Traffic Impact Analysis~~~ HEATH & ASSOCIATES, INC. Transportation and Civil Engineering BENUM-COYNE PLAT RESIDENTIAL SUBDIVISION TRAFFIC IlVIPACT ANALYSIS YELM, WA Prepared for: Benum -Coyne C/o Benum Enterprises P.O. Box 73130 Puyallup, WA 98373 OCTOBER 2002 2214 Tacoma Road • Puyallup, WA 98371 • (253) 770-1401 • Fax (253) 770-1473 BENUM-COYNE PLAT RESIDENTIAL SUBDNISION TRAFFIC IlVIPACT ANALYSIS TABLE OF CONTENTS I. Introduction .................................................................................................................3 II. Project Description ......................................................................................................3 III. Existing Conditions .....................................................................................................3 N. Forecasted Traffic Demand .........................................................................................9 V. Conclusions and Mitigation ......................................................................................16 Appendix LIST OF TABLES 1. Existing Level of Service ............................................................................................9 2. Trip Generation .........................................................................................................10 3. Future Level of Service .............................................................................................12 LIST OFFIGURES 1. Vicinity Map and Roadway System ............................................................................4 2. Site Plan ......................................................................................................................5 3. Existing Peak Hour Volumes ......................................................................................7 4. Trip Distribution and Assignment ............................................................................11 5. Pipeline Traffic .........................................................................................................13 6. 2006 Peak Hour Volumes Without Froject ...............................................................14 7. 2006 Peak Hour Volumes With Project ....................................................................15 2 BENUNI-COYNE PLAT RESIDENTIAL SUBDIVISION TRAFFIC IMPACT ANALYSIS L INTRODUCTION This study serves to investigate traffic impacts related to the proposed Benum-Coyne Plat subdivision. The main goals of this study focus on the assessment of existing traffic conditions and intersection congestion, forecasts of newly generated project traffic, and estimations of future intersection delay. The first task includes the collection of general roadway information, road improvement information, entering sight distance data, and peak hour traffic counts. Next, a detailed level of service analysis of the existing volumes is made to determine the present degree of intersection congestion. Forecasts of future traffic and dispersion patterns on the street system are then determined using established trip generation and distribution techniques. Following this forecast, the future service levels for the key intersections are investigated. As a final step, appropriate conclusions and possible off-site mitigation measures are defined. II. PROJECT DESCRIPTION The proposed project is a residential subdivision comprised of 108 individual housing lots. The site is located in the northeast quadrant of Yelm with Wilkenson Road along its west border. The triangular shaped property is bordered on the southerly side by the Burlington Northern Railroad and the Centralia Power Canal on the north. Primary access to site will be via two accesses to Wilkerson Road. Other roads serving the site include Canal Road and N.P. Road. Based on management projections, occupation of this development is anticipated by 2005/2006. Figure 1 on the following page shows the general site location and serving roadways while the overall lot configuration and internal roadway is shown in Figure 2. III. EXISTING CONDTIIONS A. Surrounding Roadway System Roadways serving the proposed site range from two lane major arterials to two-lane collector roads which vary in width, terrain, and posted speeds. These roadways vary in their overall function as part of the general network. The key streets near the site are described on page 6. BENUM-COYNE PIAT HEATH & ASSOCIATES, INC VICINITY MAP t ROADWAY SYSTEM Transportation and Civil Engineering FIGURE I N PRELIMINARY SITE PLAN BENUM AND COYNE PROPERTY A PART OF THE SWl4 SECTION 17, T17N, R2E, W.M. CRY OF YELM, THURSTON COUNTY, WASHINGTON eunae seas I ~ // NISWALLY MNES ,: -, LLL ~ ~~~ / ~ __ I, -- _ 3 E'ER C,Wµ `~~,~ / ~~ ~~ -~ ~ ~/ T wJ~r` f / \~~\ ,'// ` // \ \\ A ~, 1 ~CRB~ pR011710N TA11C13 HEATH & ASSOCIATES, INC sRRE PinN Transportation and Civil Engineering FIGURE 2 South First Street is also State Route 507. This is a two lane road, with a left turn lane at the intersection with SR-510. The speed limit near the intersection is 25 mph, while to the south the speed limit is 55 mph. Shoulders are roughly 5 feet wide and consist of asphalt and grass or curb and sidewalk. Yelm Avenue is a two-lane roadway which lies northeast of the property and runs in a northwesterly-southeasterly direction. Lanes aze 12 feet wide, while shoulders aze roughly 4 feet wide and composed of asphalt/gravel or curb and sidewalk. Northwest of the intersection with the S First Street, Yehn Avenue is also State Route 510, while southeast of the intersection it is State Route 507. Wilkenson Road is a two-lane roadway which lies along the west side of the property. Lane widths are approximately 10 feet wide, while shoulders aze minimal. The speed limit is 25 mph south of its intersection with N.P. Road and 35 mph north of the intersection. N.P. Road is a two-lane roadway which lies southeast of the property and runs in a southwesterly-northeasterly direction. Lanes aze approximately 10 feet wide, while shoulders aze gravel and minimal in cross-section. The speed limit along this road is posted at 35 mph. Rhoton Road is a two-lane roadway which lies west of the property and runs in a north- south direction. Lanes are also approximately 10 feet wide, while shoulders are minimal along this street. The speed limit is posted at 25 mph. B. Existing Peak Hour Volumes Field data for this study was collected in May, July and October of 2002. Traffic counts, for this type of use, are taken during the evening peak period between the hours of 4 PM and 6 PM. This specific peak period is targeted for analysis purposes since it generally represents a worst case scenario for residential developments with respect to traffic conditions. This is primarily due to the common 8 AM to 5 PM work schedule and the greater number of recreation and shopping trips associated with the eazly evening period as they travel home from work. In order to discern the true peak hour in the azea an AM peak hour count was taken at the intersection of 1st and Yelm. As was noted in the comparison, volumes are 38 percent higher during the PM peak hour versus the AM peak hour. Figure 3 on the following page shows the evening peak hour count taken at several intersections which would most likely receive the bulk of this project's traffic. The route and intersections analyzed provide the routes to the regional corridors serving Yelm, namely SR-507 and SR-510. Average daily traffic (ADT) volumes for State Routes are available from the Washington State Department of Transportation. 6 BENUM PLAT HEATH & ASSOCIATES, INC IX15TINGPMPEAKFIOURVOLUMES Transportation and Civil Engineering FIGURP 3 C. Level of Service Description Existing peak hour delays were determined through the use of the Highway Capacity {~'ry Manual. Capacity analysis is used to determine level of service (LOS) which is an -~~ established measure of congestion for transportation facilities. LOS is defined for a variety of facilities including intersections, freeways, arterials, etc. A complete definition >, of level of service and related criteria can be found in the HCM. The methodology for determining the LOS at signalized intersections strives to determine the volume to capacity (vac) ratios for the various intersection movements as well as the average control delay for those movements. Delay is generally used to measure the degree of driver discomfort, frustration, fuel consumption, and lost time. Control delay, in particular, ,.