Loading...
TIAHEATH & ASSOCIATES, INC. BENUM-COYNE PLAT RESIDENTIAL SUBDIVISION TRAFFIC IlVIPACT ANALYSIS YELM, WA Prepared for: Benum -Coyne C/o Benum Enterprises P.O. Box 73130 Puyallup, WA 98373 Transportation and Civil Engineering OCTOBER 2002 BENUM-COYNE PLAT RESIDENTIAL SUBDIVISION TRAFFIC M'ACT ANALYSIS TABLE OF CONTENTS I. Introduction ............................................ II. Project Description ................................. III. Existing Conditions ................................ IV. Forecasted Traffic Demand .................... V. Conclusions and Mitigation ................... .................................................................3 .................................................................3 .................................................................3 .................................................................9 ...............................................................16 Appendix LIST OF TABLES 1. Existing Level of Service ............................................................... 2. Trip Generation .............................................................................. 3. Future Level of Service .................................................................. LIST OF FIGURES ..........................9 ........................10 ........................12 1. Vicinity Map and Roadway System ................................................ ............................4 2. Site Plan ......................................................................................................................5 3. Existing Peak Hour Volumes ......................................................................................7 4. Trip Distribution and Assignment ............................................................................11 5. Pipeline Traffic .........................................................................................................13 6. 2006 Peak Hour Volumes Without Project ...............................................................14 7. 2006 Peak Hour Volumes With Project ....................................................................15 2 BENUM-COYNE PLAT RESIDENTIAL SUBDIVISION TRAFFIC IMPACT ANALYSIS I. INTRODUCTION This study serves to investigate traffic impacts related to the proposed Benum-Coyne Plat subdivision. The main goals of this study focus on the assessment of existing traffic conditions and intersection congestion, forecasts of newly generated project traffic, and estimations of future intersection delay. The first task includes the collection of general roadway information, road improvement information, entering sight distance data, and peak hour traffic counts. Next, a detailed level of service analysis of the existing volumes is made to determine the present degree of intersection congestion. Forecasts of future traffic and dispersion patterns on the street system are then determined using established trip generation and distribution techniques. Following this forecast, the future service levels for the key intersections are investigated. As a final step, appropriate conclusions and possible off-site mitigation measures are defined. II. PROJECT DESCRIPTION The proposed project is a residential subdivision comprised of 108 individual housing lots. The site is located in the northeast quadrant of Yelm with Wilkenson Road along its west border. The triangular shaped property is bordered on the southerly side by the Burlington Northern Raikoad and the Centralia Power Canal on the north. Primary access to site will be via two accesses to Wilkenson Road. Other roads serving the site include Canal Road and N.P. Road. Based on management projections, occupation of this development is anticipated by 2005/2006. Figure 1 on the following page shows the general site location and serving roadways while the overall lot configuration and internal roadway is shown in Figure 2. IIZ EXISTING CONDITIONS A. Surrounding Roadway System Roadways serving the proposed site range from two lane major arterials to two-lane collector roads which vary in width, terrain, and posted speeds. These roadways vary in their overall function as part of the general network. The key streets near the site are described on page 6. 3 n~ur<t i r' \ ' \~ N PRELIMINARY SITE PLAN BENUM AND COYNE PROPERTY A PART OF THE SW/4 SECTION 17, T17N, R2E, W.M. CRY OF YELM, THURSTON COUNTY, WASHINGTON cx.rloc xua - I / / NISOUALLY PINES ~, :. ~ i ~ .. j ,. L / / ~ ~ i S. _. _. ~_ ~ ~~ L ~PEPPERIp6E U/VE % ~ Ip ~ S~ .. ~,' NTRAL/A POWER ~ ~ ~ ~i / / / \ / I r ~ t . T1IACTC e ~ \\\ _, ^~j 1 ~- ~.~ I it ~ 0 r' t..' ~. ~ \ '\~` ~j R 'I ~b s M. ~I. a ,~ ~~ ! a,' ~ ~ j \~ I` h ~ ~ 1 ~ ~ Z r~ t 'r' a =~ ~\J ~ ~ O i ~(\/ ~ _ , r- . ~~ , - j~z Y J~ III 'r ~ s w• s. .` ,~~~.-* / PP . YcKEtIN~ IRRIGAT70N TRACTS /f' L/ ~j v 1°/ HEATH & ASSOCIATES, INC Transportation and Civil Engineering SITE PLAN FIGURt_ 2 South First Street is also State Route 507. This is a two lane road, with a left turn lane at the intersection with SR-510. The speed limit near the intersection is 25 mph, while to the south the speed limit is 55 mph. Shoulders are roughly 5 feet wide and consist of asphalt and grass or curb and sidewalk. Yelm Avenue is a two-lane roadway which lies northeast of the property and runs in a northwesterly-southeasterly direction. Lanes are 12 feet wide, while shoulders are roughly 4 feet wide and composed of asphalt/gravel or curb and sidewalk. Northwest of the intersection with the S First Street, Yelm Avenue is also State Route 510, while southeast of the intersection it is State Route 507. Wilkerson Road is a two-lane roadway which lies along the west side of the property. Lane widths are approximately 10 feet wide, while shoulders are minimal. The speed limit is 25 mph south of its intersection with N.P. Road and 35 mph north of the intersection. N.P. Road is a two-lane roadway which lies southeast of the property and runs in a southwesterly-northeasterly direction. Lanes are approximately 10 feet wide, while shoulders are gravel and minimal in cross-section. The speed limit along this road is posted at 35 mph. Rhoton Road is a two-lane roadway which lies west of the property and runs in a north- south direction. Lanes are also approximately 10 feet wide, while shoulders are minimal along this street. The speed limit is posted at 25 mph. B. Existing Peak Hour Volumes Field data for this study was collected in May, July and October of 2002. Traffic counts, for this type of use, are taken during the evening peak period between the hours of 4 PM and 6 PM. This specific peak period is targeted for analysis purposes since it generally represents a worst case scenario for residential developments with respect to traffic conditions. This is primarily due to the common 8 AM to 5 PM work schedule and the greater number of recreation and shopping trips associated with the early evening period as they travel home from work. In order to discern the true peak hour in the area an AM peak hour count was taken at the intersection of lst and Yelm. As was noted in the comparison, volumes are 38 percent higher during the PM peak hour versus the AM peak hour. Figure 3 on the following page shows the evening peak hour count taken at several intersections which would most likely receive the bulk of this project's traffic. The route and intersections analyzed provide the routes to the regional corridors serving Yelm, namely SR-507 and SR-510. Average daily traffic (ADT) volumes for State Routes are available from the Washington State Department of Transportation. T~ansp~~tagionAandOC Iil~ EEg neerv g EXISTING PM PEAK 110UR VOLUMES FIGURE 3 C. Level of Service Description Existing peak hour delays were determined through the use of the Highway Capacity Manual. Capacity analysis is used to determine level of service (LOS) which is an established measure of congestion for transportation facilities. LOS is defined for a variety of facilities including intersections, freeways, arterials, etc. A complete definition of level of service and related criteria can be found