Project Rev & CorrespondenceCity of Yelm Invoice No. CDD-06-0175
Community Development Department
INVOICE -
- Customer
Name Lawn Pros Date 08/28/2006
__ -
Address PO Box 741 Order No. SUB-05-0305-YL
- --- -
City Yelm State WA ZIP 98597 Rep Terra Valley
--__ - -
Phone FOB
Description Unit Price TOTAL
__ __
1 1 1/2" irrigation meter - pretapped preplumbed $650.00 $650.00
101st Way SE
r~ayment uetans
O Cash
O Check
O
SubTotal $650.00
Shipping & Handling _ $0.00
--- - _
Taxes WA
TOTAL $650.00
_ -- ___
~ce Use Only
`~
City of Yelm
Community Development Department
P.O. Box 479
Yelm, WA 98597
(360) 458-3835
THANK YOU
r~oF 1~P CITY OF
~ ~ YELM
P.O. Box 479
Yelm, WA 98597
360-458-8403
RECEIVED * ~ * ~
3I% HUNDRED FIFTY DOLLARS & 00 CENTS
RECEIVED FROM DATE REC. NO.
RAINIER GENERAL DEVELOPMENT 08/29/06 43572
P.0. BOB 627
RAINIER.. KA 98576 BUDGETARY
360-446-3083
D
RECEIPT No. 4 3 5 7 2
AMOUNT REF. NO.
650.00 CHECK 35703
CDD-06-0175
IRRIGATION METER 101ST WAY SE TERRA VALLEY
OFFICE OF THE HEARING EXAMINER
CITY OF YELM
REPORT AND DECISION
CASE NO.: SUB-05-0305-YL (TERRA VALLEY)
APPLICANT: Terra Valley LLC
Doug Bloom
4200 6th Avenue SE, Ste. 301
Lacey, WA 98503
SUMMARY OF REQUEST:
The applicant is requesting preliminary plat approval to allow subdivision of approximately
9.7 acres into 41 single family residential lots.
SUMMARY OF DECISION:
Request granted, subject to conditions.
PUBLIC HEARING:
After reviewing Planning and Community Development Staff Report and examining
available information on file with the application, the Examiner conducted a public
hearing on the request as follows:
The hearing was opened on January 17, 2006.
Parties wishing to testify were sworn in by the Examiner.
The following exhibits were submitted and made a part of the record as follows:
EXHIBIT "1" - Planning and Community Development Staff Report and
Attachments
TAMI MERRIMAN appeared, presented the Community Development Department Staff
Report, and testified that the City had provided proper notice and that the SEPA official had
issued an MDNS which addressed an oak stand in the open space. A pond will also
remain in the open space area and the habitat area marked and protected. The site is in
an area of high groundwater and the MDNS requires the storm pond six feet above the
-1-
elevation of the high ground water. The parcel fronts on Longmire Street and will provide
access to undeveloped property to the east. The parcel will also provide an access into
Tahoma Terra in the townhouse area. The density calculates to 4.22 dwelling units per
acre considering only the site, but the code allows inclusion of the abutting right-of-way to
the centerline of a public or private road.
GRANT BECK appeared and testified that the zoning code sets forth the definition of
"gross density" which includes half of an abutting public road.
DOUG BLOOM appeared and testified that he has reviewed the staff report and conditions
of approval and has no objection.
No one spoke further in this matter and so the Examiner took the request under
advisement and the hearing was concluded.
NOTE: A complete record of this hearing is available in the City of Yelm Community
Development Department
FINDINGS, CONCLUSIONS AND DECISION:
FINDINGS:
1. The Hearing Examiner has admitted documentary evidence into the record, heard
testimony, and taken this matter under advisement.
2. Notice of the date and time of hearing was posted on the project site, mailed to the
owners of the property within 300 feet of the project site, and published in the
Nisqually Valley News.
3. A Mitigated Determination of Nonsignificance was issued on November 14, 2005.
4. The applicant has a possessory ownership interest in a rectangular, 9.7 acre parcel
of unimproved property abutting the south side of Longmire Street SE, east of SR-
510 within the City of Yelm. The applicant requests preliminary plat approval to
allow subdivision of the site into 41 single family residential lots with an average lot
size of 5,000 square feet.
5. The Tahoma Terra Golf and Country Club abuts the south property line and Phase
2 of the Tahoma Terra Master Planned Development abuts the west property line.
Phases 1 and 2 of Tahoma Terra abut the north side of Longmire Street opposite
the site. The preliminary plat map shows two accesses extending south into the site
from Longmire Street and a looped road system provide access to all lots. An
internal plat road extends from the looped road system to the southwest corner of
-2-
the parcel where it provides access to the Tahoma Terra project in the area
proposed for townhouses. A second internal plat road extends to the east property
line in the southeast portion of the site. The parcel abutting the east property line
is presently unimproved. The preliminary plat map shows an open space area
extending along Longmire Street and a second open space area in the southcentral
portion of the site. A stormwater pond is located in the southwest corner of the site
between the west property line and the internal plat road.
6a The site is located within the Low Density Residential District (R-4) of the Yelm
Municipal Code (YMC). Section 17.12.010 YMC sets forth the intent of the R-4
District which includes enhancement of the residential quality of the City by
providing a high standard of development for single family residential areas. Section
17.12.020 YMC authorizes outright single family residential dwellings at a density
of not more than four dwelling units per gross acre. The proposed preliminary plat,
located adjacent to the Tahoma Terra project and served by all public utilities and
services, will provide a high standard of development in accordance with the intent
of the R-4 classification.
7. Section 17.12.050. YMC does not require a minimum lot area for lots within the R-4
district, but does require setbacks of 25 feet from collector roads, 35 feet from
arterials, 15 feet from local streets with a 20 foot minimum driveway approach, as
well as side and rear yard setbacks. Said section also authorizes a maximum
building coverage of 50% and a maximum development coverage of 75%. The
preliminary plat map shows rectangular lots of adequate size and configuration to
provide a reasonably sized building envelope while meeting all bulk requirements.
The project satisfies the bulk regulations of the R-4 District.
8. Chapter 14.12 YMC requires that a plat applicant dedicate a minimum of 5% of the
gross area of the subdivision as usable open space. Open space uses may include
environmental interpretation or education, parks, recreation lands, athletic fields or
foot pads/bicycle trails. The plat map shows open spaces in the south, central, and
north portions of the site which total .81 acres or 9% of the site. The applicant will
dedicate the open space at the time of final subdivision approval.
9. A mitigating measures in the MDNS issued pursuant to the authority of the State
Environmental Policy Act (SEPA) requires the applicant to enter a mitigation
agreement with the Yelm School District to offset the impacts on the district of
school aged children residing in the plat. Entry of the agreement will ensure that the
plat makes appropriate provision for schools and school grounds.
10. Chapter 15.24 YMC requires that all new subdivisions improve street frontages to
current standards. The City identifies Longmire Street as a neighborhood collector
which requires a 16 foot travel lane, vertical curb, seven foot wide planter strip, and
-3-
street trees 35 feet on center. The standards also require "No Parking" signs, a five
foot wide sidewalk, and streetlighting. The internal plat roads will meet the local
access standards of 11 foot travel lanes; two, seven foot parking lanes, concrete,
rolled edge curb and gutter; six foot wide, planter strip; street trees 35 feet on
center; streetlighting; and five foot wide sidewalk on one side. Chapter 16.16.090
YMC requires applicants to provide for the continuation of streets to adjoining
subdivisions, and the applicant has provided connections to abutting parcels to the
east and west. Adequate entering and stopping sight distance is or must be made
available at the intersections of the internal plat roads and Longmire Street, and the
applicant must also satisfy the City's Transportation Facility Charge of $757.50 per
unit, payable at building permit. The streets provide adequate parking for residents
and guests, and therefore the plat makes appropriate provision for streets, roads,
alleys, and other public ways.
11. The City of Yelm will provide both domestic water and fire flow to the site subject to
the applicant paying current fees. The applicant will extend a water main located in
Longmire Street to the northeast of the property to the Tahoma Terra Master
Planned Development. The City will also provide sanitary sewer service to all lots,
and the applicant will extend an existing sewer line in Longmire Street across the
front of the parcel to the Tahoma Terra Master Planned Development. The plat
makes appropriate provision for potable water supplies and sanitary waste.
12. Mitigating measures in the MDNS require the applicant to exceed City stormwater
requirements set forth in the 1992 DOE stormwater Manual. The applicant must
elevate the bottom of the infiltration gallery at least six feet above the elevation of
the high groundwater as identified by Thurston County. The MDNS requires
individual dry wells to accommodate roof runoff, and also requires the system to
accommodate stormwater generated by required frontage improvements.
Compliance with the mitigating measures will ensure that the plat makes
appropriate provision for drainage ways. The applicant must satisfy the
requirements of Chapter 17.80 YMC and provide landscaping and screening along
the perimeter of the site. The applicant may either install Type 2 landscaping or
fencing to meet said requirements.
CONCLUSIONS:
1. The Hearing Examiner has jurisdiction to consider and decide the issues presented
by this request.
2. The applicant has shown that the proposed preliminary plat of Terra Valley is
consistent with the R-4 zone classification of the YMC and meets all development
criteria of YMC.
-4-
3. In accordance with Section 16.12.170 YMC the proposed preliminary plat makes
appropriate provision for the public health, safety, and general welfare for open
spaces, drainage ways, streets, roads, alleys, transit stops, potable water supplies,
parks and recreation, playgrounds, schools and school grounds, and safe walking
conditions.
4. The proposed preliminary plat will serve the public use and interest by providing an
attractive location for a single family residential subdivision convenient to downtown
Yelm and to the significant amenities located in Tahoma Terra and at the Tahoma
Terra Golf and Country Club, and therefore should be approved subject to the
following conditions:
1. The conditions of the Mitigated Determination of Non-significance are hereby
referenced and are considered conditions of this approval.
2. Each dwelling unit with the subdivision shall connect to the City water
system. The connection fee and meter fee will be established at the time of
building permit issuance.
3. All conditions for cross connection control as required in Section 246-290-
490 WAC.
4. All planting strips and required landscaping located in any open space and
stormwater tract, and along Longmire Street shall be served by an irrigation
system with a separate water meter and an approved backflow prevention
device.
5. Each dwelling within the subdivision shall connect to the City S.T.E.P. sewer
system. The connection fee and inspection fee will be established at the
time of building permit issuance.
6. The applicant shall pay a fire protection impact fee. The impact fee for 2006
is $0.216 per sq. ft. of new development.
7. The proponent shall design and construct all stormwater facilities in
accordance with the 1992 DOE stormwater Manual, as adopted by the City
of Yelm. Best Management Practices (BMP's) are required during
construction. A 10-foot setback from all property lines and easements are
required for stormwater facilities.
8. The final stormwater plan shall be submitted with civil engineering plans and
shall include an operation and maintenance plan. The plan shall include high
ground water protection as required in the MDNS.
-5-
9. All roof drain runoff shall be infiltrated on each lot utilizing individual drywells.
10. The stormwater system shall be held in common by the Homeowners
Association. The Homeowners Agreement shall include provisions for the
assessment of fees against individual lots for the maintenance and repair of
the stormwater facilities.
11. The proponent shall submit a fire hydrant plan to the Community
Development Department for review and approval as part of the civil
engineering plans prior to final subdivision approval.
12. The proponent shall submit fire flow calculations for all existing and proposed
hydrants. All hydrants must meet minimum City standards.
13. The applicant shall be responsible for the installation of hydrant locks on all
fire hydrants required and installed as part of development. The applicant
shall coordinate with the Yelm Public Works Department to purchase the
required hydrant locks. Hydrant lock details shall be included in Civil Plan
Submission.
14. Street lighting is required. Civil plan submittal shall include a lighting design
plan for review and approval.
15. Prior to the submission final plat application, the proponent will provide the
Community Development Department an addressing map for approval.
16. Prior to the submission of final plat application, a subdivision name must be
reserved with the Thurston County Auditor's Office.
17. The proponent shall submit a final landscaping and irrigation plan with the
civil engineering plans to include the perimeter of the project site, planter
strips, open space improvements, and stormwater facilities.
18. The proponent shall provide a performance assurance device in order to
provide for maintenance of the required landscaping until the tenant or
homeowners' association becomes responsible for landscaping
maintenance. The performance assurance device shall be 150 percent of the
anticipated cost to maintain the landscaping for three years.
