Prelim Drainage Report \ I , I Yelm Retail Preliminary Drainage Report April 1997 f I I I f . I " { I D- C C C C C 0 C D n u C C C C " 0 0 D -D C PROJECT INFORMATION Project: , Prepared: ~ Pr~pared For: Contact: - REVIEWING AGENCY Jurisdiction: Project Number: Project Contact: Yelm Retail Center Apnl1997 Mlke Edwards lVl1ke Edwards PO Box 3800 Lacey, Washmgton 98509 (360) 459-1100 " City ofYelm Ken Garmann DESIGNER INFORMATION, Prepared By: Project Contact: SCA Project Number: File Number: SCA Engineering 677 Woodland Square Loop SE PO Box 3485 Lacey, WA 98509-3485 (360)493-6002 (360)493-2476 FAX Robert W. Balmelli, P.E. 95031 f:\text\reports\50310416 pdr' PROJECT ENGINEER'S CERTIFICATION I hereby certIfy that thIS Prehmmary Dramage Report for Yelm Retail Center m Yelm; Washmgton has been prepared by me or under my superVISIOn and meets the mtent of the CIty of Yelm Dramage DeSIgn and ErosIOn Control Manual, unless noted otherWIse, and normal s~andards of engmeermg practIce I understand 'that the JUriSdictIOn does not and WIll not assume habIhty for the suffiCIency, SUItability, or performance of dr~mage facilitIes .desIgned for thIS development. o -0 c 'C. e o o c o o o c Table of Contents Part 1 Project Description SECTION 1 - EXISTING CONDITIONS 1 SECTION 2 - PROJECT DESCRIPTION 1 ' SECTION 3 - INFILTRATION RATES/SOILS REPORT 3 " SECTION 4 - WELLS & SEPTIC SYSTEMS 3 SECTION 5 - FUEL TANKS 4. SECTION 6 - SUB-BASIN DESCRIPTION 4 SECTION 7 - ANALYSIS OF 100-YEAR FLOOD 4 SF;CTION 8 - AESTHETIC CONSIDERATIONS FOR STORMWATER FACILITIES 4 I SECTION 9 - DOWNSTREAM ANALYSIS AND FACILITY SIZING 4 SECTION 10 - COVENANTS, DEDICATIONS, EASEMENTS 5 SECTION 11 - PROPERTY OWNERS ASSOCIATION ARTICLES OF INCORPORATION 5 Pa,:t II ,Erosion Cohtrol Plan SECTION 1 " CONSTRUCTION SEQUENCE AND PROCEDURE 6 SECTION 2 . TRAPPING SEDIMENT 6 , SECTION 3 - PER~ENT EROSION CONTROL & SITE RESTORATION 7 SECTION 4 - GEOTECHNICAL ANALYSIS AND REPORT 7 SECTION 5 - INSPECTION SEQUENCE 7 SECTION 6 - CONTROL, OF POLLUTANTS OTHER THAN SEDIMENTS 8 I n u Part III Maintenance Plan o c o o o -0 SECTION 1 - REQUIRED MAINTENANCE SECTION, 2 - RESPONSIBLE ORGANIZATION I SECTION 3 - VEGETATION MANAGEMENT PLAN SECTION 4 - SOURCE CONTROL. Appendices Dramage CalculatIOns FacIhty\Summary Forms , SCS Soils Map, Sou Logs, InfiltratIOh Tests ViCInIty IMap \ Dramage Plan 11 14 14 14 I - --~~"- I 'J.;-y , J l J I, ,J. . (..... C' ,.C ~C' C' 1~~ C" ,:.,""" :',C ' . 0, ~\ ,l, \. ,I' :c' C C. c, c .0 ~.o " ," c '-\.~, I ~ ., , 'C .l-O--..:::....-J-~~-'- i;C ;------:- ~,..,T\-------.-- .,. " , ' -.j~ ,t' \.,( /, l__"" , .1 \ I (~, " .!--'---__~ ~:~ J~----- I'; i' /. " " \';, I, f' ~. , ~h i -<, < , _,-,,,.-_ ,_____- ~,y----" __ ---:__,~~~----.---;~-;;:-r....--r.--~ r ,,;' , " \" '. ',. ,I. ,I , -} -1 .;.". ? h.' 'i \ ~. f , , , ,~ " ,( ( ~ ,I ~,\> ):" , , . , )- F ~\ /. " ~' f, ;} .-:\' I> ..:: "'} 1'- y ~c \' :' !'\ \ ~ ,..."e Part 1 :1;: " , ~. '-:J , ' J''''' .( ~ \, , I, " l,.. I' , ' ,. t" j' ....~ .i ; , I '. " ~ '" ",,( ,J ., I!-. I"! _~ 'v -#1 ~ 'j \ " ", ". .\~ "' \,,\:J 1.- ;, Project Desctlption \ , f .\ -'-'""'---- - ~~.:;.. ~- .<: 1\., , .. ',r Jo ,'t' " 't~ ,.. " ~-----'- ~-- o ,0 o o c o o o o o o o o o o o o 0, o Yelm Retail Center PROJECT DESCRIPTION The format of tlus report follows the outlIne proVIded m the Dramage DeSIgn and , ~ ,ErosIOn Control Manual (DDECM) for Thurston County SECTION 1 - EXISTING CONDITIONS -The 641 acre project SIte IS located m Yelm, Wasillngton, at the corner ofYelm Avenue and Killian Road. The property IS 9c:cupIed by two houses and a mobile home with grayel driveways and variOUS outbuIldmgs. The SIte conSIsts of faIrly level topography WIth relIef varying from 2-10% slopmg from northeast to southwest. See EXIstmg SIte and, DemohtlOn Plan. I Offsite Drainage - From SCA's, SIte mvestIgatIOn It appears that all eXIstmg on-SIte dramage IS mfiltrated on-SIte, wluch IS representatIve of the Nisqually class of soils. 'It appears that there IS no off-SIte dramage onto the property Existing Drainage Features amJ Environmentally Sensitive Areas There are no ponds, raVInes, gullies, springs, steep slopes, or other enVIronmentally senSItIve areas IdentIfied on-SIte or down gradIent of the property All runoff from eXIstmg features appears to mfilttate on-SIte GroJlndwater Sensitive Area The project SIte IS located m an aquIfer senSItIve area based on reVIew of Thurston County ComprehenSIve Plan Map M-8 SECTION 2 - PROJECT DESCRIPTION Project Proponent: MIke Edwards Parcel Numbers: 21724130600,21724130500 Total Site Area: 641 Acres Zoned. CommercIal Site Address. Y~lm Avenue and Killian Road Required Permits: - CommerCIal Plat" GradIng, utllity,~ paVIng, buildmg, plumbmg, ~echamcal, electrIcal, etc. SCA Engineering April 1997 Page, 1 o o o o D ,0 1] o o o o o c o o o o o o Yelm Retail Center , SecITownship/Rahge: SectIOn 24, Townsmp 17 North, Range 1 East, W.M., , Thurston County, W A Legal Description: (Not mcluded) The proposed project IS a commerCIal bindIng SIte plan (Chapter 16.32) vested on July 25, 1995 It will convert the SIte from reSIdentIal use to commerCIal use The SIte will be/ cleared of all eXistIng structures and graded to a slope of 2% or less slopIng northeast. A retaImng wall will be constructed In the south corner as needed. Three bUIldmgs are proposed buildIng footprmts for wfuch would total 54,800 square feet. ImperviOUS area will total 5 62 acres or about 88% (see table below) , , / All phases of the project will Include erOSIOn control measures, SIte cleanng, gradIng, storm draInage.Improvement~, and roadway and underground utilitIes such as water, power, samtary sewer, and telecommumc~tIOns. ' Develonment Coverag-e Summary (acres) ImperVIous Roadway Area. DIsturbed PerVIOUS Area. UndIsturbed PerVIOUS lJll-ea. ImpervIOUS Roof Area. EXistIng 0.22 5.98 000 0.21 Proposed 4.36 079 000 1:26 A. Stormwater Treatment Subbasm f( and B Treatment