in the HCM. The methodology for determining the LOS at signalized intersections strives to determine the volume to capacity (v/c) ratios for the various intersection movements as well as the average control delay for those movements. Delay is generally used to measure the degree of driver discomfort, frustration, fuel consumption, and lost time. Control delay, in particular, includes movements at slower speeds and stops on intersection approaches as vehicles move up in queue position or slow down upstream of an intersection. Aside from the overall quantity of traffic, three specific factors influence signalized intersection LOS. These include the type of signal operation provided, the signal phasing pattern, and the specific allocation of green time. The methodology for determining the LOS at unsignalized intersections strives to determine the potential capacities for the various vehicle movements and ultimately determines the average total delay for each movement. Potential Capacity represents the number of additional vehicles that could effectively utilize a particular movement, which is essentially the equivalent of the difference between the movement capacity and the existing movement volume. Total delay is described as the elapsed time from when a vehicle stops at the end of a queue until the vehicle departs from the stop line. Average total delay is simply the mean total delay over the entire stream. A number of factors influence potential capacity and total delay including the availability/usefulness of gaps. The range for intersection level of service is LOS A to LOS F with the former indicating the best operating conditions with low control delays and the latter indicating the worst conditions with heavy control delays. Existing LOS is shown in Table 1 on the following page. This analysis involved the Signal 2000 and HCS-2000 programs which is based on the 2000 Highway Capacity Manual. D. Level of Service Results The results of the level of service analysis are given below the table. These results were determined through the use of the automated intersection analysis programs known as HCM 2000 and Signa12000. This program is based on Highway Capacity Manual analysis procedures for unsignalized and signalized intersections. targeted and analyzed. Baseline 2006 peak hour volumes without the project were derived by applying a 3 percent growth rate per year to the existing volumes of Figure 3. The traffic from several pipeline projects (see Figure 5) were also added to the volume to reflect future 2006 traffic without the project The pipeline projects identified were Dairy Queen, Jack in the Box, Bruno Plat, Yelm Alternative School, Rhoton Industrial Plat and the Teitge (Mill Road) Plat. 2006 intersection volumes without the project are given in Figure 6, with pipeline trips included, while volumes with the project are shown in Figure 7. D. Level of Service A level of service analysis was made of the future peak hour volumes with and without project generated trips added to the primary intersections and entrance nodes. Results for intersection delay conditions were determined through the use of the HCM 2000 and Signal 2000 programs. A summary of the analysis results is shown in Table 3. TABLE 3 Future 2006 Level of Service Delays given in seconds per vehicle Without Proiect With Proiect Intersection Control Geometry LOS Delay LOS Delay Yelm/SR-507 Signal Southbound D 50.9 D 52.9 Westbound E 58.5 E 59.7 Northbound F 97.7 F 99.6 Eastbound E 60.4 E 64.2 Overall E 66.3 E 68.7 Railway/1st Stop Westbound B 13.7 C 15.0 Southbound A 8.0 A 8.1 Rhoton/NP Rd Stop Westbound B 12.6 B 14.0 Southbound A 7.7 A 7.9 NP/Wilkenson Stop Eastbound C 15.8 C 20.8 Northbound A 8.1 A 8.2 S Ent/Wilkenson Stop Westbound - - C 16.5 Southbound - - A 8.2 N Ent/Wilkenson Stop Westbound - - B 14.9 Southbound - - B 8.0 The 2006 LOS analysis both with and without the project indicate delays of LOS E overall for the primary Yelm Ave/First St intersection. Project traffic is expected to add several seconds to average overall delays at this location. Other intersections studied as part of this project will experience LOS C or better without or with project traffic. 12 BENUM-COYNE PIAT HEATH & ASSOCIATES, INC PIPEUNe vowMes ', Transportation and Civil Engineering FIGURE 5 i\ i \ ~ i j Tra spo~r~ta&onAandOC Iil~ Eng neerin~ 2006 PM PEAK Y1OUR VOLUMES WITt10UT PROJECT FIGURE 6 E. Left Turn Lane Warrants Left turn lanes are a means of providing a necessary storage area for left turning vehicles at intersections. For atwo-lane or four-lane arterial with no left turn storage, delays are often created by vehicles waiting to complete the desired left turn movement. These turning vehicles typically block the heavier through movement, thereby causing some disruptions to traffic flow and subsequent congestion. Methods have been developed by various agencies to determine under what circumstances a left turn lane would be needed. Moderate traffic presently exists on Wilkenson and very little traffic for the project is expected to be coming from the north into the plat. By inspection a left turn pocket is not warranted. V. CONCL USIONS AND MITIGATION The Benum-Coyne Plat project is located northeasterly of downtown Yelm and proposes 108 single-family residential lots. Access to the site is proposed off of Wilkenson Road. Based on ITE data, this project is expected to create an average of 1034 residential trip movements during a typical weekday. An estimated 81 vehicle trips are generated during the AM peak hour and 109 trips during the PM peak. Several intersections were reviewed for LOS which is expected to receive the bulk of project traffic. Based on this review, the project does not result in a change in LOS at the intersections studied. Sight distance at the project entrances appears to be adequate, based on a 35 mph assumed speed limit but should meet city of Yelm requirements. The light amount of project volume from the north coupled with the moderate traffic on Wilkenson Road would not warrant a left turn pocket at either entrance. Based on this analysis the following recommendations are made: 1. Provide the city of Yelm mitigation fee for 109 PM peak hour trips. No other mitigation is identified. t6 BENUM-COYNE PLAT RESIDENTIAL SUBDIVISION TRAFFIC IMPACT ANALYSIS APPENDIX 17 LEVEL OF SERVICE The following are excerpts from the 2000 Highway Capacity Manual -Transportation Research Board Special Report 209. Quality of service requires quantitative measures to characterize operational conditions within a traffic stream. Level of service (LOS) is a quality measure describing operational conditions within a traffic stream, generally in terms of such service measures as speed and travel time, freedom to maneuver, traffic interruptions, and comfort and convenience. Six LOS are defined for each type of facility that has analysis procedures available. Letters designate each level, from A to F, with LOS A representing the best operating conditions and LOS F the worst. Each level of service represents a range of operating conditions and the driver's perception of those conditions. Level-of-Service definitions The following definitions generally define the various levels of service for arterials. Level of service A represents primarily free-flow operations at average travel speeds, usually about 90 percent of the free-flow speed for the arterial classification. Vehicles are seldom impeded in their ability to maneuver in the traffic stream. Delay at signalized intersections is minimal. Level of service B represents reasonably unimpeded operations at average travel speeds, usually about 70 percent of the free-flow speed for the arterial classification. The ability to maneuver in the traffic stream is only slightly restricted and delays are not bothersome. Level of service C represents stable operations; however, ability to maneuver and change lanes in midblock locations may be more restricted than in LOS B, and longer queues, adverse signal coordination, or both may contribute to lower average travel speeds of about 50 percent of the average