Drainage Report 12-01-04 Approved
CHRISTENSEN COMMERCIAL CENTER
Drainage and Erosion Control Report
proponent: Rick Christensen
P.O. Box 189
11915 Clear Lake Road S.
Eatonville, WA 98328
(360) 832-3621
Prepared By: Robert E. Tauscher, P.E.
Jerome W Moirissette & Associates Ina, ".S
1700 Cooper Point Road SW, r B2
Olympia, WA 98502
Phone. (360) 352-9456
Pax. (360) 352-9990
Submitted: August 2004
Revised September 2004
RYYROUEp 1•=u2 cor-~s7tZ U~77 oK.
~rvr.~ E_rJ.,~~-e-d+-._• tz-is-o4-
TABLE OF CONTENTS
1. DRAINAGE REPORT
Section 1 - Project Description I
Section 2 - Existing Conditions 1
Section 3 - Infiltration Rate/Soils Report I
Section 4 - Wells 2
Section 5 - Fuel Tanks 2
Section 6 - Sub-basin Description 2
Section 7 - 100 Year Flood 3
Section 8 - Aesthetic Considerations 3
Section 9 - Facility Sizing and Downstream Analysis 3
Section 10 - Covenants, Dedications, and Easements 5
Section 11 - Articles of Incorporation 5
It. EROSION CONTROL REPORT
Section 1 - Sequence 6
Section 2 - Trapping Sediment 6
Section 3A - Permanent Erosion Control 7
Section Y - Geoteehnical Report 7
Section 5 - Inspection 7
Section 6 - Control of Pollutants Other than Sediment 7
III. APPENDIX
A. Soils Report
B. Calculations and Hydraulic Analysis
C. Commercial Stormwater Faciliks Maintenance Agreement
0. Thurston Region Stormwater Facilities Summary Form
E. Site Plan
F. Engineers Construction Inspection Report Form
Christensen i
Drainage and Erosion Control Report
IWM&A N 03148
PROJECT ENGINEER'S CERTIFICATE
"I HEREBY CERTIFY THAT THIS PROJECT, CHRISTENSEN COMMERCIAL
CENTER, YELM, WASHINGTON HAS BEEN PREPARED BY ME OR UNDER MY
SUPERVISION AND MEETS MINIMUM STANDARDS OF CITY OF YELM AND
NORMAL STANDARDS OF ENGINEERING PRACTICE. I UNDERSTAND THAT
THE JURISDICTION DOES NOT AND WILL NOT ASSUME LIABILITY FOR THE
SUFFICIENCY, SUITABILITY. OR PERFORMANCE OF DRAINAGE FACILITIES
DESIGNED BY ME."
Robert E. Tauschen P.E.
Jerome W. Morrissette & Associates Inc., P.S.
V ' T9Vs
c otwasw cy~
gFarnvsv
ntsrEa~
9XP(aES: (111071 p
Christensen ii
Drainage and Erosion Control Report
JWM&A 4 03)48
CHRISTENSEN COMMERCIAL CENTER
YELM, WASHINGTON
DRAINAGE AND EROSION CONTROL REPORT
PART I. DRAINAGE REPORT
This report has been prepared as part of the requirements for the Site Plan Review for the
subject site and in accordance with the "Stormwater Management Manual for the Puget
Sound Basin, " 1992 and the City of Yelm requirements.
Section I - Project Description:
The existing proposed site consists of 6.08 Acres with numerous building and
sports fields. The site lies on the southeast side of SR 507 in Yelm. Washington,
in the Northeast quarter (N'E %G) of the Northwest quarter (NW 14) of Section
twenty nine (29), Township seventeen (17) North, Range two (2) East. The
assessors parcel number is 64303400501.
The site is relatively flat. Attached in Appendix F is a copy of the sub-basin
analysis developed for the site.
The first phase of the project is to development parcel 3. The access roadway will
be constructed as well as a new building and parking lot on parcel 3. The
stormwater system will be collect from Lot 3, the internal roadway and the
frontage improvements and convey to bio-filtration swale and eventually into an
infiltration galleries for disposal. Roof runoff from the new buildings on lot 3 will
be diverted to a drywell. The design infiltration rate is 10 inches/hour.
Future development of the remaining three lots will require treatment and disposal
of stormwater on each individual lot. The proposed pond could be upsized to
accommodate the stormwater from the three lots after treatment.
The stormwater system has been designed to the standards of the "Stormwater
Management Manual for the Puget Sound Basin," 1992. The swales are sized for
the 6-Month/24 Hour Design Event and the infiltration pond is sized for the 100
Year/24 Hour Design Event.
Section 2 - Existing Conditions:
The proposed is vacant with a few old structures which will be tom down. The
site has a gentle slope towards the east with an elevation change from 350 feet at
the south western side at SR 507 to 340 along the east side.
Section 3 - Infiltration Rates/Soils Report:
Christensen
Drainage and Erosion Conwol Report
J WM&A k 03148
Soils on the site are listed in the Soil Conservation Services Soil Survey of
Thurston County Washington as Spanoway very gravelly sandy loam. Typical
soils are a dark grayish brown and gravelly sandy loam near the surface with dark
yellowish brown very gravelly sandy loam occurring within two feet of surface
(See Soils Report and logs in Appendix A). The soil mapping from this soil
survey indicates that the predominant soil group at this site is "B".
An evaluation of the surficial soils was conducted and a copy of the soils
information is located in Appendix A. The soils report confirms the soil survey
mapping. The soil logs typically indicate gravel and sandy gravel to 18-108". The
infiltration rate measured in a falling head test performed at 36 inches below the
existing surface is 130 inches per hour. A description of the falling head
infiltration test device used to perform the percolation test and infiltration tests
results are found in Attachment A.
Field percolation tests performed yielded a percolation rate range between three
holes of 30 in/hr to 60 in/hr. Incorporating a factor of safety greater than 3, the
estimated percolation rate used for desigm is 10 inches per hour.
A preliminary soils report for the site completed for the owner, by John Knowles
is attached for reference.
Section 4 - Wells and Septic Systems:
All existing wells on the onsite well will be decommissioned per Washington
State Department of Health standards. A search was conducted to identify all
existing groundwater wells in the vicinity of the proposed project. The nearest
well is 300 feet southeast of the site at the Arco Gas Station at the comer of Bald
Hills Road and SR 507. The proposed building will connect to the City of Yelm
water system, no wells will be drilled for this development.
The proposal will connect to the City of Yelm STEP sewer system. The City has
determined the STEP system to be adequate for the proposed site.
Section 5 - Fuel Tanks:
Based on information from the current property owner, numerous site inspections,
and the expressed intentions of the owner, it is evident that there are no known
fuel tanks existing on the property. No fuel tanks will be brought onto the property
during development.
Section 6 - Sub-basin Description:
Christensen
Drainage and Erosion Control Report
In/W&A # 03148
The improved portion of the site has been divided into three sub-basin tributary to
the biofiltration Swale and the infiltration pond.
A sub-basin analysis was conducted for this project and can be located in
Appendix E of this plan.
Section 7 - 100 Year Flood:
The project does abut Yelm Creek and is proposed to be constructed outside the
flood zone. A Shorelines Permit was approved by the City of Yelm.
Section 8 - Aesthetic Considerations:
All disturbed areas will be vegetated or landscaped. The stormwater facilities
consist of a catch basins and conveyance piping to collect runoff and convey to
the pond. The parking lot section meets the city of Yelm standards.
Consequently, the overall aesthetic affect of the stormwater facilities on this site
will be consistent with other facilities within the vicinity and should not detract
from surroundine areas.
Section 9 - Facility Sizing and Downstream Analysis:
The impacts of the proposed development on stormwater runoff have been
analyzed in accordance with the procedure described in the °Stormwater
Management Manual for the Puget Sound Basin." 1992. All stormwater
conveyance and detention systems were designed for the 100 Year /24 Hour
Design Event as outlined in the above listed Manual. The hydraulic analysis for
the on-site stormwater facilities can be found in Appendix B.
The evaluation performed includes the pond storage and HYDRA analyses
(HYDRA Version 5.85. duly 1994). Copies of the HYDRA Input and Output files
and table summarizing the site area and pond voltnne characteristics are included
in Appendix B.
POST DEVELOPMENT SITE CHARACTERISTICS
Total Site Area 6.08 Acres
Pass-Through Drainage Area 0.0 Acres
Parcel I
Area Tributary to Facility Including Offsite (Acres): 0.86 Acres
Total Onsite Area Tributary to Facility (Acres): 0.86 Acres
Design Impervious Area Tributary to Facility (Acres): 0.50 Acres
Chnstensen 3
Drainage and Erosion Control Report
JWMBA ~ 03148
Design Landscaped Area Tributary to Facility (Acres): 0.37 Acres
Design Total Tributary Area to Facility (Acres): 0.86 Acres
Parcel 2
Total Area of Parcel: 1.95 Acres
Area Tributary to Facility Including Offsite (Acres): 1.95 Acres
Total Onsite Area Tributary to Facility (Acres): 1.95 Acres
Stormwater Pond Area Tributary to Facility 0.39 Acres
Design Impervious Area Tributary to Facility (Acres): 0.63 Acres
Design Landscaped Area Tributary to Facility (Acres): 0.93 Acres
Undesturbed Area Tributary to Facility (Acres): 0.39 Acres
Design Total Tributary Area to Facility (Acres): 1.56 Acres
Parcel 3
Total Area of Parcel: 110 Acres
Total Area Tributary to Facility Including Offsite (Acres): 1.31 Acres
Total Onsite Area Tributary to Facility (Acres): 1.31 Acres
Design Impervious Area Tributary to Facility (Acres): 0.84 Acres
Design Landscaped Area Tributary to Facility (Acres): 1.31 Acres
Open Space Area (Acres): 0.79 Acres
Design Total Tributary Area to Facility (Acres): 1.31 Acres
Parcel 4
Total Area Tributary to Facility Including Offsite (Acres): 0.74 Acres
Total Onsite Area Tributary to Facility (.Acres): 0.74 Acres
Design Impervious Area Tributary to Facility (Acres): 0.49 Acres
Design Landscaped Area Tributary to Facility tAcresy 0.25 Acres
Design Total Tributary Area to Facility (Acres): 0.74 Acres
Roadway
Total Area Tributary to Facility Including Offsite (Acres): 0.40 Acres
Total Onsite Area Tributary to Facility (Acres): 0.40 Acres
Design Impervious Area Tributary to Facility (Acres): 0.34 Acres
Design Landscaped Area Tributary to Facility (Acres): 0.10 Acres
Design Total Tributary- Area to Facility (Acres): 0.40 Acres
SCS Data Hydrologic Soil Group "B"
Curve Numbers
Impervious Areas 98
Pervious Areas 90
Undeveloped Lots - Meadow/Pasture 78
SYSTEM MINIMUM REQUIREMENTS
Christensen 4
Drainage and Erosion Control Report
JWM&A # 03149
On site
Total Area (Acres): 6M Acres
Required Pond Volume per HYDRA 10.294 CF
Infiltration Rate with 9,267 sf Pond Bottom 2.15 CTS
Svstem Performance
Within the subject site, stormwater from parking lots and playground will be
routed to a treatment device or across an adjacent bio-fitter swales and into
infiltration galleries. Runoff from the new building and the gym roofs will be
directed to drywells adjacent to the buildings.
The onsite HYDRA analyses performed for the 24 hour - 100 Yen Event, the
peak flow into the stormwater pond will be 4.63 CTS. The maximum storage
volume expected in the pond per HYDRA 10,294 CF. The design infiltration rate
is 2.15 CFS with the pond bottom of 9,267 SF and 11,559 CF of storage volume
provided in the pond.
Downstream Analysis
There are no downstream impacts due to all stomwvater being detained and
infiltrated on site.
Section 10 - Covenants, Dedications, Easements:
Operation and maintenance of the stormwater galleries, catch basins, and piping
will be the responsibility of the property owner. The facilities will require routine
maintenance and a draft Commercial/Industrial stormwater facilities maintenance
agreement prepared for this proposal is located in Appendix D.
Section 11 - Articles of Incorporation:
The parcel is privately owned. Articles of Incorporation are not required for the
proposal.
Christensen
Drainage and Erosion Control Report
J %Wf&A P 03148
PART IL EROSION CONTROL REPORT
Section I - Sequence:
The following is the construction sequence for construction of the parking lots and
ponds.
1. Install silt fences where shown on the improvement plans.
2. Rough grade parking lot areas.
4. Install stormwater pond and structures.
5. Finish grade, topsoil, fertilize, and seed disturbed areas.
6. Mulch landscaped areas if construction is performed between October 15
and April 15.
7. Once disturbed surfaces have developed suitable groundcover.. remove
perimeter silt fences.
Section 2 - Trapping Sediment:
The proposed grading of the site, as well as the construction of the items listed
below, will mitigate against any major diversion of stormwater runoff by
maintaining natural drainage patterns. The structural components of the erosion
control plan will work in combination with temporary and permanent soil
stabilization efforts to minimize the amount of sediment-laden runoff entering
adjacent properties and the existing on-site wetlands.
Measures Taken to Control Sediment:
• Filter Fabric Silt Fences located down-slope of all earthwork that
may pose a potential of releasing sediment-laden water to the on-
site infiltration pond and the 100 year flood plain.
permanent sediment trapping will be accomplished in the wet pond, where
vegetation and pond configuration will cause soil particles to drop out of solution
as the stormwater passes through the area.
All entrances are paved and site is surrounded by paved city streets. If a
substantial amount of soil is being deposited on adjacent streets due to truck
traffic, the road will immediately be cleaned of all debris and further preventative
measures will be taken to ensure the problem ceases, such as establishing a tire
wash down area.
All of the above features of the Erosion and Sedimentation Control Plan, if
installed and periodically maintained, are expected to minimize the potential for
Christensen 6
Drainage and Erosion Control Report
JWMdA 4 03149
sediment-laden runoff escaping the site and entering the downstream environment
during and after the construction of the project.
Section 3 - Permanent Erosion Control:
The following measures will be taken for soil stabilization to minimize the
amount of sediment-laden runoff entering adjacent properties and the existing on-
site wetlands.
• Stabilization of cut and fill areas with hydro seeding and, if
necessary, chopped hay mulching (or jute matting).
Permanent erosion control on this site will be accomplished through the
development of landscaping or grass groundcover on all unpaved disturbed areas.
Section 4 - Geotechnical Report:
There we no other incipiently unstable stormwater related conditions within the
project site. hence; no other additional soil investigations or analyses are planned.
Section 5-Inspection:
The construction of stom water facilities on the subject site will be monitored by
the Owner and the Owner's representative in accordance with the requirements of
the Drainage Manual.
The following is the recommended inspection sequence for the construction of
stormwater facilities described above:
I. At completion of rough grading.
2. At completion of paving, fine grading, fertilizing, seeding, and mulching.
3. At completion of the pond.
Section 6 - Control of Pollutants Other Than Sediments:
As the subject site development will consist of commercial use, it will most likely
not involve the storage or use of non-sediment pollutants on this site. Temporary
pollutant sources, such as cement truck wash-down waste, fuel spillage during
equipment refueling, and construction waste materials may develop for short
periods during the construction of the parking lots and stormwater facilities.
Care will be taken to minimize the adverse impacts of these conditions. Activities
such as concrete truck wash-down and equipment refueling will be carried out in
the vicinity of construction, at least 25 feet from the stormwater facilities.
Christensen 7
Drainage and Erosion Control Report
1 WM&A # 03149
Construction material stockpile areas should be limited to the immediate vicinity
of the dwellings being constructed. Bulk petrochemical storage, in the form of
gasoline, fuel, oil, lubricants. and other such hazardous fluids will not be
permitted on this site.
Christensen 8
Drainage and Erosion Control Report
J WM&A 4 03148
APPENDIX A
Soils Report
Soil Survey
158
Spanaway Series well drained soils on flood plains. These soils formed it
alluvium. Slope is 0 to 3 percent. Elevation is 20 to 75
The Sparrow ay series consists of very deep, feet. The average annual precipitation is 40 to 50
somewhat excessively drained sods on terraces. These inches, the average annual air temperature is about 50
soils formed in glacial outwash and volcanic ash. Slope decrees F. and the average frost-free season is 150 s
is 0 to 15 percent. Elevation is 100'.0 400 feet. The 200 days.
average annual precipitation is 40 to 55 inches, the These soils are fine-silty, mixed, nonacid, mesic
average annual air temperature is about 51 degrees F, Apuic Xerofluvents.
and the average frost free season is 150 to 200 days- Typical patch of Sultan silt loam, 7 miles east of
These soils are sandy skeletal. mixed. mesic Andic Lacey, about 1,000 feet east and 1,975 feet north of ;h
Xerumbrepts. southwest corner of sec. 16, T 16 N., R. 1 E.
Typical pecan of Spanaway gravelly sandy loam, 0 to
3 percent slopes. 4 miles southeast of Lacey; about 250 Ap-O to 7 inches, dark yellowish brown (10VR 3/4) sil
feet west and 400 feet south of the northeast corner of loam, brown 110YR 5!3) dry, moderate fine and
sec. 25. T 36 N.. R. 1 W medium granular structure; slightly hard. very
friable. slightly sticky and slightly plastic, many fine
A- 15 inches; black (1 2x11 gravelly sandy medium, and coarse roots; many very fine and fine
loam. very dark grayish brown (10'YR 312) dry; weak tubular pores; slightly acid, abrupt smooth
fine granular structure; loose, very friable, nohsticky boundary
and nonelastic, many fine, medium. and coarse 3F-7 to 20 inches; dark yellowish brown (10VR 4741
roots: 25 percent pebbles, strongly act; dear silt loam, brown ;1 OYR 5/3) dry: moderate fine and
smooth boundary medium subangular blocky structure; slightly hard
Bw 15 to 20 Inches, dark yellowish brown (10YR 3114) very friable, slightly sticky and slightly plastic; man'
very gravelly sandy loam, light alive brown (2.5Y very fine, fine, and medium roots many very fine
Sr4) dry: weak fine subangular blocky structure: and fine tubular pores; slightly acid; clear wavy
loose, very friable, nonsticky and nonplastic; many boundary
fine, medium, and coarse roots: 55 percent pebbles, gw1 '0 to 25 inches; dark brown it DYR 3/3) silt loan
medium acid: clear smooth boundary grayish brown (2.5Y 5/2) dry; common fine
C 20 to 60 inches, dark yellowish brown (10YR 4,4) prominent red (25YR 5/8) mottles: moderate fine
extremely gravelly sand, yellowish brown 110YR and medium subangular blocky structure, slightly
5:4) dry, single grained; loose; few fine roots, 80 hard, very friable, slightly sticky and slightly plastic
percent pebbles, 10 percent cobbles, slightly acid. common fire and medium roots: common very fine
The thickness of the solum ranges from 15 to 25 and fine tubular poresslightly acidgradual wavy
inches. The content of coarse fragments in the control boundary
section ranges from 50 to 85 percent. The weighted Bw2-25 to 45 inches; dark brawn (10YR 4/3) silt loan
average texture of this section is very gravelly sand or light brownish stay (10YR 6/2) dry: common
extremely gravelly sand- The umbric efepedon is 10 to medium prominent red (2.5YR 5/8) mottles,
20 inches thick. moderate medium and coarse subangular blocky
The A horizon has hue of 10YR or 7.5YR, value of 3 structure: slightly hard, very friable, slightly sticky
or 4 when dry and chroma of 1 or 2 when moist or dry and slightly plastic; few very fine and fine roots; fe'
It is medium acid or strongly acid. The Bw horizon has very fine and fine tubular pores; slightly acid.
value of 4 or 5 when dry and 3 or 4 when moist. It is gradual wavy boundary
very gravelly sandy loam, very gravelly loam, or C-45 to 60 inches, grayish brown (10YR 5/2) silt loa:
extremely gravelly sandy loam. The C horizon has hue light gray (10YR 7/2) dry; common medium
of 10YR or 2.5Y, value of 5 or 6 when dry and 4 or 5 prominent dark brown (7.5YR 4/4) mottles: massiv
when moist, and chroma of 3 or 4 when dry or moist It slightly hard. very friable. slightly sticky and slight'
is extremely gravelly sand or extremely gravelly loamy plastic. slightly acid.
sand and is slightly acid or neutral
The soils are slightly acid or neutral in the control
Sultan Series section and range from slightly acid to strongly acid
below a depth of 40 inches. Mottles that have chroma
The Sultan series consists of very deep, moderately of 3 or more are at a depth of more than 20 inches.
