Mountain Sunrise Refund Memo
M E M O R A N D U M
City of Yelm
Community Development Department
To: Barb Bange
From: Roberta Allen
Date: July 30, 2007
Subj: Refund of Sidewalk, Planter Strip and Street Trees Bond
Bob Benum and Bob Coyne of Mountain Sunrise Development, LLC deposited $48,410.00 into an Assigned savings Account for the installation of sidewalks, planter strips and street trees
for a subdivision, Case No. SUB-02-8329-YL, Mountain Sunrise, Phase II, for the Right-Of-Way portion of the SR 510 bypass. At this time, the subdivision is completed and the Right-Of-Way
for SR 510 has been purchased by the State of Washington.
Therefore, please prepare a check in the amount of $48,410.00 made payable to Mountain Sunrise Development, LLC, PO Box 73130, Puyallup, WA 98373. When the check is ready, please return
the check to me and I will close out the file.
Thanks Barb.
cc: Tami Merriman