systems In Subbasms A and B will be compost stormwater filters as manufactured by CSF Treatment Systems, Portland OR. DeSIgn flow for the SIX month 24 hour storm IS i 10 cfs In SubbaSIn A and 52 cfs In SubbaSIn B Sub-BaSIn C and D , SubbaSIn C ,and D conSIst of the roof area of the large bUIldIng on the southwest edge of the property (Lot 3, 4, 5, and 6) and the bUIldIng on the ,northeast corner (Lot 1 and 2) The roof area runoff will be Infiltrated WIthout treatment 'Per the Thurston County Manu,al. SCA Engineering April 1997 Page 2 c o o c o Yelm Retail Center i3 Stormwater Storag-e. BASIN ImpervIOus Roof PerVIOUS Total Storage Acres Area Acres Acres CuFt Acre$ , A 2.97 023 038 358 9,980 B 1.39 0 012 151 4,290 C 0 08 0 08 2,400 D 0 023 029 052 980 Totals 4.36 126 079 641 17,650 01 Storage was calculated by consIdermg the reqUIrement to,mfiltrate the deSIgn I event m 48 hours and mlillmum storage requIrements per the Thurston County Manual. Storage will be prOVIded m the medIa VOIds wIthm, mfiltratIOn trenches. o c o o c o o o o o o o o C Roof Runoff: All roof runoff will be tIghthned dIrectly mto mdIVIdual undergroulJ.d mfiltratIOn drywells. See Drmnage CalculatIOns m the Appenchx for calculatIOns of storage volume reqUIred and prOVIded. ' - 'Value of Remodels in Past 5 Years: 1 NA. Not a remodel proJect. SECTION 3 - INFILTRATION RATES/SOILS REPORT The Soil ConservatIOn ServIce (SCS) soil survey of Thurston County classIfies the on-SIte soils as Spanaway Soil Senes consIstmg mamly of Spanaway Sandy Gravelly Loam. On- SIte soil test pItS completed by SCA confirm the Spanaway SCS ClassIficatIOn. CopIes of the soil logs are mcluded m the Appenchx. Falling Head PercolatIOn tests performed on-SIte wfucated an mfiltratIOn rate of over 60 mches/hr as shown m appenchx. A deSIgn mfiltratIOn rate of 20"/hr was used to SIze the storage capaCIty of the underground mfiltratIOn gallery See Appenchx for soils analYSIS and mfilt~atIOn test results , SECTION 4 - WELLS & SEPTIC SYSTEMS No on-SIte wells were found dUrIpg our SIte mvestIgatIOn or soils work. SeptIc systems for the three dwelling uruts will be abandoned accordIng to law SCA Engineering , April 1997 Page 3 'C o o o o o o o c c c o o o o D 0, · o D Yelm Retail Center SECTION 5 - FUEL TANKS No on-SIte fuel tanks were located dUring SCA's SIte mvestIgatIOn or SOlIs work. A note on the plans declares that If such tanks are found, the contractor IS to follow DOE procedures (WAC 173-160) to abandon. SECTION 6 - SUB-BASIN DESCRIPTION From SCA's SIte VISIt, It appears no off-SIte runoff is tributary to the subject SIte All ramfall on the SIte appears to mfiltrate on-site Tlus IS tYPICal of the Nisqually classmcatIOn of soils. SECTION 7 - ANALYSIS OF IOO-YEAR FLOOD , Our reView of the FEl\iIA FIRM map for the proposed project reveals that there IS no major stream on-SIte The 'SIte has been Identmed as a Zone C classmcatIOn on the FEMA FIRM Map . SECTION 8 - AESTHETIC CONSIDERATIONS FOR STORMWATER FACILITIES All dIsturbed perVIOUS areas will De vegetated and landscaped. Subbasm B compost filter will be pre-cast, bUrIed and Subbasm A will be cast-In-place above ground or pre- cast, bUrIed. SECTION 9 - DOWNSTREAM ANALYSIS AND FACILITY SIZING . Prehmmary calculatIOns for the project stdrmwater storage and treatment systems can be found m the Appenchx of tlus report. All storm"':.ater runoff will be mfiltrated orr~sIte , SCA Engineering April 1997 Page 4, o c c o o o o o o c c Yelm Retail Center SECTION 10 - , COVENANTS, DEDICATIONS, EASEMENTS On-SIte dramage facilitIes reqUIrmg routme mamtenance mclude. . Conveyance swale . Catch basms and storm sewers . InfiltratIOn gallerIes (3) . Inlet structures (3) to mfiltratIon gallerIes . _ -Two compost leaf filters . Roof drams Easements for ::lcce~s to and mamtenance of conveyance, treatment, and mfiltratIOn facilitIes will be granted to CIty of Yelm. An agreement for facilitIes mamtenance w.ill be reached wIth the CIty ofYelm usmg the model mcluded m the TCDDECM. I CC&R's prepared for the project lIst the mamtenance reqUIrements. A copy of the completed CC&R's can be supphed to the CIty upon completIOn of the proJect. SECTION 11 - PROPERTY OWNERS ASSOCIATION ARTICLES OF INCORPORA TION 'Because the project will be owned by one person, no prqperty owners association will be furmed I n u / o o o o c o SCA Engil)eering April 199~ Page 5 [I U ,~,..{ ,{ " <;"> :...' .... ~" y )' (\ :,y' LJ r' :,0' , ; 'r r, , c '," (.-. c' (Ii. U~ "1' U),! ,C c' ,Pi U" ~ __,_,~,-.-c-~r, " \" [ 'l. :.,\ ~ ~ " L,\ c r ',~ tJ 'r n W ,~<; I t'" t .J ')' 1 }. (' '"'I' I.' r .r :: ') ". ,,' ~: ~ f>,t-: h !: " ..., ~. Il: J / , " , ",-- ~: ,~ ;;":- J, ; , .r f ~'. h, l.'l i' '-:'.~ I' " ,- -:;: .~~ ,r,.." y ,";, ....",? ) " .1.,",; f \. ~ -l,. f l ~- ; J' ~ , ' I. ' ; T -! " j"'! ~ ~I >1 ,; ,!.--' ,r-:~ '/"", ~~ " 1':'< " -\"- - -~,,,,,,,--~ ~. , " r . .", ~~ ',;, " 'r!J ., "" .r ,\... , , ' , 'r ." <- ,I :~ ~; . . " }'-" r r, l~l ~ j '\ It,-'>: -:. ", ~ 'h r 1 ,.. ~'i . pClrt 11' . .j' ' o.."l\f ? -' ". .j ,,' ,; '. ~;, (J.' " J{ " "\." " .} ;< ". " ': ~ r '\ \ -,> >..- " I, ;~ 'hi ,\ ,. 'j\ x r .~:. "~ " '-! t. I,' ~f' C' '1 "f !,,\ t:... ,<\ oJ ". '-- '\'1 1,..... ;',~ T' 't '''.... 'f > ~ ,(" ,;,'~ ,~ ," .\ ." ";,,..; }.,....\,;.J.... ., Erosion Control plan '" .., ,. ., - - \ "- , ; , " ..,.-- -~--~ l;" '; " r. , ~'. c c c, o D C C C C C o C Yelm Retail Center EROSION CONTROL PLAN SECTION 1 - / CONSTRUCTION SEQUENCE AND PROCEDURE Proposed development of the resIdentIal property will Include SIte gradIng and erOSIOn control measures deSIgned to contaIn slit and soli WIthIn the project boundanes dunng constructIOn untli permanent erOSIOn control IS m place ErOSIOn/sedImentatIOn control will be achIeved by a combmatIon of structural/vegetatIve cover measures and constructIOn practices tailored to fit the SIte I Best ConstructIOn Management PractIces (BMP's) will be employed to properly clear and grade the SIte and to schedule constructIOn actIVItIes. Before any constructIOn begInS on- SIte, erOSIOn control facilitIes shall first be I.nstalled. The planned ,constructIOn sequence IS as follows. , 1 Schedule pre-constructIOn conference WIth the CIty, project engIneer and constructIOn stakIng surveyor - , .. 