Loading...
Memo to Stephanie re drainage (2) 4wbF T`p., M E M O R A N D UM City of Yelm Community Development Department WASHINGTON To: Stephanie Conners, Project Manager From: Grant Beck, Director of Community Development Date: August 30, 2007 Subj: Stevens Street Drainage - Prairie Park During review of the proposed Stevens Street connector between 1 st Street and West Road, the issue had been raised as to whether it was possible to handle storm water generated from the new road section east of the intersection of Stevens and 4t" Street by connecting to the Prairie Park stormwater system. This section of roadway is approximately 300 feet in length and would have a surface width of 28 feet (two travel lanes a total of 23 feet wide and a 5 foot bike lane). Jim Gibson, our Development Review Engineer, reviewed the final design Prairie Park storm system along with the design calculations and determined that the system, at full build-out of the approved Prairie Park planned development, has sufficient excess capacity to accept the approximately 600 cubic feet of storm water generated by the Stevens Street project with no impact to the proposed development. C. Tim Petersen, Public Works Director Jim Gibson, Development Review Engineer File Number PDD-00-8246-YL