ 429 NB RT ---- TH ------ LT ---- RT TH LT 60 572 211 564 663 278 .106 .863 .759 .353 .353 .156 26.1 36.1 48.5 .11 .39 .31 .1 11.3 11.5 .0 .0 .0 .0 .0 .0 1.00 1.00 1.00 26.2 47.5 60.0 C+ D E+ 0 0 0 ---- ------ 49.1 ---- D ---- 843 ------ ---- Intersection: LOS D -------------- 01/05/05 13:17:29 EB RT TH LT RT+TH LT 344 219 426 278 .808 .788 .253 .157 42.1 48.6 .35 .33 11.0 14.0 .0 .0 .0 .0 1.00 1.00 53.1 62.7 D E+ 0 0 56.8 E+ 563 -------------- JULSON PLAT 01/05/05 YELM AVE & SR-507 13:17:29 2007 PM PEAK HOUR VOLUMES WITH PROJECT SIGNAL2000/TEAPAC[Ver 1.10.10] - Evaluation of Intersection Performance ------------------------------------------------------------- Sq 46 I Phase 1 1 Phase 2 1 Phase 3 1 Phase 4 1 Phase 5 1 I + I++ I i I I . I + I++ I I I ****i I i I v I **** I ^ I I I i I I++++ v I**** I I North i <* I * +>I I++++> I++++> I I i * I *+ I I++++ I++++ I I * I *+ I I v I v I ------------------------------------------------------------- I G/C=0.156 I G/C=0.353 I G/C=0.105 I G/C=0.019 I G/C=0.201 I I G= 18.7" I G= 42.3" I G= 12.6" I G= 2.3" I G= 24.1" I I Y+R= 4.0" I Y+R= 4.0" I Y+R= 4.0" I Y+R= 4.0" I Y+R= 4.0" I I OFF= 0.0$ I OFF=18.9$ I OFF=57.5$ ( OFF=71.3$ I OFF=76.5$ I ------------------------------------------------------------- C=120 sec G=100.0 sec = 83.3$ Y=20.0 sec = 16.7$ Ped= 0.0 sec = 0.0$ MVMT TOTALS SB Approach WB Approach NB Approach EB Approach Int Param:Units RT TH LT RT TH LT RT TH LT RT TH LT Total AdjVol: vph 66 552 204 198 95 136 60 572 211 224 120 219 2657 Wid/Ln:ft/# 12/1 12/1 12/1 0/0 12/1 12/1 12/1 12/1 12/1 0/0 12/1 12/1 g/C Rqd@C:$ 25 40 29 0 32 27 25 40 29 0 34 29 g/C Used: $ 35 35 16 0 20 11 35 35 16 0 25 16 SV @E: vph 564 663 252 0 319 158 564 663 252 0 414 252 4101 ----------- -------------- -------------- -------------- -------------- ----- Svc Lv1:LOS C+ D+ E+ E+ E+ C+ D E+ D E+ D Deg Sat:v/c 0.12 0.83 0.73 0.00 0.86 0.72 0.11 0.86 0.76 0.00 0.81 0.79 0.78 HCM Delis/v 26.3 44.5 57.9 0.0 66.0 64.9 26.2 47.5 60.0 0.0 53.1 62.7 52.6 =-~-Tot Del:min 7 102 49 0 81 37 7 113 53 0 :~,~.5 57 582 # Stops:veh it 126 49 0 71 33 10 133 50 0 81 53 617 ----------- -------------- -------------- -------------- -------------- ----- Queue l:veh 3 30 12 0 19 9 3 32 13 0 20 14 32 Queue l: ft 70 762 313 0 468 219 63 810 328 0 511 347 810 ----------- ------------- ------------- -------------- -------------- ----- ----------- -------------- -------------- -------------- -------------- ----- APPR TOTALS Int Param:Units SB Approach WB Approach NB Approach EB Approach Total AdjVol: vph 822 429 843 563 2657 ----------- -------------- -------------- -------------- -------------- ----- Svc Lv1:LO5 D E+ D E+ D Deg Sat:v/c 0.75 0.82 0.78 0.80 0.78 HCM Delis/v 46.4 65.6 49.1 56.8 52.6 Tot Del:min 158 118 173 133 582 # Stops:veh 186 104 193 134 617 ----------- -------------- -------------- -------------- -------------- ----- Queue l:veh 30 19 32 20 32 Queue 1: ft 762 468 810 511 810 TWO-WAY STOP CONTROL SUMMARY General Information ite Information nal st Intersection Canal Rd & Entrances enc /Co. urisdiction Date Performed nal sis Year nal sis Time Period Pro'ect Descri tion 2007 PM PEAK HOUR VOLUMES WITH PROJECT EastlWest Street: Canal Road North/South Street: Entrances Combined Intersection Orientation: East-West tud Period hrs : 0.25 ehicle Volumes and Ad'ustments Ma'or Street Eastbound Westbound Movement 1 2 3 4 5 6 L T R L T R olume veh/h 0 103 0 0 29 55 Peak-hour factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate (veh/h) 0 114 0 0 32 61 Proportion of heavy vehides, PHV 0 -- -- 0 -- -- Median type Undivided RT Channelized? 0 0 Lanes 0 1 0 0 1 0 onfiguration LT TR U stream Si nal 0 0 Minor Street Northbound Southbound Movement 7 8 9 10 11 12 L T R L T R olume veh/h 0 0 0 33 0 0 Peak-hour factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate (veh/h) 0 0 0 36 0 0 Proportion of heavy vehides, PHV 0 0 0 0 0 0 Percent grade (%) 0 0 Flared approach N N Storage 0 0 RT Channelized? 0 0 Lanes 0 0 0 0 0 0 onfiguration LR ontrol Dela Queue Len th Level of Serv ice pproach EB WB Northbound Southbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR olume, v (vph) 0 36 apacity, ct„ (vph) 1514 gig /c ratio 0.00 0.04 ueue length (95%) 0.00 0.14 ontrol Delay (s/veh) 7.4 9.6 LOS A A pproach delay (s/veh) -- -- 9,B pproach LOS -- -- A HCS'000~~~ Copyright c 2003 University of Florida. All Rights Reserved Version ! Id KEY: Below curve, storage not ~ needed for capacity. Above curve, further analysis recommended. ti ti ~ ~ 21 H r , ao Mp ti 50 MPN l21 ~ 60 MPH (2) 25 20 15 10 5 Total DHV Turning Left (single turning movement) (1) DHV is total volume from both directions. (2) Speeds are posted speeds. Left-Turn Storage Guidelines ITwo-Lane. Unsignalized~ Figure 910 1200 1100 - 1000 900 800 .= g p ~ W 700 u ° ~ O ~ cc , oC ~ 3 soo W U ~ I- e- p ~ ~ o ~ ~ ~ 500 Z ~ N Z w i` ~ ~ J J 1 X00 a ~ ? ~ j c 2 ~ ~-- J ~ ~ ~ 1, ~ W {-- F- w ~ 300 ~ ~ ~ v~ ~ 0 Intersections At Grade Des/gn Manual Page 910-18 EngNsh Version May 2001