~, includes movements at slower speeds and stops on intersection approaches as vehicles move up in queue position or slow down upstream of an intersection. Aside from the overall quantity of traffic, three specific factors influence signalized intersection LOS. ~., ~ These include the type of signal operation provided, the signal phasing pattern, and the specific allocation of green time. The methodology for determining the LOS at unsignalized intersections strives to determine the potential capacities for the various vehicle movements and ultimately determines the average total delay for each movement. Potential Capacity represents the number of additional vehicles that could effectively utilize a particular movement, which is essentially the equivalent of the difference between the movement capacity and the existing movement volume. Total delay is described as the elapsed time from when a vehicle stops at the end of a queue until the vehicle departs from the stop line. Average total delay is simply the mean total delay over the entire stream. A number of factors influence potential capacity and total delay including the availability/usefulness of gaps. The range for intersection level of service is LOS A to LOS F with the former indicating the best operating conditions with low control delays and the latter indicating the worst conditions with heavy control delays. Existing LOS is shown in Table 1 on the following page. This analysis involved the Signa12000 and HCS-2000 programs which is based on the 2000 Highway Capacity Manual. D. Level of Service Results The results of the level of service analysis are given below the table. These results were determined through the use of the automated intersection analysis programs known as HCM 2000 and Signa12000. This program is based on Highway Capacity Manual analysis procedures for unsignalized and signalized intersections. TABLE 1 Existing Level of Service Delays given in seconds per vehicle Intersection Control Approach LOS Delay Yelm/SR-507 Signal Southbound D 42.9 Westbound D 41.2 Northbound E 57.4 Eastbound D 44.4 Overall D 45.9 Railway/1st Stop Westbound B 11.2 Southbound A 7.8 Rhoton/NP Rd Stop Westbound B 10.6 Southbound A 7.4 NP/Wilkenson Stop Eastbound B 13.4 Northbound A 7.9 As shown in Table 1, the intersection of Yelm/First presently experiences moderate delays, with overall delays at LOS D. E. Pedestrian and Bicycle Traffic Observations for pedestrian and bicycle activity were made during the vehicle count and during other visits to gather field information. Very little non-motorist activity was noted. Non-motorist volumes did not appear to have much influence on vehicle progression. The location of this project would dictate that the Yehn School District would transport students to school by bus rather than walk to school. F. Transit The nearest transit service available is on Yelm Avenue. Intercity Route 94 runs on Yelm Avenue, with a stop neaz the Yelm/First intersection. No direct transit service would be provided for the proposed site. Only minor transit usage would be realized in the future with most project trips made via passenger car. No trip generation reductions were made for transit. G. Sight Distance at Accesses Preliminary examinations of the proposed accesses onto Wilkenson Road were made to determine whether or not adequate entering and stopping sight distance can be provided for inbound and outbound project traffic. Based on field reviews, it appears that both the north and south accesses have the ability to provide sufficient available sight distance. No obstructions or horizontal or vertical road curvature was noted which would affect exiting and entering the site. 9 IV. FUTURE TRAFFIC DEMAND A. Trip Generation Trip generation is used to determine the magnitude of project impacts on the surrounding street system. Data presented in this report was taken from the Institute of Transportation ~' Engineer's publication Trip Generation, Sixth Edition. The designated land use for this project is defined by Single Family Detached Dwelling Units (LUC 210). Data for the 4 PM to 6 PM peak hour was used for future traffic estimations. Table 2 gives a summary of the estimated project trip generation. Included are the average weekday volume and the AM and PM peak hour volumes for the 108 proposed units. TABLE 2 Trip Generation Volumes 108 Single Family Dwelling Units Time Period Volume Average Weekday Traffic 1034 vpd AM Peak Inbound 21 vph AM Peak Outbound 60 vph AM Peak Total 81 vph PM Peak Inbound 70 vph PM Peak Outbound 39 vph PM Peak Total 109 vph As shown in Table 2, approximately 26 percent fewer trips aze expected for the AM peak hour versus the PM peak. The PM peak hour contains not only commute traffic but also a greater number of personal and recreation trips. The anticipated inbound/outbound split for the critical PM peak is estimated at 64 percent entering and 36 percent exiting. B. Trip Distribution Pattern Trip distribution describes the process by which project generated trips are dispersed onto the street network surrounding the site. Site generated trips aze expected to follow the trip pattern shown in Figure 4 on the following page. The direct access to the SR-507 corridor would draw most traffic in that direction with dispersing to the region from the intersection of 1st and Yehn. Some traffic would filter toward Tacoma and Pierce County via other roads not studied. As shown in Figure 4, the distribution is split with 20 percent southwesterly on SR-507, 30 percent easterly on SR-507, 10 percent contained within Yehn, and 40 percent northwesterly on SR-510. C. Peak Hour Volumes With and Without the Project Completion of the infrastructure and occupancy of the homes for this subdivision is expected by the year 2006, therefore, future traffic volumes for the 2006 horizon year is 10 G C 30% INBOUND: 70 VPH OUTBOUND: 39 VPFi BENUM-COYNE PLAT ® HEATH & ASSOCIATES, INC TRIP DISTRIBUTION -PROJECT TRAFFIC Transportation and Civil Engineering FIGURE 4 i 0 O I l ~o p STOP - targeted and analyzed. Baseline 2006 peak hour volumes without the project were derived by applying a 3 percent growth rate per year to the existing volumes of Figure 3. The traffic from several pipeline projects (see Figure 5) were also added to the volume to reflect future 2006 traffic without the project The pipeline projects identified were Dairy Queen, Jack in the Box, Bruno Plat, Yelm Alternative School, Rhoton Industrial Plat and the Teitge (Mill Road) Plat. 2006 intersection volumes without the project are given in Figure 6, with pipeline trips included, while volumes with the project are shown in Figure 7. D. Level of Service A level of service analysis was made of the future peak hour volumes with and without project generated trips added to the primary intersections and entrance nodes. Results for intersection delay conditions were determined through the use of the HCM 2000 and Signal 2000 programs. A summary of the analysis results is shown in Table 3. TABLE 3 Future 2006 Level of Service Delays given in seconds per vehicle Without Project With Proiect Intersection Control Geometry LOS Delay LOS Delay Yelm/SR-507 Signal Southbound D 50.9 D 52.9 Westbound E 58.5 E 59.7 Northbound F 97.7 F 99.6 Eastbound E 60.4 E 64.2 Overall E 66.3 E 68.7 Railway/1st Stop Westbound B 13.7 C 15.0 Southbound A 8.0 A 8.1 Rhoton/NP Rd Stop Westbound B 12.6 B 14.0 Southbound A 7.7 A 7.9 NP/Wilkenson Stop Eastbound C 15.8 C 20.8 Northbound A 8.1 A 8.2 S Ent/Wilkenson Stop Westbound - - C 16.5 Southbound - - A 8.2 N Ent/Wilkenson Stop Westbound - - B 14.9 Southbound - - B 8.0 The 2006 LOS analysis both with and without the project indicate delays of LOS E overall for the primary Yelm Ave/First St intersection. Project traffic is expected to add several seconds to average overall delays at this location. Other intersections studied as part of this project will experience LOS C or better without or with project traffic. 12 BENUM-COYNE PLAT HEATH & ASSOCIATES, INC Transportation and Civil Engineering PIPELINE VOLUMES FIGURE 5 BENUM-COYNE PLAT ® HEATH & ASSOCIATES, INC 2006 PM PEAK HOUR VOLUMES WITHOUT PROJECT Transportation and Civil Engineering FIGURE 6 sc~ o ~ 1 ~o STOP BENUM-COYNE PLAT ® HEATH & ASSOCIATES, INC 2006 PM PEAK HOUR VOLUMES WITH PROJECT Transportation and Civil Engineering FIGURE 7 E. Left Turn Lane Warrants Left turn lanes are a means of providing a necessary storage area for left turning vehicles at intersections. For atwo-lane or four-lane arterial with no left turn storage, delays are often created by vehicles waiting to complete the desired left turn movement. These turning vehicles typically block the heavier through movement, thereby causing some disruptions to traffic flow and subsequent congestion. Methods have been developed by various agencies to determine under what circumstances a left turn lane would be needed. Moderate traffic presently exists on Wilkenson and very little traffic for the project is expected to be coming from the north into the plat. By inspection a left turn pocket is not warranted. V. CONCL USIONS AND MITIGATION The Benum-Coyne Plat project is located northeasterly of downtown Yelm and proposes 108 single-family residential lots. Access to the site is proposed off of Wilkenson Road. Based on ITE data, this project is expected to create an average of 1034 residential trip movements during a typical weekday. An estimated 81 vehicle trips are generated during the AM peak hour and 109 trips during the PM peak. Several intersections were reviewed for LOS which is expected to receive the bulk of project traffic. Based on this review, the project does not result in a change in LOS at the intersections studied. Sight distance at the project entrances appears to be adequate, based on a 35 mph assumed speed limit but should meet city of Yelm requirements. The light amount of project volume from the north coupled with the moderate traffic on Wilkenson Road would not warrant a left turn pocket at either entrance. Based on this analysis the following recommendations are made: 1. Provide the city of Yelm mitigation fee for 109 PM peak hour trips. No other mitigation is identified. 