-6-
DECISION°
The request for preliminary plat approval of Terra Valley is hereby granted subject to the
conditions contained in the conclusions above.
ORDERED this 26th of January , 2006. r, _ ~{,
STEPHEN K. CAUSSEAUX, JR.
Hearing Examiner
TRANSMITTED this 26th day of January, 2006, to the following:
APPLICANT: Terra Valley LLC
Doug Bloom
4200 6th Avenue SE, Ste. 301
Lacey, WA 98503
Chris Merritt
Olympic Engineering
1252 Devon Loop NE
Olympia, WA 98506
City of Yelm
Tami Merriman
105 Yelm Avenue West
P.O. Box 479
Yelm, Washington 98597
-~-
CASE NO.: SUB-05-0305-YL (TERRA VALLEY)
NOTICE
1. RECONSIDERATION: Any interested party or agency of record, oral or
written, that disagrees with the decision of the hearing examiner may make a written
request for reconsideration by the hearing examiner. Said request shall set forth specific
errors relating to:
A. Erroneous procedures;
6. Errors of law objected to at the public hearing by the person requesting
reconsideration;
C. Incomplete record;
D. An error in interpreting the comprehensive plan or other relevant material; or
E. Newly discovered material evidence which was not available at the time of
the
hearing. The term "new evidence" shall mean only evidence discovered after the hearing
held by the hearing examiner and shall not include evidence which was available or which
could reasonably have been available and simply not presented at the hearing for
whatever reason.
The request must be filed no later than 4:30 p.m. on February 6, 2006 (10 days from
mailing) with the Community Development Department 105 Yelm Avenue West, Yelm, WA
98597. This request shall set forth the bases for reconsideration as limited by the above.
The hearing examiner shall review said request in light of the record and take such further
-s-
action as he deems proper. The hearing examiner may request further information which
shall be provided within 10 days of the request.
2. APPEAL OF EXAMINER'S DECISION: The final decision by the Examiner
may be appealed to the city council, by any aggrieved person or agency of record, oral or
written that disagrees with the decision of the hearing examiner, except threshold
determinations (YMC 15.49.160) in accordance with Section 2.26.150 of the Yelm
Municipal Code (YMC).
NOTEe In an effort to avoid confusion at the time of filing a request for
reconsideration, please attach this page to the request for reconsideration.
-9-
a~~~T~p~ City of Yelm
~' ~ Community Development Department
I05 Yelm Avenue West
P.O. Box 479
YELM Yelm, WA 98597
WASHINGTON
Case Number: SUB-05-0305-YL
Proponent: Terra Valley LLC, Doug Bloom
Agent: SCA Consulting Group
Request: Subdivide approximately 9.7 acres into 41 single family
residential lots
Recommendation: Approval with conditions
Exhibit I: Site plan dated August 2005
Exhibit II: Notice of Application & Comment Letters
Exhibit III: Mitigated Determination of Non-Significance & Comment Letters
Exhibit IV: Public Hearing Notice
Proposal
The proponent is proposing to subdivide approximately 9.7 acres into 41 single-family
residential lots. The property is zoned R-4 Low Density Residential, which allows up to
4 dwelling units per acre.
Property Characteristics
The property is located on Longmire Street, south of State Route 510. The property is
identified by Assessor's Tax Parcel Number 21724340000.
The subject property is surrounded by single family residential uses.
Notice of Application and Public Hearing
Notice of this application was mailed to state and local agencies, and property owners
within 300 feet of the project site on September 26, 2005.
Notice of the date and time of the public hearing before the Hearing Examiner was
posted on the project site, mailed to the owners of property within 300 feet of the project
site, on January 3, 2006.
Notice of the date and time of the public hearing was published in the Nisqually Valley
News in the legal notice section on Friday, January 6, 2006.
Concurrency
Chapter 15.40 YMC requires the reviewing authority to determine that required urban
infrastructure is available at the time of development. Concurrency means the facilities
necessary to serve a proposed development are in place or planned for and properly
funded with a reasonable expectation that the facilities will be in place at the time
needed to preserve adopted levels of service.
Concurrency with sewer infrastructure is achieved pursuant to Section 15.40.020 (B)(1)
YMC when the project is within an area approved for sewer pursuant to the adopted
sewer comprehensive plan for the city and improvements necessary to provide city
standard facilities and services are present to meet the needs of the proposed
development.
Concurrency with water infrastructure is achieved pursuant to Section 15.40.020 (B)(2)
YMC when the project is within an area approved for municipal water service pursuant
to the adopted water comprehensive plan for the city and improvements necessary to
provide city standard facilities and services are present.
Concurrency with transportation infrastructure is achieved pursuant to Section
15.40.020 (5)(c) YMC when the project:
• Makes on-site and frontage improvements consistent with city standards and
roads necessary to serve the proposed project consistent with safety and public
interest;
• Makes such off-site facility improvements, not listed on the capital facilities plan,
as are necessary to meet city standards for the safe movement of traffic and
pedestrians attributable to the project;
• Makes a contribution to the facilities relating to capacity improvements identified
in the adopted six-year traffic improvement program, in the form of a
transportation facility charge.
Concurrency with school infrastructure is achieved when the developer provides a letter
from the local school district that the school facilities impacted by the proposed
development are present, or are on an approved and funded plan, to assure that
facilities will be available to meet the needs and impacts of the proposed development.
State Environmental Policy Act
The City of Yelm SEPA Responsible Official issued a Mitigated Determination of Non-
significance based on WAC 197-11-158 on November 14, 2005. This determination is
final and fulfils the City's responsibility for disclosure of potential, significant
environmental impacts. The Hearing Examiner may take action to deny or condition the
proposal based on impacts identified in the environmental checklist or other
environmental documents.
Page 2 of 10
The Mitigated Determination of Non-significance was issued with the following
conditions:
Prior to final subdivision approval, the developer shall complete the following
transportation improvements:
• The south half of Longmire Street shall be improved to City Standards for a
Neighborhood Collector along the property frontage.
• All interior streets shall be improved to City Standards for a Local Access
Residential.
• The SR 510/Longmire intersection improvement required by the Tahoma
Terra Master Plan Approval shall be completed prior to final plat application
for this subdivision.
• The interior street shall provide a future street connection to the west.
2. Civil plan submission shall include an updated preliminary stormwater plan that
meets or exceeds the standards in the 1992 stormwater Manual as adopted by
the City of Yelm. The stormwater plan shall include the following elements:
^ The elevation of the bottom of the infiltration gallery shall be a minimum of six
feet above the elevation of the high groundwater area as identified by
Thurston County, and must be 50 feet horizontally, or 2 feet vertically away
from the High Ground water area, which ever distance is less.
^ Individual dry wells are required for roof runoff.
^ The stormwater system shall be designed to accommodate stormwater
generated by required frontage improvements.
3. The applicant shall provide a tree and vegetation plan that identifies and protects
any priority oak species.
4. Temporary erosion control systems to be approved by the City of Yelm.
5. The developer shall provide at least 5% of total acreage as qualified open space.
This shall include the area of the man made pond, and oak habitat species area.
6. The developer shall enter into an agreement with Yelm Community Schools to
mitigate project impacts to the School District.
Lots Size and Setbacks
The Yelm Zoning Code does not establish minimum or maximum lot sizes, although it
does require standard yard setbacks of 15 feet from the front property line adjacent to
local access road with a minimum 20 foot driveway approach, 5 feet from side property
lines with a minimum of 12 feet between the two side yards, and 25 feet from the rear
property line. The setback for a flanking yard is 15 feet from the property line.
Adjacent Land Uses and Zoning
The property is bordered by properties that are currently developed as single family
residences, and is adjacent to the Tahoma Terra Master Planned Community.
Page 3 of 10
The plat as conditioned meets City of Yelm development requirements, and is a
compatible use with surrounding properties.
Open Space
The Growth Management Act establishes a goal for open space and recreation that
states "encourage the retention of open space and development of recreational
opportunities, conserve fish and wildlife habitat, increase access to natural resource
lands and water, and develop parks" [RCW 36.70A.020(9)].
Chapter 14.12 YMC provides guidelines for the retention and creation of open space
within the City. This chapter requires a minimum of five percent of the gross area of a
new subdivision be dedicated as usable open space. Appropriate uses of dedicated
open space include:
Environmental interpretation or education
Parks, recreation lands, or athletic fields
Footpaths or bicycle trails
No more than five percent of any dedicated open spaces may be impermeable surfaces
and open space must be sited so as to be suitable for its intended purpose and at least
75% of the open space must be assessable to either the general public or all residents
of the associated development. Open space shall be dedicated at the time of final
subdivision approval.
Schools
New residential units create a demand for additional school services and facilities. The
Yelm School District requests that the proponent enter into an agreement with the
school district for the payment of mitigation fees based on the project's impact.
This request for a mitigation agreement between the proponent and the school district
became a condition of the Mitigated Determination of Non-significance issued pursuant
to the State Environmental Policy Act.
Essential Public Facilities
The SE Thurston Fire/EMS has adopted a fire protection impact fee. This fee is used
by the Fire District to fund those capital facilities required by new development. The
impact fee for 2006 is $0.216 per sq. ft. of new development.
Page 4 of 10
Transportation and Site Access
The City of Yelm Development Guidelines and the concurrency requirements of Chapter
15.24 YMC require all new subdivisions to improve street frontages to current City
standards. Longmire Street is identified as a Neighborhood Collector Street, which
requires a 16 foot travel lane, vertical curb, a 7-foot planter strip with street trees 35 feet
on center and "No Parking" signs, a 5 foot sidewalk, and street lighting. The developer
of this subdivision is improving Longmire Street as part of the Tahoma Terra Master
Planned Development located at the southern end of Longmire Street.
Streets within the subdivision will be constructed to the local access standard and
dedicated to the City upon final subdivision approval. A local access street includes two
11 foot travel lanes, two 7 foot parking lanes, a concrete rolled edge curb and gutter, a 6
foot planter strip with street trees 35 feet on center, a 5 foot sidewalk on one side of the
street, and street lighting.
Chapter 16.16.090 YMC requires that the layout of new subdivisions provide for the
continuation of streets existing in adjoining subdivisions and to provide for the
continuation of new streets within the subdivision to adjacent properties that have not
been subdivided. The applicant has provided a connection at the property to both the
east and west.
The completed project will increase traffic and impact the City's transportation system.
Chapter 15.40, concurrency Management, requires all development to mitigate impacts
to the City transportation system. A single family home generates 1.01 p.m. peak hour
trips per unit. The Transportation Facility Charge per unit is $757.50 and payable at
time of building permit issuance.
Parking
Chapter 17.72 YMC requires minimum parking ratio of two spaces per dwelling unit,
which is typically met in subdivisions within a standard driveway. On-street parking is
allowed on both sides of local access residential streets.
Water System
The City's Water Comprehensive Plan identifies the property as being within the water
service area. There is an existing watermain located in Longmire Street, northeast of
the property. The developer of this subdivision is extending the waterline past this
property to the Tahoma Terra Master Planned Development located at the southern end
of Longmire Street.
The current fee to connect to the City water system is $1,500.00 per Equivalent
Residential Unit (each ERU equals 900 cubic feet of water consumption per month).
Page 5 of 10
The proposed subdivision would be required to connect to the City's water system and
the projects internal roadways will be required to have a water main installed to serve
fire hydrants and individual services.
Any existing well(s) on the property must be decommissioned per Department of
Ecology standards and any water rights associated with these wells shall be dedicated
to the City of Yelm.
The City of Yelm is dedicated to providing the best quality water possible to its
consumers. Section 246-290-490, WAC, requires that the City take measures to ensure
that contamination does not occur as a result of cross contamination.
An irrigation meter may be installed for the purpose of irrigation. A backflow prevention
device will be required for all landscape irrigation connections between the irrigation
system and the water meter. This also includes any individual irrigation systems that
may be located on any individual lot within the subdivision.
Identified in the 2002 City of Yelm Water Comprehensive Plan is a requirement to install
fire hydrant locks as part of the City's water conservation and accountability program.
In 2004, the City was also required to complete a vulnerability assessment in response
to the new homeland security measures as a result of 9/11.