free-flow speed for the arterial classification. Level of service D borders on a range in which small increases in flow may cause substantial increases in approach delay and hence decreases in arterial speed. LOS D may be due to adverse signal progression, inappropriate signal timing, high volumes, or some combination of these. Average travel speeds are about 40 percent of free-flow speed. Level of service E is characterized by significant delays and average travel speeds of one- third the free-flow speed or less. Such operations are caused by some combination of adverse progression, high signal density, high volumes, extensive delays at critical intersections, and inappropriate signal timing. Level of service F characterizes arterial flow at extremely low speeds, from less than one- third to one-quarter of the free-flow speed. Intersection congestion is likely at critical signalized locations, with long delays and extensive queuing. These definitions are general and conceptual in nature, and they apply primarily to uninterrupted flow. Levels of service for interrupted flow facilities vary widely in terms of both the user's perception of service quality and the operational variables used to describe them. For each type of facility, levels of service are defined based on one or more operational parameters that best describe operating quality for the subject facility type. While the concept of level of service attempts to address a wide range of operating conditions, limitations on data collection and availability make it impractical to treat the full range of operational parameters for every type of facility. The parameters selected to define levels of service for each facility type are called "measures of effectiveness" or "MOE's", and represent available measures that best describe the quality of operation on the subject facility type. Each level of service represents a range of conditions, as defined by a range in the parameters given. Thus, a level of service is not a discrete condition, but rather a range of conditions for which boundaries are established. The following tables describe levels of service for signalized and unsignalized intersections. Level of service for signalized intersections is defined in terms of avera e control delay. Delay is a measure of driver discomfort, frustration, fuel consumption and lost travel time, as well as time from movements at slower speeds and stops on intersection approaches as vehicles move up in queue position or slow down upstream of an intersection. Level of service for unsignalized intersections is determined by the computed or measured control delay and is determined for each minor movement. Signalized Intersections -Level of Service Control Delay per Level of Service Vehicle (sec) A <_10 B >l0and<_20 C > 20 and <_35 D > 35 and <_55 E > 55 and _<80 F > SO 19 Unsignalized Intersections -Level of Service Level of Service A B C D E F Average Total Delay per Vehicle (sect <_10 >l0and<_15 >15ands25 > 25 and <_35 >35and<_50 > 50 As described in the 2000 Highway Capacity Manual, level of service breakpoints for all- way stop controlled (AWSC) intersections are somewhat different than the criteria used for signalized intersections. The primary reason for this difference is that drivers expect different levels of performance from distinct kinds of transportation facilities. The expectation is that a signalized intersection is designed to carry higher traffic volumes than an AWSC intersection. Thus a higher level of control delay is acceptable at a signalized intersection for the same level of service. AWSC Intersections -Level of Service Level of Service A B C D E F Average Total Delay per Vehicle (sec) <_10 > 10 and <_ 15 >15and<_25 >25 and <_35 > 35 and _<50 > 50 20 BENUM-COYNE PLAT Summary of Trip Generation Calculation For 108 Dwelling Units of Single Family Detached Housing October 14, 2002 Average Rate Standard Deviation Adjustment Factor Driveway Volume Avg. Weekday 2-Way Volume 9.57 3.69 1.00 1034 7-9 AM Peak Hour Enter 0.19 0.00 1.00 21 7-9 AM Peak Hour Exit 0.56 0.00 1.00 60 7-9 AM Peak Hour Total 0.75 0.90 1.00 81 4-6 PM Peak Hour Enter 0.65 0.00 1.00 70 4-6 PM Peak Hour Exit 0.36 0.00 1.00 39 4-6 PM Peak Hour Total 1.01 1.05 1.00 109 AM Pk Hr, Generator, Enter 0.19 0.00 1.00 21 AM Pk Hr, Generator, Exit 0.58 0.00 1.00 63 AM Pk Hr, Generator, Total 0.77 0.91 1.00 83 PM Pk Hr, Generator, Enter 0.65 0.00 1.00 70 PM Pk Hr, Generator, Exit 0.37 0.00 1.00 40 PM Pk Hr, Generator, Total 1.02 1.05 1.00 110 Saturday 2-Way Volume 10.09 3.67 1.00 1090 Saturday Peak Hour Enter 0.51 0.00 1.00 55 Saturday Peak Hour Exit 0.43 0.00 1.00 46 Saturday Peak Hour Total 0.94 0.99 1.00 102 Sunday 2-Way Volume 8.78 3.33 1.00 948 Sunday Peak Hour Enter 0.46 0.00 1.00 50 Sunday Peak Hour Exit 0.40 0.00 1.00 43 Sunday Peak Hour Total 0.86 0.95 1.00 93 Note: A zero indicates no data available. Source: Institute of Transportation Engineers Trip Generation, 6th Edition, 1997. TRIP GENERATION BY MICROTRANS YELM AVE ~ I 2751 I Right Thru Lgft ~ T ~,~, ~ W ~~ North ~ v7 N a ~ /14/02 4:00:00 PM ~ < ~- /14102 5:45:00 PM m ~ ~ .- ~ ~--, r--m ~ m ~ 1 1 ~ ~1 ~ ~' ~~ Jnr,~ ra~nnt L~1Js_~ ~ _5. ~z17 Out In Total Grouns Printed- Unshifted File Name : untitled2 Site Code :00001924 Start Date :05/14/2002 Page No : 1 YELM AVE 1ST AVE SE YELM AVE 1ST AVE SE ~ Southboun d Westbound Northbound Eastbound Start Time Ri ht Thru Left Ri ht Thru Left Ri ht Thru Left Ri ht Thru Left Int. Total Factor 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 04:00 PM 11 129 33 31 12 7 13 96 40 46 24 34 476 04:15 PM 27 134 34 22 11 14 9 98 34 44 17 27 471 04:30 PM 28 132 40 19 19 14 6 84 53 35 12 28 470 04:45 PM 25 134 30 17 15 10 8 96 53 44 22 26 480 Total 91 529 137 89 57 45 36 374 180 169 75 115 1897 05:00 PM 28 136 49 05:15 PM 25 125 32 05:30 PM 27 132 37 05:45 PM 33 145 26 Total 113 538 144 Grand Total 204 1067 281 Apprch % 13.1 68.8 18.1 Total % 5.2 27.2 7.2 Heath & Associates Inc. Transportation Division 2214 Tacoma Road Puyallup, WA 98371 27 15 13 29 15 10 34 16 13 28 19 16 118 65 52 207 122 97 48.6 28.6 22.8 5.3 3.1 2.5 7 85 47 47 25 33 51Z 8 101 52 32 12 29 470 17 101 51 53 26 35 542 8 94 44 51 15 25 504 40 381 194 183 78 122 2028 76 755 374 352 153 237 3925 6.3 62.7 31.0 47.4 20.6 31.9 1.9 19.2 9.5 9.0 3.9 6.0 Heath & Associates Inc. Transportation Division 2214 Tacoma Road Puyallup, WA 98371 File Name : untitled2 Site Code :00001924 Start Date :05/14/2002 Page No : 2 YELM AVE 1ST AVE SE YELM AVE 1ST AVE SE Southbound Westbound Northbound Eastbound Start Time Right Thru Left Right Thru Left Right Thru Left Right Thru Left Total Total Total Total Total , PeaK Hour From 04:00 NM t0 05:45 I'M - F'ea Intersection 05:00 PM Volume 113 538 144 795 Percent 14.2 67.7 18.1 05:30 27 132 37 196 Volume Peak Factor High Int. 05:00 PM Volume 28 136 49 213 Peak Factor 0.933 {1or1 118 65 52 235 50.2 27.7 22.1 34 16 13 63 05:30 PM 34 16 13 63 0.933 40 381 194 615 6.5 62.0 31.5 17 101 51 169 05:30 PM 17 101 51 169 0.910 183 78 122 383 47.8 20.4 31.9 53 26 35 114 05:30 PM 53 26 35 114 0.840 2028 542 0.935 YELM AVE I~ In I_ 147.41 Right T~ru Lgft ~ T ~,A, ~ _ w ~~ North ~ y N -~ ~ ~ /14/02 5:00:00 PM ~~ y ~ 14/02 5:45:00 PM 2 ~ ~~ ~m ~ T r ,~ ,~, Out In Total Heath & Associates Inc. Transportation Division 2214 Tacoma Road Puyallup, WA 98371 (_rn~ine Drinhc~i_ I In~tiif+dl File Name : untitled1 Site Code :00001924 Start Date :06/13/2002 Page No : 1 YELM AVE 1ST AVE SE YELM AVE 1ST AVE SE Southbound Westbound Northbound Eastbound Start Time Ri ht Thru Left Ri ht Thru Left Ri ht Thru Left iii ht Thru Left Int. Total Factor 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 07:00 AM 4 49 9 74 16 10 2 129 20 25 3 53 394 07:15 AM 11 67 17 32 12 1 2 100 28 32 15 34 351 07:30 AM 17 89 11 49 12 7 1 100 19 29 8 31 373 07:45 AM 12 70 16 38 15 9 6 100 17 33 9 30 355 Total 44 275 53 193 55 27 11 429 84 119 35 148 1473 1 81 29 31 9 25 319 3 87 19 27 6 27 309 5 104 28 34 15 44 375 5 106 35 38 18 60 468 14 378 111 130 48 156 1471 25 807 195 249 83 304 2944 2.4 78.6 19.0 39.2 13.1 47.8 0.8 27.4 6.6 E.5 2.E 10.3 YELM AVE Right Thru Lgft ~ J~ NT ~ ~ w s y in w 2 -~ ~~ 13/02 7:00:00 AM 2 c ~ 13/02 8:45:00 AM m ~ y ~~ " ~ o~~ r m ~ T r Out In Total 08:00 AM 15 68 13 30 9 8 08:15 AM 16 72 16 24 9 3 08:30 AM 25 62 14 29 12 3 08:45 AM 31 84 18 32 30 11 Total 87 286 61 115 60 25 Grand Total 131 561 114 308 115 52 Apprch % 16.3 69.6 I 14.1 64.8 24.2 10.9 Total % 4.4 19.1 3.9 in_5 s_a ~_R Heath & Associates Inc. Transportation Division 2214 Tacoma Road Puyallup, WA 98371 Groups Printed-Unshifted __ _ _ _ ___ RHOTON RD ~ RA ILWAY RD SE ' Southbound Westbound _ Start Time ' _ Ri hg t ' Thru Left ; Ri ht Thru Left , Factor' 1.0 1.0 ; 1.O i 1.O i 1.0 ; 1.0 . 