Preliminary Drainage
Crystal Springs Estates
Yelm, WA
Preliminary Drainage Report
~uiy Zoos
PRELIMINARY DRAINAGE REPORT
Project Information
Yelm, Washington
July 2005
Project: Crystal Springs Estates
Prepared for: Rainier General Development
Contact: Doug Bloom
P.O. Box 627
Rainier, WA 98576
(360) 446-3083
Reviewing Agency
Jurisdiction:
Project Number:
Project Contact
Project Engineer
Prepared by:
Contact:
OE Project No.
File Name:
~wo~ W~ap~~oo
~ ~
1or~
-~ _ 3T4C7 ,. /,
City of Yelm
Tami Merriman
(360) 458-8496
Olympic Engineering
1252 Devon Loop NE
Olympia, WA 98506
(360) 870-2561
FAX (360) 705-9361
Chris M. Merritt, P.E.
05016
05016_pdr.doc
PROJECT ENGINEERS CERTIFICATION: I hereby certify that this
Preliminary Drainage Report for the Crystal Springs Estates Plat in the
City of Yelm, Washington has been prepared by me or under my
supervision and meets the intent of the Thurston County Drainage Design
and Erosion Control Manual (DDECM) and/or the WSDOE 1992
Stormwater Management Manual, unless noted otherwise, and normal
standards of en meerin ractice. I understand that the urisdiction does
E'j(~}}tpS fEtt410~~ not and will no tassume liability for the sufficiency, suit bility, or
performance of drainage facilities designed for this development.
1
Table of Contents
PART I STORM DRAINAGE REPORT ........................................................ 2
SECTION 1 -PROPOSED PROJECT DESCRIPTION ...................... ......... 2
SECTION 2 -EXISTING CONDITIONS ............................................ ......... 3
SECTION 3 -INFILTRATION RATES /SOILS REPORT ................. ......... 4
SECTION 4 - WELLS AND SEPTIC SYSTEMS ................................ ......... 4
SECTION 5 -FUEL TANKS ............................................................... ......... 4
SECTION 6 - SUB-BASIN DESCRIPTION ........................................ ......... 4
SECTION 7 -ANALYSIS OF 100-YEAR FLOOD .............................. ......... 5
SECTION 8 -AESTHETIC CONSIDERATIONS FOR FACILITIES ......... 5
SECTION 9 -DOWNSTREAM ANALYSIS ........................................ ......... 5
SECTION 10 -COVENANTS, DEDICATIONS, EASEMENTS .......... ......... 5
SECTION 11 -ARTICLES OF INCORPORATION .............................. ......... 5
PART II EROSION CONTROL REPORT ....................................................6
SECTION 1 - CONSTRUCTION SEQUENCE AND PROCEDURE .......... 6
SECTION 2 -TRAPPING SEDIMENT ........................................................ 6
SECTION 3 -PERMANENT EROSION CONTROL ................................... 7
SECTION 4 - GEOTECHNICAL ANALYSIS AND REPORT ..................... 7
SECTION 5 -INSPECTION SEQUENCE ................................................... 7
SECTION 6 - CONTROL OF POLLUTANTS .............................................. 8
PART III MAINTENANCE PLAN ................................................................9
SECTION 1 -REQUIRED MAINTENANCE ...............................................9
SECTION 2 -RESPONSIBLE ORGANIZATION ...................................... 20
SECTION 3 -VEGETATION MANAGEMENT PLAN .............................. 20
SECTION 4 - SOURCE CONTROL ............................................................ 20
APPENDICES
Appendix 1-Preliminary Drainage
Calculations
Appendix 2- Vicinity Map
Appendix 3 -Drainage Basin Map
Appendix 4 -Soils Report
ll
PART I STORM DRAINAGE REPORT
SECTION 1 -PROPOSED PROJECT DESCRIPTION
Prepared for: Rainier General Development
Contact: Doug Bloom
P.O. Box 627
Rainier, WA 98576
(360) 446-3083
Parcel Number:
Total Site Area:
Zoned:
Site Address:
Required Permits:
Section, Township, Range
22718330102,22718330304
5.60 Acres
R-6
1311 & 1405 Crystal Springs Road NW
Yelm, WA 98597
Grading, Utility, Building, etc.
Section 18
Township 17 North
Range 2 East, W.M.
Project Overview
The project site is located adjacent to Crystal Springs Road in Yelm. The
applicant proposes to construct a new public roadway through the parcel
connecting to Crystal Springs Road and to install utility services to serve 23 single
family lots. Access to the proposed lots will be from the new public roadway
The development will be constructed in one phase. Construction will include
clearing and grading of the site, storm drainage improvements, underground
utilities, and paving. City of Yelm sanitary sewer and water mains will be
extended into the site to provide services to the residential lots.
Stormwater facilities will be constructed that consist of proposed a biofiltration
swale and wetvault for storm water treatment along with an infiltration pond and
underground drainrock gallery for retention and infiltration of stormwater runoff
created by the new development. For stormwater design purposes, the proposed
development has been subdivided into two drainage sub-basins (see preliminary
calculations in Appendix).
Stormwater Treatment:
A proposed biofiltration swale in Basin `A' and a proposed wetvault in Basin `B'
will provide treatment of Stormwater runoff. The proposed treatment facilities
exceed the minimum WSDOE requirements. See Preliminary Drainage
Calculations in Appendix.
Stormwater Storage:
All Stormwater runoff from the new roadway and the Crystal Springs Road
frontage will be collected in a series of catch basins and conveyed to either the
biofiltration Swale or wetvault for treatment. Discharge from the biofiltration
Swale in Basin `A' will flow into an infiltration pond; and discharge from the
wetvault in Basin `B' will flow into an underground drainrock gallery for
Stormwater retention and infiltration to groundwater. The proposed Stormwater
storage facilities exceed the minimum storage requirements per the WSDOE. See
Preliminary Drainage Calculations in Appendix.
Roof Runoff:
Roof runoff from each residential home will be tightlined to individual lot
infiltration drainrock drywells. The drywells shall be sized per Table 8.2 in the
DDECM using a soil hydrologic Group "A" classification (125 cf per 1,000 sf of roof
area).
SECTION 2 -EXISTING CONDITIONS
The project site contains a single family residence with several outbuildings. The
home will remain and some of the outbuildings will be demolished. Site relief is
rolling, rising from the east at Crystal Springs Road a distance of 1501ineal feet to
the property's highest elevation of 332 ft. The site then slopes to the west
approximately 140 lineal feet to a low point of 324 ft. Terrain then rises to the
west a distance of 200 lineal feet to an elevation of 326 ft., and then continues to
slope away in a westerly direction to a low point of 309 ft. at Yelm Creek. Yelm
Creek defines the western property line. Site vegetation consists of a small 2nd
growth fir tree grove near the northeastern property corner, field grasses with
isolated conifer and deciduous trees on the uplands, and thick indigenous brush
and field grass ground cover bordering Yelm Creek on the lowlands. The project
site is bounded to the east by Crystal Springs Road NW, developed residential
property to the south and west, and residential property to the north.