Sewer System
The City's Sewer Comprehensive Plan identifies the property as being within the sewer
service area. There is an existing sewermain located in Longmire Street, northeast of
the property. The developer of this subdivision is extending the sewer line past this
property to the Tahoma Terra Master Planned Development located at the southern end
of Longmire Street.
The current fee to connect to the City sewer system is $5,569.00 per Equivalent
Residential Unit (each ERU equals 900 cubic feet of water consumption per month).
Any existing on-site sewage disposal system(s) shall be abandoned per Thurston
County Health Department standards.
Stormwater Quality and Quantity
Impervious surfaces create stormwater runoff which, when uncontrolled and untreated
can create health, safety, and environmental hazards. The City of Yelm has adopted
the 1992 Department of Ecology Stormwater Manual, which requires all development to
treat and control stormwater.
The proponent has submitted a preliminary stormwater report which includes a
conceptual design for the treatment and infiltration of the stormwater. The east and
Page 6 of 10
south portion of the property is identified by Thurston County as a potential high
groundwater flooding buffer area. Thurston County, in other areas of the County that
are potential high groundwater flooding areas, indicates in the Interim Site Development
Standards for New Development in Salmon Creek Basin that if there is more than six
feet of separation between the level of the high groundwater and the bottom of any
infiltration gallery, the project should be designed to the effective drainage manual.
Stormwater facilities require continued maintenance to ensure they remain in proper
working condition.
Street Lighting
Adequate street lighting is necessary to provide safety to pedestrians, vehicles, and
homeowners. Street lighting is reviewed at the time of civil plan review in order to
assure adequate lighting.
Subdivision Name and Addressing
A subdivision name must be reserved with the Thurston County Auditor's Office prior to
submitting for final subdivision approval.
Addressing and street naming within the subdivision will be assigned by the Community
Development Department prior to application for final subdivision approval.
Landscaping
Landscaping and screening are necessary to provide screening between compatible
and incompatible land uses, to safeguard privacy and to preserve the aesthetic assets
of the City. Chapter 17.80 YMC requires all development to provide on site
landscaping.
The site is adjacent to properties that are compatibly zoned. Chapter 17.80 YMC
requires that the perimeter of the site be landscaped with a Type II landscaping. In
residential subdivisions the City allows fencing to meet the landscaping requirement for
the perimeter of the site. Landscape requirements shall be installed and approved prior
to application for final plat.
Landscaping is required in open space and stormwater facilities.
Chapter 17.80 YMC requires that at time of civil plan review and approval the proponent
provide the Community Development Department a detailed final landscape and
irrigation plan for approval.
Section 17.80.090 (F) YMC states that the owner/developer of any project requiring site
plan review approval, subdivision approval, or short subdivision approval shall provide a
Page 7 of 10
performance assurance device in order to provide for maintenance of the required
landscaping until the tenant or homeowners' association becomes responsible for
landscaping maintenance. The performance assurance device shall be 150 percent of
the anticipated cost to maintain the landscaping for three years.
Staff Recommendation
Section 16.12.170 YMC requires written findings prior to a decision on a preliminary
subdivision.
The proponent has established that the proposed subdivision, if conditioned, adequately
provides for the public health, safety and general welfare and for such open spaces,
drainage ways, streets, potable water supplies, sanitary wastes, parks and recreation,
schools, and sidewalks.
That the public use and interest will be served by the subdivision of the property, if
conditioned.
The subdivision, if conditioned, is in conformance with the Yelm-Thurston County Joint
Comprehensive Plan, the City of Yelm Zoning Code, the City of Yelm Subdivision Code,
the Shoreline Management Act and the Thurston County Shoreline Master Program,
and the City of Yelm Development Guidelines.
The Hearing Examiner should approve the preliminary subdivision with the following
conditions:
1. The conditions of the Mitigated Determination of Non-significance are hereby
referenced and are considered conditions of this approval.
2. Each dwelling unit with the subdivision shall connect to the City water system.
The connection fee and meter fee will be established at the time of building
permit issuance.
3. All conditions for cross connection control as required in Section 246-290-490
WAC.
4. All planting strips and required landscaping located in any open space and
stormwater tract, and along Longmire Street shall be served by an irrigation
system with a separate water meter and an approved backflow prevention
device.
Page 8 of 10
5. Each dwelling within the subdivision shall connect to the City S.T. E.P. sewer
system. The connection fee and inspection fee will be established at the time of
building permit issuance.
6. The applicant shall pay a fire protection impact fee. The impact fee for 2006 is
$0.216 per sq. ft. of new development.
7. The proponent shall design and construct all stormwater facilities in accordance
with the 1992 DOE stormwater Manual, as adopted by the City of Yelm. Best
Management Practices (BMP's) are required during construction. A 10-foot
setback from all property lines and easements are required for stormwater
facilities.
8. The final stormwater plan shall be submitted with civil engineering plans and
shall include an operation and maintenance plan. The plan shall include high
ground water protection as required in the MDNS.
9. All roof drain runoff shall be infiltrated on each lot utilizing individual drywells.
10. The stormwater system shall be held in common by the Homeowners
Association. The Homeowners Agreement shall include provisions for the
assessment of fees against individual lots for the maintenance and repair of the
stormwater facilities.
11. The proponent shall submit a fire hydrant plan to the Community Development
Department for review and approval as part of the civil engineering plans prior to
final subdivision approval.
12. The proponent shall submit fire flow calculations for all existing and proposed
hydrants. All hydrants must meet minimum City standards.
13. The applicant shall be responsible for the installation of hydrant locks on all fire
hydrants required and installed as part of development. The applicant shall
coordinate with the Yelm Public Works Department to purchase the required
hydrant locks. Hydrant lock details shall be included in Civil Plan Submission.
14. Street lighting is required. Civil plan submittal shall include a lighting design plan
for review and approval.
15. Prior to the submission final plat application, the proponent will provide the
Community Development Department an addressing map for approval.
16. Prior to the submission of final plat application, a subdivision name must be
reserved with the Thurston County Auditor's Office.
Page 9 of 10
17. The proponent shall submit a final landscaping and irrigation plan with the civil
engineering plans to include the perimeter of the project site, planter strips, open
space improvements, and stormwater facilities.
18. The proponent shall provide a performance assurance device in order to provide
for maintenance of the required landscaping until the tenant or homeowners'
association becomes responsible for landscaping maintenance. The performance
assurance device shall be 150 percent of the anticipated cost to maintain the
landscaping for three years.
Based on the Analysis and Conditions of Approval above, staff recommends that the
Hearing Examiner approve SUB-05-0305-YL.
Page 10 of 10
a
o.
YELM
WASHINGTON
Sign in Sheet
City of Yelm
Community Development Department
Yelm Hearing Examiner
January 17, 2006
Please sign in and indicate if you wish to speak at this meeting or to be added to the
mailing list to receive future agendas and minutes.
Name
Mailing Address Would you like a
copy of the
decision mailed
to ou?
~.;~~;.r., ~...5^~:.,~ Wit- ...;a ~,G~~_ ~
~~ U~~. ~~~~,,~ ~~a ,~ ~x ~ z~
f~ ~ ~ <~i~ F ~ ; Cc~ y'.~ .S 7 C
,~
All Hearing Examiner meetings are audio taped. For information on obtaining a copy please call the Yelm
Community Development Department at 360-458-3835.
~~~ TEA City of Yelm
~s
°' Community Development Department
105 Yelm Avenue West
P.O. Box 479
YELM Yelm, WA 98597
WASHINGTON
Case Number: SUB-05-0305-YL
Proponent: Terra Valley LLC, Doug Bloom
Agent: SCA Consulting Group
Request: Subdivide approximately 9.7 acres into 41 single family
residential lots
Recommendation: Approval with conditions
Exhibit I: Site plan dated August 2005
Exhibit II: Notice of Application & Comment Letters
Exhibit III: Mitigated Determination of Non-Significance & Comment Letters
Exhibit IV: Public Hearing Notice
Proposal
The proponent is proposing to subdivide approximately 9.7 acres into 41 single-family
residential lots. The property is zoned R-4 Low Density Residential, which allows up to
4 dwelling units per acre.
Property Characteristics
The property is located on Longmire Street, south of State Route 510. The property is
identified by Assessor's Tax Parcel Number 21724340000.
The subject property is surrounded by single family residential uses.
Notice of Application and Public Hearing
Notice of this application was mailed to state and local agencies, and property owners
within 300 feet of the project site on September 26, 2005.
Notice of the date and time of the public hearing before the Hearing Examiner was
posted on the project site, mailed to the owners of property within 300 feet of the project
site, on January 3, 2006.
Notice of the date and time of the public hearing was published in the Nisqually Valley
News in the legal notice section on Friday, January 6, 2006.
Concurrency
Chapter 15.40 YMC requires the reviewing authority to determine that required urban
infrastructure is available at the time of development. Concurrency means the facilities
necessary to serve a proposed development are in place or planned for and properly
funded with a reasonable expectation that the facilities will be in place at the time
needed to preserve adopted levels of service.
Concurrency with sewer infrastructure is achieved pursuant to Section 15.40.020 (B)(1)
YMC when the project is within an area approved for sewer pursuant to the adopted
sewer comprehensive plan for the city and improvements necessary to provide city
standard facilities and services are present to meet the needs of the proposed
development.
Concurrency with water infrastructure is achieved pursuant to Section 15.40.020 (B)(2)
YMC when the project is within an area approved for municipal water service pursuant
to the adopted water comprehensive plan for the city and improvements necessary to
provide city standard facilities and services are present.
Concurrency with transportation infrastructure is achieved pursuant to Section
15.40.020 (5)(c) YMC when the project:
• Makes on-site and frontage improvements consistent with city standards and
roads necessary to serve the proposed project consistent with safety and public
interest;
• Makes such off-site facility improvements, not listed on the capital facilities plan,
as are necessary to meet city standards for the safe movement of traffic and
pedestrians attributable to the project;
• Makes a contribution to the facilities relating to capacity improvements identified
in the adopted six-year traffic improvement program, in the form of a
transportation facility charge.
Concurrency with school infrastructure is achieved when the developer provides a letter
from the local school district that the school facilities impacted by the proposed
development are present, or are on an approved and funded plan, to assure that
facilities will be available to meet the needs and impacts of the proposed development.
State Environmental Policy Act
The City of Yelm SEPA Responsible Official issued a Mitigated Determination of Non-
significance based on WAC 197-11-158 on November 14, 2005. This determination is
final and fulfils the City's responsibility for disclosure of potential, significant
environmental impacts. The Hearing Examiner may take action to deny or condition the
proposal based on impacts identified in the environmental checklist or other
environmental documents.
Page 2 of 10
The Mitigated Determination of Non-significance was issued with the following
conditions:
1. Prior to final subdivision approval, the developer shall complete the following
transportation improvements:
^ The south half of Longmire Street shall be improved to City Standards for a
Neighborhood Collector along the property frontage.
^ All interior streets shall be improved to City Standards for a Local Access
Residential.
^ The SR 510/Longmire intersection improvement required by the Tahoma
Terra Master Plan Approval shall be completed prior to final plat application
for this subdivision.
• The interior street shall provide a future street connection to the west.
2. Civil plan submission shall include an updated preliminary stormwater plan that
meets or exceeds the standards in the 1992 stormwater Manual as adopted by
the City of Yelm. The stormwater plan shall include the following elements:
^ The elevation of the bottom of the infiltration gallery shall be a minimum of six
feet above the elevation of the high groundwater area as identified by
Thurston County, and must be 50 feet horizontally, or 2 feet vertically away
from the High Ground water area, which ever distance is less.
^ Individual dry wells are required for roof runoff.
^ The stormwater system shall be designed to accommodate stormwater
generated by required frontage improvements.
3. The applicant shall provide a tree and vegetation plan that identifies and protects
any priority oak species.
4. Temporary erosion control systems to be approved by the City of Yelm.
5. The developer shall provide at least 5% of total acreage as qualified open space.
This shall include the area of the man made pond, and oak habitat species area.
6. The developer shall enter into an agreement with Yelm Community Schools to
mitigate project impacts to the School District.
Lots Size and Setbacks
The Yelm Zoning Code does not establish minimum or maximum lot sizes, although it
does require standard yard setbacks of 15 feet from the front property line adjacent to
local access road with a minimum 20 foot driveway approach, 5 feet from side property
lines with a minimum of 12 feet between the two side yards, and 25 feet from the rear
property line. The setback for a flanking yard is 15 feet from the property line.