04:00 PM 0 _ 32 _ 0 fi 2 0 7; 04:15 PM 0 29 2 ~ 1 0 13' 04:30 PM 0 26 O j 2 0 7 4 :45 PM 0 0 33 O j 2 0 9 j _ __ Total 0 120 2 , 7 0 36 05:00 PM 0 32 2 3 0 15 05:15 PM 0 31 2 2 0 9 05:30 PM 0 25 1 1 0 10 05:45 PM 0 35 1 5 0 10 _ _ Total 0 123 6 11 0 44 Grand Total 0 243 8 18 0 80 Apprch % 0.0 96.8 I 3.2 18.4 0.0 81.6 Total % 0.0 31.0 1.0 2.3 0.0 10.2 File Name : untitled1 Site Code :00001928 Start Date :07/31 /2002 Page No : 1 FIRST ST Northbound Right i Thru ! _ Left'__ Int. Total -- 1.0 i 1.0 1.0 - - - 22 - 38 --- - _- - ~ - 101 13 30 0 88 12 48 0 95 6 33 0 83 53 149 _ 0 367 16 41 0 ! 109 20 47 0; 111 17 38 0 ' 92 21 33 0 ', 105 74 159 0 , ---- - - - 417 127 308 0 ~ 784 29.2 70.8 0.0 16.2 39.3 0.0 I Out In Total 326 251 577 ~ 243 8 Thru Left 1 ~-- T ° North N ~ ~ ~~ D " ~' /31/2002 4:00:00 PM /31/2002 5:45:00 PM m 3 o ~ ~ ~~ c ~ Unshifted c m i w tn' w- t f I ~ Thru Right .. --308 ---127 323. ._...435''.. 758 - . . Iri Total ..Out. FIRST ST Heath & Associates Inc. Transportation Division 2214 Tacoma Road Puyallup, WA 98371 RHOTON RD Southbound Start Time Right I ~ Thru I Left Peak Hour From 04:00 PM to 05:45 PM - Pei Intersection 05:00 PM Volume 0 123 6 Percent 0.0 95.3 4.7 05:15 Volume 0 31 2 Peak Factor High Int. 05:45 PM Volume 0 35 1 Peak Factor File Name : untitled1 Site Code :00001928 Start Date :07/31/2002 Page No : 2 ', RAILWAY RD SE Westbound ~I I FIRST ST Northbound _ APP' ' Right i Thru Left APP' ~ Ri ht ~ g Thru ! Left ~~ _ APP' Int. Total Total ' Total ; - ~ Total F 1 --- ----- -- ------- 129 11 0 44 55; 74 159 0 233 417 i 20.0 0.0 80.0 31.8 68.2 0.0 33 2 0 9 11 ~ 20 47 0 67 111 I 0.939 05:00 PM 05:15 PM 36 ! 3 0 15 18 20 47 0 67 ' 0.896 i 0.764 0.869 Out In Total 170 129 299 123 6 Thru Lek 1 ~- T North ~~ ° .. y ~ ~~ r /31/2002 5:00:00 PM ~ S ~ /31/2002 5:45:00 PM m ~+ ~ r."l' A ~ unStlltted ~ o m w~ N - i Thru Right i 159 74 I__T_ 167; f 233 i I 400 _ _ Out Iri Total FIRST ST Heath & Associates Inc. Transportation Division 2214 Tacoma Road Puyallup, WA 98371 File Name : untitled4 Site Code :00001928 Start Date :10/10/2002 Page No : 2 WILKENSEN RD WILKENSEN RD NP RD SE _ Southbound Northbound Eastbound Start Time Ri ht ; g Thru Left ; Right ' Thru ~ Left Right Thru Left Total Int _ Total - Total - . -_ . Total Peak Hour From 04:00 PM to 05:45 PM -Peak 1 of 1 _ __ Intersection 04:00 PM Volume 88 202 0 290: 0 181 0 181 ', 8 0 92 100 571 Percent 30.3 69.7 0.0 0.0 100.0 0.0 ' 8.0 0.0 92.0 04:30 Volume 17 57 0 74 0 47 0 47 '' 5 0 31 36 157 Peak Factor 0.909 High Int. 04:45 PM 04:15 PM ~ 04:30 PM Volume 26 53 0 79 '! 0 49 0 49 5 0 31 36 Peak Factor 0.918 ! 0.923 ! 0.694 IL N D ~ I Out In Total 273 290 563' 88 202 Right Thru ~ 1 ~~ _~ ~ y~ T ~ N North w ~w~ ° ~ ~ o ~ ~ - ~ 0/10!2002 4:00:00 PM ~ a0 ~ 0/10/2002 4:45:00 PM a z ~ ~ ~ Unshifted O F, i i Left Thru --._-r-- l__.__ O.i _181 _ 210 ~ 181 391' _ Out In Total WILKENSEN RD BENUM-COYNE YELM AVE & SR-507 EXISTING PM PEAK HOUR VOLUMES 10/17/02 10:15:42 SIGNAL2000/TEAPAC[Ver 1.10.10] - HCM Input Worksheet Intersection # 0 - Area Location Type: NONCBD I I I I I I Key: VOLUMES -- > I 118 I 65 I 52 I) I I WIDTHS I 0.0 112.0 112.0 II I v LANES I 0 1 1 1 1 II -------------------- I I II \ 40 12.0 1 . ------------- / I \ ------------------- /I\ -- 381 12.0 1 I ___________________ ------------------- I 144 12.0 1 / + / 194 12.0 1 North ------------------- __________________= I 538 12.0 1 -- ------------------- \ I / ------------- 113 12.0 1 \ II I I I -------------------- II 122 I 78 I 183 I Phasing: SEQUENCE 44 I II 12.0 112.0 I 0.0 I PERMSV N N N N I I I 1 1 1 1 0 1 OVERLP N N N N I II I I I LEADLAG LD LD SB WB NB EB RT TH LT RT TH LT RT TH LT RT TH LT Heavy veh, ~HV 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Pk-hr fact, PHF .93 .93 .93 .91 .91 .91 .84 .84 .84 .93 .93 .93 Pretimed or Act A A A A A A A A A A A A Strtup lost, 11 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Ext eff grn, a 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Arrival typ, AT 3 3 3 3 3 3 3 3 3 3 3 3 --------------- -------------- -------------- -------------- -------------- Ped vol, vped 0 0 0 0 Bike vol, vbic 0 0 0 0 Parking locates NO NO NO NO Park mnvrs, Nm 0 0 0 0 Bus stops, NB 0 0 0 0 Grade, ~G .0 .0 .0 .0 ------------------------------------------------------------------------- Sq 44 I Phase 1 1 Phase 2 1 Phase 3 1 Phase 4 I Phase 5 1 Phase 6 1 I + I++ I I 1 I I I + I++ I I ++++I I I I I I v I ****I I I I I I I I++++ v I I I I North I <* I **>I I****> I I I I I * i ** I I++++ I I I I * I ** I I v I I I ------------------------------------------------------------------------- C=120"I G= 13.9" I G= 27.9" I G= 19.1" I G= 43.2" I G= 0.0" I G= 0.0" I I Y+R= 4.0" I Y+R= 4.0" I Y+R= 9.0" I Y+R= 4.0" I Y+R= 0.0" I Y+R= 0.0" I ------------------------------------------------------------------------- BENUM-COYNE YELM AVE & SR-507 EXISTING PM PEAK HOUR VOLUMES SIGNAL2000/TEAPAC[Ver 1.10.10] - HCM Capacity and LOS Worksheet Delay and LOS Lane group, LG Adj Flow, v LG capacity, c v/c ratio, X Grn ratio, g/C Unif delay, dl Incr calib, k Incr delay, d2 Queue Delay, d3 Unif delay, dl* Prog factor, PF Contrl delay, d Lane group LOS Final Queue,Qbi --------------- Appr delay, dA Approach LOS Appr flow, vA --------------- Intersection: --------------- SB RT TH LT RT+TH LT 197 56 391 204 .504 .275 .232 .116 40.0 48.5 .11 .11 1.1 .7 .0 .0 .0 .0 1.00 1.00 41.1 49.2 D+ D 0 0 42.9 D+ 253 -------------- Delay 45.9 -------------- WB RT TH LT RT TH LT 44 419 213 570 670 281 .077 .625 .758 .360 .360 .159 25.3 31.7 48.3 .11 .21 .31 .1 1.8 11.3 .0 .0 .0 .0 .0 .0 1.00 1.00 1.00 25.3 33.6 59.6 C+ C E+ 0 0 0 -------------- 41.2 D+ 676 NB RT TH LT LOS D RT+TH LT 311 145 387 204 .804 .711 .232 .116 43.5 51.1 .35 .27 11.7 11.0 .0 .0 .0 .0 1.00 1.00 55.1 62.1 E+ E+ 0 0 -------------- 57.4 E+ 456 -------------- 10/17/02 10:15:42 EB RT TH LT RT TH LT 122 578 155 570 670 281 .214 .863 .552 .360 .360 .159 26.6 35.7 46.5 .11 .39 .15 .2 11.2 2.3 .0 .0 .0 .0 .0 .0 1.00 1.00 1.00 26.8 46.9 48.9 C+ D D 0 ---- 0 --- 0 --- 44.4 ---- D+ ---- 855 ----- ----- BENUM-COYNE YELM AVE & SR-507 EXISTING PM PEAK HOUR VOLUMES SIGNAL2000/TEAPAC[Ver 1.10.10] - HCM Back of Queue Worksheet Queues in Worst Lanes Lane group, LG Init queue, QbL Ln flow, vL Ln satflow, sL Ln capacity, cL Flow ratio, yL v/c ratio, XL Effect green, g Grn ratio, g/C Upstr filter, I Grn arrivals, P Platn ratio, Rp Prog f actr , PF2 Queue (1st) , Q1 Queue factr, kB Queue (2nd) , Q2 Avg queue, Q --------------- 90~ factor, fB 90$ queue, Qp Avg spacing, Lh Avail storg, La Avg distance Avg ratio, RQ 90~ distance 90~ ratio, RQp SB RT TH LT RT+TH LT 0 0 197 56 1683 1770 391 204 .117 .032 .504 .275 27.9 13.9 .232 .116 1.00 1.00 .23 .12 1.00 1.00 1.00 1.00 5.7 1.7 .47 .32 .5 .1 6.2 1.8 -------------- 1.69 1.77 10.5 3.2 25.3 25.3 0 0 156 46 .00 .00 265 81 .00 .00 WB RT TH LT RT TH LT 0 0 0 44 419 213 1583 1863 1770 570 670 281 .028 .225 .120 .077 .625 .758 43.2 43.2 19.1 .360 .360 .159 1.00 1.00 1.00 .36 .36 .16 1.00 1.00 1.00 1.00 1.00 1.00 1.0 11.5 6.8 .58 .64 .38 .0 1.0 1.1 1.0 12.6 7.9 -------------- 1.78 1.61 1.67 1.8 20.3 13.1 25.3 25.3 25.3 0 0 0 26 318 199 .00 .00 .00 46 513 332 .00 .00 .00 NB RT TH LT RT+TH LT 0 0 311 145 1667 1770 387 204 .187 .082 .804 .711 27.9 13.9 .232 .116 1.00 1.00 .23 .12 1.00 1.00 1.00 1.00 9.8 4.7 .46 .32 1.6 .7 11.4 5.4 -------------- 1.63 1.71 18.5 9.2 25.3 25.3 0 0 289 136 .00 .00 469 232 .00 .00 10/17/02 10:15:42 EB RT TH LT RT TH LT 0 0 0 122 578 155 1583 1863 1770 570 