Thurston County, Washington
summer, irrigation is needed for lawn grasses, shrubs, and the average frost free period is 150 to 200 days.
vines, shade trees, and ornamental trees. Mulch, Typically, the surface layer is black stony sandy loan
- fertilizer, and irrigation are needed to establish lawn about 16 inches thick. The subsoil is very dark brown
grasses and other small-seeded plants. Topsoil can be gravelly sandy loam about 6 inches thick. The
¢ stockpiled and used to reclaim areas disturbed during substratum to a depth of 60 inches or more is grayish
- construction. brown extremely gravelly sand.
The main limitation affecting septic tank absorption Included in this unit are small areas of Alderwood
_ fields is a poor filtering capacity in the substratum If the soils on till plains, Baldhill soils on terminal moraines,
density of housing is moderate or high, community and Everett. Indianola, and Nisqually soils on terraces.
sewage systems are needed to prevent the Also included are small areas of Spanaway soils that
contamination of water supplies caused by seepage have a gravelly sandy loam surface layer and small
from onside sewage disposal systems. The slope areas of Spanaway stony sandy loam that have slopes
j hinders the installation of the absorption fields. of 3 to 15 percent. Included areas make up about 15
Absorption lines should be installed on the contour percent of the total acreage.
i" Douglas-fir is the main woodland species on this unit. Permeability is moderately rapid in the subsoil of the
Among the trees of limited extent are Oregon white oak, Spanaway soil and very rapid in the substratum.
lodgepole pine, and red alder Douglas-fir and Scotch Available water capacity is loud. Effective rooting depth
k-_ pine are grown on Christmas tree plantations. On the is 60 inches or more. Runoff is slow, and the hazard of
basis of a 100-year site curve, the mean site index for water erosion is slight.
Douglas fir is 140. On the basis of a 50-year site curve, This unit is used mainly for hayland, pasture, or
it is 108. The highest average growth rate of an homesHes. The main limitations affecting hay and
unmanaged, even-aged stand of Douglas `ir is 145 pasture are the low available water capacity and the
cubic feet per acre per year at 65 years of age. stones on the surface. Proper grazing practices, weed
This soil is suited to year-round logging. Unsurfaced control, and fertilizer are needed to ensure maximum
roads and skid trails are slippery when wet. Logging quality of forage- Rotation grazing helps to maintain the
P reads require suitable surfacing material for
year round quality of the forage. Because of the surface stones,
use. Rounded pebbles and cobbles for road spreading animal manure, mowing, and seeding are
construction are readily available on this unit. difficult. In summer, irrigation is needed for maximum
Disturbance of the protective layer of duff can be production of most forage crops. Sprinkler irrigation is
minimized by the careful use of wheeled and tracked the best method of applying water. The amount of wale
- equipment. applied should be sufficient to wet the root zone but
Seedling establishment and seedling mortality are the small enough to minimize the leaching of plant
main concerns in the production of timber Reforestation nutrients
_ can be accomplished by planting Douglas-fir seedlings. This unit is well suited to homesites. Pebbles,
If the stand includes seed trees, natural reforestation of cobbles, and stones should be removed, particularly in
cutover areas by Oregon white oak and lodgepole pine areas used for lawns. In summer, irrigation is needed
occurs infrequently Droughtiness in the surface layer for lawn grasses, shrubs, vines, shade trees, and
reduces the seedling survival rate When openings are ornamental trees. Mulch, fertilizer, and irrigation are
made in the canopy, invading brushy plants can delay needed to establish lawn grasses and other small-
the establishment of planted Douglas fir seedlings. seeded plants. Cutbanks are not stable and are subject
Common forest understory plants are cascade to sloughing.
Oregon-grape, salal, western brackenfern, western The main limitation affecting septic tank absorption
swordfern, Indian plum, and Scotch-broom. fields is a poor filtering capacity in the substratum. If the
This map unit is in capability subclass IVs. density of housing is moderate or high, community
sewage systems are needed to prevent the
112-Spanaway stony sandy loam, 0 to 3 percent contamination of water supplies caused by seepage
slopes. This very deep, somewhat excessively drained from onsite sewage disposal systems.
soil is on terraces. It formed in glacial outwash and This map unit is in capability subclass IVs.
volcanic ash. The native vegetation is mainly grasses,
ferns, and a few conifers. Elevation is 200 to 400 feet. 113-Spanaway stony sandy loam, 3 to 15 percent
The average annual precipitation is 40 to 50 inches, the slopes. This very deep, somewhat excessively drained
average annual air temperature is about 51 degrees F, soil is on terraces. It formed in glacial outwash and
j W"J`A
Jerome W. Mornssette & Associates Inc., P.S.
1100 Cooper Point Road SW, #8 2, Olympia, WA 98502-1110
(360)352-9456 1 FAX (360)352-9990
Soil Boring Log
Project Number. a3~g8 Project Name: P;CV r;,,... ;,,y5 al
Boring Number: i Location:
Contractor.
Total Depth of Hole: Rig Type:
Evaluation Conducted By: 5. 6c,` 2`
Project Engineer: -T- ~i< EO
Method of Excavation: npp„t ~tiF,J qtr
DEPTH COLOR Soil Description
I.
54" _,6V .-.ac's
Comments: Rtc r~,,
Civil / Municipal / Geotechmcal Engineering and Planning
- u- _ - L° FGA -nmc -7S5
EE~I~,1 TLST 10)0 A" _
I
~l___. LR CSC D' TIME I
t -
Jerome W. Morrissette & Associates Inc., P.S.
1700 Cooper Point Road SW, #32, Olympia, WA 98502-1110
(360)352-9456 / FAX (360)352 9990
Soil Boring Log
Project Number: /4S Project Name: w
sir., gm.A
Boring Number: - Location:
Date:
Contractor: y,,anrc;-
Total Depth of Hole:` Rig Type:
Evaluation Conducted By: t" ~ q QS
Project Engineer: T, ou awc~-
Method of Excavation: rr-T•,;
DEPTH COLOR Soil Description
i. ;LA
Comments:
Civil / Mmiicipal / Geotechnical Er moenng antl Planning
FAEzr -t5T7- $ z- -
s Fc -h fb:4Zum
- o~~u Ta7, _ytlio_H~
. ''Z (a «a3f.a ~enG il'.~Z
,
rr~? ~.FsT 11;q 7M
f
SOIL EVALUATION REPORT
FORM 1: GENERAL SITE INFORMATION
PROJECT TITLE: Rick Christiansen Retail SHEET 1 OF 1
PROJECT NO.: DATE. 3/25/03
PREPARED BY. John Knowles, P.E.
1 SITE ADDRESS OR LEGAL DESCRIPTION: North of SR507, immediately west of the Yelm
Creek crossing (11628 SR 507, Yelm, WA)
2. PROJECT DESCRIPTION: Develop the site into a retail center with several office and retail
buildings and all associated roadway and utility improvements.
3. SITE DESCRIPTION: The rectangular shaped project site is occupied by one abandoned
residential building (to be removed) centrally located on the southern 113 of the site. Site relief is
relatively flat with the exception of the eastern 1/4 of the site that slopes to the east at a 5%
gradient. The extreme eastern portion of the site is a designated wetland bordering Yelm Creek.
The site has relatively few trees and a light density of Scot's Broom growth throughout the site.
The project site is bounded by undeveloped property to the north and east, a Chevron Mini Mart to
the west, and SR507 to the south. On site soils are well drained and formed in glacial outwash.
4. SUMMARY OF SOILS WORK PERFORMED Five test pits were excavated by backhoe to a
maximum depth of 120" below existing grade. Soils were inspected by entering and visually
logging each test pit to a depth of four feet. Soils beyond four feet were inspected by examining
backhoe tailings. Test pit soil log data sheets are included in this report.
5. ADDITIONAL SOILS WORK RECOMMENDED Atlditional soils work will likely be required
once a site plan has been generated and the location of proposed drainage infiltration facilities are
identified.
fi. FINDINGS: The Soil Conservation Service of Thurston County mapped the onsite soils as a
Spanaway Stony Sandy Loam (112). All test pits confirm this designation All test pits revealed very
gravelly fine sandy loam surface soils, overlying a gravelly and cobbley coarse sand substratum.
Substratum coarse soils were loose to slightly dense and had very few fines present. Winter water
table was present in all test pits and should be considered high for the season.
7 RECDMMENDA710N5. The Spanaway soil series is a somewhat excessively drained soil that
formed in glacial outwash. Infiltration rates are generally rapid in the substratum soils. The
substratum soils should be targeted for all drainage infiltration facilities. A design infiltration rate of
20 in/hr would be appropriate for all targeted C horizon soils as recommended in the attached soil
log information sheets
During construction, care must be taken to prevent erosion of exposed soils. Drainage facility
infiltration surfaces must be properly protected from contamination by the fine-grained upper
horizon soils and from compaction by site construction activities. Soils not properly protected will
cause drainage infiltration facilities to prematurely fail.
I hereby certify that I prepared this report, and conducted or supervised the performance of related
work. I certify that I am qualified to do this work. I represent my work to be complete an accurate
within the bounds of uncertainty inherent to the practice of soils s coca, and to be suitable for its
intended use. 01 e' ~P
S
SIGNED: ~J w •NAglr~yl~.
O T .un
DATE
kiWINWORDWEKFiLES\0]tdsoils rpt)
M114
~ecrsF~°
'gs70vAL t"
ErIRES 200
SOIL EVALUATION REPORT
FORM 2: SOIL LOG INFORMATION
PROJECT TITLE: Rick Christianen Retail SHEET: 1 OF 5
PROJECT NO.. 0314 DATE: 3/25/03
PREPARED BY: John Knowles, P.E.
SOIL LOG: At
LOCATION: 30 ft. east and 20 ft. south of the N.W. property corner.
1. TYPES OF TEST DONE. 2. SCS SOILS. SERIES: 3. LAND FORM:
None Spanaway Stony Sandy Loam Terrace
(112)
4. DEPOSITION HISTORY: 5. HYDROLOGIC SOIL. 6. DEPTH OF SEASONAL HW'
Glacial outwash & volcanic ash GROUP: 116'-
B
7 CURRENT WATER 8. DEPTH TO IMPERVIOUS 9. MISCELLANEOUS.
DEPTH: LAYER: Level
116" Greater than bottom of hole
10. POTENTIAL FOR: EROSION RUNOFF PONDING
Slight Slow Minimal
11. SOIL STRATA DESCRIPTION. See Following chart
12. SITE PERCOLATION RATE. See FSP
13. FINDINGS & RECOMMENDATIONS: Use a design infiltration rate of 20 inlhr less for drainage
infiltration facilities located in the C2 horizon soils at 30" or greater below the existing ground surface.
Maintain minimum separation requirements above the high winter water table observed at 88" + below
the existing grade.
Soils Strata Description
Soil Log #1
Hoa [).nth color Texlure oCL oO RG CF STR MOT IND CEM ROO <X> FSP
A 0'- 22" 10YR2/2 VGrVFiSaLm 20 <5 <50 1S9K - - - mf 2-6 2
Bw 22"- 25' t0YRT2 VGrVFiSaLm 20 - <60 1SBK - - - mf 2-6 3
C1 25"- 30" 10YR4/6 ExGr& <5 Q5 SG - - - H >20 15
CnbLmMSa
C2 301-100' 10YRY4 ExGr& <5 - <90 SG - - - - >20 20
CcbCSa
SOIL EVALUATION REPORT
FORM 2: SOIL LOG INFORMATION
PROJECT TITLE: Rick Christianen Retail SHEET. T OF 5
PROJECT NO.: 0314 DATE. 3/25103
PREPARED BY: John Knowles, P.E.
SOIL LOG. #2
LOCATION: 400 ft. east and 20 ft. south of the N.W. property corner.
1. TYPES OF TEST DONE: 2. SCS SOILS SERIES: 1 LAND FORM.
None Spanaway Stony Sandy Loam Terrace
(112)
4. DEPOSITION HISTORY' 5. HYDROLOGIC SOIL 6. DEPTH OF SEASONAL HW:
Glacial oulwash & volcanic ash GROUP: 88"+
B
7. CURRENT WATER 8. DEPTH TO IMPERVIOUS 9. MISCELLANEOUS.
DEPTH: LAYER: Level
88" Greater than bottom of hole
10. POTENTIAL FOR EROSION RUNOFF PONDING
Slight Slow Minimal
11. SOIL STRATA DESCRIPTION: See Following chart
12. SITE PERCOLATION RATE. See FSP
13. FINDINGS & RECOMMENDATIONS. Use a design infiltration rate of 20 in/hr for drainage infiltration
facilities located in the C2 horizon soils at 30" or greater below the existing ground surface. Maintain
minimum separation requirements above the high winter water table observed at 88" + below the
existing grade.
Soils Strata Description
Soil Log #2
Haa Depth Color Texture %CL %ORG OF STR MOT IND CEM ROO <X> FSP
A 0"- 18' 10YR22 VGNFISaLm <20 <5 <50 1SBK - - - mf 2-6 2
Bw 18' 21 10YR312 VGrVFiSaLm <20 <60 1SBK - - - mf 2~6 3
C1 21'- 30" t0YR416 ExGr& 15 - 75 SG - - - H >20 15
Cobi-mMSa
C2 30-100 10YR514 ExGr& <5 - <90 SG - - - - >20 20
Coli
SOIL EVALUATION REPORT
FORM 2: SOIL LOG INFORMATION
PROJECT TITLE: Rick Chnstianen Retail SHEET: 3 OF 5
PROJECT NO.. 0314 DATE: 3125103
PREPARED BY: Jahn Knowles, P.E.
SOIL LOG. #3
LOCATION: 210 ft. east and 20 ft. south of the N,W. property corner.
1. TYPES OF TEST DONE: 2. SCS SOILS SERIES. 3. LAND FORM:
None Spanaway Stony Sandy Loam Terrace
(112)
4. DEPOSITION HISTORY 5. HYDROLOGIC SOIL 6. DEPTH OF SEASONAL HW'
Glacial outwash & volcanic ash GROUP 91"+
B
7. CURRENT WATER 8. DEPTH TO IMPERVIOUS 9. MISCELLANEOUS.
DEPTH: LAYER: Level
91' Greater than bottom of hole
10. POTENTIAL FOR: EROSION RUNOFF PONCING
Slight Slow Minimal
11. SOIL STRATA DESCRIPTION: See Following chart
12. SITE PERCOLATION RATE. See FSP
13. FINDINGS & RECOMMENDATIONS. Use a design infiltration rate of 20 in/hr for drainage infiltration
facilities located in the C2 horizon soils at 32" or greater below the existing ground surface. Maintain
minimum separation requirements above the high winter water table observed at 91" + below the
existing grade.
Soils Strata Description
Soil Log #3
Harz Depth Color Texture %CL %ORG CF STR MOT INC) CEM ROO X FSF
A 0'- 20" 10YR2/2 VGrVFiSaLm 120 <5 <50 1S8K - - - mt 2-5 2
Bw 2(1 23 10YR3/2 VGNFISaLm <20 - <60 1SBK - - - mf 2-5 3
C1 23"- 32' 10YR4/6 ExGr & <5 - Q5 SG - - - H X20 1--
CabLmMSa
C2 32'-100 10YR514 ExGr & <5 - 'ea SG - - - - >20 2C
CobCSa
SOIL EVALUATION REPORT
FORM 2: SOIL LOG INFORMATION
PROJECT TITLE: Rick Christianen Retail SHEET. 4 OF 5
PROJECT NO.: 0314 DATE. 3/25/03
PREPARED BY: John Knowles, P.E.
SOIL LOG: #4
LOCATION: 100 ft. east and 200 ft, south of the N.W. property corner.
1. TYPES OF TEST DONE: 2. SCS SOILS SERIES. 3. LAND FORM:
None Spanaway Stony Sandy Loam Terrace
(112)
4. DEPOSITION HISTORY: 5. HYDROLOGIC SOIL 6. DEPTH OF SEASONAL HW
Glacial outwash & volcanic ash GROUP: 106"+
B
7 CURRENT WATER 8. DEPTH TO IMPERVIOUS 9. MISCELLANEOUS.
DEPTH: LAYER: Level
106" Greater than bottom of hole
10. POTENTIAL FOR EROSION
Sli RuIVORF PONDING
ght Slow Minimal
11. SOIL STRATA DESCRIPTION: See Following chart
12. SITE PERCOLATION RATE. See FSP
13. FINDINGS & RECOMMENDATIONS. Use a design infiltration rate of 20 in/hr for drainage infiltration
facilities located in the C2 horizon soils at 31" or greater below the existing ground surface. Maintain
minimum separation requirements above the high winter water table observed at 106" + below the
existing grade.