Adjacent Land Uses and Zoning
The property is bordered by properties that are currently developed as single family
residences, and is adjacent to the Tahoma Terra Master Planned Community.
Page 3 of 10
The plat as conditioned meets City of Yelm development requirements, and is a
compatible use with surrounding properties.
Open Space
The Growth Management Act establishes a goal for open space and recreation that
states "encourage the retention of open space and development of recreational
opportunities, conserve fish and wildlife habitat, increase access to natural resource
lands and water, and develop parks" [RCW 36.70A.020(9)].
Chapter 14.12 YMC provides guidelines for the retention and creation of open space
within the City. This chapter requires a minimum of five percent of the gross area of a
new subdivision be dedicated as usable open space. Appropriate uses of dedicated
open space include:
• Environmental interpretation or education
• Parks, recreation lands, or athletic fields
• Footpaths or bicycle trails
No more than five percent of any dedicated open spaces may be impermeable surfaces
and open space must be sited so as to be suitable for its intended purpose and at least
75% of the open space must be assessable to either the general public or all residents
of the associated development. Open space shall be dedicated at the time of final
subdivision approval.
Schools
New residential units create a demand for additional school services and facilities. The
Yelm School District requests that the proponent enter into an agreement with the
school district for the payment of mitigation fees based on the project's impact.
This request for a mitigation agreement between the proponent and the school district
became a condition of the Mitigated Determination of Non-significance issued pursuant
to the State Environmental Policy Act.
Essential Public Facilities
The SE Thurston Fire/EMS has adopted a fire protection impact fee. This fee is used
by the Fire District to fund those capital facilities required by new development. The
impact fee for 2006 is $0.216 per sq. ft. of new development.
Page 4 of 10
Transportation and Site Access
The City of Yelm Development Guidelines and the concurrency requirements of Chapter
15.24 YMC require all new subdivisions to improve street frontages to current City
standards. Longmire Street is identified as a Neighborhood Collector Street, which
requires a 16 foot travel lane, vertical curb, a 7-foot planter strip with street trees 35 feet
on center and "No Parking" signs, a 5 foot sidewalk, and street lighting. The developer
of this subdivision is improving Longmire Street as part of the Tahoma Terra Master
Planned Development located at the southern end of Longmire Street.
Streets within the subdivision will be constructed to the local access standard and
dedicated to the City upon final subdivision approval. A local access street includes two
11 foot travel lanes, two 7 foot parking lanes, a concrete rolled edge curb and gutter, a 6
foot planter strip with street trees 35 feet on center, a 5 foot sidewalk on one side of the
street, and street lighting.
Chapter 16.16.090 YMC requires that the layout of new subdivisions provide for the
continuation of streets existing in adjoining subdivisions and to provide for the
continuation of new streets within the subdivision to adjacent properties that have not
been subdivided. The applicant has provided a connection at the property to both the
east and west.
The completed project will increase traffic and impact the City's transportation system.
Chapter 15.40, concurrency Management, requires all development to mitigate impacts
to the City transportation system. A single family home generates 1.01 p.m. peak hour
trips per unit. The Transportation Facility Charge per unit is $757.50 and payable at
time of building permit issuance.
Parking
Chapter 17.72 YMC requires minimum parking ratio of two spaces per dwelling unit,
which is typically met in subdivisions within a standard driveway. On-street parking is
allowed on both sides of local access residential streets.
Water System
The City's Water Comprehensive Plan identifies the property as being within the water
service area. There is an existing watermain located in Longmire Street, northeast of
the property. The developer of this subdivision is extending the waterline past this
property to the Tahoma Terra Master Planned Development located at the southern end
of Longmire Street.
The current fee to connect to the City water system is $1,500.00 per Equivalent
Residential Unit (each ERU equals 900 cubic feet of water consumption per month).
Page 5 of 10
The proposed subdivision would be required to connect to the City's water system and
the projects internal roadways will be required to have a water main installed to serve
fire hydrants and individual services.
Any existing well(s) on the property must be decommissioned per Department of
Ecology standards and any water rights associated with these wells shall be dedicated
to the City of Yelm.
The City of Yelm is dedicated to providing the best quality water possible to its
consumers. Section 246-290-490, WAC, requires that the City take measures to ensure
that contamination does not occur as a result of cross contamination.
An irrigation meter may be installed for the purpose of irrigation. A backflow prevention
device will be required for all landscape irrigation connections between the irrigation
system and the water meter. This also includes any individual irrigation systems that
may be located on any individual lot within the subdivision.
Identified in the 2002 City of Yelm Water Comprehensive Plan is a requirement to install
fire hydrant locks as part of the City's water conservation and accountability program.
In 2004, the City was also required to complete a vulnerability assessment in response
to the new homeland security measures as a result of 9/11.
Sewer System
The City's Sewer Comprehensive Plan identifies the property as being within the sewer
service area. There is an existing sewermain located in Longmire Street, northeast of
the property. The developer of this subdivision is extending the sewer line past this
property to the Tahoma Terra Master Planned Development located at the southern end
of Longmire Street.
The current fee to connect to the City sewer system is $5,569.00 per Equivalent
Residential Unit (each ERU equals 900 cubic feet of water consumption per month).
Any existing on-site sewage disposal system(s) shall be abandoned per Thurston
County Health Department standards.
Stormwater Quality and Quantity
Impervious surfaces create stormwater runoff which, when uncontrolled and untreated
can create health, safety, and environmental hazards. The City of Yelm has adopted
the 1992 Department of Ecology Stormwater Manual, which requires all development to
treat and control stormwater.
The proponent has submitted a preliminary stormwater report which includes a
conceptual design for the treatment and infiltration of the stormwater. The east and
Page 6 of 10
south portion of the property is identified by Thurston County as a potential high
groundwater flooding buffer area. Thurston County, in other areas of the County that
are potential high groundwater flooding areas, indicates in the Interim Site Development
Standards for New Development in Salmon Creek Basin that if there is more than six
feet of separation between the level of the high groundwater and the bottom of any
infiltration gallery, the project should be designed to the effective drainage manual.
Stormwater facilities require continued maintenance to ensure they remain in proper
working condition.
Street Lighting
Adequate street lighting is necessary to provide safety to pedestrians, vehicles, and
homeowners. Street lighting is reviewed at the time of civil plan review in order to
assure adequate lighting.
Subdivision Name and Addressing
A subdivision name must be reserved with the Thurston County Auditor's Office prior to
submitting for final subdivision approval.
Addressing and street naming within the subdivision will be assigned by the Community
Development Department prior to application for final subdivision approval.
Landscaping
Landscaping and screening are necessary to provide screening between compatible
and incompatible land uses, to safeguard privacy and to preserve the aesthetic assets
of the City. Chapter 17.80 YMC requires all development to provide on site
landscaping.
The site is adjacent to properties that are compatibly zoned. Chapter 17.80 YMC
requires that the perimeter of the site be landscaped with a Type II landscaping. In
residential subdivisions the City allows fencing to meet the landscaping requirement for
the perimeter of the site. Landscape requirements shall be installed and approved prior
to application for final plat.
Landscaping is required in open space and stormwater facilities.
Chapter 17.80 YMC requires that at time of civil plan review and approval the proponent
provide the Community Development Department a detailed final landscape and
irrigation plan for approval.
Section 17.80.090 (F) YMC states that the owner/developer of any project requiring site
plan review approval, subdivision approval, or short subdivision approval shall provide a
Page 7 of 10
performance assurance device in order to provide for maintenance of the required
landscaping until the tenant or homeowners' association becomes responsible for
landscaping maintenance. The performance assurance device shall be 150 percent of
the anticipated cost to maintain the landscaping for three years.
Staff Recommendation
Section 16.12.170 YMC requires written findings prior to a decision on a preliminary
subdivision.
The proponent has established that the proposed subdivision, if conditioned, adequately
provides for the public health, safety and general welfare and for such open spaces,
drainage ways, streets, potable water supplies, sanitary wastes, parks and recreation,
schools, and sidewalks.
That the public use and interest will be served by the subdivision of the property, if
conditioned.
The subdivision, if conditioned, is in conformance with the Yelm-Thurston County Joint
Comprehensive Plan, the City of Yelm Zoning Code, the City of Yelm Subdivision Code,
the Shoreline Management Act and the Thurston County Shoreline Master Program,
and the City of Yelm Development Guidelines.
The Hearing Examiner should approve the preliminary subdivision with the following
conditions:
1. The conditions of the Mitigated Determination of Non-significance are hereby
referenced and are considered conditions of this approval.
2. Each dwelling unit with the subdivision shall connect to the City water system.
The connection fee and meter fee will be established at the time of building
permit issuance.
3. All conditions for cross connection control as required in Section 246-290-490
WAC.
4. All planting strips and required landscaping located in any open space and
stormwater tract, and along Longmire Street shall be served by an irrigation
system with a separate water meter and an approved backflow prevention
device.
Page 8 of 10
5. Each dwelling within the subdivision shall connect to the City S.T.E.P. sewer
system. The connection fee and inspection fee will be established at the time of
building permit issuance.
6. The applicant shall pay a fire protection impact fee. The impact fee for 2006 is
$0.216 per sq. ft. of new development.
7. The proponent shall design and construct all stormwater facilities in accordance
with the 1992 DOE stormwater Manual, as adopted by the City of Yelm. Best
Management Practices (BMP's) are required during construction. A 10-foot
setback from all property lines and easements are required for stormwater
facilities.
8. The final stormwater plan shall be submitted with civil engineering plans and
shall include an operation and maintenance plan. The plan shall include high
ground water protection as required in the MDNS.
9. All roof drain runoff shall be infiltrated on each lot utilizing individual dniwells.
10. The stormwater system shall be held in common by the Homeowners
Association. The Homeowners Agreement shall include provisions for the
assessment of fees against individual lots for the maintenance and repair of the
stormwater facilities.
11. The proponent shall submit a fire hydrant plan to the Community Development
Department for review and approval as part of the civil engineering plans prior to
final subdivision approval.
12. The proponent shall submit fire flow calculations for all existing and proposed
hydrants. All hydrants must meet minimum City standards.
13. The applicant shall be responsible for the installation of hydrant locks on all fire
hydrants required and installed as part of development. The applicant shall
coordinate with the Yelm Public Works Department to purchase the required
hydrant locks. Hydrant lock details shall be included in Civil Plan Submission.
14. Street lighting is required. Civil plan submittal shall include a lighting design plan
for review and approval.
15. Prior to the submission final plat application, the proponent will provide the
Community Development Department an addressing map for approval.
16. Prior to the submission of final plat application, a subdivision name must be
reserved with the Thurston County Auditor's Office.
Page 9 of 10
17. The proponent shall submit a final landscaping and irrigation plan with the civil
engineering plans to include the perimeter of the project site, planter strips, open
space improvements, and stormwater facilities.
18. The proponent shall provide a performance assurance device in order to provide
for maintenance of the required landscaping until the tenant or homeowners'
association becomes responsible for landscaping maintenance. The performance
assurance device shall be 150 percent of the anticipated cost to maintain the
landscaping for three years.
Based on the Analysis and Conditions of Approval above, staff recommends that the
Hearing Examiner approve SUB-05-0305-YL.
Page 10 of 10
rn
z
a
~o
Z_ N
W
a
~
_ ~
z ~
U s
~o
~ •ZF~Yy\ F
m a4 e °J e'' FJ
~ s
M. + o
I I - -- --I
I W `OO I
I I
I ~ -- ~
4 IJ O I
I ~
o s
I I ``~*s IQ W
°o
~
~s ~ ~ N i
'r
~ ,~" i YI I a, Q~ I
~IW ~ ~ I
I .yl
I ~ I I
I ~I~ a h I
L ~
r-- d-'-~--
I I fil I
--° is rvo..a
~_~ _-_.r. _ _
:I'
I
I
I I i
idd
~ y ~-........
k
-----~- - ;
„
:
- ----
I
a~
~
I; I
l
0
e
Iw
I ~ x
~
m - +---
I I -T----+----~
~ I
I
I I
I
- - - - ~ - _ _ '
I 1
- _ _.__ ____~ ._______.___.E
a
Q
L~
r
_Z
_U vi
r
~ i
z L
~~w i=~
z~~ ~3 0
o
OFW ~z
O
O
~
a F
0~ O
Oro O'n ~
~zg ~~
° o
~~ _~
_$
Z L ~ Q N
Ou3
~N
~ u
N
~ J ~ Z
K O
uu ~ ~O
~
a0U1
K
~'+ U U
> u~
~,
°
~
~ o~
jW0
U1~
J
z
o w~ ~~ w
aC~O a L
~ ?L
" ~ ~n °-' ~ 5 S, °z
[
n
Ul
N X ~
~ 1D p
d
5 ~
N a ~
a "'
2 ~
'n ~
a ~
a iC' ~" O
Z i
ip
'n to
a>~
Z
0 W
~gu
n
mW~
a
i` ~~
_ _
N
o
-
~
~
m
N O
F O
O ~-
i~
O
O ~ J Jl
W j r V Q > N K Ol O V ~ dJ V V Y ~ U
~ L 1
~ Q
a ~ ~
~~ ~
> >oo
~ ~<~ ~
~
V W N
(n
W V
a On
LL O
rOj
0
a Jl Z ..