670 281 .077 .310 .088 .214 .863 .552 43.2 43.2 19.1 .360 .360 .159 1.00 1.00 1.00 .36 .36 .16 1.00 1.00 1.00 1.00 1.00 1.00 2.8 17.9 4.8 .58 .64 .38 .2 3.2 .5 3.0 21.1 5.2 -------------- 1.74 1.54 1.71 5.2 32.4 8.9 25.3 25.3 25.3 0 0 0 75 533 132 .00 .00 .00 132 820 226 .00 .00 .00 BENUM-COYNE 10/17/02 YELM AVE & SR-507 10:15:42 EXISTING PM PEAK HOUR VOLUMES SZGNAL2000/TEAPAC[Ver 1.10.10] - Evaluation of Intersection Performance ------------------------------------------------- Sq 44 I Phase 1 1 Phase 2 1 Phase 3( Phase 4 1 i + I++ I I I I + I + + I I ++++I I I I v I ****I I I I I I++++ v I I North I <* I * *>I I****> I I * I ** I I++++ I I * I ** I I v I ------------------------------------------------- I G/C=0.116 I G/C=0.232 I G/C=0.159 I G/C=0.360 I I G= 13.9" I G= 27.9" I G= 19.1" I G= 43.2" I I Y+R= 4.0" I Y+R= 4.0" I Y+R= 4.0" I Y+R= 4.0" I I OFF= 0.0$ I OFF=14.9$ I OFF=41.5$ I OFF=60.7$ I ------------------------------------------------- C=120 sec G=104.0 sec = 86.7$ Y=16.0 sec = 13.3$ Ped= 0.0 sec = 0.0$ MVMT TOTALS SB Approach WB Approach NB Approach EB Approach Int Param:Units RT TH LT RT TH LT RT TH LT RT TH LT Total AdjVol: vph 127 70 56 44 419 213 218 93 145 122 578 155 2240 Wid/Ln:ft/# 0/0 12/1 12/1 12/1 12/1 12/1 0/0 12/1 12/1 12/1 12/1 12/1 g/C Rqd@C:$ 0 29 25 25 35 29 0 33 27 27 41 27 g/C Used: $ 0 23 12 36 36 16 0 23 12 36 36 16 SV @E: vph 0 375 175 570 670 255 0 371 175 570 670 255 4086 ----------- -------------- -------------- -------------- -------------- ----- Svc Lv1:LOS D+ D C+ C E+ E+ E+ C+ D D D Deg Sat:v/c 0.00 0.50 0.28 0.08 0.63 0.76 0.00 0.80 0.71 0.21 0.86 0.55 0.67 HCM Delis/v 0.0 41.1 49.2 25.3 33.6 59.6 0.0 55.1 62.1 26.8 46.9 48.9 45.9 Tot Del:min 0 34 11 5 59 53 0 71 38 14 113 32 430 # Stops:veh 0 43 13 7 87 51 0 73 35 21 134 36 500 ----------- -------------- --------=----- -------------- -------------- ----- Queue l:veh 0 10 3 2 20 13 0 19 9 5 32 9 32 Queue l: ft 0 265 81 46 513 332 0 469 232 132 820 226 820 APPR TOTALS, Int Param:Units SB Approach WB Approach NB Approach EB Approach Total ------------- -------------- ----- AdjVol: vph 253 676 456 855 2240 ----------- -------------- -------------- -------------- -------------- ----- Svc Lvl:LOS D+ D+ E+ D+ D Deg Sat:v/c 0.45 0.63 0.77 0.71 0.67 HCM Delis/v 42.9 41.2 57.4 44.4 45.9 Tot Del:min 45 117 109 159 430 # Stops:veh 56 145 108 191 500 ----------- -------------- -------------- -------------- -------------- ----- Queue l:veh 10 20 19 32 32 Queue 1: ft 265 513 469 820 820 BENUM-COYNE YELM AVE & SR-507 2006 PM PEAK HOUR VOLUMES WITHOUT PROJECT 10/17/02 10:18:04 SIGNAL2000/TEAPAC[Ver 1.10.10] - HCM Input Worksheet Intersection # 0 - Area Location Type: NONCBD I I I I I I Key: VOLUMES -- > I 188 I 92 I 89 II I I WIDTHS I 0.0 112.0 112.0 II I v LANES I 0 1 1 1 1 II -------------------- I I I II \ 53 12.0 1 ------------- / I \ ------------------- /I\ -- 439 12.0 1 I ___________________ ------------------- I 176 12.0 1 / + / 253 12.0 1 North ------------------- __--____--________= I 616 12.0 1 -- ------------------- \ I / ------------- 172 12.0 1 \ II i I I -------------------- II 167 I 99 I 231 I Phasing: SEQUENCE 44 I II 12.0 112.0 I 0.0 I PERMSV N N N N () 1 1 1 1 0 1 OVERLP N N N N I () I I I LEADLAG LD LD SB WB NB EB RT TH LT RT TH LT RT TH LT RT TH LT --------------- ------------- -------------- -------------- -------------- --------------- -------------- -------------- -------------- -------------- Heavy veh, $HV 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Pk-hr fact, PHF .93 .93 .93 .91 .91 .91 .84 .84 .84 .93 .93 .93 Pretimed or Act A A A A A A A A A A A A Strtup lost, 11 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Ext eff grn, a 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Arrival typ, AT 3 3 3 3 3 3 3 3 3 3 3 3 --------------- -------------- -------------- -------------- -------------- Ped Vol, vped 0 0 0 0 Bike Vol, vbic 0 0 0 0 Parking locates NO NO NO NO Park mnvrs, Nm 0 0 0 0 Bus stops, NB 0 0 0 0 Grade, ~G .0 .0 .0 .0 ------------------------------------------------------------------------- Sq 44 I Phase 1 1 Phase 2 1 Phase 3 1 Phase 4 1 Phase 5 1 Phase 6 I I + I++ I t i I I I + I++ I I ++++I I I I I I v I ****I I I I I I I I++++ v I I I I North I <* I **>I I****> I I I I I * I ** I I++++ I I I I * I ** I I v I I I ------------------------------------------------------------------------- C=120"I G= 13.6" I G= 28.5" I G= 19.0" I G= 42.9" I G= 0.0" I G= 0.0" I ( Y+R= 4.0" I Y+R= 4.0" I Y+R= 4.0" I Y+R= 4.0" I Y+R= 0.0" I Y+R= 0.0" I ------------------------------------------------------------------------- BENUM-COYNE YELM AVE & SR-507 2006 PM PEAK HOUR VOLUMES WITHOUT PROJECT SIGNAL2000/TEAPAC[Ver 1.10.10] - HCM Volume Adjust & Satflow Worksheet Volume Adjustment Volume, V Pk-hr fact, PHF Adj my flow, vp --------------- Lane group, LG Adj LG flow, v Prop LT, PLT Prop RT, PRT --------------- Saturation Flow Rate Base satflo, so Number lanes, N Lane width, fW Heavy veh, fHV Grade , f g Parking, fp Bus block, fbb Area type, fa Lane util, fLU Left-turn, fLT Right-turn, fRT PedBike LT,fLpb PedBike RT,fRpb Local adjustmnt Adj satflow, s SB WB RT TH LT RT TH LT 188 92 89 53 439 253 .93 .93 .93 .91 .91 .91 202 ----- 99 ----- 96 ---- 58 ----- 482 ----- 278 - RT+TH LT RT TH --- LT 301 96 58 482 278 .000 1.00 .000 .000 1.00 ---- .671 ------ .000 ---- 1.000 ----- .000 ----- .000 ---- SB RT TH LT WB RT TH LT 1900 1900 1 1 1.000 1.00 .980 .980 1.000 1.00 1.000 1.00 1.000 1.00 1.000 1.00 1.000 1.00 1.000 .950 .899 1.00 1.000 1.00 1.000 1.00 1.000 1.00 1675 1770 1900 1 1.000 .980 1.000 1.000 1.000 1.000 1.000 1.000 .850 1.000 1.000 1.000 1583 1900 1900 1 1 1.00 1.00 .980 .980 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 .950 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1863 1770 SIGNAL2000/TEAPAC[Ver 1.10.10] - HCM Capacity and LOS Worksheet Capacity Analysis Lane group, LG Adj Flow, v Satflow, s Lost time, tL Effect green, g Grn ratio, g/C LG capacity, c v/c ratio, X Flow ratio, v/s Crit lane group --------------- Sum crit v/s,Yc Crit v/c, Xc --------------- --------------- SB RT TH LT RT+TH LT 301 96 1675 1770 4.0 4.0 28.5 13.6 .237 .113 398 200 .756 .480 .180 .054 -------------- 0.861 .993 -------------- -------------- I~:Z? RT TH LT RT TH LT 58 482 278 1583 1863 1770 4.0 '4.0 4.0 42.9 42.9 19.0 .358 .358 .158 567 667 280 .102 .723 .993 .037 .259 .157 10/17/02 10:18:04 NB EB RT TH LT RT TH LT 231 99 167 172 616 176 .84 .84 .84 .93 .93 .93 275 ----- 118 ----- 199 ---- 185 ---- 662 189 RT+TH LT - RT ---- TH ----- LT 393 199 185 662 189 .000 1.00 .000 .000 1.00 ----- .700 ----- .000 ---- 1.000 ----- .000 ---- .000 ----- NB RT TH 1900 1 1.000 .980 1.000 1.000 1.000 1.000 1.000 1.000 .895 1.000 1.000 1.000 1667 LT 1900 1 1.00 .980 1.00 1.00 1.00 1.00 1.00 .950 1.00 1.00 1.00 1.00 1770 RT 1900 1 1.000 .980 1.000 1.000 1.000 1.000 1.000 1.000 .850 1.000 1.000 1.000 1583 EB TH LT 1900 1900 1 1 1.00 1.00 .980 .980 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 .950 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1863 1770 NB RT TH LT RT+TH LT 393 199 1667 1770 4.0 4.0 28.5 13.6 .237 .113 396 200 .992 .995 .236 .112 -------------- -------------- Total lost, L 16.0 EB RT TH LT RT TH LT 185 662 189 1583 1863 1770 4.0 4.0 4.0 42.9 42.9 19.0 .358 .358 .158 567 667 280 .326 .993 .675 .117 .355 .107 BENUM-COYNE YELM AVE & SR-507 2006 PM PEAK HOUR VOLUMES WITHOUT PROJECT SIGNAL2000/TEAPAC[Ver 1.10.10] - Evaluation of Intersection Performance ------------------------------------------------- Sq 44 I Phase 1- Phase 2 1 Phase 3 1 Phase 4 1 I + I++ I I i I + I + + I i ++++I /I~ I +> I<+ + I I <++++I I I I ~ I ****I I I I I I++++ v I I North I <* I * *>I I****> I I I * I ** I I++++ I I * I ** I I v I ------------------------------------------------- I G/C=0.113 I G/C=0.237 I G/C=0.158 I G/C=0.358 I I G= 13.6" I G= 28.5" I G= 19.0" I G= 42.9" I I Y+R= 4.0" I Y+R= 4.0" I Y+R= 4.0" I Y+R= 4.0" I I OFF= 0.0$ I OFF=14.7$ I OFF=41.7$ I OFF=60.9$ I ------------------------------------------------- C=120 sec G=104.0 sec = 86.7$ Y=16.0 sec = 13.3$ MVMT TOTALS Param:Units AdjVol: vph