Soils Strata Description
Soil Log #4
Hor Deo[b Color Texture %CL %0RG CF STR MOT IND CEM ROO <x> FSP
A 0"- 20" 10YR2/2 VGrVFSaLm <20 <5 <50 1SBK - - - Mf 2-6 2
B. 201 23 10YR312 VGNF5aLm <20 <60 1SBK - - - mf 2-6 3
C1 23"- 31" 10YR416 ExGr& <5 - <75 SG - - - H >20 15
CobLmMSa
C2 31"-120' 10YR514 ExGr& <5 - <90 SG - - - >20 20
CobCSa
SOIL EVALUATION REPORT
FORM 2: SOIL LOG INFORMATION
PROJECT TITLE: Rick Christianen Retail SHEET: 5 OF 5
PROJECT NO.. 0314 DATE, 3125103
PREPARED BY John Knowles, P.E.
SOIL LOG. #5
LOCATION: 250 ft. west and 50 ft. north of the S.E. property corner.
1. TYPES OF TEST DONE: 2. SCS SOILS SERIES, 3. LAND FORM:
None Spanaway Stony Sandy Loam Terrace
(112)
4. DEPOSITION HISTORY: 5. HYDROLOGIC SOIL 6. DEPTH OF SEASONAL HW:
Glacial outwash & volcanic ash GROUP: 90" ±
B
7 CURRENT WATER 8. DEPTH TO IMPERVIOUS 9. MISCELLANEOUS:
DEPTH: LAYER: Level
90" Greater than bottom of hole
10. POTENTIAL FOR: EROSION RUNOFF PGNGING
Slight Slow Minimal
11. SOIL STRATA DESCRIPTION: See Following chart
12. SITE PERCOLATION RATE. See FSP
13. FINDINGS & RECOMMENDATIONS. Use a design infiltration rate of 20 in/hr for drainage infiltration
facilities located in the C2 horizon soils at 28" or greater below the existing ground surface. Maintain
minimum separation requirements above the high winterwater table observed at 90"+ below the
existing grade.
Soils Strata Description
Soil Log #5
H07 Depth Color Texture %CL %ORG CF STR MOT NO CEM ROO <X> FSP
A 0"- 10YRZ2 VGrVFiSaLM a20 <5 <50 13BK - - - nrf 2-6 2
20"
3w 20'- 10YR312 VGrVFiSaLm <20 - <60 1SBK - - - mf 2-6 3
22
C1 22 10YR4I6 ExGr& <5 - 75 SG - - - ff >20 15
28' CObLmMSe
C2 28 10YR514 ExGr& <5 - <90 SG - - - >20 20
110' Cobcs.
Abbreviations
Textural Class Structure Grades of Structure
Texture STR
Cobble -Cob Granular - Gr Strong -3
Stone - St Block - Blk Moderate -2
Gravel) - Gr Plat - PI Weak -1
Sand - Sa Massive - Mas
Loam -Lm Single Grained -SG
Silt - Si Sub-Angular Block - SBK
Clayey - CI
Coarse - C
Very -V
Extreme) - Ex
Fine - F
Medium - M
Induration & Cementation
IND CEM
Weak -Wk
Moderate - Mod
Strong Str
Mottles MOT
1 Letter Abundance 1st Number Size 2nd Letter Contrast
Few - F Fine -1 Faint - F
Common - C Medium -2 Distinct - D
Man - M Coarse -3 Prominent - P
Roots ROO
1st Letter Abundance 2nd Letter Size
Few _f Fine -f
Common c Medium - m
Man m Coarse -c
APPENDIX B
Calculations and Hydraulic Analysis
CHRISTENSEN DRAINAGE DESIGN CALCULATIONS
Existing and Pmvosed Conditions
Pre - Developed 6.08 Acres
School Site
Table D.2 - Commercial - 85% impervious
SCS Mapping Soil Type Spanoway Gravely Sandy Loam 0-3 % Slopes, Type B
Curve Number for Type B Soil - 94 - 5.45 inches of runoff
Post - Developed
Table D.2 - Commercial - 85% impervious
Curve Number for Type B Soil - 94 - 5.45 inches of runoff
Curve Number for Impervious - 98 - 5.91 In of Runoff
Lots 1, 2 84 = 154,817 at = 3.55 Ac, left undisturbed
Parcel3-91,673 sf 91,673 Sr = 210 Acres
Proposed Landscape = 20,648 SF = 0,47 Acres
Proposed 23,963 SF Parking Lot= 23,963 SF = 0.55 Acres
Proposed 10,998 SF Building = 10,998 SF = 0.25 Acres
Proposed 1489 SF Sidewalk = 1,489 SF = 0.03 Acres
Total Impervious 36,450 SF = 084 Acres
Undesturbed Open Space Area = 34,575 SF = 0.79 Acres
Parcel Percent Impervious 40 %
Parcel 2 - 85,082 at 85,082 SF = 1.95 Acres
Proposed Landscape= 40,712 SF = 093 Acres
Proposed Parking Lot = 17,618 SF 0.40 Acres
Proposed Building = 9,000 SF = 021 Acres
Proposed Sidewalk= 832 SF = 0,02 Acres
Total Impervious 27,450 SF 0.63 Acres
Undesturbed Area = 16,920 SF = 0.39 Acres
Parcel Percent Impervious 32 %
Parcel 1 - 37,520 si 37,520 SF = 0.86 Acres
Proposed Landscape = 15,905 SF = 0 37 Acres
Proposed Parking Lot = 12,300 SF - 0.26 Acres
Proposed Building = 8,400 SF = 0.19 Acres
Proposed Sidewalk = 915 SF = 0.02 Acres
Total impervious 21,615 SF - 0.50 Acres
Parcel Percent Impervious 58 %
Parcel 4 - 32,215 at 32,215 SF = 0.74 Acres
Proposed Landscape = 10,816 SF = 0.25 Acres
Proposed Parking Lot= 12,000 SF = 0.28 Acres
Proposed Building = 8,400 SF = 0.19 Acres
Proposed Sidewalk = 999 SF 0.02 Acres
Total impervious 21,399 SF = 049 Acres
Parcel Percent Impervious fib %
Internal Roadway- 18,407 sf Area 18,407 SF = 044 Acres
Proposed Landscape 3,762 SF = 3,762 SF = 0.09 Acres
Proposed 11,145 SF Pavement= 11,145 SF = 0.26 Acres
Proposed 3,500 SF Sidewalk= 3,500 SF 008 Acres
Total Impervious 14,645 SF = 0.34 Acres
Parcel Percent Impervious 80 %
CHRISTENSEN DRAINAGE DESIGN CALCULATIONS
Total Site Area 264,897 SF - 8.08 Acres
Total Developed Area 213,402 SF = 4.90 Acres
Total Pond Area 9,267 SF = 0.21 Acres
Total Undisturbed Area 51,495 SF = 1.18 Acres
Total Landscaped Area 143,338 SF = 3.29 Acres
Total Impervious 121,559 SF = 2,79 Acres
Total Site Percent Impervious 46 %
Frontage Improvements- 6,451 at Area 6,451 SF = 015 Acres
Proposed Landscape = 1,011 SF = 0.02 Acres
Proposed 4.306 SF Pavement = 4,306 SF = 0.10 Acres
Proposed 1,134 SF Sidewalk= 1,134 SF = 0.03 Acres
Total Impervious 5,440 SF = 0.12 Acres
Parcel Percent Impervious 84 %
ON SITE INFILTRATION POND SIZING
On Site Area 264,897 SF= 6.08 Acres
Off Site Area 6,451 SF = 0.15 Acres
On Site Impervious 121,559 SF = 279 Acres
off Site Impervious 5,440 SF= 0.12 Acres
Site Percent Impervious 46 %
Design Landscape Area 144,349 SF = 3 31 Acres
Undisturbed Open Space Area 91,843 SF= 211 Acres
Total Area Tributary to Faplity = Site Area - Open Spam 219,853 SF = 5.05 Acres
Per HYDRA the runoff volume 24 hr/100yr Storm Event = 10285 cf
Per HYDRA the incoming runoff rate 24hr/100yr Storm Event = 4 63 cfe
Total volume provided= 11559 pf>10.285 cf OK
Bottom area = 9267 sf
Using 10 inthr infiltration rate, over a 9267 sf Bottom, Infiltration Rare = 2.15 cfs
SWALE 03 SIZING FOR PARCEL 3 S 6 INTERNAL ROADWAY AND FRONTAGE IMPROVEMENTS
100-Year Evert 6-Month Event
Length 155 ft 159 ft
Bottom Width 8 R 8 ft
Per HYDRA the depth of flow = 6.85 2.92 in
Per HYDRA the runoff velocity = 0.57 f/s 0.38 Us
Side Slopes 31 31
Residence Time 5.33 min 900 min
Mannings n 1120 0 ,20
Swale Depth provided = 22.8 in 22.8 in
SWALE#2 SIZING FOR PARCEL 1
100-Year EyeM 8-Month Event
Length 200 ft 100 ft
Bottom Width 5 ft 5 ft
Per HYDRA the depth of flow = 2 88 in 1.12 in
Per HYDRA the renoff velocity = 0 49 f/s 0 28 f/s
Side Slopes 3:1 31
Residence Time 3.38 min 546 min
Mannings n 0.20 010
Swale Depth provided = 18 in 18 m
SWALE H SIZING FOR PARCEL 2
100-Year Event 6-Month Event
Length 200 It 100 ft
Bottom Width 5 ft 5 ft
Per HYDRA the depth of flow = 4.73 in 1.86 in
Per HYDRA the runoff velocity = 0.66 Vs 0.38 f/s
Side Slopes 3.1 31
Residence Time 2.53 min 4.03 min
Mannings n 0.20 0.20
Swale Depth provided = 18 in 18 in
JOB CHRISTENSEN DEVEOLPMENT
REM STORMWATER DESIGN 100 YEAR 24 HOUR
REM EVENT FOR STORAGE SIZING
TOT 6.15
FIL C:\HYE\IA.INC
NEW PARKING LOT STORMWATER
REM C:\HYDRA\CMD\CHRISTEN.CMD
REM THIS FILE CREATES STORMWATER RUNOFF FLOWS GENERATED
REM DURING THE 100 YEAR 24 HOUR EVENT FOR STORAGE FOR THE
REM CHRISTENSEN DEVELOPMENT STORMWATER IMPROVEMENT.
REM THE METHODOLOGY IS CONSISTANT WITH THE 1992 STORMWATER
REM MANUAL FOR THE PUGET SOUND BASIN
REM THE DESIGN PIPE 1S A 12 INCH PVC PIPE WITH
REM A MANNINGS n OF 0.009 (CIVIL ENGINEERING REFERNECE,
REM SEVENTH EDITION, LINDBURG), MINIMUM COVER OF 2 FEET,
REM MINIMUM DEPTH OF 2 FEET, MINIMUM VELOCITY OF 0.01
REM FT/SEC, MINIMUM SLOPE OF 0.001 AND d/D OF 0.9.
DPD 0.009, 4, 2, 2, 0.01, 0.001, 0.9
CND 6, 0.9, 0.20, 3, 5, 3, 1, 0, 0, 0, U
REM PARCEL 4, FRONTAGE AND INCITE ROADWAY ARE DISRECTED TO THE SWALEI, PARCELS
REM 1 & 2 ARE DISSECTED TO THE BWALE2.
REM BUILDING ROOF RUNOFF WILL BE COLLECTED AND CONVEYED TO INDIVIDUAL
REM INFILTRATION GALLERIES FOR DISPOSAL
REM PARCEL 3 IS SEPARATED INTO 3 SUBBASINS
NEW PARCEL 3 SUB13ASIN A
SCS 0.58, 0.40, 98, 90, 20, 0.02, 89
INL 99
DPI 53, 343.50, 341.70
HOL PARCEL3A
NEW PARCEL 3 SUBDASIN B
SCS 0.37, 0.40, 98, 90, 20, 0.02, I5
RF,C PARCF.L3A
INL 99
DPI 54, 341.60, 342.00
HOL PARCEL38
NEW PARCEL 3 SUBBASIN C
SC, 0.29, 0.40, 9S, 90, 20, 0.02, 110
REC PARCEL3B
INL 99
DPT 72, 342.00, 341.00
HOL PARCEL3C
REM THE FRON'T'AGE IMPROVEMENTS STORMWATER IS COLLECTED IN A CATCH BASIN AT
REM THE NW CORNER OF THE NEW ROADWAY INTERSECTION WITH SR 507. THE STORMWATER
REM THEN IS PIPED TO THE CATCH BASIN AT THE SOUTHWEST CORNER OF THE NEW
REM ROADWAY. THE CATCH BASIN ALSO COLLECTS THE SOUTH AND WEST SIDE OF THE NEW
REM ROADWAY STORMWATER. THE SOUTHWEST CATCH BASIN DISCHARGES TO THE
REM NORTHEAST CATCH BASIN WHICH COLLECTS THE EAST AND NORTH SIDE OF
REM THE NEW ROADWAY STORMWATER. THE NORTHEAST CATCH BASIN DISCHARGES
REM INTO THE SWALE BETWEEN PARCELS 2 AND 3 AND INTO THE POND.
NEW FRONTAGE IMPROVEMENT,
SCS 0.15, 0.84, 98, 90, 20, 0.02, 210
INL 99
DPI 193, 344.50, 343.80
HOL FRONTAGE
NEW LOT 4
SCS 0.74, 0.66, 98, 78, 20, 0.024, 251
INL 99
CHA 251, 351, 346, 351, 346
HOL LOT4
NEW SOUTH AND WEST ROADWAY
SCS 0.22, 0.80, 98, 90, 20, 0.006, 156
REC FRONTAGE
REC LOT4
INL 99
DPI 20, 343.80, 341.00
HOL SWROADWAY
NEW NORTH AND EAST ROADWAY
SCE 0.22, 0.BO, 98, 90, 20, 0.008, 156
AEC SWROADWAY
INL 99
DPI 70, 343.76, 341.50
HOL NEROADWAY
NEW LOT 1
Sr- 0.86, 0.58, 98, 78, 20, 0.007, 426
INL 99
CHA 426, 447, 344, 347, 344
HOD LOT1
NEW LOT 2
SCS 1.95, 0.58, 98, 78, 20, 0.024, 251
INL 99
CHA 251, 351, 346, 351, 346
HOL LOTS
REM SWALE 1 TREATS THE STORMWATER FROM THE FRONTAGE, ROADWAY AND PARCEL 3
REM FRONTAGE ROADWAY WHICH DISCHARGE INTO AND FLOW BETWEEN PARCELS 2 AND 3
REM AND INTO THE INFILTRATION POND. SWALE 2 TREATS THE STORMWATER FROM THE
PARCEL 1 WHICH DISCHARGES INTO A CH. SWALE 3 TREATS THE STORMWATER FROM THE
PARCEL 2 WHICH DISCHARGE INTO A CH AND IS COMBINED WITH FLOW FROM SWALE SAND
FLOW NORTH OR PARCEL 2 INTO
NEW SWALE 1
REC PARCELK
PEC NEROADWAY
INL 99
CHA 100, 346, 344.5, 343.13, 341.13
HOL SWALEI
NEW SWALE 2
AEC LOT1
INS 99
CHA 100, 344, 342, 344.5, 341
ROL SWALE2
NEW SWALF 3
REC LOT2
INL 99
CHA 100, 346, 344.5, 344.9, 441
ROL SWALE3
NEW INFILTRATION POND
REC SWALEI
RED SWALE2
REC SWALE3
RED (0/2.15/11559/2.15
RES 343, 341, 343, OVER
END
r:\HYDRA\CMD\ HYDRA Version 5.85
;.w.morrissette & associates Page 1
-_c-_- - - - _ _ - - -
C:\HYDRA\CMD\CHRISTEN.CMD 11:45 3 Sep 104
CFC
CHRISTENSEN DEVEOLPMENT
PARCEL 3 SUBBASIN A Pipe Design
Link Lonq Slope Invert San Sto Qdes Depth GrOp GrDn SrCh/Dlt
Diam Up/Dn Inf Mis Vol Up/DR HGLDp HGLDn Estimated
d/D Cover DiffOP DiffDR Cost
I 53 0.0389 341.14 0.0 0.5 0.54 2.00 343.50 341.70 *
4 339.07 0.0 0.0 6.17 2.36 347.46 344.55 0
II.89 2.63 -3.96 -2.85
LateraL length- 53 Upstream length- 53
PARCEL 3 SUBBASIN R Pipe Design
Link Long Slope Invert San Sto Qdes Depth GtOp tips SrCh/Ult
Slam Up/Dn Inf Mis Vet Up/Dn HGLDp HGLDp Estimated
On Cover DitfUp DiffDn Cost
2 54 0.0026 338.SR 0.0 0.9 O.R8 2.00 341.60 342.00
R 338.74 0.0 U.0 2.53 2.72 344.55 344.27 0
n.R9 3.26 -2.95
I.ateral length- 54 Upstream length- 107
PARCEL 3 SUBBASTN C Pipe Design
Link Long Slope Invert_ San Ste Qdes Depth GrUp GrDn SrCh/Dlt
Din. Up/Ds Inf Mis Vol Up/Dn HGLDp HGLUn Estimated
d/D Coven DitfUp DiffDn Cost
3 72 n.n0b4 338.14 0.0 1.2 1.15 2.00 342.00 341.00 *
8 338.28 0.0 0.0 3.30 3.26 344.27 343.70 0
0.77 2.72 -2.27 -2.7n
-
fateraL length- 72 Upstream length- 179
FRONTAGE IMPROVEMENTS Pipe Design
Link Long Slope Invert San St. Qdes Depth GrUp GrDn SrCh/Dlt
Din. UP/Dn Inf Mis Vel Up/Dn HGLDp HGI,Dn Estimated
d/D Cover D.ifftip DitfDn Cost
4 193 0.0036 342.14 0.0 D.1 0.15 2.00 344.50 343.80
4 341.44 0.0 0.0 1.87 2.36 350.08 349,48 0
0.80 2.36 -5.58 -5.68
Lateral length- 193 Upstream length- 193
C:\HYDRA\CMO\ HYDRA Version 5.85
j.w.morrissette s associates Page 3
- - - - ===c.o--- - -
C:\HYDRA\CMD\CHRISTEN.CMD 11:45 3-Sep-104
CFS
CHRISTENSEN DEVEOLPMENT
9 251 351.00 351.46 -0.5 7.77 3.000 0.00 1.60 1.60 0
0.0199 346.00 346.46 -0.5 0.46 5.00 0.00 O.n0 0.54
3.000 Froude Number - 0.16
-
Lateral length= 251 Upstream length= 251
SWALE 1 Channel
Long Invert Surf FreBrd Width Shape San Sto Flow Estimated
Link Slope Up/Dn Up/Du Up/Dn Depth L/C/R Int MIS Vel Cost
10 100 343.13 343.70 2.3 8.43 3.000 0.00 2.35 2.35 0
0.0200 341.13 341.70 2.8 0.57 5.00 0.00 0.00 0.61
3.000 Fronde Number = 0.16
Lateral length= 100 Upstream length= 813
SWALE 2 Channel
Long Invert Surf FreBrd Width Shape San Sto Flow Estimated
Link Slope Up/On Up/Dn Up/Dn Depth L/C/R Tel Mis Vet Cost
11 100 344.SO 344.74 -0.7 6.44 3.000 o.no 0.67 0.67 0
0.0350 341.00 341.24 0.8 0.24 5.00 0.00 0.00 D.49
3.000 Froude Number - 0.i9
Lateral length- 100 Upstream length- 526
SWALE 3 Channel
Lang Invert Surf FreBrd Width Shape San Ste Flow Estimated
Link Slope Op/Du Up/Du Ep/Dn Depth L/C/R Inf Mis Val Cost
12 100 344.50 344.89 1.1 7.36 3.000 0.00 1.60 1.60 0
0.0350 341.00 341.39 3.1 0.39 5.00 0.00 0.00 0.66
3.000 Froude Number - 0.2n
Lateral Length- 1.OU Upstream length- 351
-
Later,] length- 0 Upstream length- n
INFILTRATION POND Reservoir
Cost Invert - - Maximum Flow Values
Link Ex£ii Up/Dn/ovr San 1nt Ste MIS Design
14 0 343.00 Incoming 0.00 0.00 4.63 0.00 4.63
0 341.00 Discharge 0.00 0.00 2.15 0.00 2.15
343.00 Overflow 0.00 0.00 0.00 0.00 0.00
Stored n 0 10294 0 10294
-
C:\HYDRA\CMD\ HYDRA Version 5.R5
j.w.morrissette & associates Page 4
- -
C:\HYDRA\CMD\CHRISTEN.CMD 11:45 3-Sep-104
CFS
CHRISTENSEN DEVEOLPMENT
Lateral length- 0 Upstream length- 1690
C:\HYDRA\CMD\ HYDRA Version 5.85
j.w.morrissette 6 associates Page 1
_ - - _
C:\HYDRA\CMD\CHRISTEN.CMD 11:45 3-Sep-104
NONE
Status of DEFAULTS at start of run.