2
N ~~
N V U_
~
Q
w
~ oo~o
V
a
~
~i
m
~ _
°
a
'
.
'
..
u
..
u
>
~
N
..
~
-~ 0 O~dN W d ~ ~ d ~ O O ~ a 3 K rc z ~ K
r ~ OLJ~M '
~ ~ p<~ ? U' o~Y Ul K V' F_ w O N
K K ~ rZ N
~~"'U
W
O z w U~ w W m ~ '" o =
J N S
S
G
V ... w$ a O Jl Y NO Jl O Z Q Z b
y
K K 3 U1 H d U
rO
G G OC W
5 z Z i ~ ~+
zO O ~ a ~ h
~w w
K t
m o0 N '~ 3 3 3 ~
U K~ ~ m N uJ" ~ w ru
Q O~ Z Q w Z (J Q
V ,!1 O Jl ° N Jl 8 3 Ul
0 03 0 0 0 0 0 0 0
O OO O O 0 0 O O o
K d t
J O O_ O O KO O O O O
N 5 d i d
I
Z
W I
J
I E5 E9 E9 £9 69 OL
~ ~~ __ ___
W°x I ,1 ~~ o
r
~gp ° m ~ ~ ~ I C'7 ~ n
~ I Mn M~ C'7n - Mn (+7g !~ ~I
I ~ i 8 `, ~~' I ch m o
'~ ~ ~, I Ch v ,~
~i ~ 3S ' S NN3~ d 1 ws2 ' -
~ FYI M~ p
p I
___---- M' M, 9 '~ ~ ~Q
I V __ 4315 'Y_ .. d[15 _ ~_ Ji __ _ w.
.. _ t5 d S 1 1
I / I 4
11
I ~ i I I ~- m
M Zy O~ I ~-° ~ I I M„ °^
.- ,~ a- I sz N ~ ~ N ~ ~ih I i
II
,~,
~ I I
W •
v' I I ~ I I ! ~ ~ v ~ N '" i I Q' ~ ~yo
I ~_ 501 I ~ ~
f I O I O I I i O I I ~~ v
W I I~ ~ r M 1 ~ I rip IL
M I I~ "~~,8 ~~ vl Nv' Q ~' 1 W O
LL I i p a I Q' :. ~~~-~ U'
ti ~a a O p009 I 009 ~~ I ( OS4 Q m
N
N W I I~ 3 ~ "'~ I oo s ~~ `~, N~ I ~ ~
I
~ `' w U
~_ ~ I i g ~ ~ ~ ~ ~ ~r
w ~ I ~ ~ ~ o Q ~ ~ ~I ~ S rD °mN ~ ~ ~ ~ ~ ~ M ~ - Q ~
/~ ~ I ~I e- v ~ I I ~~ ~ N
~ `/ I I -t- - ~ 1 ~ I h ~ Z
Z I' I ~ ~ ~ O~
= O ~ ~ ~ o I I ~ $ ~ (O ~ ~ I I I• I O = O
n' I I ~~ ` N ~, 1 N° ~U
Q J ~ I~ ~ I I ~
w ~ ~o I ~~ ~ ~N ~ ~~ .^~, o I _ zO
Q 4's2~ I r ~ N~~ t 12g ~ N 8 N
s2
~ I ~ ze u~ h _
~ I I --- -_-- x
O ~._.- - ~ _ _ ~ M ~ QYZ w
_ _ _ ~
=Q +dLS 1 dat5 ~nI d31S S d3r9 ; ~ m O a
i ~ Q
1
~ '°
r I ~° g ~ ~° M~ N g ~ g _ i o ~~ ~o ess'e-= aaalnoad ~
a3alnoaa 1 ~
I F O O ~ ' 'lOA l1NOd NOI1Ya1lIdNl
1 1 ~ 3~¢0 I
~ S OS OS ~^ ar
( 0.C ~C~1
I ~ -' - ._ -H1Yd 1tlY0 _
I I 1 -_.----_- ---- _-_-_.-_ - _ ~.\
1 1 -- - - - - _ _ _
1 w _
i ~ ~ .,
1 aQ
~ 1 ~
~~ ~ o ~ r
1 Q \
w
- - ~
_~
U
Z
g
~o
Z~
W
a
I I
I I___ ~`
I W ~. I
~s IJ °, 1
J
I I ~ i
I I
••
I I ~~ I j y i
rs~=~ma
__
o
__
---- _Q__J
I
~ry`
I
I I
~
I '^ I
I~ Q ~
IW ~. I
I ~I I •I ~ a h I
I ~ I
ZF I ~
IS IwF C I
_~__
~_ i ._ .~
~ ~ --~
I I
I
I I
I I :
>°
-
~ I
I
~ I
..__....__~
l
____~ - ~
_- ~ :
-_- Q~
I~ 1
I
I ~ I
~
a ~ I ;
f O
a
H~
I I f I
I I I
a
Q
H
Z
~N
>z
Z L
ogW L~
Kd~ p
z~ 3
rii
ONU+ Oz O
V
~
ip z ZO_
OU~ Om 1
,l
4
rv2 ~o
0=8 ~~ O
N
~;U ~~ ~
°
°
E
~
~
n
Y
K
~ OHO
<~ ~3
_ ~
Q cNv
O
~ N ~
Z
~ N
u
r~0 ~
Z K~ p ~n
K ~UV
0_
O
~
O
z N
w ~
'~
Vu
m ~ ~ t J ~ 0 O
u
~ i ~'n O'a`
di
F
z ~ z
a <
i
u ~ $
o N
"200
~
~
O
-
N-
aa~~ny~
~ m ~
DO
KG
~ G
n
L ~
z o
K g
'~oY~
}a~~
~ ~
~ a ~
O~Q
N~ z p
,n ~
Y u ~
3 o
U d
W ~
W O
o lno~m
~o
~ ~ o
~~ o
0
~,° ~, o z
o
~ z >
~
~Qil~ < o
O o~ o
O
O ~
O
O
g O
G ~
~ al V J1QO
zo-~~ ~
~, ~ ~,
~ zN 4z-~>
Z
o K
~, V U
ww ~fl ~ O
G~~~~
U ~~ mz`"~
O
U
K~
u,~~z I
~
~
~p
wu~i~ I
w ~
r M1, 02
rg m
Q- m W
oz~O
~
i~ ~w
a,r, ~~
a'~ ~a a~m
aWtz~u G
Z ~ . 9
I
o i~ z~ zz~°u W T ~
0 0 0
N
~ / ~ I I
/ E9 'S
/ E9 /
I £7
I E7 O
I ~ - -
I /
Z//
Wn ~
/ I ~ I I
II M r O
1 I I ~
1 ~t
/ M M M -
/ M M
I I I
I I
/ ~ I M
/ ~
I I I I/ \
I I N \
_
------ --
I -r-~-- - ~ -------- - - II ^~//i/
~ .
I
~ -
/ - - - ~ ~/
/
/
/
M
~
I I
I,
~
I
~ / I
I
I
I /
Y I I
W ~~
~ ~ N
~
I I~
/
/
I
I
W I /
/ I I/ Q ~ / I
4V I
M I 1 /
LL ~ IZ / Q l i I
IW
,a
~ ~
° o
~ o
>e / ~
/
W / I
O > I I /
/~
W ~+ I / / 111
/
w y I ; ~
~ ~
' ~ I ~ ~ ~ I
~ O I
I
/
I
I
I I I
K
w
H
cQ
G
Q
/ it
/ ~ I
I / ~/~~ I
/
/ /
-I------
I
/ O
I N
I -------
~ I~~ e-
v I ~C,V
I ~~
1
I ~
I I ~
Q ~ N
a~~ I oll
I
/ ~ I
~/ N M
~
/ I
ti
r I ~
~I ~ ~
cl N
I
/ \
(O I 1
1
~ N i II
I I
I 1
P /
I
/ I
I I
1
I
~
I
N N
~~ h
'
~ N 1 I
I I
1 /
/ /
I 1 ~ /j -
I 1 /M/~
I 1 / //
-
1
' / // ~' ~ \~
I 1 / / /bbl ~ti
I \J/ /
l .~
I / m
I ~1 / '~I /i 510
\ '~
' /
' /
z
a \
~- o
'~ \ ~
~ ~ \ \ ~
r
r I ~, +\_ Q m
~ __
I /\ \ ~ ~
\ I
1 I I
`\ r
I I 1 I O
\` _ Q~
I
I M
h I
I ~r
1~ ~ I Z
I ~_ O ~
_
I 1
1 rn/ = O
a
I I N u
F-
n I 1 , N
~ ~
\ /
\/
/ ~
Z Q
I /
I
N
I
// ~
\ / U1
I
/ -----
I / --
X
/ I
~ /
W w
_~_-_ --
_ -_ _ _-_-_~_ _ _-~~ ^
.. ~~i
.
_._
; O
,
l
---
/ --- \
,
--r------~ ~
/,
, I Gad a, ~ ~,
~
I / I
>
1 ^~~UUU
\
`\\ \
/
g
' ~og
~' Z ~
d~ess~e-=aaalnoad \ ~
I ,
I lt5 l1
) tt M N ~ I A p° ~ m do ezo'se = aaalTlsaa
I ~ I
~ I ~ ~ > a
I ~ ~wo~. ~10~ ONOd NOI1ViJ1l13N1 ~ ~
I
I
I
~
/~ ~rcn o
~ ~
~
/
s
os
~6s
~~ as as
~~,n
1 1
~
( ~ _ - - - - _ _ _ _ _N1Vd 1lfWJ~L - _ - - _ - _ _ _ 11
I I / ~1 1
I I Q
Q
11 1
I N 1 1`
I
1
' w
~ \
1
1
Q
~ 1 r
\
R
~ / ~ L \
I ~ ~ \
1 ~
/ I Q I
I
/~ ~
1 I L
City of Yelm
~~/ \t~ Community Development Department
PO BOX 479
YELM, WA 98597
Y E LM To N 360-458-3835
NOTICE OF APPLICATION
Mailed on: September 26, 2005
PROJECT NAME AND LOCATION: Terra Valley
14947 Longmire
LAND USE CASE: SUB-05-0305-YL
An application submitted by Terra Valley LLC, 4200 6th Ave. SE, Suite 301, Lacey, WA 98503, for the
above referenced project was received by the City of Yelm on September 21, 2005. The City has
determined the application to be complete on September 26, 2005. The application and any related
documents are available for public review during normal business hours at the City of Yelm, 105 Yelm
Avenue W., Yelm WA. For additional information, please contact the Community Development
Department at 360-458-3835.
PROJECT DESCRIPTION: Subdivide 10 acres into 41 single family lots
ENVIRONMENTAL and OTHER DOCUMENTS SUBMITTED WITH THE APPLICATION: An
Addendum to Tahoma Terra Residential Development Transportation Impact Study, an Environmental
Checklist, a Preliminary Drainage Report and Site Plan were submitted with the application.
Additional Information or Project Studies Requested by the City: None.
No preliminary determination of consistency with City development regulations has been made.
At minimum, this project will be subject to the following plans and regulations: City of Yelm
Comprehensive Plan, Zoning Title 17 YMC, Critical Areas Ordinance Chapter 14.08 YMC, Storm Water
Drainage Design and Erosion Control Manual (DOE), International Building Code, State Environmental
Policy Act (SEPA) Title (14), Road Design Standards, Platting and Subdivision Title (16), and the
Shoreline Master Program.