See Section 6 for description of off-site drainage to the property, if any.
The project site is located in an aquifer sensitive area based on review of Thurston
County Comprehensive Plan Map M-8. This project will comply with the
Stormwater treatment requirements of the DOE Manual.
SECTION 3 -INFILTRATION RATES /SOILS REPORT
The Soil Conservation Service (SCS) soil survey of Thurston County classifies the
on-site soils as Spanaway Gravelly Sandy Loam (Hydrologic Group A). Soil
testing confirmed the Spanaway series classification.
Two test pits were excavated by backhoe to a maximum depth of 156" below
existing grade and two double ring infiltration tests were completed. A 15"/hr and
20"/hr rate will be used for design in Basins A and B, respectively. Test pit soil log
data sheets and infiltration test results are included in the Appendix of this
report.
SECTION 4 -WELLS AND SEPTIC SYSTEMS
No wells within 200-feet of the project boundaries were found during a site
investigation.
Water and sanitary sewer services for the proposed project will be provided by the
City of Yelm.
A septic system currently serves the existing home. This will be abandoned per
Department of Health standards during development.
SECTION 5 -FUEL TANKS
No fuel tanks were located during our site inspection or soils work. The latest
"LUST" list (Leaking Underground Storage Tank) was reviewed and no listing for
the subject site was found.
SECTION 6 -SUB-BASIN DESCRIPTION
The project site is located within the Nisqually River Drainage Basin per the
Thurston County Geodata Center. From our site visit there were no signs of
existing drainage swales or channels on the proposed property. There did not
appear to be a significant amount of off-site runoff onto the site from the adjacent
north, east, and south properties.
Yelm Creek defines the western property line of the subject project. The Coot
Company has determined the stream to be Type III and the associated wetland to
be Category 3. A 200' shoreline jurisdiction boundary has been established along
with a 50' wetland/stream setback buffer.
Hazardous material handling or transportation is not expected in the area
tributary to the on-site detention facility.
SECTION 7 -ANALYSIS OF 100-YEAR FLOOD
Approximately 40' on either side of Yelm Creek appears to be within the 100-year
floodplain.
SECTION 8 -AESTHETIC CONSIDERATIONS FOR FACILITIES
All disturbed pervious areas including the storm drainage and open space tracts
will be vegetated and landscaped.
SECTION 9 -DOWNSTREAM ANALYSIS
Preliminary calculations for the project stormwater treatment and storage
systems are included in the Appendix of this report.
All stormwater runoff generated by site development will be treated, stored, and
infiltrated on-site. In the event of a failure, storm water will overflow through the
catch basin rims and temporarily back onto the public roadway in Basin `B' and
overflow to Yelm Creek in Basin `A'. Adjacent properties should not be affected
due to failure of the proposed stormwater system.
SECTION 10 -COVENANTS, DEDICATIONS, EASEMENTS
On-site drainage facilities will require routine maintenance. A maintenance
agreement will be prepared and finalized prior to final project approval.
SECTION 11 -PROPERTY OWNERS ASSOCIATION ARTICLES OF INCORPORATION
In light of the residential nature of this project, special covenants covering
landscape, maintenance, signage, stormwater and site maintenance may be put in
place at the time of final platting. The Owner's and/or their representatives will
perform maintenance of these private storm drainage facilities.
PART II EROSION CONTROL REPORT
SECTION 1 -CONSTRUCTION SEQUENCE AND PROCEDURE
Proposed development of the residential property will include site grading and
erosion control measures designed to contain silt and soil within the project
boundaries during construction until permanent erosion control is in place.
Erosion/sedimentation control will be achieved by a combination of
structuraUvegetative cover measures and construction practices tailored to fit the
site.
Best Construction Management Practices (BMP's) will be employed to properly
clear and grade the site and to schedule construction activities. Before any
construction begins on-site, erosion control facilities shall first be installed. The
planned construction sequence is as follows:
1. Install rock construction entrance. Use 4" to 8" diameter spalls with 12"
minimum depth.
2. Install filter fabric fencing, where appropriate.
3. Construct temporary sedimentation basins, if necessary.
4. Clear site (grubbing and rough grading).
5. During November 1 through March 31, all disturbed areas greater than 5,000
sf that are to be left un-worked for more than twelve (12) hours, shall be
stabilized by one of the following: mulch, sodding, or plastic covering.
6. Install underground utilities (cable, telephone, power, etc.).
7. If applicable, provide catch basin protection by installing filter fabric and hay
bales around all inlets to drainage system.
8. After paving is complete, install landscape, sod and/or seed, and mulch all
disturbed areas.
9. Maintain all erosion control facilities until the entire site is stabilized and silt
runoff ceases.
10. Designate an area for washing of equipment and concrete trucks to control the
runoff and eliminate entry into storm drainage systems.
SECTION 2 -TRAPPING SEDIMENT
A stabilized construction entrance shall be installed at the entrance to the
proposed plat to prevent vehicles from tracking soil away from the disturbed
areas. If sediment is tracked onto public roadways, sediment shall, on a daily
basis, be swept or shoveled from paved surfaces and not washed down into the
roadside storm drainage system.
The contractor shall not be allowed to leave disturbed areas greater than 5,000 sf
that are to be left un-worked for more than twelve (12) hours uncovered during the
rainy season from November 1 through March 31. Mulch, sodding or plastic
covering will be used to prevent erosion in these areas.
During construction, the contractor will also be required to install filter fabric
fencing as needed, per the erosion control plan and as directed by the engineer, or
City Inspector
SECTION 3 -PERMANENT EROSION CONTROL & SITE RESTORATION
All disturbed areas will be paved, covered with a building or landscaped with
grass, shrubbery or trees.
SECTION 4 -GEOTECHNICAL ANALYSIS AND REPORT
There are no slopes exceeding 15% on-site, therefore, a geotechnical analysis was
deemed unnecessary.
SECTION 5 -INSPECTION SEQUENCE
In addition to the normal City inspections, the Project Engineer shall inspect the
facilities related to storm water treatment, erosion control, storage and
conveyance during construction. At a minimum, the following items shall be
inspected at the time specified:
1. The erosion control facilities shall be inspected before the start of clearing
and grading to ensure the following structures are in place:
a. Construction Entrance
b. Filter Fabric Fences
2. The conveyance systems will be inspected after construction of the facility,
but before the project is completed to ensure the following are in working
order:
a. Road Drainage Conveyance System
b. Biofiltration Swales
c. Infiltration Pond
d. Infiltration Gallery
e. Wetvault
3. The permanent site restoration measures should be inspected after
landscaping is completed.
A final inspection shall be performed to verify final grades, settings of structures
and all necessary information to complete Engineer's Construction Inspection
Report Form and Residential Agreement to maintain stormwater facilities. These
forms must be completed prior to final public works construction approval.
SECTION 6 -CONTROL OF POLLUTANTS OTHER THAN SEDIMENTS
Washout from a concrete truck shall not be dumped into the storm drain, or onto
soil or pavement, which carries stormwater runoff: It can be dumped into a
designated area to be later backfilled or hardened and broken up for disposal into
a dumpster. The Contractor will be required to designate a wash down area for
equipment and concrete trucks.