! Command file : C:\HYDRA\CMD\CHRISTEN.CMD
Input units are read as USA
Warnings are turned OFF
Output sent to display Detailed
Output sent to printer 0£f
Output sent to file Verbose
Paper width in inches 8.000
String to reset printer 27 51 36 18
String to set printer to compressed 17 15
String to set printer to 8 lines/inch 8 27 51 27
Name of printer Epson, FX series
I Print heading at top of page ON
Number of steps in hydrograph 166
Step length in minutes 60
Significant flow in hydrograph 0.010
Infiltration Diurnalization Factor 0.980
1 Maximum plot value Selected by HYDRA
Type of hydrographie plot Compact
Sanitary Tlnw by Diurnal Curve
Delay to start of actual storm 0.00
I Rational Method computations OFF
SCS computations Santa Barbara
Continuous simulation computations ON
I
! Maximum d/D for pipe design/analysis n,900
! Match point position on pipe O.UO or I.vert
Number of allowable diam drops 999
Mimimum drop thru manhole 0.000
I Manning's n Variable
Routing technique Quick
I
Calculate sanitary flows ON
I Calculate infiltration flows ON
Calculate mist flows ON
Listing of acceptable diameters !Changed by the POO command):
4 6 8 10 12 15 18 <1 24 27 30
33 36 39 42 45 48 54 60 66 72 78
84 90 96 102 108 114 120 132
_ _
1: SOB CHRISTENSEN DEVEOLPMENT
2: REM STORMWATER DESIGN 100 YEAR 24-HOUR
3: REM EVENT FOR STORAGE SIZING
4:
5: TOT 6.15
Total rainfall 6.15 Inches
C:\HYDRA\CMD\ HYDRA Version 5.85
j.w.morrissette & associates Page 2
C \HYDRA\CMD\CHRISTEN.CMD 11:45 3-Se 104
CHRISTENSEN DEVEOLPMENT
6: FIL C:\HYE\IA.INC
------START OF SUB-FILE -
1:
2: HYE 10 o.n04 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.
005 b
30.005 0.005 0.005 0.005 0.005 O.OU6 0.006 U.006 0.006 0.006 0.006 0.007 +
4: 0.007 n.007 0.007 0.007 0.007 0.00B2 0.0082 0.0082 0.0082 0.00
82 0.0082 0.0095 +
5: 0.0095 0.0095 0.0095 0.0095 0.0095 0.0134 0.0134 0.0134 0.0180
0.0180 0.034 0.054 +
6: 0.027 0.018 0.0134 0.0134 0.0134 0.0088 0.0088 0.0088 0.0088 0
.0088 0.0088 0.0088 +
7: 0.008B 0.0088 0.0088 0.0088 0.0088 0.0072 0.0072 0.0072 0.0072
o.no72 0.0072 0.0072 +
8: U.0072 0.0072 0.0072 0.0012 0.0072 0.0057 0.0057 0.0057 0.0057
0.0057 0.0057 0.0057 +
9: 0.0057 0.0051 0.0057 U.005/ 0.0057 0.0050 0.0050 0.0050 0.0050
0.0050 0.0050 0.005U +
10: 0.0050 n.oo50 O.UO5U ii.0050 0.0050 0.0040 0.0040 0.0040 0.0040
0.0040 0.0040 0.0040 +
11: U.0040 0.0040 0.004n 0.0040 0.0040 0.0040 0.0040 0.0040 0.0040
0.0040 %n040 0.0040 P
12: 0.0040 0.0040 0.0040 0.0040 0.0040 n.004n 0.0040 0.0040 0.0040
0.0040 0.0040 o.oa4O +
13: 0.0040 0.0040 0.0040 0.0040 0.004U 0.0040 0.0040 0.0040 0.0040
0.0040 0.0040 O.0n4U / O.UO40.^.tep time 10.00 Minutes
Tr,tal in o,igin,1 hyetograph 0.17 Inches
Adjustinq hystograph from 10.00 minutes to 60.00 minutes
Total volume rain in production hyetograph 6.15 Inches
Maximum intensity 1.01 Inches/Hr
Working hyeFOgraph in INCHES/HOUR:
0.00 0.50 1.00 1.5U 2.00
Time In/Hr t---------+---------+--------- I.---------+
60 0.15 1==- 1 1
120 0.16 1-- 1 1
180 0.20 1- 1 1 1
240 n.23 1== 1
300 0.27 1-- - I
360 0.32 1-°-=°- I
420 0.40 1----- I I 1 1
480 1.01 1--------- I - - - I
54U 0.47 ! --I
600 0.32
660 0.31 1 I
720 0.27 - -
780 0.25-=--
840 0.21
900 0.20
960 O.IB
1020 0.17 1-- 1
1080 0.15 1--
1140 0.15 1=
C:\HYDRA\CMD\ HYDRA Version 5.85
j.w.morrissette & associates Page 3
C:\HYDRA\CMD\CHRISTEN.CMD 11:45 3-Sep-104
CHRISTENSEN DEVELLPMENT
1200 0.15 1--
1260 0.15 1- -
1320 0.15-°°
1380 0.15 I=--
1440 0.15 1--
1500 0.00 1
-
15: RET
END OF OUR FILE
7: NEW PARKING LOT STORMWATER
8:
9: REM C:\HYDRA\CMD\CHRTSTEN.CMD
10:
11: REM THIS FILE CREATES STORMWATER RUNOFF FLOWS GENERATED
12: REM DURING THE 100 YEAR 24 HOUR EVENT FOR STORAGE FOR THE
13: REM CHRISTENSEN DEVELOPMENT STORMWATER IMPROVEMENT.
14: REM THE METHODOLOGY IS CONSISTANT WITH THE 1992 STORMWATER
15: REM MANUAL FOR THE PUGET SOUND BASIN
16: REM THE DECTGN PIPE IS A 12 TECH PVC PIPE WITH
17: REM A MANNINGS n OF 0.009 (CIVIL ENGINEERING REFERNECE,
18: REM SEVENTH EDITION, LINDBURG(, MINIMUM COVER OF 2 FEET,
19: REM MINIMUM DEPTH OF 2 FEET, MINTMUM VELOCITY OF 0.01
20: REM F'1'/SEC, MTNTMUM SLOPE OF 0.001 AND d/0 OF 0.9.
21:
22: DPD 0.009, 4, 2, 2, n,nl, 0.001, 0.9
Manninqs n u.)0900
Minimum diameter 4.UO lnches
Minimum depth 2.n0 -.,e.t
Miuimum c wr 2.00 Feet_
Minimum velocity 0.0100 Feet/Sec
Minimum slope 0.00100
D/d 0.9000
Maximum diameter 132.n0 Inches
23: CHD 6, 0.3, 0.20, 3, , 3, 1, U, 0, 0, n
24:
25: REM PARCEL 4, FRONTAGE. AND ONSITE ROADWAY ARE DISRECTED TO THE SWALEI
, PARCELS
26: REM 1 & 2 ARE DISRECTED TO THE SWALE2.
27: REM BUILDING ROOF RUNOFF WILL BE COLLEC'T'ED AND CONVEYED TO TNDTVIDUAL
28: REM INFILTRATION GALLERIES FOR DISPOSAL
29:
30: REM PARCEL 3 IS SEPARATED TNTO 3 SUBBASTNS
31: NEW PARCEL 3 SUBBASIN A
32: STS 0.58, 0.40, 98, 90, 20, 0.02, 89
C:\HYDRA\CMD\ HYDRA Version 5.85
j.w.morrissette & associates Page 4
. - - - - - _
C:\HYDRA\CMD\CHRISTEN.CMD 11:45 3 Sep 104
CHRISTENSEN DEVEOLPMEN'T
Land segment 0.580 Acres
Portion impervious 0.400
Curve number (CM) for Impervious 98.000
Curve number (CN) for Pervious 90.000
K Factor 20.000
Slope of land 0.0200
Sheet Ilow distance 89.000 Feet
Computed concentration time 0.5:1 Minutes
Total Time of Concentration 0.52 Minutes
Total rainfall falling on impervious 5179.68 CuFt
Impervious runoff 4989.16 CuFt
Portion off impervious 9b.21 £
Peak CFS rainfall falling on impervious 0.24 Cu Ft/Sec
Peak CFS runoff from impervions 0.23 CuFt/Ser
Equivalant "C" oif impervious 0.98
Total rainfall falling on pervious 7768.93 CuFr
Pervious runoff 6312.17 CuFt
Portion off pervious 81.25 %
Pack CFS rainfall falling on pervious 0.35 CuFt!Sec
Peak CFO runoff from pervious 0.31 CuFt!Sec
Equivalent "r" off pervious 0.8E
Total raintall falling on segment 12948.21 -',Ft
Total segment runoff 11295.33 7nFt
Portion oft: segment 87.23
Peak CFS rainfall fallinq on segment 0.59 CuFt/Sec
Peak CFS runoff fri)m segment 0.54 CuE't/Sec
Dguivala nt "C" off segment 0.91
Hydroqraph oft land segment :
I - impervious runoff in ;F£
P - Pervious runoff in CPS
T Total runoff in CFS
0.00 11.20 u.40 0.60 n.80
Time t_ +
0 0.01 0.00 0.01 1
6o 0.I13 0.00 0.03 I
120 u.04 0.02 0.06 ITT 1 1 1 1
180 0.05 0.04 0.09 IPIT I I I
240 0.06 0.06 0.12 I * T I
300 0.07 O.OH 0.15 1' T I I I
360 0.09 0.11 0.20 1 TI I I
420 0.23 0.31 U.54 I IT P I
480 0.11 0.16 0.27 1 1 P 1 1
540 0.01 0.10 0.17 1 IP T I I
600 0.07 0.11 0.18 1 TP T I I
660 0.06 0.08 0.14 1 IP T I I
720 O.U6 0.09 0.15 1 IF T I I 1
C:\HYDRA\CMD\ HYDRA Version 5.85
j.w.morrissette & associates Page 5
- - -
C:\HYDRA\CMD\CHRISTEN.CMD 11:45 3-Sep 104
CHRISTENSEN DEVEOLPMENT
780 0.05 0.07 0.11 IIP T I
840 n.o5 0.07 0.12 I IF T I
900 0.04 0.06 0.10 IIP T 1 1
960 0.04 0.06 0.10 IIP T I
1020 0.03 0.05 0.08 1' T I
1080 0.04 0.05 0.09 IIP T I
1140 0.03 0.05 0.08 I* T I I I
1200 0.04 0.05 0.09 IIPT I I I
1260 0.03 0.05 0.08 1* T I I
1320 0.04 0.05 0.09 IIPT I
1380 n.03 0.05 0.08 1` T I
1440 0.00 0.00 0.01 1 1 1 1 1
Time _ _ - +
0.00 U.2U 0.40 0.60 0.80
33: INL 99
Inlet hydrographs
I - Incoming hydrograph
X. - Exit hydrograph to system
R - Pond or reservoir/1
0.00 0.20 0.40 n.60 0.60
Time +___________i_________+_-_______t
0 0.01 0.01 0.00 1 I 1 1 1
60 0.03 0.03 0.00 1 1 1 1 1
120 O.n6 0.06 0.00 1 * ! ( !
160 0.09 0.09 0.00 I
240 0.11 0.12 0.00 I
300 0.15 0.15 0.00 '
360 0.2U 0.20 0.00 *1
420 0.54 0.54 0.00
480 0.27 0.27 0.00
540 0.17 0.11 0.00
600 0.18 0.18 0.00 1
660 0.14 0.14 0.00 I 1 1 1
720 0.15 0.15 0.00 1 1 1 1
X80 n.11 n.ll 0.00 1 1 1 1
840 0.12 0.12 0.00 1 1 1
900 0.10 0.10 0.00 1
960 0.10 0.10 0.00
1020 0.08 0.08 O.On
1080 0.09 0.09 0.00
1140 O.na 0.08 0.00
1200 O.U9 0.09 ?.UU
1260 0.08 0.08 0.00
1320 0.09 0.09 O.OU
1380 0.08 0.08 0.00
1440 0.01 O.U1 0.00
Time + + -
0.00 0.20 0.40 0.60 0.80
34: DPI 53, 343.50, 341.70
Length 53.00 Feet
Ground ele,,Li un up 343.50 FeNt
Ground elevation down 341.70 Feet
C:\HYDRA\CMD\ HYDRA Version 5.85
j.w.morrissette 6 associates Page 6
_ _ - - - -
C:\HYDRA\CMD\CHRISTEN.CMD 11:45 3-Sep-104
CHRISTENSEN DEVEOLPMENT
Minimum diameter 4.00 Inches
Lump sum cost 0.00 Dollars
ManuingsN 0.00900
MinSlope 0.00100
Link number 1
NOTE: Adjusting hydrographs for worst case situation
@Adding Sto into Event
@Adding Diurnal into Design
@Adding Event into Design
Average Design Flow 0.00 Cu Ft/Sec
Storm flow (no SF) 0.538 Cuft/Sec
Design flow including SF 0.538 Cutt/Sec
Combined SF 1.000
Design diameter 4.00 Inches
Invert elev up 341.14 Feet
Invert elev down 339.07 Feet
Slope 0.0389
Depth of fluid in pipe 3.56 Inches
d/D U.890
Partial flow velocity 6.459 Feet/Sec
Downstream hydrograph in CPS (Initial time-0.14 min):
0.0000 0.2000 0.4000 0.6000 0.80n0
Time f._________+-__-
0 O.OOR4 I
60 0.0287 I
120 0.0575 1-
180 0.0880-°
240 0.1186--
300 0.1515 I I
360 0.2014 1=-------
420 0.5381 1--------- 1=-- °1-==.--_- 1 1
480 0.2686 =-==-1-
540 0.1735
600 0.1801 1-------- I I I
660 0.1428 I-=-=== I I I
720 0.1478 1 I
78n 0.1128 1- 1
840 0.1218 1
900 0.0991 1--
960 0.1047 I' -
1020 0.0788
1080 0.0902 1
1140 0.0793
1200 0.0900 - -
1260 0.0798 1-
1320 0.0897-=-
1380 0.0803 1- !