16 BENUM-COYNE PLAT RESIDENTIAL SUBDNISION TRAFFIC IlVIPACT ANALYSIS APPENDIX ~~ 17 LEVEL OF SERVICE The following aze excerpts from the 2000 Highway Capacity Manual -Transportation Research Board Special Report 209. Quality of service requires quantitative measures to characterize operational conditions within a traffic stream. Level of service (LOS) is a quality measure describing operational conditions within a traffic stream, generally in terms of such service measures as speed and travel time, freedom to maneuver, traffic interruptions, and comfort and convenience. Six LOS aze defined for each type of facility that has analysis procedures available. Letters designate each level, from A to F, with LOS A representing the best operating conditions and LOS F the worst. Each level of service represents a range of operating conditions and the driver's perception of those conditions. Level-of-Service definitions The following definitions generally define the various levels of service for arterials. Level of service A represents primarily free-flow operations at average travel speeds, usually about 90 percent of the free-flow speed for the arterial classification. Vehicles aze seldom impeded in their ability to maneuver in the traffic stream. Delay at signalized intersections is minimal. Level of service B represents reasonably unimpeded operations at average travel speeds, usually about 70 percent of the free-flow speed for the arterial classification. The ability to maneuver in the traffic stream is only slightly restricted and delays are not bothersome. Level of service C represents stable operations; however, ability to maneuver and change lanes in midblock locations maybe more restricted than in LOS B, and longer queues, adverse signal coordination, or both may contribute to lower average travel speeds of about 50 percent of the average free-flow speed for the arterial classification. Level of service D borders on a range in which small increases in flow may cause substantial increases in approach delay and hence decreases in arterial speed. LOS D may be due to adverse signal progression, inappropriate signal timing, high volumes, or some combination of these. Average travel speeds are about 40 percent of free-flow speed. Level of service E is characterized by significant delays and average travel speeds of one- third the free-flow speed or less. Such operations are caused by some combination of adverse progression, high signal density, high volumes, extensive delays at critical intersections, and inappropriate signal timing. 18 Level of service F characterizes arterial flow at extremely low speeds, from less than one- third to one-quarter of the free-flow speed. Intersection congestion is likely at critical signalized locations, with long delays and extensive queuing. These definitions aze general and conceptual in nature, and they apply primarily to uninterrupted flow. Levels of service for interrupted flow facilities vary widely in terms of both the user's perception of service quality and the operational variables used to describe them. For each type of facility, levels of service aze defined based on one or more operational pazameters that best describe operating quality for the subject facility type. While the concept of level of service attempts to address a wide range of operating conditions, limitations on data collection and availability make it impractical to treat the full range of operational parameters for every type of facility. The pazameters selected to define levels of service for each facility type are called "measures of effectiveness" or "MOE's", and represent available measures that best describe the quality of operation on the subject facility type. Each level of service represents a range of conditions, as defimed by a range in the pazameters given. Thus, a level of service is not a discrete condition, but rather a range of conditions for which boundaries are established. The following tables describe levels of service for signalized and unsignalized intersections. Level of service for signalized intersections is defined in terms of avera e control delay. Delay is a measure of driver discomfort, frustration, fuel consumption and lost travel time, as well as time from movements at slower speeds and stops on intersection approaches as vehicles move up in queue position or slow down upstream of an intersection. Level of service for unsignalized intersections is determined by the computed or measured control delay and is determined for each minor movement. Signalized Intersections -Level of Service Control Delay per Level of Service Vehicle (sec) A <_10 B > 10 and _<20 C >20 and <_35 D > 35 and <_55 E > 55 and <_80 F > 80 19 Unsignalized Intersections -Level of Service Level of Service A B C D E F Average Total Delay per Vehicle (sec) _<10 > 10 and <_ 15 >15and<_25 >25and<_35 >35and<_50 > 50 As described in the 2000 Highway Capacity Manual, level of service breakpoints for all- way stop controlled (AWSC) intersections are somewhat different than the criteria used for signalized intersections. The primary reason for this difference is that drivers expect different levels of performance from distinct kinds of transportation facilities. The expectation is that a signalized intersection is designed to carry higher traffic volumes than an AWSC intersection. Thus a higher level of control delay is acceptable at a signalized intersection for the same level of service. AWSC Intersections -Level of Service Level of Service A B C D E F Average Total Delay per Vehicle (sec) <_ 10 > 10 and <_15 >15ands25 > 25 and <_35 > 35 and <_ 50 > 50 20 BENUM-COYNE PLAT Summary of Trip Generation Calculation For 108 Dwelling Units of Single Family Detached Housing October 14, 2002 Average Standard Adjustment Rate Deviation Factor riveway Volume Avg. Weekday 2-Way Volume 9.57 3.69 1.00 1034 7-9 AM Peak Hour Enter 0.19 0.00 1.00 21 7-9 AM Peak Hour Exit 0.56 0.00 1.00 60 7-9 AM Peak Hour Total 0.75 0.90 1.00 81 4-6 PM Peak Hour Enter 0.65 0.00 1.00 70 4-6 PM Peak Hour Exit 0.36 0.00 1.00 39 4-6 PM Peak Hour Total 1.01 1.05 1.00 109 AM Pk Hr, Generator, Enter 0.19 0.00 1.00 21 AM Pk Hr, Generator, Exit 0.58 0.00 1.00 63 AM Pk Hr, Generator, Total 0.77 0.91 1.00 83 PM Pk Hr, Generator, Enter 0.65 0.00 1.00 70 PM Pk Hr, Generator, Exit 0.37 0.00 1.00 40 PM Pk Hr, Generator, Total 1.02 1.05 1.00 110 Saturday 2-Way Volume 10.09 3.67 1.00 1090 Saturday Peak Hour Enter 0.51 0.00 1.00 55 Saturday Peak Hour Exit 0.43 0.00 1.00 46 Saturday Peak Hour Total 0.94 0.99 1.00 102 Sunday 2-Way Volume 8.78 3.33 1.00 948 Sunday Peak Hour Enter 0.46 0.00 1.00 50 Sunday Peak Hour Exit 0.40 0.00 1.00 43 Sunday Peak Hour Total 0.86 0.95 1.00 93 Note: A zero indicates no data available. Source: Institute of Transportation Engineers Trip Generation, 6th Edition, 1997. TRIP GENERATION BY MICROTRANS Heath 8~ Associates Inc. Transportation Division 2214 Tacoma Road Puyallup, WA 98371 Gmurx Printarl- t Inchiftari File Name : untitled2 Site Code :00001924 Start Date :05/14/2002 Page No : 1 YELM AVE 1ST AVE SE YELM AVE 1ST AVE SE ' Southbound Westbound Northbound Eastbound Start Time Ri ht Thru Left Ri ht Thru Left Ri ht Thru Left Ri ht Thru Left Int. Total ~ Fador 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 04:00 PM 11 129 33 31 12 7 13 96 40 46 24 34 476 04:15 PM 27 134 34 22 11 14 9 98 34 44 17 27 471 04:30 PM 28 132 40 19 19 14 6 84 53 35 12 28 470 04:45 PM 25 134 30 17 15 10 8 96 53 44 22 26~ 480 Total 91 529 137 89 57 45 36 374 180 169 75 1151 1897 05:00 PM 28 136 49 27 15 13 05:15 PM 25 125 32 29 15 10 05:30 PM 27 132 37 34 16 13 05:45 PM 33 145 26 28 19 16 Total 113 538 144 118 65 52 Grand Total 204 1067 281 207 122 97 Apprch % 13.1 68.8 I 18.1 48.6 28.6 22.8 Total % 5.2 27.2 7.2 5.3 3.1 2.5 J 7 85 47 47 25 331 512 8 101 52 32 12 29 470 17 101 51 53 26 35 542 8 94 44 51 15 25 504 40 381 194 183 78 122 2028 76 755 374 352 153 237 3925 6.3 62.7 31.0 47.4 20.6 31.9 1.9 19.2 9.5 9.0 3.9 6.0 YELM AVE ~ T t z75t I Right T~ru LQft ~ ~ T ~ ~ w ~ NoM w N H W ~ i~ 14/02 4:00:00 PM ~ ~ ~ 14/02 5:45:00 PM y ~~ c r ~m ~~ r ~ T r ® o Out In Total Heath 8~ Associates Inc. Transportation Division 2214 Tacoma Road Puyallup, WA 98371 40 381 194 615 6.5 62.0 31.5 17 101 51 169 05:30 PM 17 101 51 169 0.910 YELM AVE 1ST AVE SE YELM AVE 1ST AVE SE j Southbound Westbound Northbound Eastbound Start Time Right Thru Left App. Right Thru Left App' Right Thru left App' Right Thru Left App. Int. i Total Total Total Total , Total Peak Hour From 04:00 PM to 05:45 PM -Pea Intersection 05:00 PM Volume 113 538 144 795 Percent 14.2 67.7 18.1 05:30 27 132 37 196 Volume Peak Factor High Int 05:00 PM Volume 28 136 49 213 Peak Factor 0.933 File Name : untitled2 Site Code :00001924 Start Date :05/14/2002 Page No : 2 183 78 122 383' 2028 47.8 20.4 31.9 53 26 35 1141 542 0.935 05:30 PM 53 26 35 114 0.840 YELM AVE Right Thru Lgft T p ~_ W ~ ~, h ~ W ~ 4 ~ 1M02 5:00:00 PM ~ < r 1M02 5:45:00 PM m N m ^~ ~ r ~, T r o Out In Total KlOrl 118 65 52 235 50.2 27.7 22.1 34 16 13 63 05:30 PM 34 16 13 63 • 0.933 Heath 8t Associates Inc. Transportation Division 2214 Tacoma Road Puyallup, WA 98371 Groups Printed- UnshiRed File Name : untitled1 Site Code :00001924 Start Date :06/13/2002 Page No : 1 YELM AVE 15T AVE SE YELM AVE 15T AVE SE Southbound Westbound Northbound Eastbound Start Time Ri ht Thru Left Ri ht Thru Left Rf ht Thly Left ht Thru Left Int. Total Factor 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 07:00 AM 4 49 9 74 16 10 2 129 20 25 3 53 394 07:15 AM 11 67 17 32 12 1 2 100 28 32 15 34 351 07:30 AM 17 89 11 49 12 7 1 100 19 29 8 31 373 07:45 AM 12 70 16 38 15 9 6 100 17 33 9 30 355 Total 44 275 53 193 55 27 11 429 84 119 35 148 1473 08:00 AM 15 68 13 30 9 8 08:15 AM 16 72 16 24 9 3 08:30 AM 25 62 14 29 12 3 08:45 AM 31 84 18 32 30 11 Total 87 286 61 115 60 25 Grand Total 131 561 114 308 115 52 Apprch % 16.3 69.6 14.1 64.8 24.2 10.9 Total % 4.4 19.1 3.9 10.5 3.9 1.8 1 81 29 31 9 25 319 3 87 19 27 6 27 309 5 104 28 34 15 44 375 5 106 35 38 18 60 468 14 378 111 130 48 156 1471 25 807 195 249 83 304 2944 2.4 78.6 19.0 39.2 13.1 47.8 0.8 27.4 6.6 8.5 2.8 10.3 YELM AVE r T I 2225 t Right Tryru L~ ~ ~ T ,~ ~_ W ~ (A ~ W t ~ 13/02 7:00:00 AM ~ m h 13102 8:45:00 AM ~ '~ rcZ ~ ~m ~, T r Out In Togl Heath & Associates Inc. Transportation Division 2214 Tacoma Road Puyallup, WA 98371 File Name : untitled1 Site Code :00001924 Start Date :06/13/2002 Page No : 2 YELM AVE 1ST AVE SE YELM AVE 1ST AVE SE Sotrthbound Westbound Northbound Eastbound Start Time Right Thru Left ~~~ Right Thru Left T ~~ Right Thru Left ~~~ Right Thru Left T ~~ Peak Hour From 07:00 AM to 08:45 AM -Pea Intersection 07:00 AM Volume 44 275 53 372 Percent 11.8 73.9 14.2 07:00 4 49 9 62 Volume Peak Factor High Int. 07:30 AM Volume 17 89 11 117 Peak Factor 0.795 klofl 193 55 27 275 70.2 20.0 9.8 74 16 10 100 07:00 AM 74 16 10 100 0.688 11 429 84 524 2.1 81.9 16.0 2 129 20 151 07:00 AM 2 129 20 151 0.868 119 35 148 302 39.4 11.6 49.0 25 3 53 81 07:00 AM 25 3 53 81 0.932 YELM AVE t nazi Right Thru L¢ft T w ~ North ~ ~ w ~ ~ ~ 13!02 7:00:00 AM ~- 73/02 7:15:00 AM m N df~i ~ ,--~o ~~LL..,, m a'] z i i ~ L. b' ~, T r o Out M Total Int. Total 1473 394 0.935 Heath & Associates Inc. Transportation Division 2214 Tacoma Road File Name : 1928c Puyallup, WA 98371 Site Code :00001928 Start Date :10/10/2002 Page No : 1 Groups Printed- Unshifted _ NW RHOTON RD - ---- NP RD SE -- NW RHOTON RD Southbound _ Westbound _ _ N _orthbound ___ Start Time~ Right Thru ' Left _ __ Right Thru _ Left _ J Rift _- _ Thru Left Int. Total __ - Factor 1.0 1.0 1.0 -- 1.0 1.0 1.0 - 1.0 -- 1.0 __ - 1.0 _ 04:00 PM 0 16 3 1 0 19 26 9 0 74 04:15 PM 0 12 0 , 1 0 24 18 12 0 67 04:30 PM 0 16 2 1 0 14 36 12 0 81 04:45 PM 0 22 0 2 0 26 15 13 0 78 _ _ __ Total 0 66 5 5 0 83 95 46 0 300 05:00 PM 0 24 2 0 0 18 20 15 0 79 05:15 PM 0 21 0 1 0 18 16 13 0 69 05:30 PM 0 26 1 0 0 10 25 15 0 77 05:45 PM 0 19 0 0 0 11 24 __ 12 0 66 __ Total 0 90 3 ; 1 0 57 85 55 0 291 Grand Total 0 156 8 6 0 140 180 101 0 591 Apprch % 0.0 95.1 4.9 4.1 0.0 95.9 64.1 35.9 0.0 Total % 0.0 26.4 1.4 : 1.0 0.0 23.7 30.5 17.1 0.0 Out In Total 107 i ;.._164 ~ 271 15G 8 I Thru Left ~ i ~ I I i i ?I ~O North ~ ~ i ~I ~; .9 OH O/2002 4:IX1:00 PM " ~' A ~ 0/11Y2002 5:45:00 PM m ~ ~ ~~o UruFyfted ~ 0 u6 A - i I Thru R M 101 180 _ 296. 