2. Construct temporary stabilized constructIOn entrance 3 Install, filter fabnc fenCIng where approprIate and place silt protectIOn around catchbaSlns ' \ 4. Perform clearIng and grubbIng maccordance WIth the condItIOns of gradIng permIt. 5 MaIntaIn eqUIpment and water supply for dust control. 6 Hydroseed or seed/mulch areas subject to erOSIOn. , 7 MaIntaIn all erOSIOn ~ontrol facilitIes until the entIre SIte IS constructed and IS stabilized and silt laden runoff ceases. 8 Keep conveyance systems to mfiltratIOn systems blocked until constructIOn IS completed ard perman~nt erOSIOn control IS In place and paved surfaces are clean'ed of constructIOn silt and debrIS 9 Open conveyance systems to InfiltratIOn facilitIes. f' u SECTION 2 - TRAPPING SEDIMENT c o o o D o The on-SIte solis belong to the Nisqually soil group and have a shght erOSIOn potentIal accordIng to the SC~ A stabilized constructIOn entrance shall be Installed at the north end of the SIte to prevent velucles from track~ng soil away from the dIsturbed areas onto 19th Ave S.E. If sedIment IS tracked off-SIte, sedIment shall, on a daily baSIS, be swep"t or shoveled from paved surfaces and not washed down Into the roadSIde dItch. The follOWIng IS a bnef summary of the BMP's used for thIS proJect. . SeedIng of stnpped areas (hydroseed and seed/mulch) - PrOVIdes soli stabilizatIOn by plantIng grasses and legumes In areas whIch will remam bare for more than 7 days where permanent cover IS not necessary or appropnate SCA Engineering April 1997 Page 6 o o c c C \ o o c o o .J C C o o o o o o o. Yelm Retail Center · ConstructIOn Entrance - To reduce the amount of mud, dIrt, rocks, etc. transported onto publIc roads by motor velucles or runoff by constructIng a stab:Q1zed pad of rock' spalls at entrances to constructIOn SItes and waslung ofbres dUrIng egress. . Filter fence - To mtercept and retaIn sedIment under sheet flpw cond.1tIOns from I d.1sturbed areas dUrIng constructIOn operatIOns In order to prevent sedunent from leaVIng' the SIte, enterIng the dramage system, or damagIng the treatment or mfiltratIOn system., Filter fences must be prOVIded Just upstre'am of the pomt"(s) of d.1scharge of runoff from a SIte before the flow'becomes concentrated to decrease the velOCIty of sheet flows. The con~ractor should not be allowed to leave dIsturbed areas (that are to be left unworked for more than 7 days) uncovered durIng the ramy season from November 1 ' through March 31 Straw, mulch, sodd.1ng, hydroseedIng or plastIC covermg should be used to prevent erosl<;m m 'these areas. DurIng constructIOn, tl~e contractor will be reqUIred to Install filter fabnc fenCIng and protect stormwater catchbasms from siltatIOn, as shown on the approved plans as needed and/or as d.1rected by the project engIneer or CIty mspector , SECTION 3 - PERMANENT EROSION CONTROL & SITE v . ~ESTORATION All dIsturbed areas will ,be asphalted, covered WIth a bmldrng or landscaped WIth grass, shrubbery or trees SECTION 4 - GEOTECHNICAL ANALYSIS AND REPORT Slopes exceedIng 15% do not eXIst on-SIte, therefore, a geotechrncal analYSIS for slqpe or soil stability was not deemed necessary Se~ Append1x for a complete soils deSCrIptIOn. I . SECTION 5- INSPECTION SEQUENCE In add.1tIOn to the normal CIty mspectIOns, the Project (Engrneer shall InSpect the facilitIes related to stor~water treatmef\t, erOSIOn control, storage and conveyance durIng constructIOn. At a mIrnmum, the follOWIng Items shall be mspected at the tIme specIfied. ' 1 The erOSIOn control facilitIes shall be Inspected before the start of clearmg and grad.1ng to ensure t4e followmg structures are m place a. ConstructIOn Entrance b Filter FabrIC Fences, If needed SCA Engineering April 1997 Page 7 o o c c c c o c c o c o o o c o c o c Yelm Retail Center 2. InfiltratIOn ,facilitIes will. be mspected before and dUrIng constructIOn to msure that heavy eqUIpment does not compact the mfitratIOn surface Conveyance to mfiltratIOn facilitIes will be plugged until all trIbutary area IS st~bilized and paved area IS dea.ged. 3 The conveyance, systems will be mspected after co~structIon of the facility, but before the project IS completed to ensure the followmg are m workmg order' a. Road\,Vay Dr~age ' b. Compost Filters c. InfiltratIOn Gallery d. Inlet SedImentatIOn ProtectIOn e Roof Drams 4. The permanent SIte restoratIOn measures should be mspected after landscapmg IS completed. A final mspectIOn shall be performed to venfy final grades, ~ettillgs of control structures and all necessary mformatIOn to complete i EngIneer's ConstructIon InspectIOn Report Fqrm. These forms must be completed prIor to final pubhc works constructIOn apPI:oval. , SECTION 6 - CONTROL OF POLLUTANTS OTHER THAN. SEDIMENTS r Washout from a concrete truck shall not be dumped mto the storm draIn, or onto soil or pavement wmch carnes stormwater runoff. It 'can be dumped mto a deSIgnated area to. be later backfilled or hardened and broken up for msposal mto a dumpster The Contractor will be reqUIred to deSIgnate a washdown area for eqUIpment and concrete trucks. It IS not antICIpated that InSectICIdes, fungICIdes, herbICIdes, rodentIcIdes, etc will be ( employed In the constructIOn of thIS proJect. No petroleum products should be allowed to enter the draInage system. SCA Engineering April 1997 PageS '."--'~~--", fI' 'G .[ [, '[ c., '[ 'C C~ C ,[ " C' 'C "C C I,', ,[ -1" " . , '.c. c c .,' ,"c '"-' ..Oi' ? ' ~~~~~-----'--'---'---" .r --.") --, -~'-.-c:--.:-.-..,- ~~.,.--".-~ ~'-~~-r----;-~..--,._-- .t. .i I r..' '1' t ') .f Part III - Malntenance Plan -'- ~__---'---, --L---':"'_;~_ 1'.' ---~----'--~.