1440 0.006U I I
Time +
0.0000 0.2000 0.4000 0.6000 0.8000
C:\HYDRA\CMD\ HYDRA Version 5.85
j.w.morrissette & associates Page 7
-
C:\HYDRA\CMD\CHRISTEN.CMD 11:45 3-Sep-104
CHRISTENSEN DEVEOLPMENT
35: HOL PARCEL3A
Tag PARCEL3A
Link 1
From line 35
In file C:\HYDRA\CMD\CHRISTEN
Sent to Hold[1]
36:
37: NEW PARCEL 3 SUBBASIN B
38: SCS 0.37, 0.40, 98, 90, 20, 0.02, 75
Land segment 0.370 Acres
Portion impervious 0.400
Curve number (CN) fur Impervious 98.000
Curve number (CN) for Pervious 90.000
K Factor 20.000
Slope of land 0.020U
Sheet flow distance 75.000 Feet
Computed conrentrati.on time 0.44 Minutes
'T'otal Time of Concentration 0.44 Minutes
Total rainfall falling on impervious 3304.03 C, Ft
Impervious runoff 3178.66 Cu Ft
Portion off impervious 96.21 S
Peak CFS raintall falling on impervious 0.15 CuFt/Sec
Peak CFS runoff from impervious 0.15 Cu Ft/Sec
Equivalent "C" off impervious 0.98
Total rainfall falling on pervious 4956.04 CuFt
Pervious runoff 4026.39 CuFt
Portion off pervious 81.24 8
Peak CFS rainfall falling on pervious 0.23 CuFt/Sec
Peak CFS runoff from pervious 0.20 CuFt/Sec
Equivalant "C" nit pervious 0.86
Total rainfall falling on segment 8260.06 Cu Ft
Total segment runoff 7205.05 Cu Ft
Portion off segment 87.23 9
Peak CFS rainfall falling on segment 0.38 CuFt/Sec
Peak CFS runoff from segment 0.34 CuFt,'Sec
Equivalant "C" off segment 0.91
C:\HYDRA\CMD\ HYDRA Version 5.85
j.w.morrissette 6 associates Page 8
_ - - - -
C \HYDRA\CMD\CHRISTEN.CMD 11:45 3-Sep-104
CHRISTENSEN DEVEOLPMENT
Hydrograph off land segment :
I - Impervious runoff in CPS
P - Pervious runoff in CPS
T - 'Dotal runoff in CFS
0.00 0.10 0.20 n.30 0.40
Time -
0 0.01 0.00 0.01 1 1
60 0.02 0.00 0.02 1* 1
120 0.03 0.01 0.04 1 IT 1
180 0.03 0.02 0.06 IPI 'I I
240 0.04 0.04 0.08 1 T 1
300 0.05 0.05 0.10 1 TI I I
960 0.06 0.07 0.13 1 IP I T I
420 0.15 0.20 0.34 1 1 1 PI T
480 0.07 0.10 0.1/ I I PI T I
540 0.05 0.07 0.11 1 1 P T I
boo 0.05 0.07 0.11 1 1 P T I
b60 0.04 0.05 0.05 I IP T I I I
720 0.04 0.06 0.09 I I P T I I I
780 n.03 0.04 0.07 I TP T I I I
H40 U.03 0.05 0.08 1 1 P T 1 I I
900 0.03 0.04 0.05 I IP T I I
96n 0.03 0.04 O.U7 11P T I
1020 0.02 0.03 0.05 I1P T I
1080 0.02 n.0a 0.06 IIP T I I I
1140 0.02 0.03 0.05 IIP T I I
1200 0.02 0.03 0.06 IIP T I I
1260 0.02 0.03 0.05 IIP I I I
1320 0.02 0.03 0.06 IIP 'I I I
1380 0.02 0.03 0.05 11P T
1440 0.00 0.00 0.00 I I
Time. +---------I-----------------------------t
O.OU U.10 0.20 0.30 0.40
39: REC PARCEL3A
Hold[Numj 1
LOOkinq up Newry number 1
40: INL 99
Inlet hydrographs
I - Incoming hydrograph
R - Exit hydrograph to system
R - Pond or reservoir/l
C:\HYDRA\CMD\ HYDRA Version 5.85
j.w.morrissette & associates Page 9
- - - - - - - - - - -
C:`,H YDRA\CMD\CHRISTEN.CMD 11:45 3-Sep-104
CHRISTENSEN DF.VEOLPMENT
0.00 0.10 0.20 0.30 0.40
Time +---_---_-t-- __---t----------
o n.01 0.01 0.00 1
60 0.02 0.02 0.00 1*
120 0.04 0.04 0.00 1 "
180 0.06 0.06 0.00 1
240 0.08 0.08 U.00 I
300 0.10 0.10 O.UO I
360 0.13 0.13 0.00 1
420 0.34 0.34 0.00 1
480 0.17 0.17 O.OU I
540 0.11 0.11 0.00 1
600 0.11 0.11 o.on I
660 0.09 0.09 0.00 1 * 1 1
720 0.09 0.09 0.00 1 * 1 1
780 n.O7 0.07 0.00 1 1 1 1
R40 0.08 0.08 0.00 1
900 0.06 0.06 O.On I
960 0.07 0.07 0.00 1
1020 0.05 0.05 0.00
1080 0.06 0.06 0.00
1140 0.05 0.05 0.00 1
1200 O.OG 0.06 0.00
1260 0.05 0.05 O.nO * 1 1
132n u.06 0.06 0.on * 1
I
1380 D.0S 0.05 0.00 1 * 1 1 1 1
1440 0.00 U.00 0.00 1 1 1 1
Time t---------t' _----t---------t
O.UO 0.10 0.20 n.3n 0.40
41: DPI 54, 341.60, 342.00 Length 54.on Feet
Ground elevation up 341.60 Feet
Ground elevation down 342.00 Feet
Minimum diameter 4.00 Inches
Lump sum cost 0.00 Dollars
ManningsN 0.00900
Mi.nSlope 0.00100
Link number
NOTE: Adjusting hydrngraphs for worst case situation
@Adding Sto into Event
@Addinq Diurnal into Design
@Adding Event into Design
Average Design Flow O.On Cu Ft/Sec
Storm tlV. (no SF) 0.882 Cutt/Sec
Design Ile. including SF 0.882 Cuft/Sec
Combined SF 1.000
Design diameter 8.00 Inones
Inv rt elev up 339.88 Feet
Invert elev down 338.74 Feet
slope 0.00259
Depth of fluid in pipe 7.12 Inches
d/D n.R90
Partial tLOw velocity 2.646 Feet/Sec
C:\HYDRA\CMD\ HYDRA Version 5.85
l.w.morrissette s associates Page 10
_
C:',HYDRA\CMD\CHRISTEN.CMD 11:45 3-Sep-104
CHRISTENSEN DEVEOLPMENT
Downstream hydrograph in CF:3 (Initial time=0.34 min):
O.0000 0.2500 0.5000 0.7500 1.0000
Time + +
0 0.0138 1
60 0.0479 I-
12U 0.093) 1--
180 0.1448
'40 0.1939--' I
300 0.2486 -------I
360 0.3290 I-
4-0 0.8B19 I 1 "-j
480 0.4383-- ---I---- I
540 0.2845--
600 0.2935 °1-
660 0.2352 - I
720 0.2414 1- - "'----I
180 0.1844
840 0.1995 I- -
900 U.1629 I
960 0.1719 I
1020 0.1287 1
1080 0.1479
1140 U.1311
1200 0.1478 ~I
1260 0.1314
1320 0.1477----
liB0 0.1316 1---
1440 0.0098 1 1 1
Time
O.0000 0.2500 0.5000 0.7500 ,.nco(u
42: HOL PARCEL3B
Tau PARCEL3B
Link
From line 4L
in file ,HYDRA\CMD\CHRISTEN
Sent to Hold[l]
43:
44: NEW PARCEL 3 SUBBASTN C.
4S: SCS 0.29, 0.40, 98, 9U, 2(), 0.02, 110
Land segment 0.290 Acres
Portion impervious 0.400
Curve number (CN) for Impervious 98.000
Curve number (CN) for Pervious 90.000
K Factor 20.000
Slope of land 0.0200
Sheet tlow distance 110.000 Feet
Computed concentration Lime 0.65 Minutes
Total Time of Concen LiaLiun 0.65 Minutes
Total rainfall falling on impervious 2589.64 Cu Ft
C:\HYDRA\CMD\ HYDRA Version 5.85
l.w.morrissette s associates Page 11
- T_=__ - - - -
C:\HYDRA\CMD\CHRISTEN.CMD 11:45 3-Sep-104
CHRISTENSEN DEVEOLPMENT
Impervious runoff 2491.81 Cu Ft
Portion off impervious 96.22 LL
Peak CPS rainfall falling on impervious 0.12 CuFt/Sec
Peak CPS runoff from impervious 0.12 CuFt/Sec
Equivalent "C" off impervious 0.98
Total rainfall falling on pervious 3884.46 Cu Ft
Pervious runoff 3156.40 Cu Ft
Portion off pervious 81.26 %
Peak CPS rainfall falling on pervious 0.18 CuFt/Sec
Peak. CFS runoff from pervious 0.15 Cu Ft/Sec
Equivalent "C" off pervious 0.86
Total rainfall falling on segment 6474.10 Cu Ft
Total segment runoff 5648.20 Cott
Portion off segment 87.24 8
Peak CFS rainfall falling on segment 0.30 Cu Ft/Sec
Peak CPS runoff from segment 0.27 Cu Ft/Sec
Equivalent "C" off segment 0.91
Hydrograph oft land segment :
I - Impervious runoff in r_FS
P - Pervious runoff in CPS
T - Total runoff I. CFS
0.00 0.10 0.20 0.30 0.40
Time
0 0.00 o.no 0.00 I I
60 0.01 0.00 0.01 1 1
120 0.02 0.01 0.03 11T 1
180 0.03 0.02 0.04 IPIT I
240 0.03 0.03 0.06 1 T I
300 0.04 0.04 0.08 1* T I I I
360 0.05 0.05 0.10 1 ` T'1 I
420 0.12 0.15 U.27 1 11 P I T I
4BO 0.06 0.08 0.14 1 I P I T I
540 0.04 O.nS 0.09 1 IP T I I I
600 0.04 0.05 O.n9 I IP T I I I
660 0.03 O.n4 U.07 I IP T I I I
720 0.03 0.04 0.07 I IT T I I 1 1
780 0.02 O.U3 0.06 IIP I I I I
Hon 0.03 0.04 0.06 1 IP T I I
900 0.02 0.03 U.05 IIP T I I I
96U 0.02 0.03 0.05 IIP T I
1020 0.02 0.02 0.04 I` T I
1060 0.02 0.03 0.05 IIP T I
1140 0.02 0.02 0.04 1- T I
1200 0.02 0.03 0.05 IIP 'f I I
1260 0.02 0.02 0.04 1- T I I
1320 0.02 0.03 O.U5 IIP T I I
1380 0.02 0.02 0_n4 1' T
1440 0.00 0.00 0.00 1 1 1 1
Time f__ +
0.00 0.10 0.20 0.30 0.40
C:\HYDRA\CMD\ HYDRA Version 5.85
j.w.morrissette 6 associates Page 12
C:\HYDRA\CMD\CHRISTEN.CMD 11:45 3-Sep-104
CHRISTENSEN DEVEOLPMENT
46: REC FARCEL39
Hold[NUm] 1
Looking up record number 2
47: INL 99
Inlet hydrographs
I - Incoming hydrograph
X - Exit hydrograph to system
R - Pond or reservoir/l
0.00 0.10 0.20 0.30 0.40
Time
0 0.00 0.00 0.00 1 1 1
60 n.01 0.01 0.00 1 1
120 0.03 0.03 0.00 1
180 0.04 0.04 0.00 1
240 0.06 0.06 0.00 1
300 0.08 0.08 0.00 1
360 0.10 0.10 0.00 1 *1
420 0.27 0.27 0.00 1 I 1 1 1
460 0.14 0.14 0.00 1 1 '
540 0.09 0.09 0.00 1
b00 0.09 0.09 0.00 1
660 0.07 0.07 0.00 I
720 0.07 0.07 0.00 1 * 1
78n n.n6 n.o6 0.00
B40 0.06 0.06 0.00
900 0.05 0.05 0.00
960 0.05 0.05 0.00 1
1020 0.04 0.04 n.00 I
1080 0.05 0.05 U.00 I "
1140 0.04 0.04 n.00 I
1200 0.05 U.05 0.00 1
1260 0.04 0.04 0.00 1 1 1 1 1
1320 0.05 0.05 0.00 1
1380 0.04 0.04 n.uo I
1440 0.00 0.00 0.00 1 1
Time +____-____}-________}_________{_--------I
0.00 0.10 0.20 0.30 0.40
4B: DPI 72, 342.n0, 341.OU
Length 72.00 Feet
Ground elevation up 342.00 Feet
Ground elevation down 341.00 Feet
Minimum diameter 4.00 Inches
Lump sum cost 0.00 Dollars
ManningsN 0.00900
MinSlope 0.00100
Link number 3
NOTE: Adjusting hydrographs for worst case situation
@Adding Ste into Event
@Adding Diurnal into Design
@Adding Event into Design
Average Design Flow 0.00 Cu Ft/Sec
C:\HYDRA\CMD\ HYDRA Version 5.85
j.w.morrissette & associates Page 13
- _ -o====
C:\HYDRA\CMD\CHRISTEN.CMD 11:45 3-Sep-104
CHRISTENSEN DEVEOLPMENT
Storm flow (no SF) 1.150 Cuft/Sec
Design flow including SF 1.150 Cutt/Sec
Combined IF 1.000
Design diameter 8.00 Inches
Invert elev up 338.74 Feet
Invert elev down 338.28 Feet
Slope 0.00639
Depth of fluid in pipe 6.16 Inches
d/D 0.770
Partial flow velocity 3.975 Feet/Sec
Downstream hydrograph in CFS (Initial time=0.30 min):
0.0000 0.5000 1.0000 1.5000 2.0000
Time
0 0.0180 1 1 1 1 1
60 O.n627 I
120 0.1221 1=
180 0.1892
240 0.2529 -
300 0.3247 1----=
360 0.4292 1=~~=
420 1.1503 1
480 0.5746 1- =
540 0.3695 I-=--- I
600 0.3848 1-------
660 0.3058
720 0.3167
780 0.2391 I°
840 0.2620 1
900 0.2116 1---
960 0.2257 1====
1020 0.1670 1-
1080 0.1941 I=-
1140 0.1708 1-- 1
1200 0.1940 1=== I I
1260 0.1111 1- I I
1320 0.1938 1-°- 1 1
1380 0.1714 1-- 1
1440 0.0137 1 1 1 1
Time
0.0000 0.5000 1.0000 1.5000 2.0000
49: HOL PARCEL3C
Tag PARCEL3C
Link 3
From line 49
In file C:\HYDRA\CMD\CHRISTEN
Sent to Hold[l]
50:
C:\HYDRA\CMD\ HYDRA Version 5.85
j.w.morrissette & associates Page 14
_ _ - - . _ - - - - _
C:\HYDRA\CMD'\CHRISTEN.CMD 11:45 3-Sep-104
CHRISTENSEN DEVEOLPMENT
51: REM THE FRONTAGE IMPROVEMENTS STORMWATER IS COLLECTED IN A CATCH BASI
N AT
52: REM THE NW CORNER OF THE NEW ROADWAY INTERSECTION WITH SR 507. THE ST
ORMWATER
53: REM THEN IS PIPED TO THE CATCH BASIN AT THE SOUTHWEST CORNER OE' THE N
EW
54: REM ROADWAY. THE CATCH BASIN ALSO COLLECTS THE SOUTH ANN WEST SIDE OF
THE NEW
55: REM ROADWAY STORMWATER. THE SOU'T'HWEST CATCH BASIN DISCHARGES TO THE
56: REM NORTHEAST CATCH BASIN WHICH COLLECTS THE EAST AND NORTH SIDE OF
57: REM THE NEW ROADWAY STORMWATFR. THE NORTHEAST CATCH BASIN DISCHARGES
58: REM INTO THE SWALE BETWEEN PARCELS 2 AND 3 AND INTO THE PONE).
59:
60: NEW ERONTAGE IMPROVEMENTS
61: SCS 0.15, 0.84, 9B, 90, 20, 0.02, 210
Land segment 0.150 Acres
Portion impervious O.R40
Curve number (CF! for Impervious 99.000
Curve number (ON) for Pervious 90.000
K Factor 20.000
Slope of land 0.0200
Sheet flow distance 210.000 Feet
Computed concentration time 1.24 Minutes
Total Time of Concentration 1.24 Minutes
Total raintall falling on impervious 2812.89 Cu Ft
impervious runoff 2707.n4 CuFt
Portion cef impervious 46.24 'a
Peak CE'S rainfall felling on impervious 0.13 CuFt/Set.
Peak CFS runoff from impervious 0.12 CuFt/Sec
Equivalent "r" nit impervious U.97
Total rainfall falling oa pervious 535.79 CuFt
Pervious runoff 435.45 CuFt
Portion off pervious 81.27 k
Peak CFS rainfall. falling on pervious 0.0245 CuFt/Sec
Peak CFS runoff from pervious 0.0208 CuFt/Sec
Equivalent "C" oft m,vious 0.85
Total rainfall falling on segment 3348.68 Cu Ft
Total seqment runoff 3142.49 Cu Ft
Portion off segment c 91.84 8
Peak -FS rainfall falling on segment 0.15 Cu Ft/Sec
Peak CFS runoff from segment 0.15 fuFt/Sec
Equivalent "r" off segment U.95
r:\HYDRA\CMD\ HYDRA Version 5.85
j.w.morrissette s associates Page 15
_ _ - - - - - -
C:\HYDRA\CMD\CHRISTEN.CMD 11:45 3-9ep-104
CHRISTENSEN DEVEOLPMENT
Hydrograph oft land segment :
I - Impervious runoff in CFS
P - Pezvious runott in CPS
T - Total runoff in CPS
0.00 U.05 0.10 0.15 n.20
Time +
0 0.00 0.00 0.00 1
60 0.01 0.00 0.01 1
120 0.02 0.00 0.02 1 IT I
180 0.03 O.n0 0.03 1 IT
240 0.03 0.00 0.04 1 * 1
300 0.04 0.01 0.04 1 IT I
360 0.05 0.01 0.06 IP IT
420 0.1: 0.02 0.15 1 P I T
480 O.U6 0.01 O.U8 IP T T
540 0.04 0.01 0.04 1 1 T
600 0.04 0.01 0.05 IP ITI
660 0.03 o.01 0.04 1 IT I
720 0.03 n.01 0.04 IT I
780 0.02 0.00 0.03 IT
840 0.03 0.01 0.03 1 IT I
9110 0.02 0.00 0.02 I IT
960 0.02 :1.00 0.03 I IT
1020 0.02 0.00 0.02 1 IT
in8o 0.02 0.00 0.02 1 IT 1 1 1
1140 0.02 U.00 0.02 1 IT 1
1200 0.01 o.on 0.02 1 1. 1 1 1
1260 0.02 0.00 0.02 I IT I
1320 0.02 0.00 0.02 1 IT I 1 1 1
13H0 0.02 0.00 0.02 1 • I
1440 0.00 0.n0 0.00 1 1
T.me
0.00 0.05 0.10 0.15 0.20
b2: iNL 99
Tnlet hydrographs
I - Incominq hydrograph
x Foil hydrograph to system
R - Pond or reservoir/I
0.00 O.n5 u.10 0.15 0.20
Time + +
0 0,00 U.n0 0.00
60 0.01 0.01 n.00
120 0. 0a 0.02 0.00
180 0.03 0.03 0.00 I
240 0.04 0.04 O.nU
300 0.04 0.04 0.00 1
360 0.06 0.06 0.00 1
42n 0.15 U.15 0.00 1
480 0.08 0.08 0.00 1
540 0.04 0.04 0.00 1
600 0.05 0.05 n,n0 I *I
660 0,04 U.n4 0.00 1 k
C:\fiYDRA\CMD\ HYDRA Version 5.85
j.w.morrissette & associates Page 16
- -
C:\HYDRA\CMD\CHRISTEN.CMD 11:45 3-Sep-104
CHRISTENSEN DEVEOLPMENT
720 0.04 0.04 0.00 1
780 0.03 0.03 0.00 1
840 0.03 0.03 0.00
900 0.02 0.02 0.00 1
960 0.03 0.03 0.00 1
102U 0.02 0.02 0.00 1* 1 1 1 1
1080 0.02 n.02 0.00 1
1140 0.02 0.02 0.00 I
1200 0.02 0.02 0.00 1 '
1260 0.02 0.02 0.00 1
1320 0.02 0.02 0.00 1
1380 0.02 0.02 0.00 1
1440 0.00 0.00 0.00 1
Ti.. _t______________ ___t-________t
0.un U.DS 0.10 0.15 0.20
63: DPI 193, 344.50, 343.80
Iength 193.00 Feat
Ground elevation up 344.50 Feet
Ground elevation down 343.80 Peet
minimum diameter 4.00 Inches
Lump sum cost 0.00 Dollars
ManningsN n,00goo
MinSlcpe 0.00i00
Link number 4
NOTE: Adjusting hydr,graphs for worst case situation
@Adding Sto into Event
@Adding Diurnal into Design
@Adding E,,ent into Design Average Design Flow 0.00 CuFt/.3ec
Storm tlow (no SF) 0.145 Cuft/Sec
Design flow including IF 0.145 CutL/Sec
Combined SF 1.000
Design diameter 4.00 Inches
Invert elev up 342.14 Feel
Invert elev down 341.44 Feet
Slope 0.00363
Depth oY tLuid in pipe 3.20 inches
d/D 0.800
Partial flow "'l"'1ty l.'417 Fret/SPc
Downstream 'aydrograph in CFS tinitial time-1.b8 min):
0.0noo 0.0500 n.Lnoo 0.1500 0.2000
Time +
2 0.0045
62 n,p145 1
122 0.0228 1- =
182 0.0300
242 0.0372 1
302 0.0448 I
362 0.0572 1-
422 0.1454--------- 1_-- - -`-1-----
482 0.0755 1'-----1-... 1 !