Wid/Ln:ft/# g/C Rqd@C:$ g/C Used: $ SV @E: vph Svc Lv1:LOS Deg Sat:v/c HCM Delis/v Tot Del:min # Stops:veh Queue l:veh Queue 1: ft APPR TOTALS Param:Units AdjVol: vph Svc Lv1:LO5 Deg Sat:v/c HCM Delis/v Tot Del:min # Stops:veh Queue l:veh Queue 1: f t SB Approach WB RT TH LT RT 202 99 96 58 0/0 12/1 12/1 12/1 0 32 26 25 0 24 11 36 0 383 171 567 D D C+ 0.00 0.76 0.48 0.10 0.0 50.6 51.7 25.8 0 64 21 6 0 70 23 10 0 17 6 2 0 440 144 61 SB Approach WB 397 D 0.69 50.9 85 93 17 440 10/17/02 10:18:04 Ped= 0.0 sec = 0.0$ Approach NB Approach EB Approach Int TH LT RT TH LT RT TH LT Total 482 278 275 118 199 185 662 189 2843 12/1 12/1 0/0 12/1 12/1 12/1 12/1 12/1 37 31 0 36 29 29 44 28 36 16 0 24 11 36 36 16 667 254 0 381 171 567 667 254 4082 D+ F F F C E D E+ 0.72 0.99 0.00 0.99 1.00 0.33 0.99 0.68 0.82 37.2102.2 0.0 88.8115.3 28.3 71.2 53.9 66.3 75 118 0 145 96 22 196 42 785 104 69 0 98 50 34 165 45 668 25 21 0 28 15 8 43 11 43 621 521 0 701 391 207 1095 285 1095 Int approach NB Approach EB Approach Total 818 592 1036 2843 E+ F E+ E+ 0.77 0.99 0.82 0.82 58.5 97.7 60.4 66.3 199 241 ~ 260 785 183 148 244 668 25 28 43 43 621 701 1095 1095 BENUM-COYNE YELM AVE & SR-507 2006 PM PEAK HOUR VOLUMES WITH PROJECT 10/17/02 10:19:45 SIGNAL2000/TEAPAC[Ver 1.10.10] - HCM Input Worksheet Intersection # 0 - Area Location Type: NONCBD I I II 203 I 100 I 93 II 0.0 112.0 112.0 II 0 1 1 1 1 II I I II / I \ 204 -- 12.0 ------ 1 -- / -------- 616 12.0 - 1 -- ---------- 172 ---------- ------ 12.0 ------ --- 1 --- \ - I i I \ I Key: VOLUMES -- > I I WIDTHS v LANES - \ ----- 60 ----- ------ 12.0 - -------- 1 -- 439 ----- 12.0 -------- 1 / ----- 253 ------ 12.0 -------- 1 II I I II 167 ( 113 I II 12.0 112.0 I II 1 I 1 1 II I i I 231 I Phasing: 0.0 I o I I /I\ I I North I SEQUENCE 44 PERMSV N N N N OVERLP N N N N LEADLAG LD LD SB WB NB EB RT TH LT RT TH LT RT TH LT RT TH LT Heavy veh, ~HV 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Pk-hr fact, PHF .93 .93 .93 .91 .91 .91 .84 .84 .84 .93 .93 .93 Pretimed or Act A A A A A A A A A A A A Strtup lost, 11 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Ext eff grn, a 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Arrival typ, AT --------------- - 3 --- 3 ------- 3 --- 3 ----- 3 ----- 3 ---- 3 -- 3 3 3 3 3 Ped vol, vped 0 0 ---- ---- 0 ---- - ----- ---- 0 ---- Bike vol, vbic 0 0 0 0 Parking locates NO NO NO NO Park mnvrs, Nm 0 0 0 0 Bus stops, NB 0 0 0 0 Grade, ~G .0 .0 .0 .0 ----------- Sq 44 I Phase 1 ---- 1 ------- Phase 2 ---- 1 ------ Phase ----- 3 1 ------------ Phase 4 1 ---- Ph ------- ase 5 --------- 1 Phase ---- 6 I I + I+ + I I I i I i + I+ + I I ++++I I I II\ I +> I<+ + I I <++++I I I I I I v I ****I I I I I I I I++++ v I I I i North I <* I * *>I I ****> I I I I I * I * * I I++++ I I I I * I * * I I v I I I ----------- C=120"I G= 13.4" -------------- I G= 29.3" I ------- G= 18 ----- .8" I ----- G= ------- 42.5" I ---- G= ------ 0.0" ----- ( G= --------- 0.0" I I Y+R= 4.0" ----------- I Y ---- +R= 4.0" I ---------- Y+R= 4 ------- .0" I ----- Y+R= ----- 4.0" I ------- Y+R= 0.0" ---------- I Y+R= 0.0" I -------------- BENUM-COYNE YELM AVE & SR-507 2006 PM PEAK HOUR VOLUMES WITH PROJECT SB WB RT ---- TH ------ LT ---- RT ----- TH ----- LT ---- ---- 203 ------ 100 ---- 93 ----- 60 ----- 439 ---- 253 .93 .93 .93 .91 .91 .91 218 ---- 108 ------ 100 ---- 66 ----- 482 ----- 278 RT+TH LT RT TH ---- LT 326 100 66 482 278 .000 1.00 .000 .000 1.00 ---- .669 ------ .000 ---- 1.000 ----- .000 ----- .000 ---- SB WB RT TH LT RT TH LT SIGNAL2000/TEAPAC[Ver 1.10.10] - HCM Volume Adjust & Satflow Worksheet Volume Adjustment --------------- --------------- Volume, V Pk-hr fact, PHF Adj my flow, vp --------------- Lane group, LG Adj LG flow, v Prop LT, PLT Prop RT, PRT --------------- Saturation Flow Rate Base satflo, so Number lanes, N Lane width, fW Heavy veh, fHV Grade, fg Parking, fp Bus block, fbb Area type, fa Lane util, fLU Left-turn, fLT Right-turn, fRT PedBike LT , fLpb PedBike RT , fRpb Local adjustmnt Adj satflow, s 1900 1 1.000 .980 1.000 1.000 1.000 1.000 1.000 1.000 .900 1.000 1.000 1.000 1676 10/17/02 10:19:45 NB EB RT ----- TH ---- LT ---- RT ----- TH ----- LT ---- ----- 231 ----- 113 ---- 167 ----- 172 ----- 616 ---- 204 .84 .84 .84 .93 .93 .93 275 ----- 135 ----- 199 ---- 185 ----- 662 ----- 219 RT+TH LT RT TH ---- LT 410 199 185 662 219 .000 1.00 .000 .000 1.00 ----- .671 ----- .000 ---- 1.000 ----- .000 ----- .000 ---- NB RT TH 1900 1 1.000 .980 1.000 1.000 1.000 1.000 1.000 1.000 .899 1.000 1.000 1.000 1675 LT 1900 1 1.00 .980 1.00 1.00 1.00 1.00 1.00 .950 1.00 1.00 1.00 1.00 1770 RT 1900 1 1.000 .980 1.000 1.000 1.000 1.000 1.000 1.000 .850 1.000 1.000 1.000 1583 EB TH LT 1900 1900 1 1 1.00 1.00 .980 .980 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 .950 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1863 1770 SIGNAL2000/TEAPAC[Ver 1.10.10] - HCM Capacity and LOS Worksheet Capacity Analysis Lane group, LG Adj Flow, v Satflow, s Lost time, tL Effect green, g Grn ratio, g/C LG capacity, c v/c ratio, X Flow ratio, v/s Crit lane group --------------- Sum Grit v/s,Yc Crit v/c, Xc SB WB NB EB RT TH LT RT TH LT RT TH LT RT TH LT RT+TH LT RT TH LT RT+TH LT RT TH LT 326 100 66 482 278 410 199 185 662 219 1676 1770 1583 1863 1770 1675 1770 1583 1863 1770 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 29.3 13.4 42.5 42.5 18.8 29.3 13.4 42.5 42.5 18.8 .244 .112 .354 .354 .157 .244 .112 .354 .354 .157 409 198 561 660 277 409 198 561 660 277 .797 .505 .118 .730 1.00 1.002 1.01 .330 1.00 .791 .195 .057 .042 .259 .157 .245 .112 .117 .355 .124 ---------- 0.870 ---- ----- Total --------- lost, L ---------- 16.0 ---- ---- ------ ---- 1.003 ---------- ---------- ---- ---- ----- ----- ---- ---- ----- ----- ---------- ---------- ---- ---- ---- ---- ------ ----- ---- ----- 1900 1 1.00 .980 1.00 1.00 1.00 1.00 1.00 .950 1.00 1.00 1.00 1.00 1770 1900 1 1.000 .980 1.000 1.000 1.000 1.000 1.000 1.000 .850 1.000 1.000 1.000 1583 1900 1900 1 1 1.00 1.00 .980 .980 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 .950 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1863 1770 BENUM-COYNE YELM AVE & SR-507 2006 PM PEAK HOUR VOLUMES WITH PROJECT SIGNAL2000/TEAPAC[Ver 1.10.10] - HCM Capacity and LOS Worksheet Delay and LOS Lane group, LG Adj Flow, v LG capacity, c v/c ratio, X Grn ratio, g/C Unif delay, dl Incr calib, k Incr delay, d2 Queue Delay, d3 Unif delay, dl* Prog factor, PF Contrl delay, d Lane group LOS Final Queue,Qbi --------------- Appr delay, dA Approach LOS Appr flow, vA --------------- Intersection: SB RT TH LT RT+TH LT 326 100 409 198 .797 .505 .244 .112 42.6 50.1 .34 .11 10.6 2.1 .0 .0 .0 .0 1.00 1.00 53.2 52.2 D D 0 0 52.9 D 426 -------------- Delay 68.7 WB RT TH LT RT TH LT 66 482 278 561 660 277 .118 .730 1.00 .354 .354 .157 26.1 33.8 50.6 .11 .29 .50 .1 4.1 55.0 .0 .0 .0 .0 .0 .0 1.00 1.00 1.00 26.2 37.9 106 C+ D+ F 0 0 0 -------------- 59.7 E+ 826 NB RT TH LT LOS E -------------- -------------- RT+TH LT 410 199 409 198 1.002 1.01 .244 .112 45.4 53.3 .50 .50 45.1 65.3 .0 .0 .0 .0 1.00 1.00 90.5 119 F F 0 0 -------------- 99.6 F 609 -------------- 10/17/02 10:19:45 EB RT TH LT RT TH LT 185 662 219 561 660 277 .330 1.00 .791 .354 .354 .157 28.3 38.8 48.7 .11 .50 .34 .3 35.8 14.3 .0 .0 .0 .0 .0 .0 1.00 1.00 1.00 28.7 74.5 63.1 C E E+ 0 -- 1 0 -- ----- 64.2 ----- E+ ---- 1066 ----- ----- BENUM-COYNE YELM AVE & SR-507 2006 PM PEAK HOUR VOLUMES WITH PROJECT SIGNAL2000/TEAPAC[Ver 1.10.10] - HCM Back of Queue Worksheet Queues in Worst Lanes Lane group, LG Init queue, QbL Ln flow, vL Ln satflow, sL Ln capacity, cL Flow ratio, yL v/c ratio, XL Effect green, g Grn ratio, g/C Upstr filter, I Grn arrivals, P Platn ratio, Rp Prog factr, PF2 Queue (1st) , Q1 Queue factr, kB Queue (2nd) , Q2 Avg queue, Q --------------- 90$ factor, fB 90~ queue, Qp Avg spacing, Lh Avail storg, La Avg distance Avg ratio, RQ 90~ distance 90~ ratio, RQ,p SB RT TH LT RT+TH LT 0 0 326 100 1676 1770 409 198 .195 .057 .797 .505 29.3 13.4 .244 .112 1.00 1.00 .24 .11 1.00 1.00 1.00 1.00 10.2 3.1 .48 .31 1.6 .3 11.8 3.4 -------------- 1.62 1.74 19.2 6.0 25.3 25.3 0 0 299. 