281 577' Out ~ In ~ Tofal NW RH TON RD Heath & Associates Inc. Transportation Division 2214 Tacoma Road Puyallup, WA 98371 File Name : 1928c Site Code :00001928 Start Date :10/10/2002 Page No : 2 NW RHOTON RD NP RD SE NW RHOTON RD _ _ _Souhbound ___ -- Westbound - - - Northbound Start Time ', Ri ht g Thru Left APP' Ri ht g Thru ~ Left T ~~ Right Thru -- Left Total Peak Hour From 04:00 PM to 05:45 PM -Peak 1 of 1 _ Intersection 04:30 PM Volume 0 83 4 87 4 0 76 80 87 53 0 Percent 0.0 95.4 4.6 5.0 0.0 95.0 62.1 37.9 0.0 04:30 Volume 0 16 2 18 1 0 14 15 36 12 0 Peak Factor High Int. 05:00 PM 04:45 PM 04:30 PM Volume 0 24 2 26 2 0 26 28 36 12 0 Peak Factor 0.837 0.714 ~ Out In Total 57 ~ 144 -~ ~ - -~ 831 4: Thru Left i ~ T j^O I ~ ~ ,~ _ * ~ Z ~ alazoo2 a:3o:oo PM ''~ ~ ,_ , ~ l a1a20025:15a>OPM rl ~o ~ ~ rn~ m Unshifted ~ ~ 0 v6 I i Thru M 53 87 159 140 X299 Out In Total NW RHOTON RD APP' Int. Total Total 140 307 48 81 0.948 48 0.729 Heath & Associates Inc. Transportation Division 2214 Tacoma Road File Name : untitled1 Puyallup, WA 98371 Site Code :00001928 Start Date :07/31 /2002 Page No : 1 Groups Printed- Unshifted _ _ _ RHOTON RD I RAILWAY RD SE i FIRST ST Southbound i Westbound ! Northbound _ Start Time Right Thru ; Left ' Right , Thru ! Left Right Thru Left Int. Total Factor 1 I 1.0 1.0 ' 1.0 ' ____ 1.0 1.0 1.0 - 1.0 - 04:00 PM 0 32 0 2 0 7 22 38 0 101 04:15 PM 0 29 2 ' 1 0 13 13 30 0 88 04:30 PM 0 26 0 ', 2 0 7 12 48 0 95 04:45 PM 0 33 0 2 0 ___ __ 9 6 __ 33 0 83 Total 0 120 2 , 7 0 36 53 149 0 367 05:00 PM 0 32 2 ' 3 0 15 : 16 41 0 109 05:15 PM 0 31 2 j 2 0 9! I 20 47 0 111 05:30 PM 0 25 1 1 0 I 10 17 38 0 92 05:45 PM 0 35 1 ~ 5 0 10 21 33 _ 0_ 105 _ Total 0 123 6 11 0 44 ', 74 159 0 417 Grand Total 0 243 8 i 18 0 0 80 I 127 29 2 308 70 8 0 784 0 0 Apprch % 0.0 96.8 3.2 18.4 0. 81.6 . . . Total % 0.0 31.0 1.0 , 2.3 0.0 10.2 16.2 39.3 0.0 Out In Total I 326 251 577 243 8, Ttru Left i 1 ~' ~~ I NO ~~ r /31/2002 4:00:00 PM " m ro 3 /31/2002 5:45:00 PM ~ c m UnsNRed ~ ~ 0 w~ w- I i I Ttru ht ' ~3~ ~ f 7~I Out In Total Fl T T Heath & Associates Inc. Transportation Division 2214 Tacoma Road Puyallup, WA 98371 File Name : untitled1 Site Code :00001928 Start Date :07/31 /2002 Page No : 2 RHOTON RD Southbound RAILWAY RD SE Westbound T FIRST ST Northbound _ _ Start Time ; Right ' Thru j Left ; Total Right ~ Thru Left Total Right Thru Left Total Int. Total Peak Hour From 04:00 PM to 05:45 PM -Peak 1 of 1 Intersection 05:00 PM Volume 0 123 6 129 11 0 44 55 74 159 0 233 417 Percent 0.0 95.3 4.7 20.0 0.0 80.0 31.8 68.2 0.0 05:15 Volume 0 31 2 33 2 0 9 11 20 47 0 67 111 Peak Factor ~ 0.939 High Int. 05:45 PM 05:00 PM ! 05:15 PM Volume 0 35 1 36 ~ 3 0 15 18 ~ 20 47 0 67 Peak Factor 0.896 0.764 0.869 Out In Tonal j 170 129 ~29~9 j I~ 123 6~ Thu Left 1 ~- ~ T 0 o Nora, ~~ /31/Z002 5:00:00 PM N 3 D !31/2002 5:45:00 PM u N ~~ A UfShRBd ~ O ~ lb N - T r 159 74 167 233 Out In Total i FIRST ST ~ Heath & Associates Inc. Transportation Division 2214 Tacoma Road File Name Puyallup, WA 98371 Site Code Start Date Page No Groups Printed- Unshifted - - ----- -- ---- _ ----- WILKENSEN RD ___ ____ WILKENSEN RD __ NP RD SE Southbound Northbound Eastbound Start Time - - Ric ht ~ _ _ ---- Thru ' -- - Left R'I~C ht _ _ Thru _ _ Left ~ -- - ~ - . R~ht Thru Factor 1.0 I 1.0 1.0 1 A ' 1.0 1.OY 1.0 1.0 04:00 PM ---- 20 - - 42 - ~ ~ ---- 0 41 - 0 ' - - --- 04:15 PM 25 50 0~ 0 49 0 0 0 04:30 PM 17 57 0 0 47 0 5 0 04:45 PM 26 53 0 I 0 44 - 0 ~- - 1 0 Total ~ - - - 88 202 0 0 181 - 0 - - _ -8 - 0 05:00 PM 18 48 0 1 0 44 0 3 0 05:15 PM 19 44 0 ~ 0 36 0 0 0 05:30 PM 10 39 0 0 43 0 1 0 05:45 PM 10 43 0 '~, 0 42 0 0 0 Total 57 174 0; 0 165 - 0; - 4 _ 0 Grand Total 145 376 0 ~ 0 346 0 12 0 Apprch % 27.8 72.2 0.0 ~ 0.0 100.0 0.0 '~i 6.4 0.0 Total % 13.7 35.6 0.0 ! 0.0 32.8 0.0 ' 1.1 0.0 Out In Total i 522 521 1043 145 376 Right Thru j ', i a~ ~~ T ~ ^ n s NoAh CrD 'J - 0/10/2002 4:00:00 M 0/10/2002 5:45:00 PM o: O ~ UrsFrfted I j j ~, T Left Thru ~ 0 346 386; 346, t 734; Out In Total WIL N EN RO ' untitled4 00001928 10/10/2002 1 Left Int. Total 1.0 27 132 18 142 31 157 16 140 92 571 19 132 16 115 25 118 24 119 84 484 176 1055 93.6 16.7 Heath & Associates Inc. Transportation Division 2214 Tacoma Road Puyallup, WA 98371 File Name : untitled4 Site Code :00001928 Start Date :10/10/2002 Page No : 2 T WILKENSEN RD WILKENSEN RD NP RD SE Southbound Northbound Eastbound Start Time Right Thru ~ Left pa~ A Right Thru Left o a~ Right Thru Left T o T Peak Hour From 04:00 PM to 05:45 PM -Peak 1 of 1 Intersection 04:00 PM Volume 88 202 0 290 0 181 0 181 8 0 92 Percent 30.3 69.7 0.0 0.0 100.0 0.0 8.0 0.0 92.0 04:30 Volume 17 57 0 74 0 47 0 47 5 0 31 Peak Factor High Int. 04:45 PM 04:15 PM 04:30 PM Volume 26 53 0 79 0 49 0 49 5 0 31 Peak Factor 0.918 0.923 Out In Total ~ 2731 r--290 _563 Ri gM Thru I ~~ r i I N ~ ~, O W North C O J - alazoo2 a:oo:oo PM ;= ~ alazoo2 a:a5:oo ~n m unsrYftea 0 t h i Left Thru 0 181. 210 181 L 3911 ~ Out In Total WILKEN EN RD APp. Int. Total Total 100 571 36 157 0.909 36 0.694 BENUM-COYNE YELM AVE & SR-507 EXISTING PM PEAK HOUR VOLUI~S 10/17/02 10:15:42 SIGNAL2000/TEAPAC[Ver 1.10.10] - HCM Input Worksheet Intersection # 0 - Area Location Type: NONCBD I I I I I I Key: VOLUMES -- > I 118 I 65 I 52 II I I WIDTHS I 0.0 112.0 112.0 II I v LANES I o f 1 1 1 II -------------------- I I I II \ 40 12.0 1 / I \ ------------------- /I\ -- 381 12.0 1 I ~~_--- -- -__- ------------------- I 144 12.0 1 / + / 194 12.0 1 North ------------------- __=_____=_---__= i 538 12.0 1 -- ------------------- \ I / ------------- 113 12.0 1 \ II ( I I -------------------- II 122 ( 78 I 183 I Phasing: SEQUENCE 44 I II 12.0 112.0 i 0.0 I PERMSV N N N N I I I 1 1 1 1 0 l OVERLP N N N N I II I I I LEADLAG LD LD SB WB NB EB RT TH LT RT TH LT RT TH LT RT TH LT Heavy veh, $HV 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Pk-hr fact, PHF .93 .93 .93 .91 .91 .91 .84 .84 .84 .93 .93 .93 Pretimed or Act A A A A A A A A A A A A Strtup lost, 11 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Ext eff qrn, a 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Arrival typ, AT 3 3 3 3 3 3 3 3 3 3 3 3 --------------- -------------- -------------- -------------- -------------- Ped vol, vped 0 0 0 0 Bike vol, vbic 0 0 0 0 Parking locatns NO NO NO NO Park mnvrs, Nm 0 0 0 0 Bus stops, NB 0 0 0 0 Grade, $G .0 .0 .0 .0 ------------------------------------------------------------------------- Sq 44 I Phase 1 1 Phase 2 1 Phase 3 1 Phase 4 1 Phase 5 1 Phase 6 1 I + I++ I I I 1 I I + 1++ I I ++++i I I I I 1 v I ****I I I I I I 1 1++++ v I I I 1 North I <* I **>I I****> i I I I * I ** I I++++ i I I I * I ** I I v I I I ------------------------------------------------------------------------- C=120"I G= 13.9" I G= 27.9" I G= 19.1" I G= 43.2" I G= 0.0" I G= 0.0" I I Y+R= 4.0" I Y+R= 9.0" I Y+R= 4.0" I Y+R= 4.0" I Y+R= 0.0" I Y+R= 0.0" I ------------------------------------------------------------------------- BENUM-COYNE YELM AVE 6 SR-507 EXISTING PM PEAR HOUR VOLUMES SIGNAL2000/TEAPAC[Ver 1.10.10] - HCM Volume Adjust & Satflow Worksheet Volume Adjustment Volume, V Pk-hr fact, PHF Adj my flow, vp --------------- Lane group, LG Adj LG flow, v Prop LT, PLT Prop RT, PRT --------------- Saturation Flow Rate Base satflo, so Number lanes, N Lane width, fW Heavy veh, fHV Grade, fg Parking, fp Bus block, fbb Area type, fa Lane util, fLU Left-turn, fLT Right-turn, fRT PedBike LT,fLpb PedBike RT,fRpb Local adjustmnt Adj satflow, s 10/17/02 10:15:42 SB WB RT TH LT RT TH LT 118 65 52 40 381 194 .93 .93 .93 .91 .91 .91 127 ----- 70 ----- 56 ---- 44 ----- 419 ----- 213 - RT+TH LT RT TH --- LT 197 56 44 419 213 .000 1.00 .000 .000 1.00 ----- .645 ----- .000 ---- 1.000 ----- .000 ----- .000 ---- SB RT TH LT 1900 1900 1 1 1.000 1.00 .980 .980 1.000 1.00 1.000 1.00 1.000 1.00 1.000 1.00 1.000 1.00 1.000 .950 .903 1.00 1.000 1.00 1.000 1.00 1.000 1.00 1683 1770 RT 1900 1 1.000 .980 1.000 1.000 1.000 1.000 1.000 1.000 .850 1.000 1.000 1.000 1583 WB TH LT 1900 1900 1 1 1.00 1.00 .980 .980 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 .950 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1863 1770 NB EB RT TH LT RT TH LT 183 78 122 113 538 144 .84 .84 .84 .93 .93 .93 218 ---- 93 ------ 145 ---- 122 ----- 578 - 155 RT+TH LT RT ---- TH ---- LT 311 145 122 578 155 .000 1.00 .000 .000 1.00 ----- .701 ----- .000 ---- 1.000 ----- .000 ----- .000 ---- NB RT TH 1900' 1 1.000 .980 