542 0.0435-t I 1
602 U.0502 - I
C:\HYDRA\CMD\ HYDRA Version 5.85
i.w.moriissetts 6 associates Page 17
- -
C:AHYDRAVCMDACHRIGTEN.CMD 11:45 3-Sap-104
CHRISTENSEN DEVEOLPMENT
662 0.0357 1
722 0.0409
782 0.0282=
842 0.0333-==--
902 0.0250 1--
962 0.0285 1=
1022 0.0199 1---
1082 0.0242 1- -
1142 0.0203 1- =
1202 0.0239 I-==
1262 0.0206 1---
1322 0.0237 1----
1382 0.0208 1- 1 1 1
1442 0.0023 1
Time +
0.0000 0.0500 0.10on 0.1500 0.2000
64: HOL FRONTAGE
'T'ag FRONTAGE
L.i uk 4
From line 64
In Tile C:\HYDRA\CMD\CHRISTEN
Sent to Hcld[21
65:
66: NEW LOT 4
67: SCS 0.74, 066, 98, 78, 20, 0.024, 251
Land segment U.740 Acres
Portion impervious 0.660
Curve number (CN) for impervious 98.000
Curve number (CN) for Pervious 78.000
K Factor 20.000
Slope of land 0.0240
Sheet ties distance 251.000 Feet
Computed concentration time 1.35 Minutes
Total Time of Gmcentretion 1.45 Mimites
Total rainfall falling on impervious 109U3.29 Cu Ft
impervious runoff 10493.04 Cu Ft
Portion off impervious 96.24 k
Peak CPS rainfall f~llinq on impervious 0.50 Cu Ft/Sec
Peak CFS runoff from impervious 0.48 Cu Ft/Sec
Equivalant "C" off impervious 0.97
Total rainfall falling on pervious 5616.84 CuFt
Pervious runoff 3394.34 Cu Ft
Portion off pervious 60.43 1
Peak CFS rainfall falling on pervious 0.26 Cu Ft/Sec
Peak CFS runoff from pervious 0.15 Cu Ft/Sec
Equivelant "r" off pervious 0.58
C:\HYDRA\CMD\ HYDRA Version 5.R5
j.w.morrissette & associates Page 18
eecec-v
_
C:\HYDRA\CMD\CHRISTEN.CMD 11:45 3-Sep-104
CHRISTENSEN DEVEOLPMENT
Total rainfall falling on segment 16520.13 CuFt
Total segment runoff 13887.37 CuFt
Portion off segment 84.06 %
Peak CFS rainfall falling on segment 0.75 CuFt/Sec
Peak DES runoff from segment 0.63 Cu Ft/Sec
Equivalant "C" off segment 0.84
Hydrograph off land segment :
I - Impervious runoft in CFS
P - Pervious runoff in CFS
T - Total runoff in CFS
0.00 0.20 0.40 0.60 0.80
Time +
0 0.02 0.00 0.02 1
60 0.06 0.00 0.06 1 !
120 0.08 0.00 0.08 1
180 0.11 0.00 0.11 1
240 0.13 0.01 0.14 1 IT
300 0.15 0.03 0.18 1 IT I
360 0.19 0.04 0.24 In IIT I I
42n 0.48 0.15 0.63 1 P I I IT
480 0.25 0.09 0.34 1 P I I I I I
s40 0.14 0.06 0.20 ! P I TI I I
600 0.17 0.06 U.23 I P I IT I I
660 0.12 0.05 0.17 In I T I I
720 0.13 0.05 0.19 1 P I T
700 U.09 0.04 0.13 IP I T
840 0.11 0.05 0.16 IP I T
900 0.08 0.04 0.12 IP I T I
960 0.09 0.04 0.13 IP I T I I I I
102n 0.07 0.03 0.10 1 I T I I I I
1080 0.08 0.03 0.11 It 1 I' I I I
1140 0.07 0.03 0.10 IPI T I I
1200 0.08 0.03 0.11 IP I T I I I
1260 O.U7 n.03 0.10 IPI T I I I
1320 0.08 0.03 0.11 IP I T I I I
1380 0.07 0.03 0.i0 IPI T I I I
1440 0.01 0.00 ().O1 I I I I
Time r + - + -
U.00 0.20 0.40 0.60 0.80
68: INL 99
C:\HYDRA\CMD\ HYDRA Version 5.85
j.w.morrissette 6 associates Page 19
=ce _ _ _
C:\HYDRA\CMD\CHRISTEN.CMD 11:45 3-Sep-104
CHRISTENSEN DEVEOLPMENT
Inlet hydrographs :
I - Incoming hydrograph
X - Exit hydroyraph to system
R - Pond or reservoir/l
0.00 0.20 0.40 0.60 0.80
Time
0 0.02 0.02 0.00 I I I 1 1
60 0.06 0.06 0.00 1
120 0.08 0.08 0.00
180 0.11 0.11 0.00
240 0.14 0.14 0.00 I
300 0.18 0.18 0.00 1 * 1
360 0.24 0.24 0.00 1 I*
420 0.63 0.63 0.00 1 I*
480 0.34 0.34 0.00 1 1
540 0.20 0.20 0.00 1 *1 1
600 0.23 0.23 0.00 It I I
660 0.1.7 0.17 0.00 * 1 1 1
720 U.I9 0.19 0.00 1 * 1 1 1
780 0.13 0.13 0.00 1 * 1
840 0.16 0.16 0.00 I
900 0.12 0.12 0.00 1 1
960 0.13 0.13 0.00 1
1020 0.10 0.10 0.00 I
1080 0.11 0.17. 0.00 1
1140 0.10 0.10 0.00
1200 0.11 0.11 0.00
1260 O.lu 0.10 0.00 I
1320 0.11 0.11 0.00
1380 0.10 0.10 0.00
1440 0.01 0.01 0.00
Time t---------+__ _
O.u0 0.20 0.40 0.60 0.80
69: CHA 251, 351, 346, 351, 346 Length 251.00 Feet
GrDp 351.00 Feet
GrDn 346.00 Feet
InvOp 351.00 Feet
InvDn 346.00 Feet
Link number 5
NOTE: Adjusting hydrographs Tor worst case situation
@Adding Sto into Event
@Adding Diurnal into Design
@Adding Event into Design
Average Design Flow 0.00 CuFt/Sec
Storm flow (no SF) 0.632 Cuft/Sec
Design flow includiny SF 0.632 Cuft/Sec
Combined SF 1.000
THE Maximum velocity 6.0000 FPS
CND Minimum velocity 0.3000 FPS
CHD Mannings "n" 0.2000
CHD Left side slope 3.0000
CHD Bottom width 5.00 Feet
C:\HYDRA\CMD\ HYDRA Version 5.85
j.w.morrissette & associates Page 20
. . _
C:\HYDRA\CMD\CHRISTEN.CMD 11:45 3 Sep 104
CHRISTENSEN DEVEOLPMENT
CHD Right side slope 3.0000
CHD Minimum freeboard 1.0000 Feet
CHD Eafiltration 0.0000 IPH
Channel Slope 0.0199
Design flow 0.63 Cuft/Sec
Depth of flow 3.26 Inches
0.27 Feet
Velocity 0.40 Ft/Sec
Travel time 10.44 Minutes
Width of surface 6.63 Feet
Downstream hydrograph in CIS (Initial time-10.44 min):
0.0000 U.20D0 0.4000 0.6000 0.8000
Time + _
10 0.0173 1 1 1
70 0.0554
130 0.0837
190 0.1089 1
250 0.1415 1==-- 1
310 0.1781--
370 0.2365 I--~- -1-
430 U.6320 I 1--------- I-----==-_-I'
490 0.3416 I-- - I
550 0.1983--
610 0.2310 =-1-
670 0.1657 1---- 1
730 D.1896 1------= I
790 0.1326 1--- - I I I
850 U.15S5 - I I I
910 0.1181 1-----
970 0.1331 I- -
1030 n.0950 1-
1090 0.1136-= 1 1 1
1150 0.0970-==
1210 0.1126-
1270 0.0987 1-
1330 0.1117-=--
1390 0.1002 -
1450 0.0097
Time - + - +
0.0000 0.2000 0.4000 0.6000 0.8000
70: HOL LOT4
Tau LOT4
Link .
From line 70
I. file C:\HYDRA\CMD\CHRISTEN
Sent, to Hold[3]
71:
C:\HYDRA\CMD\ HYDRA Version 5.85
j.w.morrissette & associates Page 21
. - -
C:\HYDRA\CMD',CHRISTEN.CMD 11:45 3-Sep-104
CHRISTENSEN DEVEOLPMENT
72: NEW SOUTH AND WEST ROADWAY
73: SCS 0.22, 0.80, 98, 90, 20, 0.008, 156
hand segment 0.220 Acres
Portion impervious 0.800
Curve number (CN) for Impervious 98.000
Curve number (CN) for Pervious 9U.000
K Factor 20.000
^lope of land 0.00800
Sheet flow distance 156.000 Feet
Computed concentration time 1.45 Minutes
Total Time of Concentration 1.45 Minutes
Total rainfall falling on impervious 3929.11 Cu Ft
Impervious runoff 3781.27 Cu Ft
Portion oft impervious 96.24 2
Peak CFS rainfall falling on impervious 0.18 Cu Ft/Sec
Peak CFS runoff from impervious 0.17 Cu Ft/Sec
Equivalant "r" off impervious 0.99
Total rainfall fallinq on pervious 982.28 CuFt
Pervious runoff 798.33 CuFt
Portion off pervious 81.27 %
Peak CFS rainfall. falling on pervious 0.0449 Cu Ft/Sec
Peak IFS runoff from pervious 0.0380 Cu Ft/Sec
Equivalant "C" oft pervious 0.85
Total rainfall falling on segment 4911.39 Cu Ft
'T'otal segment runoff 4579.61 Curt
Portion off segment 93.24 0
Peak CPS rainfa Ll falling on segment 0.22 Cu Ft/Sec
Peak CFS runoff from segment 0.21 Cu Ft/Sec
Equivalant "C" off segment 0.94
Hydrograph off land segment :
I - Impervious runoff in CPS
P Pervious runoff in CfS
T - Total runoff in CPS
0.00 0.10 0.20 0.30 0.40
Time - 4------_--}_____-__-I
0 0.01 0.00 0.01 I I I 1 1
60 0.02 0.00 0.02 I* I I I I
120 0.03 0.00 0.03 1" 1 1 1 1
180 0.04 0.00 0.04 1 1 !
240 0.05 U.01 0.05 1 * 1
300 0.05 0.01 0.06 1 IT I
360 0.01 0.01 0.08 1 IT I
420 0.17 0.04 0.21 I P I I T
480 0.09 U.02 0.11 IP T T I
540 0.05 0.01 0.06 IT I I I
600 0.06 0.n] 0.07 1 IT I I I I
C:\HYDRA\CMD\ HYDRA Version 5.85
1.w.morrissette & associates Page 22
- _ - _
C \HYDRA\CMD\L'HRISTEN.CMD 11:45 3-Sep-104
CHRISTENSEN DEVEOLPMENT
660 0.04 0.01 0.05 1 IT I
720 0.05 0.01 0.06 1 IT I f
780 0.03 0.01 0.04 1 TT I
840 0.04 0.01 0.05 ST I
90U 0.03 0.01 0.04 1 CT I
960 0.03 0.01 0.04 1 IT I I
1020 0.02 0.01 o.n3 IIT I
1080 0.03 U.01 U.04 I IT I
1140 n.02 0.01 n.03 ;IT 1
1200 0.03 0.01 0.03 1 * 1
1260 0.02 0.01 0.03 IIT I
1320 0.03 0.01 0.03 1 * 1
1380 0.02 0.01 0.03 IIT I
1440 0.n0 0.00 0.60 1
Time +-________t_
0.()() 0.10 0.20 0.30 0.40
'74: REC FRONTAGE
Hnld[Num] _
Lookinq up record number 4
75: REC LOT4
Hold[NUm] 3
Looking up record number 5
76: INL 99
Inlet hydrogrsphs
I - Incoming hydrograph
X, Exit hydr09raph t, system
R - Pond or reservoir/1
0.00 0.10 0.20 0.30 0,40
Time I__ + __f_
0 0.01 0.01 n.00 ]
60 0.02 0.02 o.Uo 1
120 0.03 0.03 U.no I
180 0.04 0.04 0.00 * 1
240 0.05 0.05 0.00
300 0.06 0.06 0.00 ]
360 0.08 0.08 O.On I
420 n,21 0.21 o.un I 1 + 1
480 0.11 0.11 0.00 1 * 1 1
S40 0.06 0.06 0.00 1
600 0.07 0.u7 n.UO 1 ] t
660 o.U5 n.n5 0.0n
700 U.06 o.n6 n. On 1 1
1
780 0.04 0.04 o.OU I
840 0.05 0.05 0.00 1
900 0.04 0.04 0.00 1
960 U.04 0.04 U.no I
1020 6.03 0.03 O.ou
1080 0.04 0.04 0.00
1140 0.03 0.03 0.00 1
1100 0.03 O.U3 0.00 1 * !
1260 0.03 0.03 0.00 1 +
C:\HYDRA\CMD\ HYDRA Version 5,85
j.w.morrissette & associates Page 23
C:\n YDRA\CMD\CHRISTEN.CMD 11:45 3-Sep-104
CHRISTENSEN DEVEOLPMENT
1320 0.03 0.03 0.00 I * I
1380 0.03 0.03 0.00 1 ' I I
1440 0.00 0.00 0.00 1 1
Time +_________t_______ __t_
0.00 0.10 0.20 0,30 0.40
77: DPI 20, 343.80, 341.00 Length 20.00 Feet
Ground elevation up 343.80 Feet
Ground elevation down 341.00 Feet
Minimum diameter 4.00 Inches
Lump sum cost 0.00 Dollars
MenningsN 0.009D0
MinSlope 0.00100
Link number 6
NOTE: Adjusting hydrographs for worst case situation
@Adding Sto into Event
@Adding Diurnal into Design
@Adding Event into Design Average Design Flow 0.00 CuFt/Sec
Storm flow (no SF) 0.989 Cuft/Sec
Design tlow including SF 0.989 Cuft/Sec
Combined SF 1.000
Design diameter 4.00 Inches
Invert .Iev up 341.44 Feet
Tnvert e1ev down 338.64 Feet
Slope 0.1400
Depth of fluid in pipe 3.48 Inches
d/D 0.870
Parti,al flow velocity 12.180 Feet/Sec
Downstream hydrograph in CFS (Initial time-0.03 min):
0.0000 0.2500 0.5000 0.7500 1.0000
Time ___r_ - 4_________}
0 0.0281
60 0.0890--
120 0.1394-==
ISO 0.1823 1 I I I
240 0.2320 I---
300 0.2878 1-- =1-
360 0.3755 - - -I=-- 1
420 0.9888
1-°•---.=1 - I- - ==1
480 0.5291 --==--1- -
540 0.3049 --°=1- I
600 0.3550 = - 1
660 0.2537--
720 0.2922 1= -1-
780 0.2034°=---=
840 0.2383 1==-- = =-1
900 0.1805 1 1
960 0.2041-= l
1020 0.1434 1==--
1080 0.1740 1=-- -
1140 0.1470--
1200 0.1704
C:\HYDRA\CMD\ HYDRA Version 5.85
j.w.morrissette & associates Page 24
- - - - - _ - -
C:\HYDRA\CMD\CHRISTEN.CMD 11:45 3-Sep-104
CHRISTENSEN DEVEOLPMENT
1260 0.1500 I-- - I 1 1
1320 0.1700 1--='
1380 0.1510 1=--
1440 0.0154 1
Time _
0.0000 0.2500 0.5000 0.7500 1.0000
78: HOL SWROADWAY
Tag SWROADWAY
Link 6
From line 78
In file C:\HYDRA\CMD\CHRISTEN
Sent to Hold[2]
79:
80: NEW NORTH AND EAST ROADWAY
81: SCS 0.22, 0.80, 98, 90, 20, 0.008, 156
Land segment 0.220 Acres
Portion impervious 0.800
Curve number (CN) for Impervious 98.000
Curve number (CN) for Pervious 90.000
K Factor 20.000
Slope of land 0.00800
Sheet flow distance 156.000 Feet
Computed concentration time 1.45 Minutes
Total Time of Concentration 1.45 Minutes
Total. rainfall falling on impervious 3929.11 CuFt
Impervious runoff 3781.27 CuFt
Portion ,if impervious 96.24 c
Peak CPS rainfall falling on impervious 0.18 Cu Ft/Sec
Peak CPS runoff from impervious 0.17 Cu Ft/Sec
Equivalant "C" off impervious 0.91
Total rainfall falling on pervious 982.28 Cu Ft
Pervious runoff 798.33 Cu Ft
portion off pervious 81.27
Peak CPS rainfall falling on pervious 0.0449 C_u Ft/Sec
Peak CFS runoff from pervious 0.0380 CuFt/Sec
Equivalent "C" oft pervious 0.85
Total rainfall falling on segment 4911.39 Cuff
Total segment runoff 4579.61 CuFt
Portion off segment 93.24 %
Peak CFS rainfall falling on segment 0.22 CuFt/Sec
Peak CFS runoff from segment 0.21 Cn Ft/Sec
Equivalant "r" off segment 0.94
C:\HYDRA\CMD\ HYDRA Version 5.85
j.w.morrissette u associates Page 25
-
C:\HYDRA\CMD\CHRISTEN.CMD 11:45 3-Sep-104
CHRISTENSEN DEVEOLPMENT
Hydrograph off land segment :
I - Impervious runoff in CPS
P - Pervious runoff in CPS
T - Total runoff in CFS
0.00 0.10 0.20 0.30 0.40
Time
0 0.01 0.00 0.01 1 1 1 1 1
60 0.02 0.00 0.02 1` 1 1 1 1
120 0.03 0.00 0.03 1
180 0.04 0.00 0.04 1
240 0.05 0.01 0.05 1 1 1
300 0.05 0.01 0.06 1 IT I
360 0.07 0.01 0.08 1 IT I
420 0.17 0.04 0.21 1 F I T
480 0.09 o.n2 0.11 1P I T 1 1
540 0.05 0.01 0.06 1 IT I
600 0.06 0.01 0.07 1 IT I
660 0.04 0.01 0.05 1 IT I
720 0.05 0.01 0.06 1 IT I
780 0.03 0.01 0.04 I IT I
840 0.04 o.n1 0.05 1 IT I
900 0.03 0.01 0.04 1 IT I
960 0.03 0.01 0.04 1 IT I
1020 0.02 0.01 0.03 IIT I
1080 0.03 0.01 0.04 1 IT I
1140 0.02 0.01 0.03 IIT I
1200 0.03 0.01 0.03 I * I
1260 0.02 0.01 0.03 IIT I
1320 0.03 0.01 0.03 1 * I
1380 0.02 0.01 0.03 IIT I
1440 0.00 0.00 0.00 1 1
Time
0.00 0.10 0.20 0.30 0.40
82: PET SWROADWAY
Hold[Mum] 2
Lookinq up record number 6
83: INL 99
Inlet hydrographs
I - Incoming hydrogrdph
X - Exit hydrograph to system
R - Pond or reservoir/l
C:\HYDRA\CMD\ HYDRA Version 5.85
).w.morrissette & associates Page 26
- -
C:\HYDRA\CMD\CHRISTEN.CMD 11:45 3-Sep-104
CHRISTENSEN DEVEOLPMENT
0.00 0.10 0.20 0.30 0.40
Time t_________t________
0 0.01 0.01 0.00 1
60 0.02 0.02 0.00 I*
120 0.03 0.03 0.00 1
SAO 0.04 0.04 0.00 1 * 1
240 0.05 0.05 0.00
300 0.06 0.06 0.00
360 O.OR O.OR 0.00 ( * f
420 0.21 0.21 n.00 I
480 0.11 0.11 0.00 1 * 1 1
540 0.06 0.06 0.00 1 " 1 1
600 0.07 0.07 0.00 1 "
660 0.05 U.n5 U.00 I I
720 0.06 0.06 0.00 1 * 1
780 0.04 0.04 0.00 I 1
840 0.05 0.05 0.00 1 " 1
900 0.04 0.04 0.00 1 * 1 1
960 0.04 0.04 0.00 1 * I I
1020 0.03 0.03 0.00 1 1
1080 0.04 0.04 0.00 * 1
1140 0.03 0.03 0.00
1200 O.U3 0.03 0.00
1260 U.03 0.03 0.00 1
1320 0.03 u.0-i 0.00 1
1380 0.03 0.03 0.00 I * I I
1440 0.00 0.00 0.00 1
Ti., 4
0.00 0.10 0.2U 0.30 0.40
84: DPI 70, 343.76, 341.50
Length 70.00 Feet
Ground elev. Lion up 343.76 Feet
Ground elevation down 341.50 Feet
Minimum di.m'ter 4.00 Inches
Lump sum cast 0.00 Dollars
ManuingsN 0.00900
MinSlope 0.00100
Link number
NOTE: Adjusting hydrographs for worst case si.tuatior"
@Adding Ste into Event
@Adding Diurnal into Design
@Adding Event into Design Average Design Flow 0.011 CuFt/Sec.