PART III MAINTENANCE PLAN
SECTION 1 -REQUIRED MAINTENANCE
The following pages contain maintenance needs for most of the components that are
part of your drainage system, as well as for some components that you may not have.
Let us know if there are any components that are missing from these pages. Ignore
the requirements that do not apply to your system. You should plan to complete a
checklist for all system components on the following schedule:
1.Monthly from November through April.
2.Once in late summer (preferably September).
3.After any major storm (use 1" in 24 hours as a guideline) items marked "S" only.
Using photocopies of these pages, check off the problems you looked for each time you
did an inspection. Add comments on problems found and actions taken. Keep these
"Checked" sheets in your files, as they will be used to write your annual report (due in
May). Some items do not need to be looked at every time an inspection is done. Use
the suggest frequency at the left of each item as a guideline for your inspection.
You may call the jurisdiction for technical assistance. Please do not hesitate to call,
especially if you are unsure whether a situation you have discovered may be a
problem.
ATTACHMENT `A'
Inspection Period:
MAINTENANCE PROGRAM
COVER SHEET
Number of Sheets Attached:
Date Inspected:
Inspector's Signature:
ATTACHMENT "A": MAINTENANCE PROGRAM
Maintenance Checklist for Conveyance Systems (Pipes, Ditches and Swales)
Frequency Drainage ~ Req'd Problem Conditions To Check For Conditions That Should Exist
System Feature
M.S. Pipes ~/ Sediment & Accumulated sediment that Pipe cleaned of all sediment and
debris exceeds 20% of the diameter debris.
of the pipe.
M ~ Vegetation Vegetation that reduces free All vegetation removed so water
movement of water through flows freely.
pipes.
A ~ Damaged Protective coating is Pipe repaired or replaced.
(rusted, bent damaged, rust is causing
or crushed) more than 50% deterioration
to any part of pipe.
M ~ Any dent that significantly Pipe repaired or replaced.
impedes flow (i.e., decreases
the cross section azea of pipe
by more then 20%).
M ~I Pipe has major cracks or Pipe repaired or replaced.
tears allowing groundwater
leakage-
M.S. Swales ~ Trash & Dumping of yard wastes such Remove trash and debris and
debris as grass clippings and dispose as prescribed by County
branches into Swale. Waste Management Section.
Unsightly accumulation of
non-degradable materials
such as glass, plastic, metal,
foam and coated paper.
M ~ Sediment Accumulated sediment that Swale cleaned of all sediment and
buildup exceeds 20% of the design debris so that it matches design.
depth.
M ~ Vegetation Grass cover is sparse and Aerate soils and reseed and mulch
not growing weedy or areas are bare areas. Maintain grass height
or over-grown overgrown with woody at a minimum of 6" for best
vegetation. stormwater treatment. Remove
woody growth, recontour and
reseed as necessary.
M ~ Conversion Swale has been filled in or If possible, speak with homeowner
by home- blocked by shed, woodpile, and request that Swale area be
owner to shrubbery, etc. restored. Contact County to
incompatible report problem if not rectified
use voluntarily.
A ~ Swale does Water stands in Swale or A survey may be needed to check
not drain flow velocity is very slow. grades. Grades need to be in 1%
Stagnation occurs. range if possible. If grade is less
than 1%, under drains may need
to be installed.
If you are unsure whether a problem exists, please contact the Jurisdiction and ask for technical assistance.
ATTACHMENT "A" (CONTINUED)
Maintenance Checklist for Catch Basins and Inlets
Frequency Drainage J Req'd Problem Conditions To Check For Conditions That Should Exist
System Feature
M,S General J Trash, Trash or debris in front of the No trash or debris located
debris, and catch basin opening is blocking immediately in front of catch
sediment capacity by more than 10%. basin opening. Grate is kept
in or on clean and allows water to
basin enter.
M J Sediment or debris (in the No sediment or debris in the
basin) that exceeds 1/3 the catch basin. Catch basin is
depth from the bottom of basin dug out and clean.
to invert of the lowest pipe into
or out of the basin.
M,S J Trash or debris in any inlet or Inlet and outlet pipes free of
pipe blocking more than 1/3 of trash or debris.
its height.
M ~ Structural Corner of frame extends more Frame is even with curb.
damage to than 3/4 inch past curb face
frame into the street (if applicable).
and/or top
slab
M J Top slab has holes larger than 2 Top slab is free of holes and
square inches or cracks wider cracks.
than 1/4 inch (intent is to make
sure all material is running
into the basin).
M J Frame not sitting flush on top Frame is sitting flush on top
slab, i.e., separation of more slab.
than 3/4 inch of the frame from
the top slab.
A J Cracks in Cracks wider than 1/2 inch and Basin replaced or repaired to
basin longer than 3 feet, any evidence design standards. Contact a
walls/ of soil particles entering catch professional engineer for
bottom basin through cracks, or evaluation.
maintenance person judges
that structure is unsound.
A J Cracks wider than 1/2 inch and No cracks more than 1/4 inch
longer than 1 foot at the joint of wide at the joint of inletloutlet
any inlet/outlet pipe or any pipe.
evidence of soil particles
entering catch basin through
cracks.
A J Settlement Basin has settled more than 1 Basin replaced or repaired to
/misalign- inch or has rotated more than 2 design standards. Contact a
went inches out of alignment. professional engineer for
evaluation.
Frequency Drainage
System Feature J Req'd Problem Conditions To Check For Conditions That Should Exist
M,S J Fire hazard Presence of chemicals such No color, odor, or sludge. Basin is
or other as natural gas, oil, and dug out and clean.
pollution gasoline. Obnoxious color,
odor, or sludge noted.
M,S J Outlet pipe is Vegetation or roots growing No vegetation or mot growth
clogged with in inlet/outlet pipe joints present.
vegetation that is more than six inches
tall and less than six inches
apart.
If you are unsure whether a problem exists, please contact the Jurisdiction and ask for technical assistance.
Comments:
Kev A =Annual (March or April preferred)
M =Monthly (see schedule)
S =After major storms
ATTACHMENT "A" (CONTINUED)
Maintenance Checklist for Grounds (Landscaping)
Frequency Drainage ~ Problem Conditions to Check For Conditions That Should Exist
System
Feature
M General ~ Weeds Weeds growing in more than Weeds present in less than 5% of
(nonpoisonous) 20% of the landscaped area the landscaped area.
(trees and shrubs only).
M ~ Safety hazard Any presence of poison iry or No poisonous vegetation or
other poisonous vegetation or insect nests present in
insect nests. landscaped area.
M,S ~ Trash or litter See Ponds Checklist. See Ponds Checklist.
M,S ~ Erosion of Noticeable rills are seen in Causes of erosion are identified
Ground Surface landscaped areas. and steps taken to slow
down/spread out the water.
Eroded areas are filled,
contoured, and seeded.
A Trees and ~ Damage Limbs or parts of trees or Trim trees/shrubs to restore
shrubs shrubs that are split or shape. Replace trees/shrubs
broken which affect more with severe damage.
than 25% of the total foliage
of the tree or shrub.