The City of Yelm invites your comments early in the review of this proposal. Comments should be
directed to Tami Merriman, Community Development Department, P.O. Box 479, Yelm WA 98597, 360-
458-3835.
THE 15-DAY PUBLIC COMMENT PERIOD ENDS AT 5:00 PM ON OCTOBER 11, 2005.
This notice has been provided to appropriate local and state agencies, and property owners within 300
feet of the project site. These recipients, and any others who submit a written request to be placed on the
mailing list, will also receive the following items when available or if applicable: Environmental Threshold
Determination, Notice of Public Hearing and Notice of Final Decision. If the proposed project requires a
City Council decision, it will be mailed to all those who participate in the public hearing and to anyone else
requesting the decision in writing. Additionally, there will be a 14-day public comment period if an
environmental determination is issued. Opportunities for appeal occur within twenty one (21) days after
the date the environmental determination is issued. City Council decision can be appealed through
Superior Court. Appeals of site plan review decisions may be filed within 14 days of Notice of Final
Decision.
1:\SUB Full Plat Subdivision\OS-0305 Terra Valley\Notice of Application.doc
N
5
a
~e
0
Z a
if
W
K
d
ff`
I _~~ //%t/~.~ W 4~\ I
f( l~ J
I I /~\ ~f ~\~ Q W `'~~
% i.r''` ..I~rc O ~ I
.,VF Q N 1
I ,: I ( I
ii"
i ! -!
I
A! i ,1 - --op~p I R
I Fr
•^O---L_________~_-_--~
I ~ H
I ~ Z
1 ~ I (~ m
F
l____1____~~___ ~ > i
S~f t~
_ _
_ 's-~s ~ R
~~ .~~ o
II
I
I
I
I
n `a
€'S r~ ~ _ € ~'
_ _
_
Z r '
~ ~
:
-
~ %r o ~
Y p LL
" ~x~ ?
~
f
~
k
~ ;
~I r ~ ~E~a a o ., 3. ~ _ : r ~ ..
5
G Y
b ~ t ~
_ ~
L
~ ~ s
- r
,~
$_
8
^°
^ e
e
m 4
u~ ~
~
J
.. .J ~ ~~ [
I Z_I ~ of ((~~
~, ` ~ ~,:
r' i
~~ - ~ ~~ ~i
'~~~~
i
3S 'lS NN3l~vdli~l \ _
^' ~ I ~ ~ ~
I
W I .No I ~ OfY NQ I~ I U. 'e
W ~ ~3' ~ ~ 4 I ~~ ~ ao 8 c~ E ~ ~' I Z \~~ i
~ I ~..
N W I IO ~`« s .. I~: N :. I
C ~ I 7y S Q 1 fD2 Ni i ~~ -.
O I ~ I~ x~r _ f")n
N I I
Q ' I I ~
~ ~ ~~ m~ I ~ rn 8~ ~F' I' ~ I o,o
~ ~, I ~ ~i N~
r ~ ~ _ ~ f ~ N ~ i ~ I..'d N 9,
~ ~ u, - -- -~~ --g =_
~ ---~2'--~c-- c \ O
r' l0 d
I'~ I ro, c_' u~ e~ e-~e N^ .-€ '9~~0~ n~K.a~~„ '
l.! .~ _ _ ` l\ .nom I d
I ! r .. _ _ _ _ _ - -wive ru J _ _ -~ _ .. ~ _ - ~~ ~~_
i' ~ ~ /
w N `\\ i
1' I
' ~N 1
I <<
~ z=
li ~ a ~ v
r ~
a
<o
a~
U
u J
< n
r ~
.; ~
a~
~U
~~
w
~~
d
~ ~ ~ c
a
o ~
on
~~
C e
¢ 6 °
pOnf ~
E
E
C O e r ~
'c
Z i'~ s
. q
~ ¢ R
u ~ t
Qa
Z Q
C L
G
J J
wa
a
- of
ICI
~~~~~ oi~
X71¢; ~.-
~:;_ e
w
w
'W
a J
~J oW
>Q :i m=•
j ~ : ~ a_
3 ~ ~~
~ ~ or<
p ~ ! u
i
'W
o ~
C
±~ 4~Q~
~:
~s
€:s`.R
~~
~~`
~~
~U
`a~~-
YELM COI~'IMUNITY SCHOOLS
_ Where all students can learn and grow __.. _ _
Erlin~ Birkland
Director of Facilities
September 27, 2005
Mr. Grant Beck
Community Development Director
City of Yelm
PO Box 479
Yelm, Washington 98597
RE: SUB-05-0305-YL
Terra Valley
Dear Mr. Grant:
Yelm Community Schools requires mitigation agreements for all subdivisions.
Please include the mitigation provision as part of the SEPA requirements.
Should you have any questions please call me at 458-6128.
Sincerely,
Erling M. Birkland
Facilities Director
Yelm Community Schools
YELM COMMUNITY SCHOOLS IS AN EQUAL OPPORTUNITY EMPLOYER AND FOLLOWS TITLE IX REQUIREMENTS
107 First Street North, P. O. Box 476, Yelm, Washington 98597, (360) 458.6128, FAX (360) 458-6434
Mitigated Determination of Non-Significance
File Number SUB-05-0305-YL
Proponent: Terra Valley LLC
Description of Proposal: Subdivide 10 acres into 41 single family residential lots.
Location of the Proposal: 14947 Longmire Street SE, Tax Parcel #'s 21724340000.
Section/Township/Range: Section 24, Township 17 North, Range 1 East, W.M.
Threshold Determination: The City of Yelm as lead agency for this action has
determined that this proposal does not have a probable significant adverse impact on
the environment. Therefore, an Environmental Impact Statement (EIS) will not be
required under Section 43.21 C.030 (2)(c) RCW. This decision was made after review of
a completed environmental checklist and other information on file with the lead agency.
This information is available to the public on request.
Conditions/Mitigating Measures: See Attachment A
Lead agency: City of Yelm
Responsible Official: Grant Beck, Community Development Director
Date of Issue: November 14, 2005
Co a line: November 28, 2005
/ ppeaf!Deadli~,; December 5, 2005
/~
`~~t/
Grant Beck, Community Development Director
This Mitigated Determination of Non-Significance (MDNS) is issued pursuant to Section 197-11-340 (2)
WAG-'`Comments must be submitted to Tami Merriman, Community Development Department, at City of
Yelm, 105 Yelm Avenue West, P.O. Box 479, Yelm, WA 98597, by November 28, 2005, at 5:00 P.M.
The City of Yelm will not act on this proposal prior to December 5, 2005, at 5:00 P.M.
You may appeal this determination to the Yelm Hearing Examiner, at above address, by submitting a
written appeal no later than December 5, 2005 at 5:00 P.M. You should be prepared to make specific
factual objections. Contact Grant Beck, Community Development Director, to learn more about the
procedures for SEPA appeals. This MDNS is not a permit and does not by itself constitute project
approval. The applicant must comply with all applicable requirements of the City of Yelm prior to
receiving construction permits which may include but are not limited to the City of Yelm Comprehensive
Plan, Zoning Code (Title 17 YMC), Critical Areas Code (Chapter 14.08 YMC), Stormwater Drainage
Design and Erosion Control Manual, International Building Code, Critical Areas Regulations (Title 14
YMC), Road Design Standards, Platting and Subdivision Code (Title 16 YMC), and the Shoreline Master
Program.
DO NOT PUBLISH BELOW THIS LINE
Published: Nisqually Valley News, November 18, 2005
Posted in public areas: November 15, 2005
Copies to: All agencies/citizens on SEPA mailing list and adjacent property owners
Dept. of Ecology w/checklist
Attachment A
Mitigated Determination of Non-Significance
SUB-05-0305-YL
Findings of Fact
1. This Mitigated Determination of Non Significance is based on the project as
proposed and the impacts and potential mitigation measures reflected in the
following environmental documents:
/ Environmental Checklist (September 19, 2005, SCA Consulting Group)
/ Preliminary Drainage and Erosion Control Report (September 2005, SCA
Consulting Group)
/ Addendum to Tahoma Terra Residential Development Transportation Impact
Study dated February 25, 2005 (August 2005, Transportation Engineering
Northwest)
2. The environmental documents indicate that the property is composed of soils and
substrates that are suitable for building and for stormwater infiltration. There is no
indication that there are any potential significant impacts to the earth (geology,
topography, soils).
3. There is no indication in any of the environmental documents that there will be any
potential long-term significant impacts to air quality from the proposed development.
4. The City of Yelm is identified as a Critical Aquifer Recharge Area, a designated
environmentally sensitive area. Potential Impacts to groundwater quality and
quantity will be mitigated through measures that meet or exceed the standards in the
1992 DOE stormwater manual as adopted by the City of Yelm. In addition, the east
and south portion of the property is identified by Thurston County as a potential high
groundwater flooding buffer area. Thurston County, in other areas of the County
that are potential high groundwater flooding areas, indicates in the Interim Site
Development Standards for New Development in Salmon Creek Basin that if there is
more than six feet of separation between the level of the high groundwater and the
bottom of any infiltration gallery, the project should be designed to the effective
drainage manual.
The City has adopted the 1992 Department of Ecology Drainage Design Manual,
which requires that stormwater generated from a development be treated for oils,
sediments, and heavy metals before infiltration.
5. The south and east portion of the site is identified by Thurston County as including a
potential Oak Stand Habitat which is a Department of Fish and Wildlife priority
species.
6. Chapter 14.12 YMC requires the dedication of open space for all residential
development. Section 14.12.050 YMC lists four (4) attributes for qualification of
open space.
Attachment A MDNS (SUB-05-0305-YL)
7. The environmental documents do not identify a potential significant impact related to
the use of energy or natural resources.
8. The environmental checklist indicates noise generated from vehicles will be minimal.
9. The City of Yelm has adopted a concurrency management system as required by
the Growth Management Act. Chapter 15.40 YMC (concurrency Management) is
designed to ensure that the improvements required to support development are
available at the time of development. A concurrency determination may be issued
for a proposal as it relates to transportation issues when: the development provides
on-site frontage improvements; the project makes off-site improvements as
necessary to provide for the safe movement of traffic; and the project makes a
contribution to projects identified the six-year transportation improvement program in
the form of a Transportation Facilities Charge.
10. The Growth Management Act at Section 36.70.070 (6)(b) RCW states that a finding
of concurrency can be issued when required improvements are in place at the time
of development or that a financial commitment is in place to complete the
improvements or strategies within six years.
11. Chapter 16.16 YMC requires that the layout of streets provide for continuation of
streets existing in adjoining subdivisions. The project provides a future street
connection to the west.
12. Section 16.16.050 (YMC) states that lots within a residential subdivision shall be
designed so that lots adjacent to arterial and collector streets are not allowed direct
access.
13. The traffic impact analysis (TIA) submitted as part of the application indicates that
the project will generate an average of 410 vehicle trips per day, with a PM peak of
41 vehicles per hour. The TIA indicates that, with average growth:
14. Section 14.04.055 YMC indicates that the principal guide in measuring
environmental impact is consistency with the land use designations of the
comprehensive plan and the development regulations designed to implement the
plan.
15. The checklist indicates that the proposal will not require addition fire or police
protection services.
16. Temporary construction impacts such as noise, light, water quality, and air quality,
are mitigated by requirements of the Zoning Code and Development Guidelines
relating to construction activities.
17. The Yelm School District has adopted a school mitigation requirement based on the
demand that new residential units create for additional school services and facilities.
Additional demands on the school system will be mitigated through the requirement
that the developer enter into a mitigation agreement with the District.
Attachment A MDNS (SUB-05-0305-YL)
Mitigation Measures
1. Prior to final subdivision approval, the developer shall complete the following
transportation improvements:
a. The south half of Longmire Street shall be improved to City Standards for a
Neighborhood Collector along the property frontage.
b. All interior streets shall be improved to City Standards for a Local Access
Residential.
c. The SR 510/Longmire intersection improvement required by the Tahoma
Terra Master Plan Approval shall be completed prior to final plat application
for this subdivision.
d. The interior street shall provide a future street connection to the west.