~-------'-"------ " -;,,;, " C D C C C C D C C o o o c o c o o o o Yelm Retail Center MAINTENANCE PLAN INSTRUCTIONS The project SIte contams the followmg facilitIes that will reqUITe mamtenance \ . Conveyance swale . Catch basms and storm sewers . InfiltratIOn galleries (3) ~ Inlet structures (3) to mfiltratIOn galleries . Two compost leaf filters . Roof drams - The followmg pages contam maIntenance heeds for~most of the components that are part of your dramage system, as well as for some components that you may not have Ignore the requIrements that do not apply to your system You should p~an, to complete a checkhst for all system compoQ,ents on the followmg schedule 1 Monthly from November through April. 2. Once m late summer (preferably September) 3 Mter any major storm (use I" m 24 hQursas a gUIdeh~e) Items marked "S" ()nly U smg photocopIes of these pages, check off the problems you looked for each trme you dId an mspectIOn. Add comments on problems found and actIOns taken. Keep these "Checked" sheets m your files, as they will.be used to Write your annual report (due m May) Some Items, do not need to be looked at every tIme an mspectIOn IS done Use the suggest frequency at the left of each Item as a gUIdehne for your mspectIOn. You may call the County for techmcal aSSIstance Do not heSItate to call, especIally If you are unsure whether a SItuatIOn you have dIscovered may be a problem. SCA Engineering April 1997 Page 9 c o c c c o 'C c c o D. C C o C '0 o o 0- Yelm Retail Center ATTACHMENT "A": MAINTENANCE PROGRAM COVER SHEET InspectIOn PerIod. Number of Sheetl? Attached. Date Inspected. Name of Inspector' Inspector's SIgnature I, Page 10 . seA Engineering 'April 1997 c o c c c c c c c c c c c C D o o o ,0 Yelm Retail Center SECTION 1 - 'REQUIRED MAINTENANCE The dramage facilities will req.mre occasIOnal mamtenance The followmg general reqmrements are the mllllmum requIrements as set forth m the Dramage DeSIgn and ErosIOn Control Manual of Thurston County The reqmred mamtenance for a range_o( typIcal storm dramage facihtIe~ and frequency of maIntenance are as shown on followmg- pages. Cost of Maintenance ' Catch basm and storm. sewer vacuummg: $200 per ton of material removed. Annual expense Compost filters: , $3000 per year to clean or replace med1a and vactor vaults. InfiltratIOn facilities: ApprOXimately 10 year We dependent on silt load allowed to by-pass the treatment system. SCA Engineering April 1997 Page 11 c Yelm Retail Center c Maintenance Checklist for Conveyance Systems (Pipes and Swales) c c Frequency Drainage WORK Problem Conditions to Check For Conditions That Should System Req'd Exist Feature M.S. Pipes Sediment & Accumulated sediment that Pipe cleaned of all , debris exceeds 20% of the diameter of sediment and debris. the pipe. M Vegetation Vegetation that reduces free All vegetation removed so movement of water through pipes. water flows freely A Damaged Protective coating is damaged, Pipe repaired or replaced. (rusted, bent I rust is causing more than 50% or crushed) deterioration to any part of,pipe. M I Any dent that significantly impedes Pipe repaired or replaced. - flow (Le. decreases the cross , - section area of pipe by more then, 20%). M Pipe has major cracks or tears , Pipe repaired or replaced. allowing groundwater leakage. M.S Swales X Trash & D'umping of yard wastes such as Remove trash ;:md debris debris grass clippings and branches into and dispose as prescribed swale. Unsightly accumulation of by City Waste . non-degradable materials such as Management Section. glass, plastic, metal, foam and coated paper . M X Sediment Accumulated sediment that Swale cleaned of all buildup exceeds 20% of the design) depth. sediment and debris so that it matches design. M X Vegetation Grass cover is sparse and weedy Aerate soils .and reseed , not growing or areas are overgrown with woody and mulch bare areas. or vegetation. Maintain grass height at a overgrown minimum of 6" for best stormwater treatment. I Remove woody growth, recontour and reseed as necessary M X Conversion Swale has been filled in or blocked If,possible, speak with by home- by shed, woodpile, shrubbery, etc. homeowner and request owner to that swale area be incompat" restored. Contact City to ible use , report problem if not . rectified voluntarily A X Swale does Water stands in swale or flow A survey may be needed to not drain velocity is very slow Stagnation check grades. Grades occurs. need to be in 1 % range if possible. If grade is less than 1 %, underdrains may need to be installed. c c c c c c c c c o D o D c SCA Engineering April 1997 Page 12 c c o Yelm Retail Center Maintenance Checklist for Infiltration Systems c Frequency Drainage Work Problem' Conditions to Check For Conditions That System Req'd Should Exist \ Feature , , A Storage area X Sediment A soil texture test indicates Sediment is removed buildup in facility is not working as its and/or facility is ~ system designed ~pabilities or was cleaned so that incorrectly'designed. infiltration system I works accordin!;l to design. A sediment trapping area is installed to reduce sediment transport into infiltration area. A X Storage area A soil texture test indicates Additional storage is drains slowly facility' is not working at it's excavated'and filled (more than 48 designed capabilities Or was with drain rock. Fine hours) or incorrectly designed. soil and 'silt is - overflows removed to improve drainage. Contact the City for information on it's rE;!quirements regarding excavation. M X Sediment Any sediment and debris filling Clean out sump to trapping area area to 10% of depth from design depth. sump bottom to bottom of outlet pipe or obstructing flow into the connector pipe. One Time X Sediment Stormwater enters infiltration Add a trapping area by trapping area area directly without treatment. constructing a sump - not present for settling of solids. . Segregate settling' , area