M ~l Trees or shrubs that have Replant tree, inspecting for
been blown down or knocked injury to stem or mots. Replace
over. if severely damaged.
A ~ Trees or shrubs which are Place stakes and rubber-coated
not adequately supported or ties around young trees/shrubs
are leaning over, causing for support.
exposure of the roots.
If you are unsure whether a problem exists, please contact the Jurisdiction and ask for technical assistance.
Comments:
Kev
A =Annual (March or April preferred)
M =Monthly (see schedule)
S =After major storms
ATTACHMENT "A" (CONTINUED)
Maintenance Checklist for Energy Dissipaters
Freq. Drainage ~ Problem Conditions to Check For Conditions That Should Exist
System
Feature
A Rock Pad ~ Missing or Only one layer of rock exists Replace rocks to design
moved rock above native soil in area 5 standard.
square feet or larger, or any
exposure of native soil.
A Rock-filled Missing or Trench is not full of rock. Add large rock (t301b. each) so
trench for moved rock that rock is visible above edge
discharge ftom of trench.
pond
M Dispersion Pipe plugged Accumulated sediment that Pipe Cleaned/flushed.
trench with sediment exceeds 20% of the design
depth.
M Perforations Over 1/2 of perforations in Clean or replace perforated pipe.
plugged pipe are plugged with debris
and sediment.
M,S Not discharging Visual evidence of water Trench must be redesigned or
water properly discharging at concentrated rebuilt to standard. Elevation of
points along trench (normal lip of trench should be the same
condition is a "sheetflow" of (flat) at all points.
water along trench). Intent
is to prevent erosion
damage.
M,S Water flows out Maintenance person Facility must be rebuilt or
top of observes water flowing out redesigned to standards. Pipe is
"distributor" during any storm less than probably plugged or damaged
catch basin the design storm or its and needs replacement.
causing or appears likely to
cause damage.
M,S Receiving area Water in receiving area is Stabilize slope with grass or
over-saturated causing or has potential of other vegetation, or rock if
causing landslide. condition is severe.
If you are unsure whether a problem exists, please contact the Jurisdiction and ask for technical assistance.
Comments:
Key: A =Annual (March or April preferred)
M =Monthly (see schedule)
S =After major storms
ATTACHMENT "A" (CONTINUED)
Maintenance Checklist for Ponds
Freq. Drainage ~I Problem Conditions to Check For Conditions That Should Exist
System
Feature
M.S. General .~ Trash & debris Dumping of yard wastes Remove trash and debris and
buildup in pond such as grass clippings and dispose as prescribed by County
branches into basin. Waste Management Section
Unsightly accumulation of
non-degradable materials
such as glass, plastic, metal,
foam, and coated paper.
M.S. ~ Trash rack Bar screen over outlet more Replace screen. Remove trash
plugged or than 25% covered by debris and debris and dispose as
missing or missing. prescribed by County Waste
Management Section.
M ~ Poisonous Any poisonous vegetation Remove poisonous vegetation.
vegetation which may constitute a Do not spray chemicals on
hazard to the public. vegetation without obtaining
Examples of poisonous guidance from the Cooperative
vegetation include: tansy Extension Service and approval
ragwort, poison oak, from the County.
stinging nettles, devilsclub
M.S. ,~ Fire hazard or Presence of chemicals such Find sources of pollution and
pollution as natural gas, oil, and eliminate them. Water is free
gasoline, obnoxious color, from noticeable color, odor, or
odor, or sludge noted. contamination.
M .~ Vegetation not For grassy ponds, grass For grassy ponds, selectively
growing or is cover is sparse and weedy thatch, aerate, and reseed ponds.
overgrown or is overgrown. For Grass cutting unnecessary unless
wetland ponds, plants are dictated by aesthetics. For
sparse or invasive species wetland ponds, hand-plant
are present. nursery-grown wetland plants in
bare areas. Contact the
Cooperative Extension Service
for direction in invasive species
such as purple looseime and reed
canary grass. Pond bottoms
should have uniform dense
coverage of desired plant species.
M .~ Rodent holes Any evidence of rodent Rodents destroyed and dam or
holes if facility is acting as berm repaired. Contact the
a dam or berm, or any Thurston County Health Dept.
evidence of water piping for guidance.
through dam or berm via
rodent holes.
M Insects When insects such as wasps Insects destroyed or removed
and hornets interfere with from site. Contact Cooperative
maintenance activities, or Extension Service for guidance.
when mosquitoes become a
nuisance.
A ~ Tree Growth Tree growth does not allow Trees do not hinder maintenance
maintenance access or activities- Selectively cultivate
interferes with maintenance trees such as alders for firewood.
activity (i.e., slope mowing,
silt removal, or ui ment
Freq. Drainage ~ Problem Conditions to Check For Conditions That Should Exist
System
Feature
movements). If trees are
not interfering with access,
leave trees alone.
M Side slopes of ~I Erosion on Check around inlets and Find causes of erosion and
pond berms or at outlets for signs of erosion. eliminate them. Then slopes
entrance/ Check berms for signs of should be stabilized by using
exit sliding or settling. Action appropriate erosion control
is needed where eroded measure(s); e.g., rock
damage over 2 inches deep reinforcement, planting of grass,
and where there is potential compaction.
for continued erosion.
M Storage area .~ Sediment Accumulated sediment that Sediment cleaned out to designed
buildup in pond exceeds 10% of the pond shape and depth; pond
designed pond depth. reseeded if necessary to control
Buried or partially buried erosion.
outlet structure probably
indicates significant
sediment deposits.
A Pond dikes .~ Settlements Any part of dike which has Dike should be built back to the
settled 4 inches lower than design elevation.
the design elevation.
A Emer-gency ~ Rock missing Only one layer of rock Replace rocks to design
overflow/ exists above native soil in standards.
spillway area 5 square feet or larger,
or any exposure of native
soil.
One time Emer-gency ~ Overflow Side of pond has no area Contact County for guidance.
overflow/ missing with large rocks to handle
spillway emergency overflows.
If you are unsure whether a problem exists, please contact the Jurisdiction and ask for technical assistance.
Comments:
Key: A =Annual (March or April preferred)
M =Monthly (see schedule)
S =After major storms
ATTACHMENT "A" (CONTINUED)
Maintenance Checklist for Infiltration Systems
Frequency Drainage J Problem Conditions to Check For Conditions That Should Exist
System
Feature
M,S General Trash & debris See Maintenance Checklist for See Maintenance Checklist for
buildup in Ponds. Ponds.
pond
M Poisonous See Maintenance Checklist for See Maintenance Checklist for
vegetation Ponds. Ponds.
M,S Fire hazard or See Maintenance Checklist for See Maintenance Checklist for
pollution Ponds. Ponds.
M Vegetation not See Maintenance Checklist for See Maintenance Checklist for
growing or is Ponds. Ponds.
overgrown
M Rodent holes See Maintenance Checklist for See Maintenance Checklist for
Ponds. Ponds.
M Insects See Maintenance Checklist for See Maintenance Checklist for
Ponds. Ponds.