2. Civil plan submission shall include an updated preliminary stormwater plan that
meets or exceeds the standards in the 1992 stormwater Manual as adopted by the
City of Yelm. The stormwater plan shall include the following elements:
a. The elevation of the bottom of the infiltration gallery shall be a minimum of six
feet above the elevation of the high groundwater area as identified by Thurston
County, and must be 50 feet horizontally, or 2 feet vertically away from the High
Ground water area, which ever distance is less.
b. Individual dry wells are required for roof runoff.
c. The stormwater system shall be designed to accommodate stormwater
generated by required frontage improvements.
3. The applicant shall provide a tree and vegetation plan that identifies and protects
any priority oak species.
4. Temporary erosion control systems to be approved by the City of Yelm.
5. The developer shall provide at least 5% of total acreage as qualified open space.
This shall include the area of the man made pond, and oak habitat species area.
6. The developer shall enter into an agreement with Yelm Community Schools to
mitigate project impacts to the School District.
Attachment A MDNS (SUB-05-0305-YL)
ow~~ Tip City o f Yelm
~' ~ Community Development Department
105 Yelm Avenue West
P.O. Box 479
YELM Yelm, WA 98597
WASNINGTON
NOTICE OF PUBLIC HEARING
YELM HEARING EXAMINER
DATE: Tuesday, January 17, 2006, 9:00 A.M
PLACE: City Council Chambers, City Hall
105 Yelm Ave West
Yelm, Washington
PURPOSE: Public Hearing to receive comments regarding the following applications:
Case Number SUB-05-0343-YL (Vista Green). A proposal by John Lubbesmeyer to subdivide 4.55 acres
into 19 single family residential lots on property located at 15132 Longmire Street, on assessor parcel
number 21724420800.
Case Number SUB-05-0305-YL (Terra Valley). A proposal by Terra Valley LLC to subdivide 10 acres into
41 single family residential lots on property located on Longmire St. on assessor parcel number
21724340000.
The City of Yelm Hearing Examiner will hold a public hearing to receive comments on the proposals. The
Hearing Examiner will make a decision on the matter within 10 days after the hearing.
Testimony may be given at the hearings or through any written comments. Comments must be received
by the close of the public hearing. Such written comments may be submitted to the City of Yelm at the
address shown above or mailed to: City of Yelm, PO Box 479, Yelm WA 98597.
Any related documents are available for public review during normal business hours at the City of Yelm,
105 Yelm Ave W., Yelm, WA. For additional information, please contact Tami Merriman at (360) 458-
3835.
The City of Yelm provides reasonable accommodations to persons with disabilities. If you need special
accommodations to attend or participate in this hearing, call the City Clerk, Agnes Bennick, at (360) 458-
8404, at least 4 days before the meeting.
ATTEST:
City of Yelm
'` .~
(~~ ~, ~ ter` r~ i< Y~ ~
Agnes Bennick, City Clerk
DO NOT PUBLISH BELOW THIS LINE
Published in the Nisqually Valley News: Friday, January 6, 2006.
Posted in Public Areas: Thursday, December 29, 2005.
~p~ THE p
~~
0.
YELM
WASHINGTON
City of Yelm
Community Development Department
105 Yelm Avenue West
P.O. Box 479
Yelm, WA 98597
NOTICE OF PUBLIC HEARING
YELM HEARING EXAMINER
DATE: Tuesday, January 17, 2006, 9:00 A.M
PLACE: City Council Chambers, City Hall
105 Yelm Ave West
Yelm, Washington
PURPOSE: Public Hearing to receive comments regarding the following applications:
Case Number SUB-05-0343-YL (Vista Green). A proposal by John Lubbesmeyer to subdivide 4.55 acres
into 19 single family residential lots on property located at 15132 Longmire Street, on assessor parcel
number 21724420800.
Case Number SUB-05-0305-YL (Terra Valley). A proposal by Terra Valley LLC to subdivide 10 acres into
41 single family residential lots on property located on Longmire St. on assessor parcel number
21724340000.
The City of Yelm Hearing Examiner will hold a public hearing to receive comments on the proposals. The
Hearing Examiner will make a decision on the matter within 10 days after the hearing.
Testimony may be given at the hearings or through any written comments. Comments must be received
by the close of the public hearing. Such written comments may be submitted to the City of Yelm at the
address shown above or mailed to: City of Yelm, PO Box 479, Yelm WA 98597.
Any related documents are available for public review during normal business hours at the City of Yelm,
105 Yelm Ave W., Yelm, WA. For additional information, please contact Tami Merriman at (360) 458-
3835.
The City of Yelm provides reasonable accommodations to persons with disabilities. If you need special
accommodations to attend or participate in this hearing, call the City Clerk, Agnes Bennick, at (360) 458-
8404, at least 4 days before the meeting.
ATTEST:
City of Yelm
Agnes Bennick, City Clerk
DO NOT PUBLISH BELOW THIS LINE
Published in the Nisqually Valley News: Friday, January 6, 2006.
Posted in Public Areas: Thursday, December 29, 2005.
Mitigated Determination ofNon-Significance
File Number SUB-05-0305-YL
Proponent: Terra Valley LLC
Description of Proposal: Subdivide 10 acres into 41 single family residential lots.
Location of the Proposal: 14947 Longmire Street SE, Tax Parcel #'s 21724340000.
Section/Township/Range: Section 24, Township 17 North, Range 1 East, W.M.
Threshold Determination: The City of Yelm as lead agency for this action has
determined that this proposal does not have a probable significant adverse impact on
the environment. Therefore, an Environmental Impact Statement (EIS) will not be
required under Section 43.21C.030 (2)(c) RCW. This decision was made after review of
a completed environmental checklist and other information on file with the lead agency.
This information is available to the public on request.
Conditions/Mitigating Measures: See Attachment A
Lead agency: City of Yelm
Responsible Official: Grant Beck, Community Development Director
Date of Issue: November 14, 2005
Corr~rnen~f~e~c~line: November 28, 2005
Appea~~Deadline: December 5, 2005
~!~-~'/
Grant Beck, Community Development Director
This Mitigated Determination of Non-Significance (MDNS) is issued pursuant to Section 197-11-340 (2)
WAG: Comments must be submitted to Tami Merriman, Community Development Department, at City of
Yelm, 105 Yelm Avenue West, P.O. Box 479, Yelm, WA 98597, by November 28, 2005, at 5:00 P.M.
The City of Yelm will not act on this proposal prior to December 5, 2005, at 5:00 P.M.
You may appeal this determination to the Yelm Hearing Examiner, at above address, by submitting a
written appeal no later than December 5, 2005 at 5:00 P.M. You should be prepared to make specific
factual objections. Contact Grant Beck, Community Development Director, to learn more about the
procedures for SEPA appeals. This MDNS is not a permit and does not by itself constitute project
approval. The applicant must comply with all applicable requirements of the City of Yelm prior to
receiving construction permits which may include but are not limited to the City of Yelm Comprehensive
Plan, Zoning Code (Title 17 YMC), Critical Areas Code (Chapter 14.08 YMC), Stormwater Drainage
Design and Erosion Control Manual, International Building Code, Critical Areas Regulations (Title 14
YMC), Road Design Standards, Platting and Subdivision Code (Title 16 YMC), and the Shoreline Master
Program.
DO NOT PUBLISH BELOW THIS LINE
Published: Nisqually Valley News, November 18, 2005
Posted in public areas: November 15, 2005
Copies to: All agencies/citizens on SEPA mailing list and adjacent property owners
Dept. of Ecology w/checklist
Attachment A
Mitigated Determination of Non-Significance
S UB-05-0305-YL
Findings of Fact
1. This Mitigated Determination of Non Significance is based on the project as
proposed and the impacts and potential mitigation measures reflected in the
following environmental documents:
/ Environmental Checklist (September 19, 2005, SCA Consulting Group)
/ Preliminary Drainage and Erosion Control Report (September 2005, SCA
Consulting Group)
/ Addendum to Tahoma Terra Residential Development Transportation Impact
Study dated February 25, 2005 (August 2005, Transportation Engineering
Northwest)
2. The environmental documents indicate that the property is composed of soils and
substrates that are suitable for building and for stormwater infiltration. There is no
indication that there are any potential significant impacts to the earth (geology,
topography, soils).
3. There is no indication in any of the environmental documents that there will be any
potential long-term significant impacts to air quality from the proposed development.
4. The City of Yelm is identified as a Critical Aquifer Recharge Area, a designated
environmentally sensitive area. Potential Impacts to groundwater quality and
quantity will be mitigated through measures that meet or exceed the standards in the
1992 DOE stormwater manual as adopted by the City of Yelm. In addition, the east
and south portion of the property is identified by Thurston County as a potential high
groundwater flooding buffer area. Thurston County, in other areas of the County
that are potential high groundwater flooding areas, indicates in the Interim Site
Development Standards for New Development in Salmon Creek Basin that if there is
more than six feet of separation between the level of the high groundwater and the
bottom of any infiltration gallery, the project should be designed to the effective
drainage manual.
The City has adopted the 1992 Department of Ecology Drainage Design Manual,
which requires that stormwater generated from a development be treated for oils,
sediments, and heavy metals before infiltration.
5. The south and east portion of the site is identified by Thurston County as including a
potential Oak Stand Habitat which is a Department of Fish and Wildlife priority
species.
6. Chapter 14.12 YMC requires the dedication of open space for all residential
development. Section 14.12.050 YMC lists four (4) attributes for qualification of
open space.
Attachment A MDNS (SUB-o5-0305-YL)
7. The environmental documents do not identify a potential significant impact related to
the use of energy or natural resources.
8. The environmental checklist indicates noise generated from vehicles will be minimal.
9. The City of Yelm has adopted a concurrency management system as required by
the Growth Management Act. Chapter 15.40 YMC (concurrency Management) is
designed to ensure that the improvements required to support development are
available at the time of development. A concurrency determination may be issued
for a proposal as it relates to transportation issues when: the development provides
on-site frontage improvements; the project makes off-site improvements as
necessary to provide for the safe movement of traffic; and the project makes a
contribution to projects identified the six-year transportation improvement program in
the form of a Transportation Facilities Charge.
10. The Growth Management Act at Section 36.70.070 (6)(b) RCW states that a finding
of concurrency can be issued when required improvements are in place at the time
of development or that a financial commitment is in place to complete the
improvements or strategies within six years.
11. Chapter 16.16 YMC requires that the layout of streets provide for continuation of
streets existing in adjoining subdivisions. The project provides a future street
connection to the west.
12. Section 16.16.050 (YMC) states that lots within a residential subdivision shall be
designed so that lots adjacent to arterial and collector streets are not allowed direct
access.
13.The traffic impact analysis (TIA) submitted as part of the application indicates that
the project will generate an average of 410 vehicle trips per day, with a Pt~l peak of
41 vehicles per hour. The TIA indicates that, with average growth:
14. Section 14.04.055 YMC indicates that the principal guide in measuring
environmental impact is consistency with the land use designations of the
comprehensive plan and the development regulations designed to implement the
plan.
15. The checklist indicates that the proposal will not require addition fire or police
protection services.
16. Temporary construction impacts such as noise, light, water quality, and air quality,
are mitigated by requirements of the Zoning Code and Development Guidelines
relating to construction activities.
17.The Yelm School District has adopted a school mitigation requirement based on the
demand that new residential units create for additional school services and facilities.
Additional demands on the school system will be mitigated through the requirement
that the developer enter into a mitigation agreement with the District.
Attachment A MDNS (SUB-05-0305-YL)
Mitigation Measures
1. Prior to final subdivision approval, the developer shall complete the following
transportation improvements:
a. The south half of Longmire Street shall be improved to City Standards for a
Neighborhood Collector along the property frontage.
b. All interior streets shall be improved to City Standards for a Local Access
Residential.
c. The SR 510/Longmire intersection improvement required by the Tahoma
Terra Master Plan Approval shall be completed prior to final plat application
for this subdivision.
d. The interior street shall provide a future street connection to the west.
2. Civil plan submission shall include an updated preliminary stormwater plan that
meets or exceeds the standards in the 1992 stormwater Manual as adopted by the
City of Yelm. The stormwater plan shall include the following elements:
a. The elevation of the bottom of the infiltration gallery shall be a minimum of six
feet above the elevation of the high groundwater area as identified by Thurston
County, and must be 50 feet horizontally, or 2 feet vertically away from the High
Ground water area, which ever distance is less.
b. Individual dry wells are required for roof runoff.
c. The stormwater system shall be designed to accommodate stormwater
generated by required frontage improvements.