1.000 1.000 1.000 1.000 1.000 1.000 .895 1.000 1.000 1.000 1667 LT 1900 1 1.00 .980 1.00 1.00 1.00 1.00 1.00 .950 1.00 1.00 1.00 1.00 1770 RT 1900 1 1.000 .980 1.000 1.000 1.000 1.000 1.000 1.000 .850 1.000 1.000 1.000 1583 EB TH LT 1900 1900 1 1 1.00 1.00 .980 .980 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 .950 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1863 1770 SIGNAL2000/TEAPAC[Ver 1.10.10] - HCM Capacity and LOS Worksheet Capacity Analysis Lane group, LG Adj Flow, v Satflow, s Lost time, tL Effect green, g Grn ratio, g/C LG capacity, c v/c ratio, X Flow ratio, v/s Crit lane group --------------- Sum Grit v/s,Yc Crit v/c, Xc SB WB NB EB RT TH LT RT TH LT RT TH LT RT TH LT RT+TH LT RT TH LT RT+TH LT RT TH LT 197 56 44 419 213 311 145 122 578 155 1683 1770 1583 1863 1770 1667 1770 1583 1863 1770 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 27.9 13.9 43.2 43.2 19.1 27.9 13.9 43.2 43.2 19.1 .232 .116 .360 .360 .159 .232 .116 .360 .360 .159 391 204 570 670 281 387 204 570 670 281 .504 .275 .077 .625 .758 ..804 .711 .214 .863 .552 .117 .032 .028 .225 .120 .187 .082 .077 .310 .088 -------------- -------------- -------------- -------------- 0.699 Total lost, L 16.0 .807 BENUM-coYNE 10/17/02 YELM AVE ~ SR-507 10:15:42 ERISTING PM PEAK HOUR VOLUMES SIGNAL2000/TEAPAC[Ver 1.10.10] - HCM Capacity and LOS Worksheet Delay SB WB NB EB and LOS RT TH LT RT TH LT RT TH LT RT TH LT Lane group, LG RT+TH LT RT TH LT RT+TH LT RT TH LT Adj Flow, v 197 56 44 419 213 311 145 122 578 155 LG capacity, c 391 204 570 670 281 387 204 570 670 281 v/c ratio, X .504 .275 .077 .625 .758 .804 .711 .214 .863 .552 Grn ratio, g/C .232 .116 .360 .360 .159 .232 .116 .360 .360 .159 Unif delay, dl 40.0 48.5 25.3 31.7 48.3 43.5 51.1 26.6 35.7 46.5 Incr calib, k .11 .11 .11 .21 .31 .35 .27 .11 .39 .15 Incr delay, d2 1.1 .7 .1 1.8 11.3 11.7 11.0 .2 11.2 2.3 Queue Delay, d3 .0 .0 .0 .0 .0 .0 .0 .0 .0 .0 Unif delay, dl* .0 .0 .0 .0 .0 .0 .0 .0 .0 .0 Proq factor, PF 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Contrl delay, d 41.1 49.2 25.3 33.6 59.6 55.1 62.1 26.8 46.9 48.9 Lane group LOS D+ D C+ C E+ E+ E+ C+ D D Final Queue,Qbi 0 0 --- 0 ----- 0 --- - 0 - 0 0 0 0 0 --------------- Appr delay, dA ---------- 42.9 - - 41.2 --- ---------- 57.4 ---- ----- ---- 44.4 ----- Approach LOS D+ D+ E+ D+ Appr flow, vA --------------- 253 ---------- ---- ----- 676 ----- ---- 456 ---------- ---- ----- 855 ---- ----- Intersection: Delay 45.9 LOS D BENUM-co7tNE YELM AVE & SR-507 EXISTING PM PEAK HOUR VOLUMES SIGNAL2000/TEAPAC[Ver 1.10.10] - HCM Back of Queue Worksheet Queues in Worst Lanes Lane group, LG Init queue, QbL Ln flow, vL Ln satflow, sL Ln capacity, cL Flow ratio, yL v/c ratio, XL Effect green, g Grn ratio, g/C Upstr filter, I Grn arrivals, P Platn ratio, RP Prog factr, PF2 Queue (1st) , Q1 Queue factr, kB Queue (2nd) , Q2 Avg queue, Q --------------- 90~ factor, fB 90$ queue, Qp Avg spacing, Lh Avail storg, La Avg distance Avg ratio, RQ 90~ distance 90~ ratio, RQp SB RT TH LT RT+TH LT 0 0 197 56 1683 1770 391 204 .117 .032 .504 .275 27.9 13.9 .232 .116 1.00 1.00 .23 .12 1.00 1.00 1.00 1.00 5.7 1.7 .47 .32 .5 .1 6.2 1.8 -------------- 1.69 1.77 10.5 3.2 25.3 25.3 0 0 156 46 .00 .00 265 81 .00 .00 WB RT TH LT RT TH LT 0 0 0 44 419 213 1583 1863 1770 570 670 281 .028 .225 .120 .077 .625 .758 43.2 43.2 19.1 .360 .360 .159 1.00 1.00 1.00 .36 .36 .16 1.00 1.00 1.00 1.00 1.00 1.00 1.0 11.5 6.8 .58 .64 .38 .0 1.0 1.1 1.0 12.6 7.9 -------------- 1.78 1.61 1.67 1.8 20.3 13.1 25.3 25.3 25.3 0 0 0 26 318 199 .00 .00 .00 46 513 332 .00 .00 .00 NB RT TH LT RT+TH LT 0 0 311 145 1667 1770 387 204 .187 .082 .804 .711 27.9 13.9 .232 .116 1.00 1.00 .23 .12 1.00 1.00 1.00 1.00 9.8 4.7 .46 .32 1.6 .7 11.4 5.4 1.63 1.71 18.5 9.2 25.3 25.3 0 0 289 136 .00 .00 469 232 .00 .00 10/17/02 10:15:42 EB RT TH LT RT TH LT 0 0 0 122 578 155 1583 1863 1770 570 670 281 .077 .310 .088 .214 .863 .552 43.2 43.2 19.1 .360 .360 .159 1.00 1.00 1.00 .36 .36 .16 1.00 1.00 1.00 1.00 1.00 1.00 2.8 17.9 4.8 .58 .64 .38 .2 3.2 .5 3.0 21.1 5.2 -------------- 1.74 1.59 1.71 5.2 32.4 8.9 25.3 25.3 25.3 0 0 0 75 533 132 .00 .00 .00 132 820 226 .00 .00 .00 BENUM-COYNE YELM AVE & SR-507 ERISTING PM PEAK HOUR VOLUMES SIGNAL2000/TEAPAC[Ver 1.10.10] - Evaluation of Intersection Performance 10/17/02 10:15:42 ------------------------------------------------- Sq 44 I Phase 1 1 Phase 2 1 Phase 3( Phase 4 1 I + I++ I I 1 I + I + + I I ++++I I I I v I ****I I I I I I++++ v I I North I <* I * *>I I****> I I i * I ** I i++++ I I * I ** I I ~ I ------------------------------------------------- I G/C=0.116 I G/C=0.232 I G/C=0.159 I G/C=0.360 I I G= 13.9" I G= 27.9" ( G= 19.1" I G= 43.2" I I Y+R= 4.0" I Y+R= 4.0" I Y+R= 4.0" I Y+R= 4.0" I i OFF= 0.0~ I OFF=14.9 I OFF=41.5 I OFF=60.7 I ------------------------------------------------- C=120 sec G=104.0 sec = 86.7 Y=16.0 sec = 13.3 Ped= 0.0 sec = 0.0~ MVMT TOTALS Param:Units AdjVol: vph Wid/Ln:ft/# q/C Rqd@C:~ g/C Used: ~ SV @E: vph Svc Lv1:LOS Deg Sat:v/c HCM Delis/v Tot Del:min # Stops:veh Queue l:veh Queue 1: ft APPR TOTALS Param:Units AdjVol: vph Svc Lv1:LOS Deg Sat:v/c HCM Delis/v Tot Del:min # Stops:veh Queue l:veh Queue 1: ft SB Approach WB Approach NB Approach EB Approach Int RT TH LT RT TH LT RT TH LT RT TH LT Total 127 70 56 44 419 213 218 93 145 122 578 155 2240 0/0 12/1 12/1 12/1 12/1 12/1 0/0 12/1 12/1 12/1 12/1 12/1 0 29 25 25 35 29 0 33 27 27 41 27 0 23 12 36 36 16 0 23 12 36 36 16 0 375 175 570 670 255 0 371 175 570 670 255 4086 D+ D C+ C E+ E+ E+ C+ D D D 0.00 0.50 0.28 0.08 0.63 0.76 0.00 0.80 0.71 0.21 0.86 0.55 0.67 0.0 41.1 49.2 25.3 33.6 59.6 0.0 55.1 62.1 26.8 46.9 48.9 45.9 0 34 11 5 59 53 0 71 38 14 113 32 430 0 43 13 7 87 51 0 73 35 21 134 36 500 0 10 3 2 20 13 0 19 9 5 32 9 32 0 265 81 46 513 332 0 469 232 132 820 226 820 Int SB Approach WB Approach NB Approach EB Approach Total 253 676 456 Y 855 N~ 2240 ---------- ----- D+ D+ E+ D+ D 0.45 0.63 0.77 0.71 0.67 42.9 41.2 57.4 44.4 45.9 45 117 109 159 430 56 145 108 191 500 10 20 19 32 32 265 513 469 820 820 BENUM-COYNE YELM AVE ~ SR-507 2006 PM PEAK HOUR VOLUMES WITHOUT PROJECT SIGNAL2000/TEAPAC[Ver 1.10.10] - HCM Input Worksheet Intersection # 0 - i I II 188 ( 92 ( 89 II 0.0 112.0 i 12.0 II 0 1 1 1 1 11 i i Ii / I \ 176 12.0 1 / ---------- 616 ------ 12.0 --- 1 -- ---------- 172 ---------- ------ 12.0 ------ --- 1 --- \ - I I I 10/17/02 10:18:04 Area Location Type: NONCBD I Key: VOLUMES -- > I I WIDTHS I v LANES -------------------- \ 53 12.0 1 ------------------- -- 439 12.0 1 ------------------- / 253 12.0 1 \ I II i i II 167 I 99 I II 12.0 112.0 I II 1 I 1 I II I I I 231 I Phasing: 0.0 I o I I SB WB NB RT TH LT RT TH LT RT TH LT Heavy veh, $HV 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Pk-hr fact, PHF .93 .93 .93 .91 .91 .91 .84 .84 .84 Pretimed or Act A A A A A A A A A Strtup lost, 11 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Ext eff grn, a 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Arrival typ, AT 3 3 3 -- 3 ----- 3 ----- 3 ---- 3 ----- 3 ----- 3 ---- --------------- Ped vol, vped ----- ----- 0 -- 0 0 Bike vol, vbic 0 0 0 Parking locates NO NO NO Park mnvrs, Nm 0 0 0 Bus stops, NB 0 0 0 Grade, ~G .0 .0 .0 /I\ I I North I SEQUENCE 44 PERMSV N N N N OVERLP N N N N LEADLAG LD LD EB RT TH LT 2.0 2.0 2.0 .93 .93 .93 A A A 2.0 2.0 2.0 2.0 2.0 2.0 3 3 3 ----- ----- 0 ---- 0 NO 0 0 .0 ------------------------------------------------------------------------- Sq 49 I Phase 1 1 Phase 2 1 Phase 3 1 Phase 4 1 Phase 5 1 Phase 6 I I + I++ I I I I I . I + I++ I I ++++I I I I I I v I ****I I I I I I I I++++ v I I I I North I <* I **>I I****> I I I I I * I ** I I++++ I I I I * I ** I I v I I I ------------------------------------------------------------------------- C=120"I G= 13.6" I G= 28.5" I G= 19.0" I G= 42.9" I G= 0.0" I G= 0.0" I I Y+R= 4.0" I Y+R= 4.0" I Y+R= 4.0" I Y+R= 4.0" I Y+R= 0.0" I Y+R= 0.0" I ------------------------------------------------------------------------- BENUM-COYNE YELM AVE & SR-507 2006 PM PEAR HOUR VOLUMES WITHOUT PROJECT SIGNAL2000/TEAPAC[Ver 1.10.10] - HCM Volume Adjust & Satflow Worksheet Volume Adjustment Volume, V Pk-hr fact, PHF Adj my flow, vp --------------- Lane group, LG Adj LG flow, v Prop LT, PLT Prop RT, PRT --------------- Saturation Flow Rate Base satflo, so Number lanes, N Lane width, fW Heavy veh, fHV Grade , fq Parking, fp Bus block, fbb Area type, fa Lane util, fLU Left-turn, fLT Right-turn, fRT PedBike LT,fLpb PedBike RT,fRpb Local adjustmnt Adj satflow, s SB WB RT TH LT RT TH LT 188 92 89 53 439 253 .93 .93 .93 .91 .91 .91 202 99 ------ 96 --- 58 ----- 482 ----- 278 ---- ----- RT+TH LT RT TH LT 301 96 58 482 278 .000 1.00 .000 .000 1.00 .671 .000 1.000 .000 .000 --------- -------------- SB RT TH 1900 1 l.ooo .980 1.000 1.000 1.000 1.000 1.000 1.000 .899 1.000 1.000 1.000 1675 LT 1900 1 l.oo .980 1.00 1.00 1.00 1.00 1.00 .950 1.00 1.00 1.00 1.00 1770 RT 1900 1 1.000 .980 1.000 1.000 1.000 1.000 1.000 1.000 .850 1.000 1.000 1.000 1583 WB TH LT 1900 1900 1 1 1.00 1.00 .980 .980 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 .950 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1863 1770 10/17/02 10:18:04 NB EB RT TH LT RT TH LT 231 99 167 172 616 176 .84 .84 .84 .93 .93 .93 275 ----- 118 ----- 199 ---- 185 ----- 662 ----- 189 ---- RT+TH LT RT TH LT 393 199 185 662 189 .000 1.00 .000 .000 1.00 ----- .700 ----- .000 ---- 1.000 ----- .000 ----- .000 ---- NB RT TH LT EB RT TH LT 1900 1900 1900 1900 1900 1 1 1 1 1 l.ooo l.oo l.ooo l.oo l.oo .980 .980 .980 .980 .980 1.000 1.00 1.000 1.00 1.00 1.000 1.00 1.000 1.00 1.00 1.000 1.00 1.000 1.00 1.00 1.000 1.00 1.000 1.00 1.00 1.000 1.00 1.000 1.00 1.00 1.000 .950 1.000 1.00 .950 .895 1.00 .850 1.00 1.00 1.000 1.00 1.000 1.00 1.00 1.000 1.00 1.000 1.00 1.00 1.000 1.00 1.000 1.00 1.00 1667 1770 1583 1863 1770 SIGNAL2000/TEAPAC[Ver 1.10.10] - HCM