from rest of facility Contact City for guidance. , o o c o o c o c c Maintenance Checklist for Composting Filter Systems o D Frequency Drainage Work Problem Conditions to Check For 'Conditions That System Req'd Should Exist 'Feature M,S Hydr Capacity X Facility no Overflowing or by passing. FiltE;r treats the design c longer handles Reduced capacity of infiltration storm event. the design systems. Infiltra~ion facilities do - event without not bli~d. overflows. A X Replace or backwash filter medium. Vactor vaults. c o o o SCA Engineering April 1997 Page 13 c o c C. o o o o c c c o c o o o o o , Yelm Retail Center SECTION 2 - RESPONSIBLE ORGANIZATION The Homeowner's Association or representative shall be responsible for the operation and maintenance' of all on-site drainage facilities. SECTION 3 - VEGETATION MANAGEMENT PLAN All disturbed pervious areas within the site will be landscaped to provide an aesthetically pleasing environment. SECTION 4 - SOURCE CONTROL Warning signs (e g, "Dump No Waste - Drains to Groundwater") will be placed along biofiltration swales and at detention pond inlets ' o SCA Engine~ring April 1997 Page 14 c ---~-,.....----,-~_.---:-- --;-. - ~c ' :c 'Co, c c :'C: 0;,"-' c <' L '/, c :c , C C '.' " C "C. " .", .C 'C 'C c ", ,l -.__~.--':.."--"-.. ---.l- ------'---'--~~ --- ~_.,--.-_.~ -- " " -~~----"--:"'-;--c --~ ,-..- ":",,, J "11,,, " .. ' ~' , " "';;,11\-\ " , /: ," }:... .\' :i... -i <- ~~~ -~~ -~~,~-,,-_:':'~-,-_:,,~' .i5.' ~~c----- ~--'-~7 '-'!: _.--'---~-~ ,y,-~-~~~-~,,,.~.;-,~~~~~~,~~~......--- ;, ,"", ,~~> ...../ e\, 1:',,", Drainage ..C{1tculat!o1}s r " ' t. ~ ~~---------"--~ ~~~ ----------------------- ~ -""'--~-- c c c c o c o c c c c c c c c c c c c Yelm Retail Center APPENDIX A DRAINAGE CALCULATIONS The following calculations were based on the requirements contained in the Drainage Design and Erosion Control Manual for Thurston County, 1994 Edition. DESIGN AND BASIN INFORMATION SUMMARY: Site Area: BASIN ImpervIous Acres Roof Area Acres PervIOUS Acres Total Acres A 2.97 0.23 038 3.58 B 1.39 0 012 151 C 0 0.8 0 08 D 0 0.23 0.29 052 Totals 4.36 1.26 079 641 Soil Classification: SCS soil classification. Hydrologic Group Design infiltration rate Nisqually Loamy Fine Sand B >20 inch/hr (falling head percolation test) Minimum Storage Requirements: (Table 4 1 DDECM) Minimum storage volume (disturbed pervious) 1,000 cf/ac disturbed pervious 3,000 cf/ac impervious Minimum storage volume (impervious) seA Engineering March 1997 c c c c c c c c f' LJ c rr G c c c rr G c \1 G rr G c Yelm Retail Center Minimum Biofiltration Swale Requirements: (Section 7 4 1, DDECM) TABLE 7.2 SUMMARY OF BIOFIL TER DESIGN CRITERIA Design Element Biofilter surface area (for 6-month design storm) Biofilter length Criterion Per impervious acre, 2,000 sf if inflow is undetained, 500 sf if metered release 50 ft minimum for swales, 10ft minimum for filter strips 2 ft minimum and 8 ft maximum for swales, no criteria for filter strips 2" maximum 15ft per second maximum 1 % minimum, 4% maximum No steeper than 3 1, prefer 5 1 Biofilter width Design flow water depth Design flow velocity Flow line slope Side slopes DRAINAGE CALCULATIONS: Minimum Stormwater Treatment: To size compost filters, use the 6 month, 24-hour storm volume Using the SCS method (Water Works by Engenious Systems, Inc), flows developed are as follows BASIN ImperVIous Roof Area PerVIous Total 6-Month, 2-Year, 100.Year, (Non-roof) Acres Acres Acres 24- Hour 24-Hour 24-Hour Acres Runoff Runoff Runoff cfs cfs cfs A 297 0.23 038 358 110 2.57 B 139 0 012 151 052 -. 1.23 C 0 08 0 08 D 0 0.23 0.29 052 seA Engineering March 1997 c c c c c c o c c o c c c c c c c (I G C Yelm Retail Center Minimum Stormwater Storage Volume Required. MINIMUM STORAGE REQUIREMENTS (Thurston County Manual) BASIN ImperVIous Roof Area Pemous Acres Total Acres MinImum Storagel Acres Acres CuFt A 2.97 0.23 038 358 9,980 B 1.39 0 012 151 4,290 C 0 0.8 0 0.8 2,400 D 0 uO.23 0.29 052 980 Totals 4.36 1.26 079 641 17,650 Note: 1. Min Storage per Table 4.1, Thurston Countv Manual, for infiltration rate of 20 inches ner hour Stormwater Storage Volume Provided: INFILTRATION TRENCH DIMENSIONS Basin Width Depth Length Diameter Volume Feet Feet Feet Distribution Provided, Pipe, Inches Cubic Feet A 14 5 500 12 10,398 B 4 5 540 24 4,518 C 5 5 300 12 2,542 D 7 5 100 12 1,255 seA Engineering March 1997 <, c ~[ [" [ 'c. c c 'C, , " 'C c c' [" c c, c c [ J;' , LJ c -,::.._.-.o._"--'------~,~"'____.:._.~ - --,-o---~_~'-:".- "!':- !J ----,---.-....,....-..~.~.,...,______. ~ 'T___r----,-,-;- _._ '. " " , (, , " "- ~ " ," .1' r! Facilzty Summary Forms .~ .-~-=------'-'"'--:.~,.-~~~~~._.:_L_._.~~_'_~_ __",_ ~__~.:...- c c c I' ~ c c r l.J c c c c c c c c c c c c THURSTON REGION FACILITY SUMMARY FORM Complete one (1) for each facIhty (detentlOn/retentlOn, coalescmg plate filter, etc.) on the project sIte Attach 8 1/2 x 11 sketch showmg locatlOn of facIhty Proponent's Fac~hty Name or Ident~fier (e.g , Pond A). See Part 6 Name of Road or Street to Access Facd~ty Yelm H~!!hway Hearmgs Exammer Case Number N / A Development Rev Project No / Bldg PermLt No N / A Parcel Number 21724130600.21724130500 Tobe completed by Utility-Staff: UtlhtyFacihty Number ProJect Number (mill) Parcel NumberStatus (num, lch) 0, Known; I>Pubhc, 2 Unknown; 3; UnassIgned Basmand Subba.Slll.. (num,6ch) (2ch forbaslIi;2ch for'subbaslll,2chfuture Responsible.]urlsdlctlOn. (alpha,.lch) Part 1 - Project Name and Proponent Project Name. Yelm Retml Center Project Owner Mike Edwards Project Contact. Mike Edwards Address. PO Box 3800. Lacev. WA 98509 Phone. (360) 459-1100 Project Proponent. (if d~fferent) N / A Address. N / A Phone. N/A Project Engmeer Robert W Balmelh, P.E Firm SeA Engmeermg Phone' (360) 493-6002 c c c c c c c c c c c c c c c c c c c Part 2 - PrOlect LocatlOn Sectwn 24 17N 1E Townsh~p Range Part 3 - Type of PermIt ApphcatlOn Type of perm~t (e.g, Commercwl Bldg): Other Perm~ts (c~rcle) DDOFIWHPA DCOE Wetlands DFEMA DShorehne Mgmt DEncroachment r5!.JNPDES o Other Commercwl Butldm,; SLte Plan DCOE 404 DDOE Dam Safety DFloodplmn DRockery / Retammg Wall r5!.J Gradmg Other Agenc~es (Federal, State, Local, etc.) that have had or w~ll remew th~s Dramage Eroswn Control Plan. N I A c c [ c c c c c c Part 4 -Proposed Prolect DeSCrlptlOn VVh,at stream basm ~s th~s proJect m (e.g, Percwal, Woodland). ProJect S~ze, acres Zonmg: Ons~te. Thompson Creek 641 Commercwl Res~dentwl Subdw~sLOn. N/A Number of Lots. Lot s~ze (average), acres. Buddmg PermLt/Commerc~al Plat Buddmg(s) Footprmt, acres Concrete Pavmg, acres. Gravel Surface, acres. Latt~ce Block Pavmg, acres. Pubhc Roads (includmg gravel shoulder), acres. Prwate Roads (includmg gravel shoulder), acres Ons~te Impervwus Surface Total, acres. 