3. The applicant shall provide a tree and vegetation plan that identifies and protects
any pricrity oak species.
4. Temporary erosion control systems to be approved by the City of Yelm.
5. The developer shall provide at least 5% of total acreage as qualified open space.
This shall include the area of the man made pond, and oak habitat species area.
6. The developer shall enter into an agreement with Yelm Community Schools to
mitigate project impacts to the School District.
Attachment A MDNS (SUB-05-0305-YL)
ArcIMS Viewer
~'~ ~ n Ap
~~ ~ ,art
""
a ~~
~ _
~-
ii ~~
[L ~.~ ~.
{41^" n~
~~ * ~ ~`
..
r •. 'R#~~...,, A,
~y~
"~ #M
k ~u'
~, '~.
* ~ r • ~ .1,1 ~..
'?
1
!^~
b~h`~s
J ~ ( ~-)~-, y~
1 V~
http://geomap l .geodata.org/website/natres/MapFrame.htm
Page 1 of 1
~u
10/11/2005
YEL~1 CO.~'llVIUNITY SCHOOLS
` W/~ere all studer7ts can learn and a •ola~
Erlin~ Birkland
Director of Facilities
September 27, 2005
Mr. Grant Beck
Community Development Director
City of Yelm
PO Box 479
Yelm, Washington 98597
RE: SUB-05-0305-YL
Terra Valley
Dear Mr. Grant:
Yelm Community Schools requires mitigation agreements for all subdivisions.
Please include the mitigation provision as part of the SEPA requirements.
Should you have any questions please call me at 458-6128.
Sincerely,
~`~ / - -
Erling M. Birkland
Facilities Director
Yelm Community Schools
1'ELM ('O1~I~Ii :ti'ITY SCHOOLS IS AN FAI ~AL OPPORTi"\ITS' FAIPL01"ER ,AND FOLLOl1'S TITLE Ia RFAL"IRE'~IEVTS
107 First Street North, P. O. Box 476, Yelm, ~i'ashington 98597, (360) 458-61°8, F.4~ (360) 458-6434
City of Yelm
~~/ \t~ Community Development Department
PO BOX 479
YELM, WA 98597
YELM 360-458-3835
WASHINGTON
NOTICE OF APPLICATION
Mailed on: September 26. 2005
PROJECT NAME AND LOCATION: Terra Valley
14947 Longmire
LAND USE CASE: SUB-05-0305-YL
An application submitted by Terra Valley LLC, 4200 6th Ave. SE, Suite 301, Lacey, WA 98503, for the
above referenced project was received by the City of Yelm on September 21, 2005. The City has
determined the application to be complete on September 26, 2005. The application and any related
documents are available for public review during normal business hours at the City of Yelm, 105 Yelm
Avenue W., Yelm WA. For additional information, please contact the Community Development
Department at 360-458-3835.
PROJECT DESCRIPTION: Subdivide 10 acres into 41 single family lots
ENVIRONMENTAL and OTHER DOCUMENTS SUBMITTED WITH THE APPLICATION: An
Addendum to Tahoma Terra Residential Development Transportation Impact Study, an Environmental
Checklist, a Preliminary Drainage Report and Site Plan were submitted with the application.
Additional Information or Project Studies Requested by the City: None.
No preliminary determination of consistency with City development regulations has been made.
At minimum, this project will be subject to the following plans and regulations: City of Yelm
Comprehensive Plan, Zoning Title 17 YMC, Critical Areas Ordinance Chapter 14.08 YMC, Storm Water
Drainage Design and Erosion Control Manual (DOE), International Building Code, State Environmental
Policy Act (SEPA) Title (14), Road Design Standards, Platting and Subdivision Title (16), and the
Shoreline Master Program.
The City of Yelm invites your comments early in the review of this proposal. Comments should be
directed to Tami Merriman, Community Development Department, P.O. Box 479, Yelm WA 98597, 360-
458-3835.
THE 15-DAY PUBLIC COMMENT PERIOD ENDS AT 5:00 PM ON OCTOBER 11, 2005.
This notice has been provided to appropriate local and state agencies, and property owners within 300
feet of the project site. These recipients, and any others who submit a written request to be placed on the
mailing list, will also receive the following items when available or if applicable: Environmental Threshold
Determination, Notice of Public Hearing and Notice of Final Decision. If the proposed project requires a
City Council decision, it will be mailed to all those who participate in the public hearing and to anyone else
requesting the decision in writing. Additionally, there will be a 14-day public comment period if an
environmental determination is issued. Opportunities for appeal occur within twenty one (21) days after
the date the environmental determination is issued. City Council decision can be appealed through
Superior Court. Appeals of site plan review decisions may be filed within 14 days of Notice of Final
Decision.
l:\SUB Full Plat Subdivision\OS-0305 Terra Valley\Notice of Application.doc
~ u~ f~~
Z ~ - --
iE I i -~
a I ' a.~, '> y ~ ~
.,, -- ---- -d---I
1 .r ^ "~ O W I
I . ~ .' W C I
~iH ay I
I
I = I
I I
I ~~ ~I
'--~ --
x I <,
I -_Y-o~ i a
' I f :~ ~
I I ~ Z
I i
I ! ~ U
~_
a`r rg
°g sY ~-~-~ _ x
~~' ~~~ o
o
II
II
~ ;' ~ s § ~ ~
L~ § ~ ~ e ~ ~
W
a > x.~ ~
LL n
? .~
z O
So°- w E ~ ~ 7~~ S 7 ~ ~
Q
W Fe~ 'O
s ? ~ ~ < ~ o ~ a a
J ~ _' .
G~~3 d ~ .n o w n n ~ ~ i ~ & z r. ~ u
_ ? ~ ~ ~ 5 t
S °~
b o~ - 8 P~ 8 3 G
~ ~ ~~ ~ F Q '~ ~ ~
W
J
Z
W-'~
\4v~
O
m
~~ I
I -
~n
~0
Vn C'Jn ~N
f7n f„~n'
~m
f7 n
Np
N X
I
1
~~
_
~~ 3S ' 3 NN31
g
b'i~I~l
~
~~
_
I
I
~ r
-
_
'„
- -
8..
-- ~ --
~
1
rNi ~ g''
I ~
~ n
W I I$
I i4 I
i
of ~
~ N~ i
cn O i I Q
I ~ y
?
F I ~z 1. oa
~
/~
N W I M1 IQ 1 I~ 5 h Nv, I
C_~ /
I I ~ ..
rno O ~- ~ f
N
~ ~~__
°
N
V
I
I O I n ~
-
I f7
r
~ 0
< J I-
I /I GD1 I I
X I N.Q~
~ (D $~ I
N J I I ~
I
I ~ D
N „~
~
.u ~ ~
~ gyp..\I
X 6 _
n
I
~ _ ~i
_ p _ - -_-_ _ ~T~ - ~~
a ,,, ~.,.: fus -
r. '~ ~ --- -- -- ~0 k! - +gS -- ------~
(D`$ 117 ~5 Vr°~ f7~ N~ .-$ ~5~~ L KG 30N0 \
oa rw arn,
I ~ 3aag. ~._ I
I -----
i' i ~ i -
'~ w ~ _ L
I,
I a a
y ' ~~
oZ
~~w
~O
0
6m
K~
R' ~
wV
Hy
_S ~'
O~
s0
6V
~~
w
\\_~
\h~
i I ~ _
~~ ~ ~
I
m,
d ~ -'
~ a o
a
~ s ~'
0
OV,
~O e
OWN ~ o
O~~ ~
~m«fi
¢yo ~
C D ° Y s
oZ' € ~ W
_- ~a
~ K 8 J
U; ~~
as
. ~
~ H
J J
wa
a
~~~~ -
~ ~ u Y
H
W
w
'W
rc J
~ J o W 'm
>a~=~
j > m ~~
F ~ ~~
~ 3N o
o ~ ~w
a ~
'W
o~
z
~~
~~a ~FF
kb3 <~m
.;cep
__ s
ag
~~_
. ~~
City of Yelm
Community Development Department
P.O. Box 479
Yelm, WA 98597
(360) 458-3835
(360) 458-3144 FAX
Memorandum
To: SPRC
From: Roberta Allen, Administrative Assistant
Date: September 26, 2005
Re: SUB-OS-0305-YL -Project Review Schedule for Terra Valley Plat
Attached is the application packet for the above referenced project. After your initial review of the information
submitted, if you need additional information from the applicant, please let me know as soon as possible. The
following is the tentative review schedule for the project.
September 26, 2005 -Notice of Application distributed -begin 15 day comment period.
October 12, 2005 -SPRC Environmental Review. Department comments/mitigation requirements for
Environmental Review.
Environmental Determination issued by Planning Department. Begin 14 day comment period followed by
7 day appeal period.
Environmental Determination appeal time expired.
SPRC project review. Department comments/conditions of approval for staff report.
Complete Staff report for public hearing.
Public Hearing Notice to Paper/Mailing/Post site. (publish 10 days prior to hearing)
Public Hearing in front of Hearing Examiner (try to schedule first Monday of the month)
Hearing Examiner approval completed
I:\SUB Full Plat Subdivision\OS-0305 Terra Valley\Proj Rev Date Memo.doc
4200 6th Avenue SE, Suite 301
Lacey, Washington 98509-3485
(360)493-6002
~" , (360)493-2476 FAX
Consulting Group
DATE: September 21, 2005
LETTER
R~Ce~VedOF TRANSMITTAL
SEP 2 1 2005
SEND TO:
City of Yelm, Community Development
SCA PROJECT NUMBER:
05003
AGENCY PROJECT NUMBER:
PROJECT NAME:
Terra Valley
VIA:
COPIES DATE
DESCRIPTION
1 9/21/05 Preliminary Plat Application w/ Adjacent Property owners list
1 9/21/05 Environmental Checklist
1 9/21/05 Reduced set of Plans 11x17
3 8/25/05 Traffic Studies
3 9/05 Drainage Reports
10 9/21/05 Full Size Plan Sets
THESE ARE TRANSMITTED AS CHECKED BELOW:
^ FOR YOUR USE
® FOR REVIEW & COMMENT
^ FOR YOUR APPROVAL
REMARKS:
TRANSMITTED BY:
CS
^ AS REQUESTED
^ APPROVED AS NOTED
^ RETURNED FOR CORRECTIONS
CC:
'.~r::.:.:.':{a
..: .
.. .... .
Ni:~ .. '::::.:, .
~. - a~7.
i~'`^
..
w~ ~ ~.
:.._.
.,
,. ,
-.'.:
r, ...... .. _. .~.. ~:.... ..
f : ^ _~_: _. ,:_:~.:., ~:::_~;...:: ~::: ~ r . ~ .'. ~ ~ ~ ~ ~ . ~.:::: ~ i ~: ~:'.~ r.:.::'>:: C7?::~.~ .~:.:~.:..':.i.: r; :' i ':'r ::.=~~ ::':.i:: r ~;i ; ':':'.':.~.:?.':;:,•:.; :;:'.: ;~.:'.:.:.:~.:..?:..:.:;...H ~ ::..: ~.:.:.:::: .. ;~;~.~ r,:. ;; :;:; i.': %: ~ :: ~;~.~.r.:.::..:~:i.~::':::'i .'. ~'.:.:~.';;'.
,...._. _
;.
r ::.:::~.:::::..:.::,~.::::.:..~.:::::._:~.~:..~..
/r .
:\ r'' - -
1
fi
t:
I:
F :.
~'.
k
+ ~,
,' ~ _
- -- ~_
_ . <. _
I
..... ...
_ -_
.:::..
:::.
::.~..
:x:
,,'
^c
. ~'~ ~-
j
- - -
`,.
,!,
..
...
._
..... ~.
...:
y ... -' :'..:.: - :'::::: .
...
i
. 1
% -~-~
~`~,
"`._d~~
~ ~ p N S
~ ~
~ ~ ~
N A _p)'N7~c~
7 O
D. A ~ ~.
Q
D ~
v~
0 c
O
m m
co cn ~ ~
N C ~
N
7
N
,.~ r
c~
~ ~
=
°; o a
r
o cQ
o
Q ~
~
_
~_
•
~
c~
a
_.
y
N O
O
O
Cil
!_~
~/~•
/1
~~J~