87 .00 .00 485 151 .00 .00 WB RT TH LT RT TH LT 0 0 0 66 482 278 1583 1863 1770 561 660 277 .042 .259 .157 .118 .730 1.00 42.5 42.5 18.8 .354 .354 .157 1.00 1.00 1.00 .35 .35 .16 1.00 1.00 1.00 1.00 1.00 1.00 1.5 14.0 9.3 .58 .64 .38 .1 1.6 3.7 1.6 15.6 13.0 -------------- 1.77 1.58 1.61 2.8 24.7 20.9 25.3 25.3 25.3 0 0 0 39 395 328 .00 .00 .00 70 625 528 .00 .00 .00 NB RT TH LT RT+TH LT 0 0 410 199 1675 1770 409 198 .245 .112 1.002 1.01 29.3 13.4 .244 .112 1.00 1.00 .24 .11 1.00 1.00 1.00 1.00 13.7 6.6 .48 .31 5.0 2.8 18.7 9.5 -------------- 1.56 1.65 29.1 15.6 25.3 25.3 0 0 473 240 .00 .00 736 395 .00 .00 10/17/02 10:19:45 EB RT TH LT RT TH LT 0 0 0 185 662 219 1583 1863 1770 561 660 277 .117 .355 .124 .330 1.00 .791 42.5 42.5 18.8 .354 .354 .157 1.00 1.00 1.00 .35 .35 .16 1.00 1.00 1.00 1.00 1.00 1.00 4.5 22.1 7.0 .58 .64 .38 .3 7.4 1.2 4.8 29.5 8.3 -------------- 1.71 1.49 1.66 8.2 43.9 13.7 25.3 25.3 25.3 0 0 0 121 745 209 .00 .00 .00 208 1112 348 .00 .00 .00 BENUM-COYNE YELM AVE & SR-507 2006 PM PEAK HOUR VOLUMES WITH PROJECT SIGNAL2000/TEAPAC[Ver 1.10.10] - Evaluation of Intersection Performance 10/17/02 10:19:45 ------------------------------------------------- Sq 44 I Phase 1 1 Phase 2 1 Phase 3 1 Phase 4 1 I + I++ I I I I + I + + I I ++++I I I I v I ****I I I I I I++++ v I I North I <* I * *>I I****> I I I * I ** I I++++ I I * I ** I I v I ------------------------------------------------- I G/C=0.112 I G/C=0.244 I G/C=0.157 I G/C=0.354 I ( G= 13.4" I G= 29.3" I G= 18.8" I G= 42.5" I I Y+R= 4.0" I Y+R= 4.0" I Y+R= 4.0" I Y+R= 4.0" I I OFF= O.Og I OFF=14.5 I OFF=42.3 I OFF=61.3~k I ------------------------------------------------- C=120 sec G=104.0 sec = 86.7 Y=16.0 sec = 13.3 Ped= 0.0 sec = 0.0~ MVMT TOTALS SB Approach WB Approach NB Approach EB Approach Int Param:Units RT TH LT RT TH LT RT TH LT RT TH LT Total AdjVol: vph 218 108 100 66 482 278 275 135 199 185 662 219 2927 Wid/Ln:ft/# 0/0 12/1 12/1 12/1 12/1 12/1 0/0 12/1 12/1 12/1 12/1 12/1 g/C Rqd@C:~ 0 33 26 25 37 31 0 36 29 29 44 29 g/C Used: $ 0 24 11 35 35 16 0 24 11 35 35 16 SV @E: vph 0 395 169 561 660 251 0 395 169 561 660 251 4072 ----------- -------------- -------------- -------------- -------------- ----- Svc Lvl:LOS D D C+ D+ F F F C E E+ E Deg Sat:v/c 0.00 0.80 0.50 0.12 0.73 1.00 0.00 1.00 1.00 0.33 1.00 0.79 0.84 HCM Delis/v 0.0 53.2 52.2 26.2 37.9105.6 0.0 90.5118.5 28.7 74.5 63.1 68.7 Tot Del:min 0 72 22 7 76 122 0 155 98 22 206 58 838 # Stops:veh 0 77 24 11 105 69 0 102 49 34 165 53 689 ----------- -------------- -------------- -------------- -------------- ----- Queue 1:veh 0 19 6 3 25 21 0 29 16 8 44 14 44 Queue 1: ft 0 485 151 70 625 528 0 736 395 208 1112 348 1112 APPR TOTALS Int Param:Units SB Approach WB Approach NB Approach EB Approach Total AdjVol: vph 426 826 609 1066 2927 ----------- -------------- -------------- -------------- -------------- ----- Svc Lv1:LOS D E+ F E+ E Deg Sat:v/c 0.73 0.77 1.00 0.84 0.84 HCM Delis/v 52.9 59.7 99.6 64.2 68.7 Tot Del:min 94 205 253 286 838 # Stops:veh 101 185 151 252 689 ----------- -------------- -------------- -------------- -------------- ----- Queue l:veh 19 25 29 44 44 Queue 1: ft 485 625 736 1112 1112 ----------- -------------- -------------- -------------- -------------- ----- ----------- -------------- -------------- -------------- -------------- ----- TWO-WAY STOP CONTROL SUMMARY eneral Information ite Information alyst gency/Co. Date Performed al sis Time Period 10/17/2002 PM PK HR Intersection urisdiction alysis Year 2002 EXISTING Pro'ect Descri lion East/West Street: RAILWAY North/South Street: RHOTON Intersection Orientation: Norfh-South tud Period hrs : 0.25 ehicle Volumes and Ad'ustments Ma'or Street Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R olume 0 159 74 6 123 0 Peak-Hour Factor, PHF 0.90 0.87 0.87 0.90 0.84 0.90 ourly Flow Rate, HFR 0 182 85 6 146 0 Percent Heavy Vehicles 0 - - 2 - - edian Type Undivided RT Channelized 0 0 anes 0 1 0 0 1 0 onfiguration TR LT stream Si nal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R olume 44 0 11 0 0 0 eak-Hour Factor, PHF 0.76 0.90 0.76 0.90 0.90 0.90 ourly Flow Rate, HFR 57 0 14 0 0 0 Percent Heavy Vehicles 2 0 2 0 0 0 Percent Grade (%) 0 0 Flared Approach N N forage 0 0 T Channelized 0 0 nes 0 0 0 0 0 0 nfiguration LR ela Queue Len th and Level of Service proach NB SB Westbound Eastbound ovement 1 4 7 8 9 10 11 12 ne Configuration LT LR (vph) 6 71 (m)(vph) 1297 648 lc 0.00 0.11 5% queue length 0.01 0.37 ntrol Delay 7.8 11.2 OS A B proach Delay - - 11.2 proach LOS - - B HCS]OOO~M Copyright i^ 2000 Univcrsity of Florida All Rights Ramcd Vcrsion a Ib TWO-WAY STOP CONTROL SUMMARY eneral Information ite Information alyst gency/Co. Date Performed al sis Time Period 10/17/2002 PM PK HR Intersection urisdiction alysis Year 2006 WITHOUT PROJECT Pro'ect Descri tion East/West Street: RAILWAY North/South Street: RHOTON Intersection Orientation: Norfh-South tud Period hrs : 0.25 ehicle Volumes and Ad'ustments Ma'or Street Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R olume 0 202 93 7 222 0 Peak-Hour Factor, PHF 0.90 0.87 0.87 0.90 0.90 0.90 ourly Flow Rate, HFR 0 232 106 7 246 0 Percent Heavy Vehicles 0 - - 2 - -- Median Type Undivided T Channelized 0 0 Lanes 0 1 0 0 1 0 onfiguration TR LT U stream Si nal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R olume 70 0 12 0 0 0 eak-Hour Factor, PHF 0.76 0.90 0.76 0.90 0.90 0.90 Hourly Flow Rate, HFR 92 0 15 0 0 0 Percent Heavy Vehicles 2 0 2 0 0 0 Percent Grade (%) 0 0 Flared Approach N N forage 0 0 T Channelized 0 0 nes 0 0 0 0 0 0 nfiguration LR Dela Queue Len th and Level of Service proach NB SB Westbound Eastbound ovement 1 4 7 8 9 10 11 12 ne Configuration LT LR (vph) 7 107 (m)(vph) 1221 521 lc 0.01 0.21 5% queue length 0.02 0.76 ontrol Delay 8.0 13.7 OS A 8 proach Delay - - 13.7 proach LOS - - B HCS'000^~ Copyright ~ 2000 Univcrsity or Florida All Rights Rained 4cmon 4 I h TWO-WAY STOP CONTROL SUMMARY General Information ite Information alyst gency/Co. Date Performed al sis Time Period 10/17/2002 PM PK HR Intersection urisdiction alysis Year 2006 WITH PROJECT ro'ect Descri tion EastNVest Street: RAILWAY North/South Street: RHOTON Intersection Orientation: North-South tud Period hrs : 0.25 ehicle Volumes and Ad'ustments a'or Street Northbound Southbound ovement 1 2 3 4 5 6 L T R L T R olume 0 251 93 7 249 0 eak-Hour Factor, PHF 0.90 0.87 0.87 0.90 0.90 0.90 ourly Flow Rate, HFR 0 288 106 7 276 0 ercent Heavy Vehicles 0 - - 2 - -- Median Type Undivided RT Channelized 0 0 anes 0 1 0 0 1 0 onfigurafion TR LT stream Si nal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R olume 70 0 12 0 0 0 eak-Hour Factor, PHF 0.76 0.90 0.76 0.90 0.90 0.90 Hourly Flow Rate, HFR 92 0 15 0 0 0 ercent Heavy Vehicles 2 0 2 0 0 0 Percent Grade (%) 0 0 Flared Approach N N forage 0 0 T Channelized 0 0 anes 0 0 0 0 0 0 nfiguration LR ela Queue Len th and Level of Service proach NB SB Westbound Eastbound ovement 1 4 7 8 9 10 11 12 ne Configuration LT LR (vph) 7 107 (m)(vph) 1165 466 /c 0.01 0.23 5% queue length 0.02 0.88 ontrol Delay 8.1 J5.0+ LOS A C pproach Delay - - 15.0+ proach LOS - - C HCS'000~ Copyright ~~ 2000 University of Florida, All Rights Resrned Version 3 Ih TWO-WAY STOP CONTROL SUMMARY General Information ite Information alyst gency/Co. Date Performed al sis Time Period 10/17/2002 PM PK HR Intersection urisdiction alysis Year 2002 EXISTING Pro'ect Descri tion EastlWest Street: N.P. RD orth/South Street: RHOTON Intersection Orientation: North-South tud Period hrs : 0.25 ehicle Volumes and Ad'ustments Ma'or Street Northbound Southbound ovement 1 2 3 4 5 6 L T R L T R olume 0 53 87 4 83 0 Peak-Hour Factor, PHF 0.90 0.73 0.73 0.84 0.84 0.90 Hourly Flow Rate, HFR 0 72 119 4 98 0 Percent Heavy Vehicles 0 - - 2 - __ edian Type Undivided RT Channelized 0 0 Lanes 0 1 D 0 1 0 onfiguration TR LT U stream Si nal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R olume 76 0 4 0 0 0 Peak-Hour Factor, PHF 0.71 0.90 0.71 0.90 0.90 0.90 Hourly Flow Rate, HFR 107 0 5 0 0 0 Percent Heavy Vehicles 2 0 2 0 0 0 Percent Grade (%) p p Flared Approach N /~/ torage 0 0 T Channelized 