1 26 ac 4.36 ac 5 62 ac rr lJ Part 5 - Pre-Developed Project SIte eharacterlstlcs Stream through SIte, y/n. Name No c c c c c DNR Type Type of feature thIS facIhty dIscharges to (i.e , lake, stream, mtermIttent stream, pothole, roadsIde dItch, sheetflow to adJacent prIvate property, etc.) Swales, Ravmes, y / n. Steep slopes, (steeper than 15%) y / n. No Yes - Less than 5% of sLte at southeast corner rr ~ Eroswn hazard, y / n. 100 yr Floodplam, y/n. Lakes or Wetlands, y/n. Seeps/Spnngs, y/n. High Groundwater Table, y/n. Wellhead Protectwn or Aqu~fer SensLtwe Area, y / n. No No No No No I' ~ Yes c rr ~ c c c c c c c c c c c c c Other Subbasm A Compost Filter Part 6 - FacIhtv DeSCrlptlOn Total Area Tnbutary to Fac~hty Includmg Offs~te (acres): Total Ons~te Area Tnbutary to Fac~ltty (acres): Des~gn Impervwus Area Tnbutary to Fac~hty (acres): Des~gn Landscaped Area Tnbutary to Fac~hty (acres). Des~gn Total Tnbutary Area to FaCLhty (acres). Enter a one (1) for the type of fac~hty Wet pond detentwn Wet pond water surface area, acres Dry pond detentwn Underground detentwn Infiltratwn pond Dry well mfiltratwn Coalescmg plate separator Centnfuge separator Other Compost Leaf Filter Outlet type (Enter a one (1) for each type present) Filter O~l water separator Smgle onfice Mult~ple onfice We~r Sp~llway Pump(s) Other Infiltratwn trench shared w~th downspout runoff from butldmg m northwest corner I' LJ c I' L C Part 7 - Release to Groundwater Des~gn Percolatwn Rate to Groundwater (if apphcable) !' LJ [l I LJ 3 35 ac 3 35 ac 297 ac o 38 ac 3 35 ac 1 1 1 20 mches / hour c c c c c c c c c c c c c c c c c c c Other Subbasm A Infiltratwn Trench Part 6 - FacIhtv DeSCrlptlOn Total Area Tnbutary to Fac~l~ty Includmg Offs~te (acres). Total OnsLte Area Tnbutary to Fac~ltty (acres): Des~gn Impervwus Area Tnbutary to FacdLty (acres). Des~gn Landscaped Area Tnbutary to Fac~ltty (acres). Des~gn Total Tnbutary Area to Fac~lLty (acres): Enter a one (1) for the type of facdLty Wet pond detentwn Wet pond water surface area, acres Dry pond detentwn Underground detentwn Infiltratwn pond Dry well mfiltratwn Coalescmg plate separator Centnfuge separator Other Compost Filter 3 58 ac 3 58 ac 3.2ac o 38 ac 3 58 ac 1 1 Outlet type (Enter a one (1) for each type present) Filter O~l water separator Smgle onfice Mult~ple onfice We~r Sp~llway Pump(s) Other Infiltratwn trench 1 Part 7 - Release to Groundwater Des~gn Percolatwn Rate to Groundwater (if appl~cable) 20 mches / hour c c c c c c c c c c c c c c c c c c c Other Subbasm B lnfiltratwn Trench and Compost Filter Part 6 - FacIhtv DeSCrlPtlOn Total Area Tnbutary to Fac~ltty Includmg OffsLte (acres). Total Ons~te Area Tnbutary to Fac~lLty (acres). Des~gn Impervwus Area Tnbutary to Fac~lLty (acres): Des~gn Landscaped Area Tnbutary to Facd~ty (acres): Des~gn Total Tnbutary Area to Fac~hty (acres). Enter a one (1) for the type of fac~hty Wet pond detentwn Wet pond water surface area, acres Dry pond detentwn Underground detentwn Infiltratwn pond Dry well mfiltratwn Coalescmg plate separator Centnfuge separator Other Compost Leaf Filter 1 51 ac 1 51 ac 1 39 ac o 12 ac 1 51 ac 1 1 Outlet type (Enter a one (1) for each type present) Filter Od water separator Smgle onfice Mult~ple onfice We~r Spdlway Pump(s) Other Compost Leaf Filter 1 Part 7 - Release to Groundwater Des~gn Percolatwn Rate to Groundwater (if apphcable) 20 mcheslhour i1 c c Other Subbasm C lnfiltratwn Trench r u Part 6 - FacIlItv DeSCrlPtlOn Total Area Tnbutary to Fac~hty Includmg OffsLte (acres). Total OnsLte Area Tnbutary to Fac~hty (acres).' Des~gn Impervwus Area Tnbutary to Fac~lLty (acres). Des~gn Landscaped Area Tnbutary to FacdLty (acres). Des~gn Total Tnbutary Area to Fac~hty (acres).' Enter a one (1) for the type of fac~ltty Wet pond detentwn Wet pond water surface area, acres Dry pond detentwn Underground detentwn Infiltratwn pond Dry well mfiltratwn Coalescmg plate separator Centnfuge separator Other 08ac 08ac o 8ac o Oac o 8ac c c c c c c c c 1 f' U Outlet type (Enter a one (1) for each type present) Filter O~l water separator Smgle onfice MultLple onfice We~r Spdlway Pump(s) Other lnfiltratwn trench [ C C C C 1 Part 7 - Release to Groundwater Des~gn Percolatwn Rate to Groundwater (if apphcable) 20 mches / hour c c c c c c c c c c c c c c c c c c c c c Other Subbasm D lnfiltratwn Trench Part 6 - FacIlIty DescrlPtlon Total Area Tnbutary to FacdLty Includmg OffsLte (acres). Total OnsLte Area Tnbutary to Fac~ltty (acres). Des~gn lmpervwus Area Tnbutary to Fac~hty (acres). Des~gn Landscaped Area Tnbutary to Fac~hty (acres). Des~gn Total Tnbutary Area to Fac~ltty (acres).' Enter a one (1) for the type of fac~ltty Wet pond detentwn Wet pond water surface area, acres Dry pond detentwn Underground detentwn Infiltratwn pond Dry well mfiltratwn Coalescmg plate separator Centnfuge separator Other Compost Leaf Filter o 52 ac o 52 ac o 23 ac o 00 ac o 52 ac 1 1 Outlet type (Enter a one (1) for each type present) Filter O~l water separator Smgle onfice Mulhple onfice WeLr Spdlway Pump(s) Other Compost Leaf Filter 1 Part 7 - Release to Groundwater Des~gn Percolatwn Rate to Groundwater (if appltcable) 20 mches I hour c c c c c c c c c c c c [ c c c c c c Part 8 - Release to Surface Water (if applIcable) Thurston County MSL ElevatlOn (f) Empty' Present DesIgn Full o 25 50 100 Volume (cu ft) 000 DIscharge to Surface Water (cfs) 00 ~",,--.....