Storm flow (no SF) 1.20n Cu£t!Sec
Design flow including SF 1.200 Cnfl./Sec
Combined .",F 1.000
Design diameter 10.00 lnches
Invert elev up 338.64 Feet
Invert elev down 338.54 Feet
Slope 0.00146
Depth of fluid in pipe 8.90 Inches
d/D 0.890
Partial flow velocity 2.305 Feet/Se,-
C:\HYDRA\CMD\ HYDRA Version 5.85
j.w.morrissette 6 associates Page - 27
11:45 3-Sep-104
CHRISTENSEN DEVEOLPMENT
Downstream hydrograph in FEE (Initial time-0.51 min):
0.0000 0.5000 1.0000 1.5000 2.0000
Ti.B --_-__-y_ -4
1 0.0334 1
bl 0.1094 1-
121 0.1719 1--
181 0.2253 1-=--
241 0.2663 1--°- 1
301 0.3518-- 1
361 0.4592-=
421 1.2003 1------ - -1-
481
481 0.6392 ~1- 1
541 0.3652
601 0.4310 1------
661 0.3038
721 0.3511 =
781 0.2427 1
841 0.2656
901 0.2187=
961 0.24'13 -
1021 0.1127 1 1
1081 0.2100 1 I
11.41 0.1-772 1 1
1201 0.2056 1 1 1 1 1
1261 0.1816 1---
1321 0.2052 I
1381 0.1820 I--
1441 0.0187 1 1
Time + -
0.0000 0.500() 1.0000 1.5000 2.0000
85: HOL NFROADWAY
Tag NEROADWAY
Link 7
From time 89
In file C:\HYDRA\CMD\CHRISTEN
Sent to Hold[2]
86:
87: NEW LOT 1
BH: CIS O.H6, 0.58, 98, 7H, 20, 0.007, 426
Land segment U.B60 Acres
Portion impervious 0.580
Curve numbel (CN) for Impervious 98.000
Curve number (CN) for Pervious 78.000
K Factor 20.000
Slope of land 0.00700
Sheer flow distance 426.000 Feet
Computed concentration time 4.24 Minutes
Total Time of Concentration 4.24 Minutes
Total rainfall falling on impervious 11135.4G Cuff
C:\HYDRA\CMD\ HYDRA Version 5.85
l.w.morrissette 6 associates Page 28
- _
C:\HYDRA\CMD\CHRISTEN.CMD 11:45 3-Sep-104
r,HRISTENSEN DEVEOLPMENT
Impervious runoff 10718.54 Cu Ft
Portion off impervious 96.26 0
Peak CFS rainfall failing On imperviuus 0.51 CuFt/Sec
Peak CFS runoff from impervious 0.47 ruFt/Sec
Equivalant "C" off impervious 0.92
Total rainfall falling on pervious 8063.61 CuFt
Pervious runoff 4875.84 ru Ft
Portion oft pervious 60.47 a
Peek CPS rainfall falling on pervious 0.37 CuFt/Sec
Peal: CFS runott from pervious 0.20 Cu Ft/Sec
Equivalant "C" oft pervious 0.55
Total rainfall falling on segment 19199.07 CnFt
Total segment runoff 15594.38 CUFF
Porf.ron off segment : 91.22
Peak CPS rairnfa Ll fulling on segment 0.88 CuFt/Sec
Peak CFS runoff from segment 0.67 Cn Ft/Sec
Equivalant "r" off segment 0.77
Hydrograph off land segment :
i Impervious r,~ngff in CPS
P - Pervious runoff in CFS
T Tnbil runoff in CFS
0.00 0.20 0.40 (1,60 n.80
Time f--------- i----__---+
0 0.02 0.00 0.0-
60 0.05 0.00 0.115
120 0.08 0.00 0.08
180 0.11 0.00 0.11 IT
240 U.13 0.02 0.15
300 0.15 0.04 0.19 IP I TI
360 0.19 0.06 0.26 I P II T
420 0.47 0.20 0.6/ PI I T 1
4811 0.29 0.1" 11.44 P I IT
540 n.13 0.07 0.20 1 P I TI
600 0.18 0,10 0.28 P I I 'P
660 0.11 0.07 0.18 P I T I I I
7211 0. ] 4 0, 08 0.22 P 1 T
7R0 U.10 0,06 0.16 1 P I T I I
840 0.11 0,06 0.17 I P I T I
900 0.09 0,06 0.14 1 PI T I
9bo 0.09 0.05 0.15 1 P I T 1
1020 6.07 0.05 11.12 IP I T I
1080 0.08 0.05 n.12 IP I T I
1140 0.07 0.05 0.12 IP I T
1200 0.07 0.05 U.12 If I T
1260 0.07 0.05 0.12 IP I T
1320 0.01 0.05 0.12 IP I T !
1380 0.07 0.09 0.12 IT I T
1440 0.01 0.01 0.02 1
Time +
0.00 0.20 0.40 0.60 0.80
C:\HYDRA\CMD\ HYDRA Version 5.85
j.w.morrissette & associates Page 29
C:\HYDRA\CMD\CHRTSTEN.CMD 11:45 3 Sep-104
CHRISTENSEN DEVEOLPMENT
89: INL 99
Inlet hydrographs :
I - Incoming hydroqraph
X - Exit hydrograph to system
R Pond or reservoir/l
0.00 0.2n 0.40 0.60 0.80
Time ._____t
0 0.02 0.02 0.00 1
60 0.05 0.05 0.00 !
120 0.08 0.08 0.00
Ian 0.11 0.11 0.00 1 * 1 1
240 0.15 0.15 0.00 1
300 0.19 0.19 0.00 1 *1
360 0.26 0.26 0.00 1 '
420 0.67 0.67 0.00 1
490 0.44 0.44 D.DO I I*
540 0.20 0.20 0.00 *I
600 0.2B 0.28 0.00
660 0.18 0.18 0.00 1
720 0.22 0.22 0.00 1
780 0.16 0.16 0.00 * I
840 0.17 0.17 0.00 1
900 U.14 0.14 0.00 ! * !
960 0.15 0.15 0.00 1 * 1
1020 0.12 0.12 0.00
1080 0.12 0.12 0.00 * I
1140 0.12 0.12 O.OU I
1200 0.12 0.12 O.OD I
1260 0.12 0.12 0.00 1
1320 0.12 0.12 0.00 1
1380 0.12 0.12 0.00 1
1440 0.02 0.02 0.00 1
Time +__-______t_______ -______________a
0.00 0.20 0.40 0.60 0.80
90: CHA 426, 347, 344, 347, 344
Length 42G.00 Feet
GrUp 347.00 Feet
GrUn 344.00 Feet
I',f)p 347.00 Feet
Inv Dn 344.00 Feet
Link number 6
NOTE: Adjusting hydrographs for worst case situation
@Addinq Sto into Event
@Adding Diurnal into Design
@Addinq Event into Design
Average Design Flow 0.00 CuFt/Sec
Storm flow (ne SF) 0.673 Cu£t/Sec
Design flew including SF 0.673 Cuft/Sec
Combined SF 1.000
CHD Maximum velocity 6.0000 FPS
CHD Minimum velocity 0.3000 FPS
C:\HYDRA\CMD\ HYDRA Version 5.85
j.w.morrissette & associates Page 30
_ -
C:\HYDRA\CMD\CHRZSTEN.CMD 11:45 3-Sep 104
CHRISTENSEN DEVEOLPMEN
CHD Mannings "n" 0.2000
CHD Left side slope 3.0000
CND Bottom width 5.00 Feet
CHD Right side slope 3.0000
CHD Minimum freeboard 1.0000 Feet
CHD Exfiltration 0.0000 IPH
Channel Slope 0.00/04
Design flow 0.67 Cuft/Sec
Depth of flow 4.56 Inches
0.38 Feet
Ve1OCitY 0.29 Ft/Sec
Travel time 24.52 Minutes
Width of surface 7.28 Feet
Downstream hydrograph in CFS (Initial time-24.52 min):
0.0000 0.2000 0.4000 0.6000 0.8000
Time +_____-___r--____-__t_________________
25 0.0162
B5 0.0544 -
145 0.0847 1--
205 0.1106°=--
-65 0.1478
325 0.1909==-- -=''--I
385 0.2558--=---I°°
445 0.6727
505 0.4397 1=
569 0.1993
625 0.2796
6B5 0.1832 I-
745 0.2190
805 0.1557 1-
865 0.1730
925 0.1430
985 0.1457-== -
1045 0.1182-~ =
1105 0.1219
1165 0.1196-==--
1225 0.1219 1~ - 1
1285 0.1206
1345 0.1220
1405 0.1214
1465 0.0154 f
Time _+___________________t___
0.0000 0.20n0 n.4000 0.6000 0.8000
91: HOL LOT1
Tag : LOTI
Link B
From line 91
In file C:\HYDRA\CMD\CHRISTFN
sent to Hold[3j
C:\HYDRA\CMD\ HYDRA Version 5.85
j.w.morrissette ff associates Page 31
-
C:\HYDRA\CMD\CHRISTEN.CMD 11:45 3-Sep-104
CHRISTENSEN DEVEOLPMENT
92:
93: NEW LOT 2
94: SCS 1.95, 0.58, 98, 78, 20, 0.024, 251
Land segment 1.95n Acres
Portion impervious 0.580
Curve number (CN) for Impervious 98.000
Curvy number (CN) for Pervious 78.000
K Factor 20.000
Slope of land 0.0240
Sheet flow distance 251.000 Feet
Computed concentration time 1.35 Minutes
Total Time of Concentration 1.35 Minutes
Total rainfall falling on impervious 25249.01 CuFt
Impervious runoff 24298.99 Cu Ft
Portion off impervious 96.24 8
Peak CPS rainfall falling on impervious 1.15 CuFt/Sec
Peak CFS runoff from impervious 1.12 CuFt/Sec
Equivalent "C" off impervious 0.97
Total rainfall falling on pervious 18283.77 Cu Ft
Pervious runoff 11049.13 CuFt
Portion off pervious 60.43 8
Peak CFS rainfall falling on pervious 0.83 CuFt/Sec
Peak CF5 runoff from pervious 0.49 CuFt/Sec
Equivalent "r" otf pervious 0.58
Total rainfall falling on segment 43532.77 Curt
Total segment runoff 35348.12 Cu Ft
Portion off segment 81.20 0
Peak CFO rainfall falling on segmP.nt 1.99 Cu Ft/Ser.
Peak CPS runoff from segment 1.60 Cu Ft/Sec
Equivalant "C" off segment 0.81
Hydrograph off land segment :
I - Impervious runoff in CFS
P - Pervious rnnotf in CFS
T - Total runoff in US
C:\HYDRA\CMD\ HYDRA Version 5.85
j.w.morrissette 6 associates Page 32
e--_ e--------- _-__-_P--_
C:\HYDRA\CMD\CHRISTEN.CMD 11:45 3-Sep-104
CHRIS'TENSEN DEVEOLPMENT
0.00 0.50 1.00 1.50 2.00
Time
0 0.04 0.00 0.04 I I 1 1
60 0.13 0.00 0.13 I
120 0.19 0.00 0.19 1
180 0.25 0.01 0.25 1 * 1 1 1
240 0.30 0.04 0.34 1 IT I I 1
300 0.35 0.08 0.44 IP I T I I
360 0.45 0.14 0.59 I P I IT 1
420 1.12 0.49 1.60 1 PI II IT 1
480 0.58 0.29 O.B8 I P IT T I I I
540 0.33 0.18 U.51 I P I TI I I
600 0.38 0.21 0.60 1 P I IT I
660 U.27 0.16 0.43 1 P I T I i
720 0.31 0.18 0.49 I P I TI 1 1
780 U.21 0.13 0.35 I PI T I I
B40 0.25 0.15 0.40 I P I T 1 I
900 0.19 0.12 0.31 IP I T I I
960 0.22 0.13 0.35 I PI T I I
1020 0.15 0.10 0.25 IPI T I I
IOBO 0.16 U.11 l>.30 IF I T I I
1140 0.15 0.10 0.25 IPT T I I
1200 0.18 0.11 0.29 IP I T I I
1260 n.16 0,10 0..6 IPT T I I
1320 0.18 U.11 0~p.29 IP I T I I
1380 0.16 0.10 0.-,6 IPI T
1440 0.02 0.01 0.02 1 1
Time i _l-
0.00 0.50 1.00 1,5o 2.00
95: INL 99
Inlet hydrographs : I - incoming hydrograph
x Exit hydrograph to system
R - Pond or reservoir/l
0.00 0.50 1.00 1.50 2.00
Time 4--
0 0.04 0.04 ?.00 1 1
60 0.13 0.13 0.00 1 ' 1
120 0.19 ..19 0.00
180 0.25 0.25 0.00 1
240 0.34 0.34 n.00 1 1 1 1
300 0.44 0.44 0.00 1
360 0.59 0.59 0.00 1 I*
420 1.60 1.60 0.00 1 I*
480 0.88 O.B8 U.00 I
540 0.51 0.51 0.00 1 *I
600 0.6o U.6u 0.00 1
660 0.43 0.43 0.00 I
720 0.49 0,49 0.00 1 *I I
780 0.35 0,35 0.00 1
840 0.40 0.4U 0.00 1
900 0.31 0,31 0.00 1 * 1
960 0.35 0,35 0.00 1 * 1
C:\HYDRA\CMD\ HYDRA Version 5.85
j.w.morrissette & associates Page 33
- - - - -
C:\HYDRA\CMD\CHRISTEN.CMD 11:45 3-Sep-104
CHRISTENSEN DEVEOLPMENT
1020 0.25 0.25 U.00 I
1080 0.30 0.30 0.00 I * I I
1140 0.25 0.25 0.00 1
1200 0.29 0.29 0.00 1
1260 0.26 0.26 0.00
1320 0.29 0.29 0.00
1380 0.2G 0.26 0.00 1 ' 1 1
1440 0.02 0.02 0.00 I I I
Time
0.00 0.50 1.00 1.50 1.00
96: CHA 251, 351, 346, 351, 346
Length 251.00 Feet
GrOp 351.00 Feet
Cron 346.00 Feet
Invlip 351.00 Feet
Inv Un 346.00 Feet
Link number 9
NOTE: Adjusting hydrographs for worst case situation
@Adding St, into Event
@Adding Diurnal into Design
@Adding Event Into Design
Average Design Flow 0.00 CuFt/Sec
Storm flow (no SP) 1.604 Cu£t/Sec
Design flow including SF 1.604 Cnft/Sec
Combined SF 1.000
CHD Maximum velocity 6.0000 FPS
CHD Minimum velocity 0.3000 FPS
CHD Mannings "n" 0.1000
r,HD Left side slop, 3.0000
CHD Bottom width 5.00 Feet
CHD Right side slope 3.O000
CHD Minimum Treeboard 1.0000 Feet
CHD ExftI tretion 0.0000 IPH
Chann,l Slope 0.0199
Design flow 1.60 Cuft/Sac
Depth of flow 5.54 Inches
0.46 Feet
Velocity 0.54 Ft/.".ec
Travel time 7.69 Minutes
width of surface 7.17 Feet
Downstream hydrogsaph in US (Initial time=7.64 min);
C:\HYDRA\CMD\ HYDRA Version 5.85
j.w.morrissette & associates Page 34
- - _
C:\HYDRA\CMD\CHRISTEN.CMD 11:45 3-Sup-104
CHRISTENSEN DEVEOLPMENT
0.0000 0.5000 1.0000 1.5000 2.0000
Time F__
8 0.0400
66 0.1263
128 0.1939 -
188 0.2545
248 0.3394 1-
308 0.4366-°~ -
368 0.5893
428 1.6042 -1-
488 n-8772 ---°'---1=---•-
548 0.51'1 I - ~I
608 0.5959 1=--- --1-
668 0.4301 = 1
728 0.490E =
789 0.3452 -
848 0,4031 I-
908 0.3081 1----
968 0,3456 -
1028 0,2482
1088 n,2953 I-
114H 0.2536 -
1208 0,2929 I----
1268 0.2581 1 -
1328 0.2910 1
1388 0.2619-
1448 0.0248
Time --t-
0.0000 0.5000 1.0000 1.5000 2.0000
97: ELL LOT'
Tag LnT2
Link
From line 97
In £i.Le C:\HYDRA\CMD\CHRISTEN
Sent to Hold[4]
98:
99: REM SWALE 1 TREATS THE STORMWATER FROM THE FRONTAGE, ROADWAY AND MARC
EL 3
100: REM FRONTAGE ROADWAY WHICH nISCHARGE INTO AND FLOW BETWEEN PARCELS L
AND 3
101: REM AND INTO THE INFILTRATION POND. -WALE 2 TREATS THE STORMWATER FRO
M THE PARCEL, 1 WHICH DISCHARGES INTO A CB. SWALE. I TREATS THE
STORMWATER FROM THE PARCEL 2 WHICH DISCHARGE INTO A CB AND IS COMBINED WITH FLOW
FROM -WALE 2AND PLOW NORTH OR PARCEL 2 INT
102:
103: NEW SWALE 1
104: REC PARCEL3C
Hoid[Num] 1
Looking up record number f
105: REC NEROADWAY
Ilold[Num] 2
Looking up record number 7
C:\HYDRA\CMD\ HYDRA Version 5.85
i.w.murrissette l associates Page 35
_ _ ---__c_ _
C:\HYDRA\CMD\CHRI9TEN.CMp 11:45 3-Sep-104
CHRISTENSEN DEVEOLPMEN
106: INL 99
107: CHA 100, 346, 344.5, 343.13, 341.13
Lenyth 100.00 Feet
GrOp 346.00 Feet
GYDm 344.50 Feet
InvHp 343.13 Feet
InvDn 341.13 Feet
Link number 10
NOTE: Adjusting hydrographs for worst case situation
@Addinq Sto into Event
@Addinq Diurnal into Design
@Addinq Event into Design
Average Design Flow 0.00 CuFt/Sec
Storm flow (no SF) 2.351 Cu£t/Sec
Design flow inoludinq SF 2.351 Cuft/Sec
Combined SF 1.000
CHD Maximum velocity 6.0000 FPS
CHD Minimum velocity 0.3000 FPS
CHD Mannings "n" 0.2000
CHD Left side slope 3.0000
CHD ?nttom width 5.00 Feet
CHD Right side slopA 3.0000
CHD Minimum treehoard 1.On00 Feet
CHD Exfiltretion 0.0000 SPH
Channel Slope 0.0200
Design flow 2.35 Cutt/Sec
Depth of flow G.85 Inches
0.57 Feet
Velocity 0.61 Ft;Sec
Travel time 2.71 Minutes
Width of surface 8.43 Feet
Downstream hydrograph in TER (Initial time-3.02 min):
0.0000 1.0000 ;..0000 3.0000 4.0000
Time + +
3 0.0510 1 1 1 1
63 0.1714 1- 1
123 0.2960 1=-
183 0.4154 !