A Storage J Sediment A soil texture test indicates Sediment is removed and/or
area buildup in facility is not working at its facility is cleaned so that
system designed capabilities or was infiltration system works
incorrectly designed. according to design. A
sediment trapping azea is
installed to reduce sediment
transport into infiltration area.
A J Storage area A soil texture test indicates Additional volume is added
drains slowly facility is not working at its through excavation to provide
(more than 48 designed capabilities or was needed storage. Soil is aerated
hours) or incorrectly designed. and rototilled to improve
overIlows drainage. Contact the City for
information on its requirements
regarding excavation.
M J Sediment Any sediment and debris filling Clean out sump to design
trapping area area to 10% of depth from sump depth.
bottom to bottom of outlet pipe
or obstructing flow into the
connector pipe.
One Time J Sediment Stormwater enters infiltration Add a trapping area by
trapping area area directly without constructing a sump for settling
not present treatment. of solids. Segregate settling
area from rest of facility.
Contact City for guidance.
M Rock filters J Sediment and By visual inspection little or no Replace gravel in rock filter.
debris water flows through filter
during heavy rain storms.
S Infiltration J Infiltration Standing Water in Inspection Excavate bottom of trench as
Trenches Failure Well After 48 hours after necessary but at least 3 feet.
storm or Overflow during Replace with crushed rock.
Storms Check pretreatment systems
for effectiveness. Check
tributary area for sediment
sources.
If you are unsure whether a problem exists, please contact the Jurisdiction and ask for technical assistance.
Comments:
Key A =Annual (March or April preferred)
M =Monthly (see schedule)
S =After major storms
SECTION 2 -RESPONSIBLE ORGANIZATION
The Homeowner's Association shall be responsible for the operation and
maintenance of all on-site drainage facilities.
SECTION 3 -VEGETATION MANAGEMENT PLAN
All disturbed pervious areas within the site will be landscaped to provide an
aesthetically pleasing environment.
SECTION 4 -SOURCE CONTROL
Warning signs (e.g., "Dump No Waste -Drains to Groundwater") will be embossed
or painted on or adjacent to all storm drain inlets and will be repainted
periodically as necessary.
Appendix I
Preliminary Drainage Calculations
DRAINAGE CALCULATIONS
The following calculations were based on the requirements contained in the Drainage
Design and Erosion Control Manual (DDECM) for Thurston County, 1994 Edition and the
WSDOE Stormwater Management Manual, 1992 edition.
DESIGN AND BASIN INFORMATION SUMMARY:
Post Development Basin Area Summary (Acres)
Sub-Basin A B Total
Impervious Roadway 0.54 0.16 0.70
Concrete Sidewalk 0.06 0.02 0.08
Impervious Driveway 0.30 0.04 0.34
Impervious Roof Area 0.36 0.14 0.50
Disturbed Pervious 0.59 0.28 0.87
Total 1.85 0.64 2.49
Roof Area: 2,000 sf/lot
Driveway Area: 600 sf/lot
Soil Classification:
SCS Soil Classification: Spanaway Gravelly Sandy Loam
Hydrologic Group: A
Design Infiltration Rate: Basin A - 15"/hr
Basin B - 20"/hr
BASIN `A' WATER QUALITY CALCULATIONS
Minimum Stormwater Treatment Area Required:
Formula 6-9 from page III-6-14: b = Qn - Zy
1.486 yi.ss~ so.s
Qsmo = 0.24 cfs (see attached StormShed output)
n = 0.07
Z=3
y=2"=0.1667'
s = 0.02
b = 1.08'
1.08' x 200' long Swale = 217 sf min.
Stormwater Treatment Area Provided:
217 sf / 2' wide =min. 109' long
Total Treatment Area Provided 2' wide x 124' long = 248 sf > 217 sf .: OK
Check Velocity:
V=Q/A = 0.24 cfs /((2)(0.1667) +(3)(0.1667)2) = 0.58 cfs < 1.5 cfs .: OK
BASIN `A' WATER QUANTITY CALCULATIONS
*See attached StormShed software output
Stage Elevation Live Storage Volume
Pond Bottom
Peak Stage*
1 ft Freeboard
Total Storage Volume Provided
48 Hour Drawdown:
317.0 0 cf
318.0 1,209 cf
318.9 2,699 cf
319.0 2,879 cf
320.0 5,066 cf
= 5,066 cf
(992 sf)(15 in/hr)(1'/12")(48 hours) = 59,520 cf
BASIN `B' WATER QUALITY CALCULATIONS
Minimum Stormwater Treatment Area Required:
StormShed software was used to model the runoff from a portion of the on-site
roadway, sidewalks, and driveway areas. The 6-month storm event resulted in a
peak volume of 842 cf.
The DOE manual, section III-4.3.2, requires that "the permanent pool volume
equals the runoff volume from the 6-month, 24-hour design storm. Therefore,
using 85 LF of 4-foot diameter pipe as a wet vault, with across-sectional area of
10 sf at a 3-foot depth, results in an available pool volume of 850 cf, which
exceeds the required volume of 842 cf.
See the following StormShed modeling output.
BASIN `B' WATER QUANTITY CALCULATIONS
*See attached StormShed software output
30' long x 6' wide x 4.5' deep infiltration gallery with 3' dia. perf. pipe
Void ratio = 0.30
[(30')(6')(4.5')- (30')(3.14)(3'^2)/4] (0.3) +(30')(3.14)(3'^2)/4
Total Storage Volume Provided = 391 cf
Active Live Volume = 292 cf at Elev. = 321.3' per StormShed modeling
391 cf > 292 cf .: OK
48 Hour Drawdown:
(30' x 6')(20 in/hr)(1'/12")(48 hours) = 14,400 cf > 292 cf .: OK
ROOF RUNOFF
Roof runoff from each residential home will be tightlined to individual lot
infiltration drainrock drywells. The drywells shall be sized per Table 8.2 in the
DDECM using a soil hydrologic Group "A" classification (125 cf per 1,000 sf of roof
area).
Olympic Engineering Crystal Springs Estates StormShed
#05016 7/26/2005
Basin A Water Qualit
Basin A 6-mo Event Summary:
BasinlD Peak O Peak T
Event
------- (cfs) (hrs)
Basin A 6-mo 0.24 8.00
Drainage Area: Basin A 6-mo
Hyd Method: SCS Unit Hyd
Peak Factor: 484.00
Storm Dur 24.00 hrs
Area CN
Pervious 0.0000 ac 77.00
Impervious 0.9000 ac 98.00
Total 0.9000 ac
Supporting Data:
Impervious CN Data:
Roadway 98.00
Driveways 98.00
Sidewalks 98.00
Pervious TC Data:
Flow type: Description: .