Capacity and LOS Worksheet Capacity Analysis Lane group, LG Adj Flow, v Satflow, s Lost time, tL Effect green, g Grn ratio, g/C LG capacity, c v/c ratio, X Flow ratio, v/s Crit lane group --------------- Sum Grit v/s,Yc Crit v/c, Xc SB RT TH LT RT+TH LT 301 96 1675 1770 4.0 4.0 28.5 13.6 .237 .113 398 200 .756 .480 .180 .054 -------------- 0.861 .993 WB RT TH LT RT TH LT 58 482 278 1583 1863 1770 4.0 4.0 4.0 42.9 42.9 19.0 .358 .358 .158 567 667 280 .102 .723 .993 .037 .259 .157 -------------- Total lost, L NB RT TH LT RT+TH LT 393 199 1667 1770 4.0 4.0 28.5 13.6 .237 .113 396 200 .992 .995 .236 .112 -------------- 16.0 EB RT TH LT RT TH LT 185 662 189 1583 1863 1770 4.0 4.0 4.0 42.9 42.9 19.0 .358 .358 .158 567 667 280 .326 .993 .675 .117 .355 .107 BENUM-COYNE YELM AVE 6 SR-507 2006 PM PEAK HOUR VOLUMES WITHOUT PROJECT SIGNAL2000/TEAPAC[Ver 1.10.10] - HCM Capacity and LOS Worksheet Delay and LOS SB RT TH LT WB RT TH LT RT TH LT 58 482 278 567 667 280 .102 .723 .993 .358 .358 .158 25.7 33.4 50.4 .11 .28 .49 .1 3.9 51.7 .0 .0 .0 .0 .0 .0 1.00 1.00 1.00 25.8 37.2 102 C+ D+ F 0 0 0 -------------- 58.5 E+ 818 NB RT TH LT Lane group, LG Adj Flow, v LG capacity, c v/c ratio, X Grn ratio, g/C Unif delay, d1 Incr calib, k Incr delay, d2 Queue Delay, d3 Unif delay, dl* Prog factor, PF Contrl delay, d Lane group LOS Final Queue,Qbi --------------- Appr delay, dA Approach LOS Appr flow, vA Intersection: RT+TH LT 301 96 398 200 .756 .480 .237 .113 42.5 49.9 .31 .11 8.1 1.8 .0 .0 .0 .0 1.00 1.00 50.6 51.7 D D 0 0 --------- 50.9 ----- D 397 --------- Delay ----- 66.3 LOS E+ RT+TH LT 393 199 396 200 .992 .995 .237 .113 45.7 53.2 .49 .50 43.1 62.1 .0 .0 .0 .0 1.00 1.00 88.8 115 F F 0 0 97.7 F 5 92 -------------- 10/17/02 10:18:04 EB RT TH LT RT TH LT 185 662 189 567 667 280 .326 .993 .675 .358 .358 .158 28.0 38.4 47.6 .11 .49 .25 .3 32.9 6.3 .0 .0 .0 .0 .0 .0 1.00 1.00 1.00 28.3 71.2 53.9 C E D 0 0 0 -------------- 60.4 E+ 1036 -------------- BENUM-COYNE YELM AVE & SR-507 2006 PM PEAR HOUR VOLUMES WITHOUT PROJECT SIGNAL2000/TEAPAC[Ver 1.10.10 - HCM Back of Queue Worksheet Queues in Worst Lanes Lane group, LG Init queue, QbL Ln flow, vL Ln satflow, sL Ln capacity, cL Flow ratio, yL v/c ratio, XL Effect green, g Grn ratio, g/C Upstr filter, I Grn arrivals, P Platn ratio, RP Prog factr, PF2 Queue (1st) , Q1 Queue factr, kB Queue (2nd) , Q2 Avg queue, Q --------------- 90~ factor, fB 90~ queue, Qp Avg spacing, Lh Avail storg, La Avg distance Avg ratio, RQ 90~ distance 90~ ratio, RQp SB RT TH LT RT+TH LT 0 0 301 96 1675 1770 398 200 .180 .054 .756 .480 28.5 13.6 .237 .113 1.00 1.00 .24 .11 1.00 1.00 1.00 1.00 9.3 3.0 .47 .31 1.3 .3 10.6 3.3 -------------- 1.63 1.74 17.4 5.7 25.3 25.3 0 0 269 83 .00 .00 440 144 .00 .00 WB RT TH LT RT TH LT 0 0 0 58 482 278 1583 1863 1770 567 667 280 .037 .259 .157 .102 .723 .993 42.9 42.9 19.0 .358 .358 .158 1.00 1.00 1.00 .36 .36 .16 1.00 1.00 1.00 1.00 1.00 1.00 1.3 13.9 9.3 .58 .64 .38 .1 1.6 3.5 1.4 15.5 12.8 -------------- 1.77 1.58 1.61 2.4 24.5 20.6 25.3 25.3 25.3 0 0 0 34 392 323 .00 .00 .00 61 621 521 .00 .00 .00 NB RT TH LT RT+TH LT 0 0 393 199 1667 1770 396 200 .236 .112 .992 .995 28.5 13.6 .237 .113 1.00 1.00 .24 .11 1.00 1.00 1.00 1.00 13.1 6.6 .47 .31 4.6 2.7 17.7 9.4 -------------- 1.57 1.65 27.7 15.4 25.3 25.3 0 0 448 237 .00 .00 701 391 .00 .00 10/17/02 10:18:04 EB RT TH LT RT TH LT 0 0 0 185 662 189 1583 1863 1770 567 667 280 .117 .355 .107 .326 .993 .675 42.9 42.9 19.0 .358 .358 .158 1.00 1.00 1.00 .36 .36 .16 1.00 1.00 1.00 1.00 1.00 1.00 4.5 22.0 5.9 .58 .64 .38 .3 7.0 .7 4.8 29.0 6.7 -------------- 1.72 1.49 1.69 8.2 43.3 11.3 25.3 25.3 25.3 0 0 0 121 733 169 .00 .00 .00 207 1095 285 .00 .00 .00 BENUM-COYNE 10/17/02 YELM AVE & SR-507 10:18:04 2006 PM PEAK HOUR VOLUMES WITHOUT PROJECT SIGNAL2000/TEAPAC[Ver 1.10.10] - Evaluation of Intersection Performance ------------------------------------------------- Sq 44 i Phase 1 1 Phase 2 1 Phase 3 1 Phase 4 1 I + I++ i I I I + I + + I I ++++I I 1 I v I ****I I I I I I++++ v I I North I <* I * *>I I****> I i I * i ** I I++++ I I * I ** I i v I ------------------------------------------------- I G/C=0.113 I G/C=0.237 I G/C=0.158 ( G/C=0.358 I I G= 13.6" I G= 28.5" I G= 19.0" I G= 42.9" I I Y+R= 4.0" I Y+R= 4.0" I Y+R= 4.0" I Y+R= 4.0" I I OFF= 0.0$ I OFF=14.7 I OFF=41.7 I OFF=60.9$ I ------------------------------------------------- C=120 sec G=104.0 sec = 86.7 Y=16.0 sec = 13.3 Ped= 0.0 sec = 0.0~ MVMT TOTALS SB Approach WB Approach NB Approach EB Approach Int Param:Units RT TH LT RT TH LT RT TH LT RT TH LT Total AdjVol: vph 202 99 96 58 482 278 275 118 199 185 662 189 2843 Wid/Ln:ft/# 0/0 12/1 12/1 12/1 12/1 12/1 0/0 12/1 12/1 12/1 12/1 12/1 g/C Rqd@C:~ 0 32 26 25 37 31 0 36 29 29 44 28 g/C Used: ~ 0 24 11 36 36 16 0 24 11 36 36 16 SV @E: vph 0 383 171 567 667 254 0 381 171 567 667 254 4082 ----------- -------------- -------------- -------------- -------------- ----- Svc Lv1:LOS D D C+ D+ F F F C E D E+ Deg Sat:v/c 0.00 0.76 0.48 0.10 0.72 0.99 0.00 0.99 1.00 0.33 0.99 0.68 0.82 HCM Delis/v 0.0 50.6 51.7 25.8 37.2102.2 0.0 88.8115.3 28.3 71.2 53.9 66.3 Tot Del:min 0 64 21 6 75 118 0 145 96 22 196 42 785 # Stops:veh 0 70 23 10 104 69 0 98 50 34 165 45 668 ----------- -------------- -------------- -------------- -------------- ----- Queue l:veh 0 17 6 2 25 21 0 28 15 8 43 11 43 Queue 1: ft 0 440 144 61 621 521 0 701 391 207 1095 285 1095 APPR TOTALS Int Param:Units SB Approach WB Approach NB Approach EB Approach Total AdjVol: vph 397 818 592 1036 2843 ----------- -------------- -------------- -------------- -------------- ----- Svc Lv1:LOS D E+ F E+ E+ Deg Sat:v/c 0.69 0.77 0.99 0.82 0.82 HCM Delis/v 50.9 58.5 97.7 60.4 66.3 Tot Del:min 85 199 241 260 785 # Stops:veh 93 183 148 244 668 ----------- -------------- -------------- -------------- -------------- ----- Queue l:veh 17 25 28 43 43 Queue 1: ft 440 621 701 1095 1095 BENUM-COYNE YELM AVE & SR-507 2006 PM PEAK HOUR VOLUMES WITH PROJECT SIGNAL2000/TEAPAC[Ver 1.10.10] - HCM Input Worksheet Intersection # 0 - I I II 203 I 100 I 93 II 0.0 112.0 112.0 II 0 1 1 1 1 II I I II / I \ N_N 204 12.0 1 / ---------- 616 ------ 12.0 --- 1 -- ---------- 172 ---------- ------ 12.0 ------ --- 1 --- \ - I I I Heavy veh, ~HV Pk-hr fact, PHF Pretimed or Act Strtup lost, 11 Ext eff grn, e Arrival typ, AT --------------- Ped vol, vped Bike vol, vbic Parking locates Park mnvrs, Nm Bus stops, NB Grade, ~G \ I 10/17/02 10:19:45 Area Location Type: NONCBD i Key: VOLUMES -- > I I WIDTHS I v LANES \ ------ 60 ------ 12.0 -------- 1 -- ----- 439 ------ 12.0 -------- 1 / ----- 253 ------ 12.0 -------- 1 II I I II 167 I 113 I II 12.0 112.0 I II 1 I 1 I II I I SB RT TH LT 2.0 2.0 2.0 .93 .93 .93 A A A 2.0 2.0 2.0 2.0 2.0 2.0 3 3 3 ----- ----- 0 ---- 0 NO 0 0 .0 wB I 231 I Phasing: 0.0 I o I I RT TH LT 2.0 2.0 2.0 .91 .91 .91 A A A 2.0 2.0 2.0 2.0 2.0 2.0 3 3 3 ----- ----- 0 ---- 0 NO 0 0 .0 NB RT TH LT 2.0 2.0 2.0 .84 .84 .84 A A A 2.0 2.0 2.0 2.0 2.0 2.0 3 3 3 ----- ----- 0 ---- 0 NO 0 0 .0 /I\ I I North I SEQUENCE 44 PERMSV N N N N OVERLP N N N N LEADLAG LD LD EB RT TH LT 2.0 2.0 2.0 .93 .93 .93 A A A 2.0 2.0 2.0 2.0 2.0 2.0 3 3 - 3 -- ----- --- - 0 -- 0 NO 0 0 .0 ------------------------------------------------------------------------- Sq 44 I Phase 1 1 Phase 2 1 Phase 3 1 Phase 4 1 Phase 5 1 Phase 6 1 I + I++ I I I I I . I + I++ I I ++++i I I I i I ~ I **** I I I I I I I I++++ v I I I i North I <* I **>I I****> ( I I I I * I ** I i++++ I I I I * I ** I I v I I I ------------------------------------------------------------------------- C=120"i G= 13.4" I G= 29.3" I G= 18.8" I G= 42.5" I G= 0.0" I G= 0.0" I I Y+R= 4.0" I Y+R= 4.0" I Y+R= 4.0" I Y+R= 4.0" I Y+R= 0.0" I Y+R= 0.0" I ------------------------------------------------------------------------- BENUM-COYNE YELM AVE & SR-507 2006 PM PEAK HOUR VOLUMES WITH PROJECT SIGNAL2000/TEAPAC[Ver 1.10.10] - HCM Volume Adjust & Satflow Worksheet Volume SB WB Adjustment RT TH LT RT TH LT Volume, V 203 100 93 60 439 253 Pk-hr fact, PHF .93 .93 .93 .91 .91 .91 Adj my flow, vp 218 108 -------- 100 ---- 66 ----- 482 ----- 278 ---- --------------- Lane group, LG -- RT+TH LT RT TH LT Adj LG flow, v 326 100 66 482 278 Prop LT, PLT .000 1.00 .000 .000 1.00 Prop RT, PRT --------------- .669 ---------- .000 ---- 1.000 ----- .000 ----- .000 ---- Saturation SB WB Flow Rate RT TH LT RT TH LT Base satflo, so 1900 1900 1900 1900 1900 Number lanes, N 1 1 1 1 1 Lane width, fW 1.000 1.00 1.000 1.00 1.00 Heavy veh, fHV .980 .980 .980 .980 .980 Grade, fg 1.000 1.00 1.000 1.00 1.00 Parking, fp 1.000 1.00 1.000 1.00 1.00 Bus block, fbb 1.000 1.00 1.000 1.00 1.00 Area type, fa 1.000 1.00 1.000 1.00 1.00 Lane util, fLU 1.000 1.00 1.000 1.00 1.00 Left-turn, fLT 1.000 .950 1.000 1.00 .950 Right-turn, fRT .900 1.00 .850 1.00 1.00 PedBike LT,fLpb 1.000 1.00 1.000 1.00 1.00 PedBike RT,fRpb 1.000 1.00 1.000 1.00 1.00 Local adjustmnt 1.000 1.00 1.000 1.00 1.00 Adj satflow, s 1676 1770 1583 1863 1770 10/17/02 10:19:45 NB EB RT TH LT RT TH LT 231 113 167 172 616 204 .84 .84 .84 .93 .93 .93 275 ---- 135 ------ 199 ---- 185 ----- 662 --- 219 RT+TH LT RT -- TH ---- LT 410 199 185 662 219 .000 1.00 .000 .000 1.00 ---- .671 ------ .000 ---- 1.000 ----- .000 ----- .000 ---- NB EB RT TH LT RT TH LT 1900 1900 1900 1900 1900 1 1 1 1 1 1.000 1.00 1.000 1.00 1.00 .980 .980 .980 .980 .980 1.000 1.00 1.000 1.00 1.00 1.000 1.00 1.000 1.00 1.00 1.000 1.00 1.000 1.00 1.00 1.000 1.00 1.000 1.00 1.00 1.000 1.00 1.000 1.00 1.00 1.000 .950 1.000 1.00 .950 .899 1.00 .850 1.00 1.00 1.000 1.00 1.000 1.00 1.00 1.000 1.00 1.000 1.00 1.00 1.000 1.00 1.000 1.00 1.00 1675 1770 1583 1863 1770 SIGNAL2000/TEAPAC[Ver 1.10.10] - HCM Capacity and LOS Worksheet Capacity Analysis Lane group, LG Adj Flow, v Satflow, s Lost time, tL Effect green, g Grn ratio, g/C LG capacity, c v/c ratio, X Flow ratio, v/s Crit lane group --------------- Sum