--y- --, ~ - , ,C C.\ C C ;[ " c~ [ c .C c' ,c. 'c ;. 'C 'C C ~c c c 'C \ -....,....,~~.,..,-;;;-..."._. --r-----~_____._,~-, ~, .' ~; ", I' c . ., '" ~ \ .t. ,. ,. , , , , ~---~~-~ . '.. ',' ,,; ,.' '" '" '~r~-'--'~,,~~~......--.-,-...:::.-~~,---__,_~ ----,----::-~~,.. " ,', v;~, ./'i.. ;r '... ,....;, '1', .1 J~ ", "l: Scs sods"Map} Soil ~~gs} Infiltration Te~ts ~-~~ ~,.--:.(,-~ ~--,,-.:.c..---,,- ~~--=""""~~---'-_"__~ j. ~~~~ ~~,~- .?, c c c c c c c c c c c c c c c c c c c Yelm Retail Center SCA #95031 Soils Analysis for Stormwater Control Facilities Date June 1995 SoIls Logged By. Robert W BalmellI SCA EngIneermg ApplIcant. Armada RetaIl Company 2001 6th Avenue Smte #3202 Seattle, WA 98121 SIte DescnptlOn. Yelm RetaIl Center SOlI Logs (See Dramage Plan for sOli log 10catlOn) Depth 0" -27" 27" -41" 41" -97" Depth 0" -23" 23" -44" 44" -98" Depth 0" -20" 20" -30" 30" -60" 60" -95" (c: \data \5031605.log) Test Hole #1 Texture and Color Black gravely sandy loam LIght brown cobbly sandy loam LIght brown cobbly fine sand Roots to 57", cobbles to 10" diameter Mottling None None None Test Hole #2 Texture and Color Black gravelly sandy loam LIght brown cobbly sandy loam GraYIsh very cobbly medmm sand Roots to 53", cobbles to 10" dIameter Mottling None None None Test Hole #3 Texture and Color Black gravelly sandy loam LIght brown cobbly sandy loam Gray cobbly very gravelly coarse sand LIght brown very cobbly medmm sand Roots to 48", cobbles to 10" dIameter Mottling None None None None c c c c c c c c c c c c c c c c c c c DOUBLE RING INFIL TROMETER TEST RESULTS seA #95031 INFILTRATION RESULTS Test Pit #2 Start (Mln) Stop (Min) Elapsed Time Total Inches Infiltration (Min) Drop Rate (In/Hr) 1232 1241 9 mln 12" 80"/hr 1243 1251 8 min 12" 90"/hr Test Depth 93" Weather CondItIons OutsIde Temperature Test Performed By Test Date Test Holes Dug By Sunny 780 Brad Shea 6/1/95 Backhoe ( c:\data\5031602.dri) L -~~~-~ ----~---~~-~-----~--..r--___~~~__r-~_~_~-,~~ r----, r~~~ ~____c--,-.F~~' -' L -' L - J L- -' L J L ~ ~ L J L J L J L J L J L J L J L ~ ~~ ~-L~ ~-L ~ L ~ L~- Project Location SCS MAP NUMBER 20 (110) - SPANAWAY GRAVELLY SANDY LOAM o TO 3% SLOPE SCS SOILS MAP YELM RETAIL CENTER Job Number 95031 ___~__~....,_"=r----- >{- " , , \ <~ j c c G -'c L c c ~c, c t c c.. ,-- ,.--..---------- ..-" " ~---".. '\ ~', " ,. , ,,;:1 J ,~~.,~..~~".." --_..._...---~~.--.---. ~, t J' ) , , ., j. ~ ~, J ViciniiyMQP .~j, ------------ - -'-""-~----_..-'-------- .. c [ [ [ [ [ [ [ [ [ [ L [1 [\ [~ [I [I I [: I [; PROJECT SITE 1?& 9& ~(( )- o o L() CD <:'>ol~ o o L() f'.. 9300 10300 ~ ~ ~ ~ ~ ......-.t Z ......-.t U ......-.t > ~ ~ f-; Z ~ u ~ ......-.t <r: E-i ~ ~ ~ ~ ~ ~ en -.. SlIa<n III S[ =~~ f:l:== r.. 1M. 1IWI5l'OlTAlDl PlMIIIIG . SIJMTNl ,~-r--~~-'- . .~ .;;--;--.r ./ \. .J c :C " c' [ c r -~ c 5~J., c' c 'c' ,;r, U I} " i) i' ( ~; .-.,.(. .J..: " , , .;, " " , , ~,~,5-.---'~'~--' ~,-..-"~--~.,--.;- " /, ,. " c:....-~,--~ j, /" ~ ' .' ----- i,I " J' ~> ; ~ " ~h .' .{ Draincige p ran "' ~_~.__~-,-~~~..-c--~ ~~~~..~.k-'--- SCA 677 Woodland Square Lp SE PO Box 3485 Lacey, Washington 98503-0485 (360) 493-6002 (360) 493-2476 Facsimile (907) 279-5929 Anchorage s. Chamberlain & Associates, Inc. June 9, 1995 Mary Hanna Murphy 7350 Alonzo Avenue NW Seattle, W A 98117 Re: Yelm Retail Center Soils and Storm Drainage SCA #95031 Dear Mary' The followmg IS a bnef descriptIOn of our mItlal soils and stormwater control analysIs for the Yelm Retail eenter proJect. INFILTRATION RATES/SOILS The Soil Conservatlon ServIce (SeS) soil survey of Thurston County classIfies the on-sIte soils as Spanaway very gravelly sandy loam. SeA analysIs of 3 on-sIte soil test pItS confirmed the SCS elasslficatlOn. Spanaway soils are very deep, excessIVely dramed soils formed m glacial outwash. AtypIcal soil profile IS as'follows. 0"-15" Black gravelly sandy loam 15"-20" Dark yellOWIsh brown very gravelly sandy loam 20"-60" Dark y~llowIsh brown very gravelly sandy loam Spanaway soils are well sUIted for stormwater mfiltratlon systems due to therr rapId permeability However, care needs to be taken to remove silt and sedImimt from stormwater to mmllmze cloggmg of mfiltratlOn systems. In admtlOn, the Ctty of Yelm Dramage Des~gn and Eroswn Control Manual (DDECM) reqUITes cleansmg of runoff pnor to mfiltratlOn. Two Double Rmg Infiltrometer tests were performed on test hole #2 to determme the project site mfiltratlOn rate. An average mfiltration rate of 85"/hr was recorded by SCA staff. However, the DDECM maxrmum allowed mfiltratlon rate of 20"fhr must be used for deSIgn. STORMWATER CONTROL The proposal IS to develop the 56 acre sIte .for a 53,620 sf grocery and retail shop buildmg, 4,000 sf bank pad, and 2,918 sf restaurant pad. Access to the proJect will be from Highway 510 and proposed new Killion Road extenSlOn. Water and sewer servIce will be prOVIded by City of Yelm. The completed proJect will create approxrmately 3 69 acres of new rmpervlOus, roadway and parking area, 069 acres of dIsturbed pervIOUS area, and 1.29 acres of roof area. Approxrmately 0.23 acres of off-sIte msturbed pervIOUS area and 1.05 acres of off"sIte rmpervIOus roadway area are tributary to the proJect. ENGINEERING PLANNING SU RVEYI NG . . SCA Mary Hanna Murphy June 9, 1995 Page 2 On-sIte Development eoverage Summary Off-sIte dIsturbed pervIOUS Off-sIte rmpervlOus roadway area. ImpervIOus Roof Area. ImpervIOus Roadway Area. DIsturbed PervIOUS Area. UndIsturbed PervIOUS Area. Totals EXIstmg o 11 ac o 18 ac o 24 ac o 23 ac o 00 ac 6.19 ac 6.95 ac Proposed o 23 ac 1. 