Fixed None Entered
Impervious TC Data:
Flow type: Description:
Shallow Impervious
Peak Vol Area Method Raintype
(ac-ft) ac /Loss
0.0793 0.90 SCS/SCS TYPE1A 6 mo
Loss Method: SCS CN Number
SCS Abs: 0.20
TC
0.00 hrs
0.06 hrs
0.5400 ac
0.3000 ac
0.0600 ac
Length: Slope: Coeff: Travel Time
0.00 ft 0.00% 0.1000 0.10 min
Length: Slope: Coeff: Travel Time
550.00 ft 1.00% 27.0000 3.40 min
Basin A Water Quantity
RLPCOMPUTE [Pond Level Pool] SUMMARY
100 yr MatchQ=PeakO= 1.0760 cfs Peak Out O: 0.3400 cfs -Peak Stg: 318.89 ft -
Active Vol: 2699.78 cf
Summary Report of all RLPooI Data
Project Precips
[2 yr] 2.00 in
[5 yr] 2.50 in
[10 yr] 3.00 in
[25 yr] 3.00 in
[100 yr] 4.00 in
[6 mo] 1.28 in
BASLIST2
[Basin A] Using [TYPE1A] As [100 yr]
LSTEND
BasinlD Peak Q Peak T Peak Vol Area Method Raintype
Event
------- (cfs) (hrs) (ac-ft) ac /Loss
Basin A 1.0760 8.00 0.3740 1.49 SCS/SCS TYPEIA 100 yr
1 of 5
Olympic Engineering Crystal Springs Estates StormShed
#05016 7/26/2005
BASLIST [fYPE1A] AS [100 yr] DETAILED
[Basin A]
LSTEND
Drainage Area: Basin A
Hyd Method: SCS Unit Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur 24.00 hrs
Area CN TC
Pervious 0.5900 ac 78.00 0.09 hrs
Impervious 0.9000 ac 98.00 0.06 hrs
Total 1.4900 ac
Supporting Data:
Pervious CN Data:
Landscaping 78.00 0.5900 ac
Impervious CN Data:
Roadway 98.00 0.5400 ac
Sidewalks 98.00 0.0600 ac
Driveways 98.00 0.3000 ac
Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Shallow Roadway 550.00 ft 1.00% 27.0000 3.40 min
HYDLIST SUMMARY
[Basin A 100-yr out]
LSTEND
HydID Peak Q Peak T Peak Vol Cont Area
------- (cfs) (hrs) (ac-ft) (ac)
Basin A 100-yr out 0.34 7.75 0.3733 1.4900
STORLIST
[Infiltration Pond]
LSTEND
Node ID: Infiltration Pond
Desc: Infiltration Pond
Start EI: 317.0000 ft
Contrib Basin:
Stage Input Volume
317.00 0.00 cf 0.00 cf
318.00 1209.00 cf 1209.00 cf
319.00 2879.00 cf 2879.00 cf
320.00 5066.00 cf 5066.00 cf
Max EI: 320.0000 ft
Contrib Hyd:
Volume
0.0000 acft
0.0278 acft
0.0661 acft
0.1163 acft
DISCHLIST
[Infiltration Pond]
LSTEND
Control Structure ID: Infiltration Pond -Stage Discharge rating curve
Descrip: Infiltration Pond
Start EI Max EI Increment
317.0000 ft 320.0000 ft 0.10
Stage Discharge
2 of 5
Olympic Engineering Crystal Springs Estates StomtShed
#05016 7/26/2005
317.0000 ft
318.0000 ft
319.0000 ft
320.0000 ft
0.0000 cfs
0.3400 cfs
0.3400 cfs
0.3400 cfs
Basin B Water Quality
Basin B 6-mo Event Summary:
BasinlD Peak Q Peak T Peak Vol Area Method
Event
------- (cfs) (hrs) (ac-ft) ac /Loss
Basin B 6-mo 0.06 8.00 0.0193 0.22 SCS/SCS
8yz5~
Drainage Area: Basin B 6-mo
Raintype
TYPE1A 6 mo
Hyd Method: SCS Unit Hyd Loss Method: SCS CN Number
Peak Factor: 484.00 SCS Abs: 0.20
Storm Dur 24.00 hrs
Area CN TC
Pervious 0.0000 ac 77.00 0.01 hrs
Impervious 0.2200 ac 98.00 0.04 hrs
Total 0.2200 ac
Supporting Data:
Impervious CN Data:
Roadway 98.00 0.1600 ac
Sidewalks 98.00 0.0200 ac
Driveways 98.00 0.0400 ac
Pervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Fixed None Entered 0.00 ft 0.00% 0.5000 0.50 min
Impervious TC Data:
Flow type: Description: Length: Slope: Coeff: Travel Time
Shallow Impervious 103.00 ft 5.00% 27.0000 0.28 min
Channel Pipe 124.00 ft 0.18% 21.0000 2.32 min
Basin B Water Quantity
RLPCOMPUTE [Gallery Level Pool] SUMMARY
100 yr MatchQ=PeakQ= 0.3187 cfs Peak Out Q: 0.1961 cfs -Peak Stg: 321.38 ft -
Active Vol: 292.31 cf
Summary Report of all RLPooI Data
Project Precips
[2 yr] 2.00 in
[5 yr] 2.50 in
[10 yr] 3.00 in
[25 yr] 3.00 in
[100 yr] 4.00 in
[6 mo] 1.28 in
BASLIST2
[Basin B] Using [TYPE1A] As [100 yr]
3 of 5
Olympic Engineering Crystal Springs Estates StormShed
#05016 7/26/2005
LSTEND
Peak Vol Area
(ac-ft) ac
0.1125 0.50
Method
/Loss
SCS/SCS
Raintype
BasinlD Peak Q Peak T
Event
------- (cfs) (hrs)
Basin B 0.3187 8.00
yr
BASLIST [TYPE1A] AS [100 y r] DETAILED
[Basin B]
LSTEND
Drainage Area: Basin B
Hyd Method: SCS Unit Hyd
Peak Factor: 484.00
Storm Dur 24.00 hrs
Area CN
Pervious 0.2800 ac 78.00
Impervious 0.2200 ac 98.00
Total 0.5000 ac
Supporting Data:
Pervious CN Data:
Landscaping 78.00
Impervious CN Data:
Roadway 98.00
Driveways 98.00
Sidewalks 98.00
Pervious TC Data:
Flow type: Description:
Sheet Landscaping
Impervious TC Data:
Flow type: Description:
Shallow Impervious
Channel Pipe
HYDLIST SUMMARY
[Basin B 100-yr out]
LSTEND
HydID Peak Q Peak T
------- (cfs) (hrs)
Basin B 100-yr out 0.20 8.25
STORLIST
[Infiltration Gallery]
LSTEND
Node ID: Infiltration Gallery
Desc: Infiltration Gallery
Start EI: 318.0000 ft
Contrib Basin:
Length Width
30.0000 ft 6.0000 ft
DISCHLIST
[Infiltration Gallery]
TYPE1A 100
Loss Method: SCS CN Number
SCS Abs: 0.20
TC
0.14 hrs
0.04 hrs
0.2800 ac
0.1600 ac
0.0400 ac
0.0200 ac
Length: Slope:
96.00 ft 5.00%
Length: Slope:
103.00 ft 5.00%
124.00 ft 0.18%
Coeff: Travel Time
0.1500 8.31 min
Coeff: Travel Time
27.0000 0.28 min
21.0000 2.32 min
Peak Vol Cont Area
(ac-ft) (ac)
0.1124 0.5000
Max EI: 322.5000 ft
Contrib Hyd:
Void Ratio
48.00
4of5
Olympic Engineering Crystal Springs Estates StormShed
#05016 7/26/2005
LSTEND
Control Structure ID: Infiltration Gallery -Infiltration control structure
Descrip: Infiltration Gallery
Start EI Max EI Increment
318.0000 ft 322.5000 ft 0.10
Infil: 20.00 in/hr Multiplier: 1.00
5of5
Appendix II
Vicinity Map
Q
z
Q
~d
W
~ r
L%
~ ~
w
~ c~ z Q
~o ~~
z ~ z U
m ~ ~ j
o Q
0
N
W
H
Q
a y
a W
N
~ Z
f- pC
Z y
V J
~ ~
N
V
w
X Z~
ao
~~ o~
~ ~ J 01
l!'1 M
N O ~ C Q
O l A ~j ~S
1~ O ~ i0
~ n 0 .n
N
M M N A
u u .-1 0
Appendix III
Drainage Basin Map
~
~
-------
_ e
.--~
--,~.