Grit v/s,Yc Crit v/c, Xc SB _ RT TH LT RT+TH LT 326 100 1676 1770 4.0 4.0 29.3 13.4 .244 .112 409 198 .797 .505 .195 .057 -------------- 0.870 1.003 WB RT TH LT RT TH LT 66 482 278 1583 1863 1770 4.0 4.0 4.0 42.5 42.5 18.8 .354 .354 .157 561 660 277 .118 .730 1.00 .042 .259 .157 -------------- Total lost, L NB RT TH LT RT+TH LT 410 199 1675 1770 4.0 4.0 29.3 13.4 .244 .112 409 198 1.002 1.01 .245 .112 EB RT TH LT -------------- 16.0 RT TH LT 185 662 219 1583 1863 1770 4.0 4.0 4.0 42.5 42.5 18.8 .354 .354 .157 561 660 277 .330 1.00 .791 .117 .355 .124 BENUM-COYNE YELM AVE & SR-507 2006 PM PEAK HOUR VOLUMES WITH PROJECT SIGNAL2000/TEAPAC[Ver 1.10.10] - HCM Capacity and LOS Worksheet Delay and LOS Lane group, LG Adj Flow, v LG capacity, c v/c ratio, X Grn ratio, g/C Unif delay, dl Incr calib, k Incr delay, d2 Queue Delay, d3 Unif delay, dl* Prog factor, PF Contrl delay, d Lane group LOS Final Queue,Qbi --------------- Appr delay, dA Approach LOS Appr flow, vA --------------- Intersection: SB RT TH LT RT+TH LT 326 100 409 198 .797 .505 .244 .112 42.6 50.1 .34 .11 10.6 2.1 .0 .0 .0 .0 1.00 1.00 53.2 52.2 D D 0 0 -------------- 52.9 D 426 -------------- Delay 68.7 WB RT TH LT RT TH LT 66 482 278 561 660 277 .118 .730 1.00 .354 .354 .157 26.1 33.8 50.6 .11 .29 .50 .1 4.1 55.0 .0 .0 .0 .0 .0 .0 1.00 1.00 1.00 26.2 37.9 106 C+ D+ F 0 0 0 -------------- 59.7 E+ 826 -------------- LOS E NB RT TH LT RT+TH LT 410 199 409 198 1.002 1.01 .244 .112 45.4 53.3 .50 .50 45.1 65.3 .0 .0 .0 .0 1.00 1.00 90.5 119 F F 0 0 -------------- 99.6 F 609 -------------- 10/17/02 10:19:45 EB RT TH LT RT TH LT 185 662 219 561 660 277 .330 1.00 .791 .354 .354 .157 28.3 38.8 48.7 .11 .50 .34 .3 35.8 14.3 .0 .0 .0 .0 .0 .0 1.00 1.00 1.00 28.7 74.5 63.1 C E E+ 0 ----- 1 --- 0 -- 64.2 ---- E+ ----- 1066 ----- ---- BENUM-COYNE YELM AVE ~ SR-507 2006 PM PEAK HOUR VOLUMES WITH PROJECT SIGNAL2000/TEAPAC[Ver 1.10.10] - HCM Back of Queue Worksheet Queues in SB WB NB Worst Lanes RT TH LT RT TH LT RT TH LT Lane group, LG Init queue, QbL Ln flow, vL Ln satflow, sL Ln capacity, cL Flow ratio, yL v/c ratio, XL Effect green, g Grn ratio, g/C Upstr filter, I Grn arrivals, P Platn ratio, Rp Prog factr, PF2 Queue (1st) , Q1 Queue factr, k8 Queue (2nd) , Q2 Avg queue, Q --------------- 90~ factor, fB 90~ queue, Qp Avg spacing, Lh Avail storg, La Avg distance Avg ratio, RQ 90~ distance 90~ ratio, RQp RT+TH LT 0 0 326 100 1676 1770 409 198 .195 .057 .797 .505 29.3 13.4 .244 .112 1.00 1.00 .24 .11 1.00 1.00 1.00 1.00 10.2 3.1 .48 .31 1.6 .3 11.8 3.4 -------------- 1.62 1.74 19.2 6.0 25.3 25.3 0 0 299 87 .00 .00 485 151 .00 .00 RT TH LT 0 0 0 66 482 278 1583 1863 1770 561 660 277 .042 .259 .157 .118 .730 1.00 42.5 42.5 18.8 .354 .354 .157 1.00 1.00 1.00 .35 .35 .16 1.00 1.00 1.00 1.00 1.00 1.00 1.5 14.0 9.3 .58 .64 .38 .1 1.6 3.7 1.6 15.6 13.0 -------------- 1.77 1.58 1.61 2.8 24.7 20.9 25.3 25.3 25.3 0 0 0 39 395 328 .00 .00 .00 70 625 528 .00 .00 .00 RT+TH LT 0 0 410 199 1675 1770 409 198 .245 .112 1.002 1.01 29.3 13.4 .244 .112 1.00 1.00 .24 .11 1.00 1.00 1.00 1.00 13.7 6.6 .48 .31 5.0 2.8 18.7 9.5 -------------- 1.56 1.65 29.1 15.6 25.3 25.3 0 0 473 240 .00 .00 736 395 .00 .00 10/17/02 10:19:45 EB RT TH LT RT TH LT 0 0 0 185 662 219 1583 1863 1770 561 660 277 .117 .355 .124 .330 1.00 .791 42.5 42.5 18.8 .354 .354 .157 1.00 1.00 1.00 .35 .35 .16 1.00 1.00 1.00 1.00 1.00 1.00 4.5 22.1 7.0 .58 .64 .38 .3 7.4 1.2 4.8 29.5 8.3 -------------- 1.71 1.49 1.66 8.2 43.9 13.7 25.3 25.3 25.3 0 0 0 121 745 209 .00 .00 .00 208 1112 348 .00 .00 .00 BENUM-COYNE 10/17/02 YELM AVE ~ SR-507 10:19:45 2006 PM PEAK HOUR VOLUMES WITH PROJECT SIGNAL2000/TEAPAC[Ver 1.10.10] - Evaluation of Intersection Performance ------------------------------------------------- Sq 44 I Phase 1 1 Phase 2 1 Phase 3 1 Phase 4 1 I + I++ I I ^ I . I + I + + I i ++++I I I I v I ****I I I I I I++++ v I I North I <* I * *>i I****> I I I * I ** i I++++ I I * I ** I I v I ------------------------------------------------- I G/C=0.112 I G/C=0.244 I G/C=0.157 I G/C=0.354 I i G= 13.4" I G= 29.3" ( G= 18.8" I G= 42.5" i I Y+R= 4.0" I Y+R= 4.0" ( Y+R= 4.0" I Y+R= 4.0" I I OFF= 0.0~ I OFF=14.5 ( OFF=42.3 I OFF=61.3$ I ------------------------------------------------- C=120 sec G=104.0 sec = 86.7 Y=16.0 sec = 13.3 Ped= 0.0 sec = 0.0~ MVMT TOTALS SB Approach WB Approach NB Approach EB Approach Int Param:Units RT TH LT RT TH LT RT TH LT RT TH LT Total AdjVol: vph 218 108 100 66 482 278 275 135 199 185 662 219 2927 Wid/Ln:ft/# 0/0 12/1 12/1 12/1 12/1 12/1 0/0 12/1 12/1 12/1 12/1 12/1 g/C Rqd@C:~ 0 33 26 25 37 31 0 36 29 29 44 29 g/C Used: ~ 0 24 11 35 35 16 0 24 11 35 35 16 SV @E: vph 0 395 169 561 660 251 0 395 169 561 660 251 4072 ----------- -------------- -------------- -------------- -------------- ----- Svc Lv1:LOS D D C+ D+ F F F C E E+ E Deg Sat:v/c 0.00 0.80 0.50 0.12 0.73 1.00 0.00 1.00 1.00 0.33 1.00 0.79 0.84 HCM Delis/v 0.0 53.2 52.2 26.2 37.9105.6 0.0 90.5118.5 28.7 74.5 63.1 68.7 Tot Del:min 0 72 22 7 76 122 0 155 98 22 206 58 838 # Stops:veh 0 77 24 11 105 69 0 102 49 34 165 53 689 ----------- -------------- -------------- -------------- -------------- ----- Queue l:veh 0 19 6 3 25 21 0 29 16 8 44 14 44 Queue 1: ft 0 485 151 70 625 528 0 736 395 208 1112 348 1112 APPR TOTALS Int Param:Units SB Approach WB Approach NB Approach EB Approach Total AdjVol: vph 426 826 609 1066 2927 ----------- -------------- -------------- -------------- -------------- ----- Svc Lvl:LO5 D E+ F E+ E Deg Sat:v/c 0.73 0.77 1.00 0.84 0.84 HCM Delis/v 52.9 59.7 99.6 64.2 68.7 Tot Del:min 94 205 253 286 838 # Stops:veh 101 185 151 252 689 ----------- -------------- -------------- -------------- -------------- ----- Queue l:veh 19 25 29 44 44 Queue 1: ft 485 625 736 1112 1112 TWO-WAY STOP CONTROL SUMMARY eneral Information ite Information alyst gency/Co. ate Performed al sis Time Period 10/17/2002 PM PK HR ntersedion urisdiction alysis Year 2002 EXISTING ro'ect Descri lion ast/West Street: RAILWAY orth/South Street: RHOTON Intersedion Orientation: North-South tud Period hrs : 0.25 ehicle Volumes and Ad'ustments a'or Street Northbound Southbound ovement 1 2 3 4 5 6 L T R L T R olume 0 159 74 6 123 0 eak-Hour Factor, PHF 0.90 0.87 0.87 0.90 0.84 0.90 ouriy Flow Rate, HFR 0 182 85 6 146 0 ercent Heavy Vehides 0 - - 2 - - edian Type Undivided T Channelized 0 0 anes 0 1 0 0 1 0 onfiguration TR LT stream Si nal 0 0 inor Street Westbound Eastbound ovement 7 8 9 10 11 12 L T R L T R olume 44 0 f 1 0 0 0 eak-Hour Factor, PHF 0.76 0.90 0.76 0.90 0.90 0.90 ouriy Flow Rate, HFR 57 0 14 0 0 0 ercent Heavy Vehides 2 0 2 0 0 0 ercent Grade (%) 0 0 tared Approach N N forage 0 0 T Channelized 0 0 nes 0 0 0 0 0 0 figuration LR eta Queue Len th and Level of Service proach NB SB Westbound Eastbound ovement 1 4 7 8 9 10 11 12 ne Configuration LT LR (vph) 6 71 (m)(vph) 1297 648 lc 0.00 0.11 5% queue length 0.01 0.37 ntrol Delay 7.8 11.2 OS A 8 proach Delay - - 11.2 proach LOS - - B HCSZOOOM Copyright ®2000 University of Fbrida, All Rights Rained Version e. Ib TWO-WAY STOP CONTROL SUMMARY eneral Information ite Information alyst gency/Co. ate Pertormed al sis Time Period 10/17/2002 PM PK HR ntersedion urisdiction alysis Year 2006 WITHOUT PROJECT ro'ect Descri lion ast/West Street: RAILWAY orth/South Street: RHOTON Intersection Orientation: North-South tud Period hrs : 0.25 ehicle Volumes and Ad'ustments a'or Street Northbound Southbound ovement 1 2 3 4 5 6 L T R L T R olume 0 202 93 7 222 0 Peak-Hour Factor, PHF 0.90 0.87 0.87 0.90 0.90 0.90 ourly Flow Rate, HFR 0 232 106 7 246 0 ercent Heavy Vehides 0 - - 2 - - edian Type Undivided T Channelized 0 0 anes 0 1 0 0 1 0 nfiguration TR LT stream Si nal 0 0 inor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R olume 70 0 12 0 0 0 eak-Hour Factor, PHF 0.76 0.90 0.76 0.90 0.90 0.90 ourly Flow Rate, HFR 92 0 15 0 0 0 ercent Heavy Vehides 2 0 2 0 0 0 ercent Grade (%) 0 0 tared Approach N N forage 0 0 T Channelized 0 0 nes 0 0 0 0 0 0 figuration LR eta Queue Len hand Levei of Service proach NB SB Westbound Eastbound ovement 1 4 7 8 9 10 11 12 ne Configuration LT LR (vph) 7 107 (m)(vph) 1221 521 lc 0.01 0.21 5% queue length 0.02 0.76 ontrol Delay 8.0 13.7 OS A 8 proach Delay - - 13.7 proach LOS - - 8 HCS100mM Copyright 0 2000 Univasiry of Florida All Rights Raaved Version 4.16 TWO-WAY STOP CONTROL SUMMARY eneral Information ite Information alyst gency/Co. ate Performed al sis Time Period 10/17/2002 PM PK HR Intersection urisdiction alysis Year 2006 WITH PROJECT ro'ect Descri tion EastNVest SUeet: RAILWAY orthlSouth SUeet: RHOTON Intersection Orientation: North-South tud Period hrs : 0.25 ehicle Volumes and Ad'ustments a"or Street Northbound Southbound ovement 1 2 3 4 5 6 L T R L T R olume 0 251 93 7 249 0 eak-Hour Factor, PHF 0.90 0.87 0.87 0.90 0.90 0.90 ourty Flow Rate, HFR 0 288 106 7 276 0 ercent Heavy Vehicles 0 - - 2 - edian Type Undivided T Channelized 0 0 anes 0 1 0 0 1 0 onfiguration TR LT sVeam Si nest 0 p Minor Street Westbound Eastbound ovement 7 8 9 10 11 12 L T R L T R olume 70 0 12 0 0 0 eak-Hour Factor, PHF 0.76 0.90 0.76 0.90 0.90 0.90 ourly Flow Rate, HFR 92 0 15 0 0 0 ercent Heavy Vehicles 2 0 2 0 0 0 ercent Grade (%) 0 0 tared Approach N N torage 0 0 T Channelized 0 0 nes 0 0 0 0 0 0 nfiguration LR eta Queue Len th and Level of Service proach NB SB Westbound Eastbound ovement 1 4 7 8 9 10 11 12 ne Configuration LT LR (vph) 7 107 (m)(vph) 1165 466 lc 0.01 0.23 5% queue length 0.02 0.88 ontrol Delay 8.1 15.0+ OS A C proach Delay - - 15,0+ proach LOS - - C HCS?OOOn+ Copyngh[ m 2000 University of Florida All Righu Reserved Version 4.16 TWO-WAY STOP CONTROL SUMMARY eneral Information ite Information alyst gency/Co. ate Performed al sis Time Period 10/17/2002 PM PK HR ntersection urisdiction alysis Year 2002 EXISTING ro'ect Descri lion ast/West Street: N.P. RD orth/South Street: RHOTON Intersection