0 0 anes 0 0 0 0 0 0 nfiguration LR Dela Queue Len th and Level of Service proach NB SB Westbound Eastbound ovement 1 4 7 8 9 10 11 12 ne Configuration LT LR (vph) 4 112 (m)(vph) 1383 754 lc 0.00 0.15 5% queue length 0.01 0.52 ontrol Delay 7.6 10.6 OS A 8 proach Delay - - 10.6 pproach LOS - - g NCS:000~ Copyright ~ 2000 Univcrsity of Florida, All Rights Rained V'crsion 4 I h TWO-WAY STOP CONTROL SUMMARY General Information ite Information alyst gency/Co. Date Performed al sis Time Period 10/17/2002 PM PK HR Intersection urisdiction alysis Year 2006 WITHOUT PROJECT Pro'ect Descri lion EastNVest Street: N.P. RD orth/South Street: RHOTON Intersection Orientation: North-South tud Period hrs : 0.25 ehicle Volumes and Ad'ustments Ma'or Street Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R olume 0 71 110 5 135 0 eak-Hour Factor, PHF 0.90 0.73 0.73 0.84 0.84 0.90 ourly Flow Rate, HFR 0 97 150 5 160 0 ercent Heavy Vehicles 0 - - 2 - - edian Type Undivided RT Channelized 0 0 anes 0 1 0 0 1 0 onfiguration TR LT U stream Si nai 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R olume 128 0 5 0 0 0 Peak-Hour Factor, PHF 0.71 0.90 0.71 0.90 0.90 0.90 Hourly Flow Rate, HFR 180 0 7 0 0 0 ercent Heavy Vehicles 2 0 2 0 0 0 ercent Grade (%) 0 0 Flared Approach N N forage 0 0 T Channelized 0 0 anes 0 0 0 0 0 0 nfiguration LR eta Queue Len th and Level of Service proach NB SB Westbound Eastbound ovement 1 4 7 8 9 10 11 12 ne Configuration LT LR (vph) 5 187 (m)(vph) 1319 658 /c 0.00 0.28 5% queue length 0.01 1.17 ontrol Delay 7.7 12.6 OS A 8 proach Delay - - 12.6 proach LOS - - 8 HCS2000~W Copyright C 2000 University or Florida. All Rights Reserved Vcmon ~t Ib TWO-WAY STOP CONTROL SUMMARY eneral Information ite Information alyst gency/Co. Date Performed al sis Time Period 10/17/2002 PM PK HR Intersection urisdiction alysis Year 2006 WITH PROJECT Pro'ect Descri tion EastNVest Street: N.P. RD orth/South Street: RHOTON Intersection Orientation: Norfh-South tud Period hrs : 0.25 ehicle Volumes and Ad'ustments a'or Street Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R olume 0 71 159 5 135 0 eak-Hour Factor, PHF 0.90 0.73 0.73 0.84 0.84 0.90 Hourly Flow Rate, HFR 0 97 217 5 160 0 ercent Heavy Vehicles 0 - - 2 - __ Median Type Undivided T Channelized 0 0 Lanes 0 1 0 0 1 0 onfiguration TR LT U stream Si nal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R olume 159 0 5 0 0 0 Peak-Hour Factor, PHF 0.71 0.90 0.71 0.90 0.90 0.90 Hourly Flow Rate, HFR 223 0 7 0 0 0 Percent Heavy Vehicles 2 0 2 0 0 0 Percent Grade (%) 0 0 tared Approach N N forage 0 0 RT Channelized 0 0 nes 0 0 0 0 0 0 nfiguration LR Dela Queue Len th and Level of Service proach NB SB Westbound Eastbound ovement 1 4 7 8 9 10 11 12 ane Configuration LT LR (vph) 5 230 (m)(vph) 1246 627 lc 0.00 0.37 5% queue length 0.01 1.68 ontrol Delay 7.9 14.0 LOS A B proach Delay - - 14.0 proach LOS - - B HCSJOOOtw Copyright L 2D00 Univcrsiry of Florida All Rights Rarned Vemon 4 Ib TWO-WAY STOP CONTROL SUMMARY eneral Information ite Information alyst gency/Co. Date Performed al sis Time Period 10/17/2002 PM PK HR Intersection urisdiction alysis Year 2002 EXISTING ro'ect Descri tion EastlWest Street: N.P. RD orth/South Street: WILKENSON Intersection Orientation: North-South tud Period hrs : 0.25 ehicle Volumes and Ad'ustments Ma'or Street Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R olume 0 181 93 7 202 88 Peak-Hour Factor, PHF 0.92 0.92 1.00 1.00 0.92 0.92 Hourly Flow Rate, HFR 0 196 0 0 219 95 Percent Heavy Vehicles 2 - - 2 - -- Median Type Undivided T Channelized 0 0 apes 0 1 0 0 1 0 onfiguration LT TR U stream Si nal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R olume 0 0 0 92 0 8 eak-Hour Factor, PHF 1.00 1.00 1.00 0.69 1.00 0.69 Hourly Flow Rate, HFR 0 0 0 133 0 11 ercent Heavy Vehices 2 0 2 2 0 2 Percent Grade (%) 0 0 Flared Approach N N torage 0 0 RT Channelized 0 0 nes 0 0 0 0 0 0 nfiguraGon LR Dela Queue Len th and Level of Service proach NB SB Westbound Eastbound ovement 1 4 7 8 9 10 11 12 ane Configuration LT LR (vph) 0 144 (m)(vph) 1246 570 lc 0.00 0.25 5% queue length 0.00 1.00 ontrol Delay 7.9 13.4 OS A 8 proach Delay - - 13.4 proach LOS - - 8 HCS?OOOt*+ Copyright D:000 University or Florida. All Rights Reserved Vernon a Ib TWO-WAY STOP CONTROL SUMMARY General Information ite Information alyst gency/Co. Date Performed al sis Time Period 10/17/2002 PM PK HR intersection urisdiction alysis Year 2006 WITH PROJECT ro'ect Descri tion East/West Street: N.P. RD North/South Street WILKENSON Intersection Orientation: North-South tud Period hrs : 0.25 ehicle Volumes and Ad'ustments Ma'or Street Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R olume 0 225 93 7 239 167 eak-Hour Factor, PHF 0.92 0.92 1.00 1.00 0.92 0.92 ourly Flow Rate, HFR 0 244 0 0 259 181 Percent Heavy Vehicles 0 - - 2 - - edian Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 onfiguration LT TR U stream Si nal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R olume 0 0 0 165 0 9 Peak-Hour Factor, PHF 1.00 1.00 1.00 0.69 1.00 0.69 Hourly Flow Rate, HFR 0 0 0 239 0 13 Percent Heavy Vehicles 2 0 2 2 0 2 Percent Grade (%) 0 0 Flared P,pproach N N forage 0 0 RT Channelized 0 0 Lanes 0 0 0 0 0 0 onfiguration LR Dela Queue Len th and Level of Service proach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 12 ane Configuration LT LR (vph) 0 252 (m)(vph) 1131 476 lc 0.00 0.53 5% queue length 0.00 3.04 ontrol Delay 8.2 20.8 LOS A C pproach Delay - - 20.8 proach LOS - - C NCS?OOOM Copyright ~ 2000 University of Florida, All Righu Reserved Vcrsion a Ib TWO-WAY STOP CONTROL SUMMARY General Information ite Information alyst gency/Co. Date Performed al sis Time Period 10/17/2002 PM PK HR Intersection urisdiction alysis Year 2006 WITH PROJECT Pro'ect Descri lion East/West Street: N ENTR orth/South Street: WILKENSON Intersection Orientation: North-South tud Period hrs : 0.25 ehicle Volumes and Ad'ustments Ma'or Street Northbound Southbound Movement 1 2 3 4 5 6 L T R L T R olume 0 320 14 0 367 0 eak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 0 355 15 0 407 0 ercent Heavy Vehices 0 - - 0 - - edian Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 onfiguration TR LT stream Si nal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R olume 8 0 0 0 0 0 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 8 0 0 0 0 0 Percent Heavy Vehicles 0 0 0 0 0 0 ercent Grade (%) 0 0 Flared Approach N N forage 0 0 T Channelized 0 0 Lanes 0 0 0 0 0 0 onfiguration LR Dela Queue Len th and Level of Service proach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 12 ne Configuration LT LR (vph) 0 8 (m)(vph) 1200 372 lc 0.00 0.02 5% queue length 0.00 0.07 ontrol Delay 8.0 14.9 OS A 8 proach Delay - - 14.9 proach LOS - - B NCS:000M Copyright ~~ 2000 University orFlorida, All Rights Reserved Vcrsion a Ib TWO-WAY STOP CONTROL SUMMARY eneral Information ite Information alyst gency/Co. Date Performed al sis Time Period 10/17/2002 PM PK HR Intersection urisdiction alysis Year 2006 WITH PROJECT Pro'ect Descri tion East/West Street: S ENTR North/South Street: WILKENSON Intersection Orientation: North-South tud Period hrs : 0.25 ehicle Volumes and Ad'ustments Ma'or Street Northbound Southbound Mov ment 1 2 3 4 5 6 L T R L T R olume 0 334 56 0 375 0 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 0 371 62 0 416 0 Percent Heavy Vehicles 0 - -- 0 -- - Median Type Undivided RT Channelized 0 0 Lanes 0 1 0 0 1 0 nfiguration TR LT U stream Si nal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R olume 31 0 0 0 0 0 Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 Hourly Flow Rate, HFR 34 0 0 0 0 0 Percent Heavy Vehicles 0 0 0 0 0 0 Percent Grade (%) 0 0 Flared Approach N N torage 0 0 RT Channelized 0 0 anes 0 0 0 0 0 0 onfiguration LR Dela Queue Len th and Level of Service proach NB SB Westbound Eastbound Movement 1 4 7 8 9 10 11 12 Lane Configuration LT LR (vph) 0 34 (m)(vph) 1137 348 !c 0.00 0.10 5% queue length 0.00 0.32 ontrol Delay 8.2 16.5 LOS A C pproach Delay - - 16.5 pproach LOS - - C NCSJ000~ Copyrightr:..2000 University o(Flonda, All Rights Reserved version a Ib