- /
,.-o
__
o
-
~ I
~~Q m I
i _ 1 i I I
,
(
N4 ' I I S
R i
I
/My~
{.i.I / I R I
I 31
= I
~I
M ' ' /
/ I
I
I (
I
~.~-
,' ~ ~ o. I I
~
~ ~ / ~ I
I
I
N I I
I
n
~
I
~ I
I
I 3 sz« .
I
I
I
I I
~ (
' I
N °I
I
~ ~
~
I 1
1 (
~ I
N 'Q
~ I I I Z
I
1 ~
"
~
~
' I Cl)
o I d
N
~
m
~ ~ I
,~
o
~ I -., o
N
,gam ~
I
I
\\
~ ~
~
-
o
I o
~
I~
~ I~ _
II
p
I °i I °
I
I
~
~
I
~ w
J
O
i
o I
I
I (n
~ o
W
U F- I
I ~ I
~ O
w ~ I
I
~ ( O I
(
I
\I. I
I
I ~
U
I
\
I
I v ~
a ~
I I
i N ~
Z O
~ I a ~
L O
al
a ~
l
X)
1
=
I ~ .
- I
--Y~- - _
- wren
~ _s..w:m x _ _ _ _ - _ _
W
~ N
W
W
w ~ a-
~co z~
z ~ z z
m ~ ~ Q
0 m
Q
? W
a ~
mz
W per,
N
Q J
Z ~
Q N
~ ~
0 ~
W
X Z t0
w a O
ti ti O ~
~ ~ J 01
lA M
N O ~ C Q
OlA j ~i
~ o a~ is
ao ~ p •n
O O N E
l0 t0 ~ ~.
Appendix IV
Soils Report
SOIL EVALUATION REPORT
FORM 1: GENERAL SITE INFORMATION
PROJECT TITLE: Crystal Springs Estates SHEET: 1 OF 1
PROJECT NO. :05122 DATE: 6/14/05
PREPARED BY :William Parnell, P.E.
1. SITE ADDRESS: 1405 Crystal Springs Road SE, Yelm 98597
TAX PARCEL NUMBER: 22718330102, 22718330304
2. PROJECT DESCRIPTION: Create a 23 lot residential subdivision.
3. SITE DESCRIPTION: The 5.6 acre project site is currently occupied by a single residential dwelling, two
barns and three smaller outbuildings. Site relief is rolling, rising from the east at Crystal Springs Road a
distance of 150 feet lineal feet to the property's highest elevation of 332 ft. The site then slopes to the west
approximately 140 lineal feet to a low point of 324 ft. Terrain then rises to the west a distance of 200 lineal
feet to an elevation of 326 ft., then continues to slope away in a westerly direction to a low point of 309 ft. at
Yelm Creek. Site distinguishing features include Yelm Creek as the western property line. Site vegetation
consists of a small 2"d growth Fir tree grove_at the northeastern property corner, field grasses with isolated
conifer and deciduous trees on the uplands, and thick indigenous brush and field grass ground cover
bordering Yelm Creek on the lowlands. The project site is bounded to the east by Crystal Springs Road SE,
developed residential property to the south and west and residential property to the north. On-site soils are a
well-drained Spanaway series formed in glacial outwash.
4. SUMMARY OF SOILS WORK PERFORMED: Two test pits were excavated by backhoe to a maximum
depth of 156" below existing grade. Soils were inspected by entering and visually logging each test pit to a
depth of four feet. Soils beyond four feet were inspected by examining backhoe tailings. Two double ring
infiltration tests were completed. Test pit soil log data sheets and infiltration test results are included in this
report.
5. ADDITIONAL SOILS WORK RECOMMENDED: Additional soils work should not be necessary unless
drainage infiltration facilities are located outside the general area encompassed by the soil test pits.
6. FINDINGS: The Natural Resource Conservation Service soil survey for Thurston County mapped the on-
site soils as a Spanaway Gravelly Sandy Loam (110). Both test pits confirmed the Spanaway designation
generally profiling a gravelly very fine sandy loam surtace soil overlying a very to extremely gravelly &
cobbley coarse-fine sand substratum. The substratum gravels and sands were slightly loose. Winter water
table was present in test pit #2 at 144" below the existing grade. No winter water table was present in test pit
#1 and indicators were not visible. Double ring infiltration tests revealed an infiltration rate of 120 in/hr at 84"
below the existing grade and 45 in/hr at 56" below the existing grade in test pit #1and #2 respectively.
7. RECOMMENDATIONS: The Spanaway soil series is a somewhat excessively drained soil that formed in
gravelly glacial outwash. Infiltration rates are generally rapid in the substratum soils. The specified
substratum C horizon soils should be targeted for all drainage infiltration facilities as noted in the attached soil
log data sheets. A design infiltration rate of 20 in/hr would be appropriate for these targeted soils in test pit #1
and 15 in/hr or less in test pit #2.
During construction, care must be taken to prevent the erosion of exposed soils. Drainage facility infiltration
surfaces must be properly protected from contamination by the fine-grained upper horizon soils and from
compaction by construction site activities. Soils not properly protected will cause drainage infiltration facilities
to prematurely fail.
I hereby certify that I prepared this report, and conducted or supervised the performance of related work. I
certify that I am qualified to do this work. I represent my work to be complete an accurate within the bounds
of uncertainty inh/e~rent to the prac ' of soils science, and to be suitable for its intended use.
SIGNED: W ~. p
DATE: C~// ~( oS of
~ Q ~~ ~
H
N ~
°O
~O 9~ 2615 ~o ~~~
Q/STEP ~~?
~~~ONALEN (~'I~~CtS
SOIL EVALUATION REPORT
FORM 2: SOIL LOG INFORMATION
PROJECT TITLE: Crystal Springs Estates SHEET: 1 OF 2
PROJECT NO. :05122 DATE: 6/13/05
PREPARED BY :William Parnell, P.E.