Orientation: North-South tud Period hrs : 0.25 ehicle Volumes and Ad'ustments a'or Street Northbound Southbound ovement 1 2 3 4 5 6 L T R L T R olume 0 53 87 4 83 0 eak-Hour Factor, PHF 0.90 0.73 0.73 0.84 0.84 0.90 ouriy Flow Rate, HFR 0 72 119 4 98 0 ercent Heavy VehiGes 0 - - 2 - edian Type Undivided T Channelized 0 0 anes 0 1 0 0 1 0 onfiguration TR LT stream Si nal 0 0 inor Street Westbound Eastbound ovement 7 8 9 10 11 12 L T R L T R olume 76 0 4 0 0 0 eak-Hour Factor, PHF 0.71 0.90 0.71 0.90 0.90 0.90 ourly Flow Rate, HFR 107 0 5 0 0 0 ercent Heavy VehiGes 2 0 2 0 0 0 ercent Grade (°~) 0 0 ared Approach N N forage 0 0 T Channelized 0 0 nes 0 0 0 0 0 0 figuration LR ' ales Queue Len hand Level of Service proach NB SB Westbound Eastbound vement 1 4 7 8 9 10 11 12 ne Configuration LT LR (vph) 4 112 (m)(vph) 1383 754 lc 0.00 0.15 5°k queue length 0.01 0.52 ntrol Delay 7.6 10.6 OS A 8 proach Delay - - 10.6 proach LOS - - g HCS?DO[Tw Copyright O 2000 Univasiry of FI«id~ All Rights Reserved Vpsion 4.1 b ate Performed 10/17/2002 al sis Time Period PM PK HR ro'ect Descri lion East/West Street: N.P. RD Intersection Orientation: North-South ehicle Volumes and Ad'ustments a'or Street - ovement 1 L olume 0 eak-Hour Factor, PHF 0.90 ourly Flow Rate, HFR 0 ercent Heavy VehiGes 0 edian Type T Channelized anes 0 L 128 lour Factor, PHF 0.71 Flow Rate, HFR 180 rt Heavy VehiGes 2 ~t Grade (%) Approach nes 0 figuration ela Queue Len th and Level of Se proach NB ovement 1 ne Configuration (vph) (m) (vph) Ic 5% queue length ontrol Delay OS proach Delay - proach LOS - TWO-WAY STOP CONTROL SUMMARY Site Information Intersection urisdiction alysis Year 71 0.7; 97 1 0 Nestbt 8 T 0 0.9( 0 0 0 N 0 0 LR SB 4 LT 5 1319 0.00 0.01 7.7 A 3 4 R L 110 5 9.73 0.84 150 5 - 2 Undivided 0 0 0 TR LT 9 10 R L 5 0 9.71 0.90 7 0 2 0 0 0 0 2006 WITHOUT PROJECT TON Southbound 160 1 0.90 0 0 0 N 0 0 0 0 0 12 R 0 9C 0 0 0 0 Westbound Eastbound 7 8 9 10 11 12 LR 187 658 0.28 1.17 12.6 e 12.6 8 HCS?000~*~ Copyright O 2000 University of Florida, All Rights Rained Version d.lb TWO-WAY STOP CONTROL SUMMARY eneral Information ite Information alyst gency/Co. ate Performed al sis Time Period 10/17/2002 PM PK HR ntersection urisdiction alysis Year 2006 WITH PROJECT ro ect Descri lion EasWVest Street: N.P. RD orth/South Street: RHOTON Intersection Orientation: North-South tud Period hrs : 0.25 ehicle Volumes and Ad'ustments a'or Street Northbound Southbound ovement 1 2 3 4 5 6 L T R L T R olume 0 71 159 5 135 0 eak-Hour Factor, PHF 0.90 0.73 0.73 0.84 0.84 0.90 ouriy Flow Rate, HFR 0 97 217 5 160 0 ercent Heavy VehiGes 0 - - 2 - -- edian Type Undivided T Channeiized 0 0 ernes 0 1 0 0 1 0 nfiguration TR LT stream Si nal 0 0 inor Street Westbound Eastbound ovement 7 8 9 10 11 12 L T R L T R olume 159 0 5 0 0 0 eak-Hour Factor, PHF 0.71 0.90 0.71 0.90 0.90 0.90 ourly Flow Rate, HFR 223 0 7 0 0 0 ercent Heavy VehiGes 2 0 2 0 0 0 ercent Grade (%) 0 0 Flared Approach N N forage 0 0 T Channelized 0 0 nes 0 0 0 0 0 0 nfiguration LR ela Queue Len hand Level of Service proadt NB SB Westbound Eastbound ovement 1 4 7 8 9 10 11 12 ne Configuration LT LR (vph) 5 230 (m)(vph) 1246 627 lc 0.00 0.37 5% queue length 0.01 1.68 ontrol Delay 7.9 14.0 OS A 8 proaGt Delay - - 14.0 proach LOS - - B HCS?000°+ Copyright O 2000 University or Florida, All Rights Rtserved Version 4.16 TWO-WAY STOP CONTROL SUMMARY eneral Information ite Information alyst gency/Co. ate Performed al sis Time Period 10/17/2002 PM PK HR ntersedion urisdiction alysis Year 2002 EXISTING ro'ect Descri lion ast/West Street: N.P. RO orth/South Street: WILKENSON Intersection Orientation: North-South tud Period hrs : 0.25 ehicle Volumes and Ad'ustments a'or Street Nouhbound Southbound ovement 1 2 3 4 5 6 L T R L T R olume 0 181 93 7 202 88 eak-Hour Factor, PHF 0.92 0.92 1.00 1.00 0.92 0.92 ouriy Flow Rate, HFR 0 196 0 0 219 95 ercent Heavy Vehicles 2 - - 2 - -- edian Type Undivided T Channelized 0 0 apes 0 1 0 0 1 0 onfiguration LT TR stream Si nal 0 0 inor Street Westbound Eastbound ovement 7 8 9 10 11 12 L T R L T R olume 0 0 0 92 0 8 eak-Hour Factor, PHF 1.00 1.00 1.00 0.69 1.00 0.69 ouriy Flow Rate, HFR 0 0 0 133 0 11 ercent Heavy Vehicles 2 0 2 2 0 2 ercent Grade (%) 0 0 tared Approach N N forage 0 0 T Channelized 0 0 nes 0 0 0 0 0 0 figuration LR eta Queue Len th and Level of Service proach NB SB Westbound Eastbound ovement 1 4 7 8 9 10 11 12 ne Configuration LT LR (vph) 0 144 (m)(vph) 1246 570 lc 0.00 0.25 5% queue length 0.00 1.00 ntrol Delay 7.9 13.4 OS A e proach Delay - - 13.4 proach LOS - - 8 HCS1000ri+ Copyright ®2000 Unive+siry or Floride4 All Rights Rained Version a I b TWO-WAY STOP CONTROL SUMMARY eneral Information ite Information alyst envy/Co. ate Performed al sis Time Period 10/17/2002 PM PK HR ntersection urisdiction alysis Year 2006 WITHOUT PROJECT ro'ect Descri tion ast/West SVeet: N.P. RD orth/South SVeet: WILKENSON Intersection Orientation: North-South tud Period hrs : 0.25 ehicle Volumes and Ad'ustments a'or Street Northbound Southbound ovement 1 2 3 4 5 6 L T R L T R olume 0 204 93 7 227 140 eak-Hour Factor, PHF 0.92 0.92 1.00 1.00 0.92 0.92 ourly Flow Rate, HFR 0 221 0 0 246 152 ercent Heavy VehiGes 2 - - 2 - - edian Type Undivided T Channelized 0 0 anes 0 1 0 0 1 0 onfiguration LT TR stream Si nal 0 0 inor Street Westbound Eastbound ovement 7 8 9 10 11 12 L T R L T R olume 0 0 0 116 0 9 eak-Hour Factor, PHF 1.00 1.00 1.00 0.69 1.00 0.69 ourly Flow Rate, HFR 0 0 0 168 0 13 ercent Heavy VehiGes 2 0 2 2 0 2 ercent Grade (%) 0 0 cared Approach N N forage 0 0 T Channelized 0 0 nes 0 0 0 0 0 0 nfiguration LR eta Queue Len th and Level of Service proach NB SB Westbound Eastbound ovement 1 4 7 8 9 10 11 12 ne Configuration LT LR (vph) 0 181 (m)(vph} 1161 512 lc 0.00 0.35 5% queue length 0.00 1.58 ntrol Delay 8.1 15.8 OS A C proach Delay - - 15.8 proach LOS - - C HCS:OOPw Copynght O 2000 Universiry or Fbrid~ All Righu Reserved Version 0.16 TWO-WAY STOP CONTROL SUMMARY eneral Information ite Information alyst gency/Co. ate Performed al sis Time Period 10/17/2002 PM PK HR ntersection urisdiction alysis Year 2006 WITH PROJECT ro'ect Descri lion asUWest Street: N.P. RD orth/South Street: WILKENSON Intersection Orientation: Norfh-South tud Period hrs : 0.25 ehicle Volumes and Ad'ustments a'or Street Northbound Southbound ovement 1 2 3 4 5 6 L T R L T R olume 0 225 93 7 239 167 eak-Hour Factor, PHF 0.92 0.92 1.00 1.00 0.92 0.92 ourly Flow Rate, HFR 0 244 0 0 259 181 ercent Heavy VehiGes 0 - - 2 - - edian Type Undivided T Channelized 0 0 anes 0 1 0 0 1 0 onfiguration LT TR stream Si nal 0 0 Minor Street Westbound Eastbound Movement 7 8 9 10 11 12 L T R L T R olume 0 0 0 165 0 9 eak-Hour Factor, PHF 1.00 1.00 1.00 0.69 1.00 0.69 ourly Flow Rate, HFR 0 0 0 239 0 13 ercent Heavy VehiGes 2 0 2 2 0 2 ercent Grade (%) 0 0 Flared Approach N N forage 0 0 T Channelized 0 0 nes 0 0 0 0 0 0 nfiguration LR ela Queue Len hand Level of Service proach NB SB Westbound Eastbound ovement 1 4 7 8 9 10 11 12 ne Configuration LT LR (vph) 0 252 (m)(vph) 1131 476 lc 0.00 0.53 5% queue length 0.00 3.04 ontrol Delay 8.2 20.8 OS A C proaGt Delay - - 20.8 proach LOS - - C HCS?OOOt*~ Copyright iD 2000 University oCFlorids, All Rights Reserved Version 4.16 TWO-WAY STOP CONTROL SUMMARY eneral Information ite Information alyst gency/Co. ate Performed al sis Time Period 10/17/2002 PM PK HR ntersedion urisdiction alysis Year 2006 WITH PROJECT ro'ect Descri lion ast/West Street: N ENTR ortiUSouth Street: WILKENSON Intersection Orientation: North-South tud Period hrs : 0.25 ehicle Volumes and Ad'ustments a'or Street Northbound Southbound ovement 1 2 3 4 5 6 L T R L T R olume 0 320 14 0 367 0 eak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 ourly Flow Rate, HFR 0 355 15 0 407 0 ercent Heavy Vehides 0 - - 0 - - edian Type Undivided T Channelized 0 0 apes 0 1 0 0 1 0 onfiguration TR LT stream Si nal 0 0 Minor Street Westbound Eastbound ovement 7 8 9 10 11 12 L T R L T R olume 8 0 0 0 0 0 eak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 ourly Flow Rate, HFR 8 0 0 0 0 0 ercent Heavy Vehides 0 0 0 0 0 0 ercent Grade (%) 0 0 tared Approach N N forage 0 0 T Channelized 0 0 nes 0 0 0 0 0 0 nfiguration LR eta Queue Len hand Level of Service proach NB SB Westbound Eastbound ovement 1 4 7 8 9 10 11 12 ne Configuration LT LR (vph) 0 8 (m)(vph) 1200 372 lc 0.00 0.02 5°k queue length 0.00 0.07 ntrol Delay 8.0 14.9 OS A B proadt Delay - - 14.9 proach LOS - - 8 NCS:000n+ Copyright O 2000 University or Florida All Righn Reserved Version 4. I b TWO-WAY STOP CONTROL SUMMARY eneral Information ite Information alyst gency/Co. ate Performed al sis Time Period 10/17/2002 PM PK HR Intersection urisdiction alysis Year 2006 WITH PROJECT ro'ect Descri lion ast/West Street: S ENTR orth/South Street: WILKENSON Intersection Orientation: North-South tud Period hrs : 0.25 ehicle Volumes and Ad'ustments Ma'or Street Northbound Southbound ovement 1 2 3 4 5 6 L T R L T R olume 0 334 56 0 375 0 eak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 ourly Flow Rate, HFR 0 371 62 0 416 0 ercent Heavy Vehicles 0 - - 0 - -- edian Type Undivided T Channelized 0 0 anes 0 1 0 0 1 0 onfiguration TR LT stream Si nal 0 0 Minor Street Westbound Eastbound ovement 7 8 9 10 11 12 L T R L T R olume 31 0 0 0 0 0 eak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 ourly Flow Rate, HFR 34 0 0 0 0 0 ercent Heavy Vehides 0 0 0 0 0 0 ercent Grade (%) 0 0 Flared Approach N N torage 0 0 T Channelized 0 0 anes 0 0 0 0 0 0 onfiguration LR Dela Queue Len th and Level of Service proadt NB SB Westbound Eastbound ovement 1 4 7 8 9 10 11 12 ne Configuration LT LR (vph) 0 34 (m)(vph) 1137 348 lc 0.00 0.10 5% queue length 0.00 0.32 ntrol Delay 8.2 16.5 OS A C proach Delay - - 16.5 proach LOS - - C HCS_'OOOtM Copyright Z' 2000 University of Florida All Rights Ramed Version 4 I b