05 ac 1.29 ac 3 69 ac o 69 ac 0.00 ac 6.95 ac A. Stormwater Treatment: Stormwater runoff from Highway 510, proposed :K.llhon Road extenslOn and new parkmg lot areas will reqUITe treatment. Acceptable types of treatment facilitIes are blOfIltratlOn swales, fIlter stnps, wetponds, and wetva'ults. As an example, If blOfiltratlOn swales are used, a total of 9,480 sf of treatment (bl{jfIltratlOn) area IS requITed to meet the mml1llum treatment standards of the eIty ofYelm DDEeM. Stormwater runoff from proposed buildmg roofs does not reqUITe treatment pnor to dIscharge mto the groundwater Therefore, all roof stormwater WIll be tIghtlmed drrectly to the SIte's mfIltratlOh facilitieS. B Storm water Storage. Stormwater runoff will likely be stored and mfiltrated on-sIte Via mfIltratlOn facilitIes. Types of mfiltratIon facilitIes mclude, but are not mmted to, open retentIon ponds, underground mfIltratIon dram rock gallenes, and underground mfIltratIOn vaults. Usmg a 20"/hr mfIltratIOn rate and Table 4.1 of the DDEeM results m a requITed stormwater storage volume of 19,010 cf. If a rock filled gallery IS used for storage, the volume of drarnrock requIred to store 19,010 cf at a 3 1 VOId ratio would be 63,367 cf. In companson, an open retentIon pond would need to be 100' x 100' x 4' deep to accommodate 19,010 cf of storage volume WIth appropnate freeboard and sIdeslopes. Please gIVe me a call at (360)493-6002 If you have any questIOns. Smcerely,. s. CHAMBERLAIN & ASSOCIATES, INC. tw- t>> /JLJt/) Robert W Balmelh ProJect Engmeer RWB/jl Enclosure (c: \corres\5031606.ltr) ENGINEERING PLANNING . . SURVEYING SCA DRAINAGE CALCULATIONS The following calculatIons are based on reqUITements con tamed m the Dramage DesIgn and ErOSIOn Control Manual (DDECM) for Thurston County, 1994 EmtlOn. DESIGN AND BASIN INFORMATION SUMMARY: Site Area (Developed Condition): Total off-sIte msturbed pervIOus Total off-sIte rmpervIOus area. Total rmpervIOus roadway area. Total rmpervIOus roof area. Total msturbed perVIOus area. Total sIte area. o 23 ac 1.05 ac 3.69 ac 1. 29 ac 0.69 ac 6.95 ac Soil Classification: SCS soil classnicatIOn HydrologIc Group SIte mfIltrabon rate (desIgn) SIte mfIltrabon rate (field tests) Spanaway gravelly sandy loam B 20" Ihr 85" Ihr Minimum Storage Requirements: Reference. Table 4.1 DDEeM Minimum storage volume (msturbed pervious) 1,000 cf/ac msturbed pervIous Minrmum storage volume (impervIous) 3,000 cf/ac ImpervIOus SUB-BASIN CALCULATIONS: Minimum Stormwater Treatment Area Require~: Reference ehapter 7, SectIOn 7 4.1, DDEeM Assume use of bIOfiltratIOn swales. Per SectIOn 7 4.1 of the DDECM, bIOfIltratIOn swales shall be mmImum 50 ft m length and shall be lined with 6" of sandy loam topsoil. ImpervIous roadway/parking area = 3.69 ac + 1.05 ac = 4.74 ac RequITed treatment area = 2,000 sf/ac (4.74 ac) = 9,480 sf ENGINEERING PLANNING . . SURVEYING seA Other optIons are available for stormwater treatment. The followmg methods of storm water treatment will be investIgated durmg prelnnmary and fmal phases of deSIgn. . BIOflltratIOn swales . BlOfiltratIOn stnps . Oil/water separators . Compost fllter umts . Wetvaults . Wetponds Minimum Stormwater Storage Volume Required. Reference Thurston eounty DDEeM, ehapter 4, Table 4.1 AppendIx II, InflltratIon Test Results Assume use of underground dramrock mflltratlOn gallenes. Two Double Rmg Inflltrometer Tests were performed on-sIte The average mfiltratIon rate was 85"/hr Therefore, a maXllllum desIgn mfiltratIon~ rate of 20"/hr must be used to determme the storage volume requITements. From Table 4.1 & 20"/hr, the mmllllum storage volume requITed per acre of: DIsturbed pervIOus surface = 1,000 cf/ac ImpervIOUS roadway surface = 3,000 cf/ac Total dIsturbed pervIOUS area = 0 69 ac + 0 23 ac = 0 92 ac Totalllllper paved/roof area = 3 69 ac + 1. 05 ac + 1. 29 ac = 6.03 ac RequITed stor-age volume 0.92 ac (1,000 cf/ac) + 6.03 ac (3,000 cf/ac) = 19,010 cf Volume of dramrock required to store 19,010 cf (19,010 cf/O 30) = 63,367 cf of dramrock, VOId ratlO = 3 1 Other optIOns are available for storage and dIscharge of stormwater The followmg optIOns will be mvestIgated durmg prelnnmary and final deSIgn phases . Underground mfiltratIon gallenes . Open retentIon pond(s) . Underground mflltratIon vaults . CombmatIons of dram rock gallenes, vaults, and open pond(s) ENGINEERING PLANNING . SURVEYING . SCA ENGINEERING ,/ APPENDIX I SCS SOILS'MAP, SOILS LOGS . PLANNING SURVEYING . Date SOlIs Logged By. Apphcant: Yelm Retail Center SCA#95031 Soils Analysis for Storm water Control Facilities June, 1995 Robert W Balmelli S Chamberlain & Associates, Inc. Armada Retail Company 2001 6th Avenue SUlte #3202 Seattle, W A 98121 SIte DescrIptIOn. Yelm Retail Center SOlI Logs: Depth 0"-27" 27" -41" 41" -97" Depth 0".23" 23" -44" 44" -98" Depth 0"-20" 20" -30" 30" -60" 60" -95" (c: \data \5031605.log) (See Dramage Plan for soil log locatIOn) Test Hole #1 Texture and Color Black gravely sandy loam Light brown cobbly sandy loam Light brown cobbly fine sand Roots to 57", cobbles to 10" mameter Mottling None None None Test Hole #2 Texture and Color Black gravelly sandy loam LIght brown cobbly sandy loam Grayish very cobbly memum sand Roots to 53", cobbles to 10" mameter Mottling None None None Test Hole #3 Texture and Color Black gravelly sandy loam LIght brown cobbly sandy loam Gray cobbly very gravelly coarse sand LIght brown very cobbly memum sand Roots to 48", cobbles to 10" diameter Mottling None None None None DOUBLE RING INFILTROMETER TEST RESULTS seA #95031 INFILTRATION RESULTS Test Pit #2 Start (Min) Stop (Min) Elapsed Time Total Inches Infiltration Rate (Min) Drop (In/Hr) 12 32 12 41 9 min 12" 80"/hr 12 43 12 51 8 min 12" 90"/hr Test Deoth 93" Weather Conditions Outside Temperature Test Performed By Test Date Test Holes Dug By Sunny 780 Brad Shea 6/1/95 Backhoe (c:\data\5031602.dri) Pro\ec' Loca"on SCS MAP NUMBER 20 (110) _ SPAllAWA~ GRA'/ELL~ SAllO~ LOAM o 10 3% SLOPE 'l'ELM RO AIL C(Nl(R ?- ~ C'~~\ SCS SO\lS MAP