SOIL LOG: #1
LOCATION: 60 ft. west and 20 ft. south of the northeast property corner.
1. TYPES OF TEST DONE: 2. SCS SOILS SERIES: 3. LAND FORM:
Double Ring Infiltration Spanaway (110) Terrace
4. DEPOSITION HISTORY: 5. HYDROLOGIC SOIL 6. DEPTH OF SEASONAL HW:
GROUP:
Glacial Outwash A/B Unknown
7. CURRENT WATER 8. DEPTH TO IMPERVIOUS 9. MISCELLANEOUS:
DEPTH: LAYER:
Greater than bottom of hole Greater than bottom of hole Sloping
10. POTENTIAL FOR: EROSION RUNOFF PONDING
Minimal Slow Minimal
11. SOIL STRATA DESCRIPTION: See Following chart
12. SITE PERCOLATION RATE: See FSP
13. FINDINGS & RECOMMENDATIONS: A double ring infiltration test completed at 84" below the
existing grade revealed an infiltration rate of 120 in/hr. Use a design infiltration rate of 20 in/hr or less for
drainage infiltration facilities located in the C1, C2 and C3 horizon soils.
Soils Strata Description
Soil Log #1
Horz Depth Color Texture %CL %ORG CF STR MOT IND CEM ROO <X> FSP
Ap 0"- 6" 10YR2/2 VCobSaLm <15 <5 <45 1 SBK - - - ff 2-6 2
Bw 6"- 10" 10YR3/6 VGrCSaLm <10 - <55 SG - - - ff 6-20 6
C1 10"- 48" 2.5Y3/2 GrCSa <1 - <35 SG - - - - >20 20
C2 48"- 90" 2.5Y4/2 VGrC-MSa <1 - <45 SG - - - - >20 20
few stones
C3 90"-156" 2.5Y4/2 ExGrC-MSa <1 - <75 SG - - - - >20 20
some cobbles
& stones
SOIL EVALUATION REPORT
FORM 2: SOIL LOG INFORMATION
PROJECT TITLE: Crystal Springs Estates SHEET: 2 OF 2
PROJECT NO. :05122 DATE: 6/13/05
PREPARED BY :William Parnell, P.E.
SOIL LOG: #2
LOCATION: 630 ft. west and 200 ft. south of the northeast property comer.
1. TYPES OF TEST DONE: 2. SCS SOILS SERIES: 3. LAND FORM:
Double Ring Infiltration Spanaway (110) Terrace
4. DEPOSITION HISTORY: 5. HYDROLOGIC SOIL 6. DEPTH OF SEASONAL HW:
GROUP:
Glacial Outwash AIB Unknown
7. CURRENT WATER 8. DEPTH TO IMPERVIOUS 9. MISCELLANEOUS:
DEPTH: LAYER:
144" Greater than bottom of hole Nearly Level
10. POTENTIAL FOR: EROSION RUNOFF PONDING
Minimal Slow Minimal
11. SOIL STRATA DESCRIPTION: See Following chart
12. SITE PERCOLATION RATE: See FSP
13. FINDINGS & RECOMMENDATIONS: A double ring infiltration test completed at 56" below the
existing grade revealed an infiltration rate of 45 in/hr. Use a design infiltration rate of 15 in/hr or less for
drainage infiltration facilities located in the C1 horizon soils.
Soils Strata Description
Horz Depth Color Texture
A 0"- 30" 10YR2/1 VFiSaLm
Bw 30"- 48" 10YR3/6 VGrLmC-FSa
C1 48"- 66" 2.5Y4/2 ExGr&Cob
C-FSa
C2 66"- 92" 2.5Y4/2 ExGr&Cob
C-MSa
C3 92"-124" 2.SY5/2 Gravel &
Cobbles with
thick Clay
binder
C4 124"-156" 2.5Y4/2 Gravel &
Cobbles with
thin silt
jackets
Soil Log #2
%CL %ORG CF STR MOT IND CEM ROO <X> FSP
<15 <5 <5 1 SBK - - - ff 2-6 2
10 - <40 SG - - - ff 6-20 6
<1 - <70 SG - - - - >20 20
<1 - <75 SG - - - - >20 20
<20 - <80 Mas - - - - - -
<10 - <85 SG - - - - >20 20
Abbreviations
Textural Class
(Texture) Structure
(STR) Grades of Structure
Cobbley -Cob Granular - Gr Strong - 3
Stone - St Block - Blk Moderate - 2
Gravelly - Gr Platy - PI Weak - 1
Sandy - Sa Massive - Mas
Loam - Lm Sin le Grained - SG
Silty - Si Sub-Angular Blocky - SBK
Clayey - CI
Coarse - C
Very - V
Extreme) - Ex
Fine - F
Medium - M
Induration 8~ Cementation
(IND) (CEM)
Weak - Wk
Moderate -Mod
Strong - Str
Mottles (MOT)
1 Letter Abundance 1st Number Size 2nd Letter Contrast
Few - F Fine - 1 Faint - F
Common - C Medium - 2 Distinct - D
Many - M Coarse - 3 Prominent - P
Roots (ROO)
1st Letter Abundance 2nd Letter Size
Few - f Fine - f
Common - c Medium - m
Man - m Coarse - c
<X> -Generalized range of infiltration rates from SCS soil survey (<X>)
DOUBLE RING INFILTRATION TEST
CRYSTAL SPRINGS ESTATES
Test Date :6/13/2005
Completed By : William Parnell, P.E.
PE Job #05120
DOUBLE RING INFILTRATION TEST
Test Hole # 1 (test run @ 84" be low existing gro und surface )
Start Sto Ela sed Time Total Dro Infiltration Rate
( Min) (Min) (Min) (Inches) (In/Hr )
0 2' 00" 2' 00" 6
2' 00" 4' 15" 2' 15" 6
4' 15" 6' 30" 2' 15" 6
6' 30" 8' 30" 2' 00" 6
8' 30" 10' 45" 2' 15" 6
10' 45" 13' 00" 2' 15" 6
13' 00" 15' 15" 2' 15" 6
15' 15" 17' 45" 2' 30" 6
17' 45" 20' 15" 2' 30" 6
20' 15" 22' 45" 2' 30" 6
22' 45" 25' 45" 3' 00" 6
25' 45" 28' 45" 3' 00" 6
28' 45" 31' 45" 3' 00" 6
31' 45" 34' 45" 3' 00" 6
34' 45" 37' 45" 3' 00" 6 120
DOUBLE RING INFILTRATION TEST
Test Hole # 2 (test run @ 56" below existing ground surface )
Start Sto Ela sed Time Total Dro Infiltration Rate
( Min) (Min) (Min) (Inches) (In/Hr )
0 5' 45" 5' 45" 6
5' 45" 12' 30" 6' 45" 6
12' 30" 19' 45" 7' 15" 6
19' 45" 27' 30" 7' 45" 6
27' 30" 35' 30" 8' 00" 6
35' 30" 43' 30" 8' 00" 6
43' 30" 51' 30" 8' 00" 6
51' 30" 59' 30" 8' 00" 6
59' 30" 1:07' 30" 8' 00" 6 45