243 n.5397 1--- 1
303 0.6778 1 I I
363 0.8898
423 2.3506-=---=---=-=.-I- -
463 1.2130 l---==--l- 1
543 0.7370===- =
603 0.8165 1=-----_=
663 0.6127
723 0.6688 1~-
783 0.4638
H43 0.5488 1-_ 1
903 0.4285 1- 1
963 0.4750-=-
1023 0.3411
C:\HYDRA\CMD\ HYDRA Version 5.85
j.w.morrissette u associates Page 36
_ _ _ _ _ _ -
C:\HYDRA\CMD\CHRISTEN.CMD 11:45 3-Sep-104
CHRISTENSEN DEVEOLPMENT
1083 0.4058 I- ]
1143 0.3503--
1203 0.4011-=
1263 0.3550-=
1323 0.4011 1===
1383 0.3550 1---
1443 0.0324 1
Time _ }
0.000u 1.0000 2.0000 3.0000 4.0000
108: HOL SWALEI
Tag SWALEI
Link 10
From line 108
In file C:\HYDRA\CMD\CHRISTEN
Sent to H,ld[1]
109:
110: NEW SWALE 2
III: REC LOT].
Hold[Num] 3
Looking up record number 8
112: INL 99
113: CIA 100, 344, 342, 344.5, 341
Length 100.00 Feet
GrUp 344.00 Feet
GrDn 342.00 Feet
Insup 344.50 Feet
InVDn 341.00 Feet
Link number 11
NOTE: Adjusting hydrographs for worst case situation
@Adding Ste into Event
@Adding Diurnal into Design
@Adding Event into Design
Average Design Flow 0.00 CuFt/Sec
Storm flow (no SF) 0.673 Cuft/Sec
Design flow including SF 0.673 Cu£t/Sec
Combined SF 1.000
CHD Maximum velocity 6.0000 FPS
CHD Minimum velocity 0.3000 FPS
CHD Mannings "n" 0.2000
CHD Left side slope 3.0000
CHD Bottom width 5.00 Feet
CHD Right side slope 3.0000
(HID Minimum freeboard 1.0000 Feet
CHD Exfiltration 0.0000 IPH
Channel Slope 0.0350
Design flow 0.67 Cuft/Sec
Depth of flow 2.88 Inches
0.24 Feet
Velocity 0.49 Ft/Sec
Travel time 3.38 Minutes
C:\HYDRA\CMD\ HYDRA Version 5.85
j.w.morrissette & associates Page 37
_ _ -
C:\HYDRA\CMD\CHRISTEN.CMD 11:45 3-Sep-104
CHRISTENSEN DEVEOLPMENT
Width of surface : 6.44 Feet
Downstream hydrograph in CFS (Initial time=27.90 min):
0.0000 0.2000 0.4000 0.6000 0.8000
Time -
26 0.0158 1 1 1 1 1
88 0.0554 1 1
148 0.0844 1=== I
208 0.1108 1= 1
268 0.1477 1--=-= I
328 0.1900-=--=__= I
388 0.2559 I==
448 - - 1 -
448 0.6727°==°= _=--=======1°=
508 0.4406 1- _ - _ °1====---1-
568 0.2005 1- - _ -°=1
62B 0.2797 1- - -
688 0.1820
748 0.2190 1===
BOB 0.1557 I
868 0.1741 1==--- I
928 0.1425 1-- I
988 0.1451 1
1048 0.1187 1=°= 1
1108 0.1214°===
1166 0.1187 1=
1228 0.1214 =
1288 0.1214 1-----
1348 0.1214 I-°=== 1
1408 0.1214 1=====
1468 0.0158
Time
0.0000 0.2000 0.4000 0.6000 0.8000
114: HOL SWALE2
Tag SWALE2
Link 11
From line 114
In file C \HYDRA\CMD\CHRISTEN
Sent to Hol.d[21
115:
116: NEW SWALE 9
117: REC LOT'
Hold[Num] 4
Looking up record number 9
118: INL 99
119: CHA 100, 346, 344.5, 344.5, 341
Length 100.00 Feet
GrUp 346.00 Feet
GrDn 344.50 Feet
Invup 344.50 Feet
InvDR 341.00 Feet
Link number 12
C:\HYDRA\CMD\ HYDRA Version 5.85
j.w.morrissette & associates Page 38
-
C:\HYDRA\CMD\CHRISTE'N.CMD 11:45 3-Sep-104
CHRISTENSEN DEVEOLPMENT
NOTE: Adjusting hydrographs for worst case situation
@Adding Stc into Event
@Adding Diurnal into Design
@Adding Event into Design
Average Design Flow 0.00 CuFt/Sec
Storm flow (no SF) 1.604 Cuft/Sec
Design flow including IF 1.604 Cuft/Sec
Combined SF 1.000
CHD Manimom velocity 6.0000 FPS
CHD Minimum velocity 0.3000 FPS
CHD Mannings "n" 0.2000
CHD Lett side slope 3.0000
CHD Bottom width 5.00 Feet
COD Right side slope 3.0000
CHD Minimum freeboard 1.0U00 Feet
CHD F.zfilh ration 0.0000 ILE
Channel Slope 0.0350
Design flow 1.6n C.ft/Sec
Depth of flow 4.73 lnches
0.39 Feet
Velocity 0.66 Ft/Sec
Travel time 2.53 Minutes
Width of surface 7.36 Feet
Downstream hydrngraph in CFS (Initial time--10.22 min):
0.0000 0.5000 1.0000 1.5oo0 2.0000
Time -__~__-__-__-t
10 0.0177
71) 0.1258 7
130 0.1950-'--
190 0.2516 -
250 0.3397--°--
310 0.4341-_--=-
370 0.5914
430 i
1.6042 I-
490
490 0.8745 -°------I-° -
550 0.5096 I- -I
610 0.5977 --1-
670 0.4270 I
730 0.4907 -°-I
790 0.3460
850 0.4026 I I I
410 0.3083 I--- I I I
970 0.3460 - I t 1
1030 0.2454
1090 0.2957 1=
1150 U.2516
1210 0.2957--=-
1270 0.2579 1~- I 1
1330 0.2594 -
1390 0.2642 I- - 1
1450 0.0252 1
Time r___________________f______--_y-------
C:\HYDRA\CMD\ HYDRA Version 5.85
j.w.morrissette & associates Page 39
- -
-
C:\HYDRA\CMD\CHRISTEN.CMD 11:45 3-Sep-104
CHRISTENSEN DEVEOLPMF.NT
0.0000 0.5000 1.0000 1.5000 2.0000
120: HOl, SWALE3
Tag SWALE3
Link 12
From line 120
In file C:\HYDRA\CMD\CHRISTEN
Sent to Hold[3]
121:
122_ NEW INFILTRATION POND
123: REC SWALEI
Hold Lou.] 1
Looking up record number 10
124: REC 3WALE2
Eold[Num] 2
Looking up record number ll
125: REC SWALE3
He ld[Nur] 3
Lookinq up record number 12
126: RED (0/2.15/11559/2.15
1 0.000 2.150
2 11559.000 2.150
127: RES 343, 341, 343, OVER
Number of points on Volume/Discharge curve .
Maximum capacity of reservoir INFINITE
inlet elevation 343.00 Ecet
Outlet. elevation 341.On Feet
Link number 19
NOTE: Adjusting hydrographs for worst case siLuction
@Adding St, into Event
@Adding Diurnal into Design
@Adding Event into Design
Average Design Flnw 0.00 CuFt/Sec
Storm flue (no SF) 4.628 CufL/Sec
Design [low including SF 4.628 Cuft/Sec
Combined SF 1.000
Diversion hydrographs :
i Incoming hydrograph in CFS
X Exit hydrograph in CFS
V - Volume of Reservoir in Cuff
divided by1000n
C:\HYDRA\CMD\ HYDRA Version 5.85
j.w.morrissette & associates P,,,, 40
- -
C:\HYDRA\CMD\CHRISTEN.CMD 11:45 3-Sep 104
CHRIS'TENSEN DEVEOLPMENT
0.00 1.25 2.50 3.75 5.00
Time
3 0.11 0.11 0.00
63 0.36 0.36 II.00
123 0.57 0.57 0.00 1
1B3 0.78 0.78 0.00 I * J
243 1.03 1.03 0.00 1
303 1.31 1.31 0.00 1 *I
36, 1.74 1.74 0.00 1
423 4.63 2.15 0.89 V 1 x 1 1
483 2.53 2.15 1.03 1 v I X 11
543 1.4`. 2.15 0.78 1 V IT X I
603 1.70 2.15 0.61 V 11 x I 1
663 1.22 2.15 0.28 IV II x
723 1.38 2.15 0.00 1 1 x
793 0.98 0.99 0.00 1
843 1.13 1.11 0.00 1
903 0.87 M7 U.00
963 0.97 0.97 0.00 1 1
1023 0.71 0.71 0.00 1
1083 0.82 0.82 0.00 1
1143 U.'i2 0.72 0.00 1 `
1203 0.82 0.82 0.00
1263 0.74 0.74 0.00 1 * 1
1323 0.82 0.82 0.00 1 * 1
1383 0.75 0.75 0.0(1 I
1443 0.08 0.08 0.00 1
Time +
0.00 1.25 2.50 3.75 5.o,
128: END
C:\HYDRA\CMD\ HYDRA Version 5.85
J.w.morrissette & associates Page 41
C:\HYDRA\CMD\CHRISTEN.CMD 11;95 3-Sep-109
CHRISTENSEN DEVEOLPMENT
S U M M A A Y O E' A N A I. Y S I S------
Run number on command tile 34
Number of links 14
Number of hydrographs 62
TotaL sanitary population 0
Total sanitary area 0.00 Acres
Total storm area 5.38 Acres
Number of pumps 0
Number of reservoirs 1
Number of diversion structures : 0
Number of inlets 12
Length of new pipe 9E2.00 Feet
Length of existing pipe 0.00 Feet
Length of channel 1226.00 Feet
Length of gutter 0.00 Feet
Length of transport units 0.00 Feat
Length ^f pressure pipe n.Oo Feet
Closing DRF and NDX Files
JOB CHRISTENSEN DEVEOLPMENT
REM STORMWATER DESIGN 6 MONTH 24-HOUR
REM EVENT FOR TREATMENT SIZING
TOT 1.79
FIL C:\HYDRA\HYE\6mTC.INC
NEW PARKING LOT STORMWATER
REM C:AHYDRAVCMDACHRIST6.CMD
REM THIS FILE CREATES STORMWATER RUNOFF FLOWS GENERATED
REM DURING THE 6 MONTH 24 HOUR EVENT FOR TREATMENT FOR THE
REM CHRISTENSEN DEVELOPMENT STORMWATER IMPROVEMENT.
REM THE METHODOLOGY IS CONSISTANT WITH THE 1992 STORMWATER
REM MANUAL FOR THE PDGET SOUND BASIN
REM THE DESIGN PIPE IS A 12 INCH PVC PIPE WITH
REM A MANNINGS n OF 0.009 (CIVIL ENGINEERING REFERNECE,
REM SEVENTH EDITION, LINDBERG), MINIMUM COVER OF 2 FEET,
REM MINIMUM DEPTH OF 2 FEET, MINIMUM VELOCITY OF 0.01
REM FT/SEC, MINIMUM SLOPE OF 0.001 AND d/D OF 0.9.
DPD 0.009, 4, 2, 2, 0.01, O.OU1, 0.9
CHD 6, 0.3, 0.20, 3, 8, 3, 1, 0, 0, 0, 0
REM PARCEL 4, FRONTAGE AND ONSITE ROADWAY ARE DISRECTED TO THE SWALF.1, PARCELS
REM I & 2 ARE DISSECTED TO THE SWALE2.
REM BUILDING ROOF RUNOFF WILL BE COLLECTED AND CONVEYED TO INDIVIDUAL
REM INFILTRATION GALLERIES FOR DISPOSAL
REM PARCEL 3 IS SEPARATED INTO 3 SUBBASINS
NEW PARCEL 3 SUBBASIN A
SCS 0.5B, 0.40, 98, 90, 20, n.D2, 8°i
INL 99
DPI 53, 343.50, 341.70
SOL PARCEL3A
NEW PARCEL 3 SUBBASIN B
SCS 0.37, 0.40, 98, 90, 20, 0.02, 75
REC PARCEL3A
INT. 99
UPI 54, 341.60, 342.00
HOL PARCEL3B
NEW PARCEL 3 SUBBASIN C
SCS 0.29, 0.40, 98, 90, 20, 0.02, 110
REC PARCEL38
INL 99
DPI 72, 342.00, 341.00
HOL PARCEL3C
REM THE FRONTAGE IMPROVEMENTS STORMWATER IS COLLECTED IN A CATCH BASIN AT
REM THE NW CORNER OF THE NEW ROADWAY INTERSECTION WITH SR, 507. THE STORMWATER
REM THEN IS PIPED TO THE CATCH BASIN AT THE SOUTHWEST CORNER OF THE NEW
REM ROADWAY. THE CATCH BASIN ALSO COLLECTS THE SOUTH AND WEST SIDE OF THE NEW
REM ROADWAY STORMWATER. THE SOUTHWEST CATCH BASIN DISCHARGES TO THE
REM NORTHEAST CATCH BASIN WHICH COLLECTS THE EAST AND NORTH SIDE OF
REM THE NEW ROADWAY STORMWATER. THE NORTHEAST CATCH BASIN DISCHARGES
REM INTO THE SWALE BETWEEN PARCELS 2 AND 3 AND INTO THE POND.
NEW FRONTAGE IMPROVEMENTS
SCS 0.15, 0.84, 98, 90, 20, 0.02, 210
INL 99
DPI 193, 344.50, 343.80
HOP FRONTAGE
NEW LOT 4
SON 0.74, 0.66, 98, 78, 20, 0.024, 251
ILL 99
CHA 251, 351, 346, 351, 346
SOL LOT4
NEW SOUTH AND WEST ROADWAY
SCS 0.22, 0.80, 98, 90, 20, 0.008, 156
REC FRONTAGE
REC LOT4
INL 99
DPI 20, 343.80, 341.00
HOL SWROADWAY
NEW NORTH AND EAST ROADWAY
SCS 0.22, 0.80, 98, 90, 20, 0.008, 156
REC SWROADWAY
INL 99
DPI 70, 343.76, 341.50
HOL NEROADWAY
NEW LOT 1
SCS 0.86, 0.58, 96, 76, 20, 0.007, 426
INL 99
CHA 426 347, 344, 347, 344
HOP LOT!
NEW LOT 2
SCS 1.95, 0.58, 98, 78, 20, 0.024, 251
INL 99
CHA 251, 351, 346, 351, 346
HOL LOTS
REM SWALE 3 TREATS THE STORMWATER FROM THE FRONTAGE, ROADWAY AND PARCELS
REM FRONTAGE ROADWAY WHICH DISCHARGE INTO AND FLOW BETWEEN PARCELS 2 AND 3
REM AND INTO THE INFILTRATION POND. SWALE 2 TREATS THE STORMWATER FROM THE
PARCEL 1 WHICH DISCHARGES INTO A CH. SWALE 3 TREATS THE STORMWATER FROM THE
PARCEL 2 WHICH DISCHARGE INTO A CB AND IS COMBINED WITH FLOW FROM SWALE SAND
PLOW NORTH OR PARCEL 2 INTO
NEW SWALE 1
NET PARCEL3C
REC NEROADWAY
INL 99
CHA 100, 346, 344.5, 343.13, 341.13
HOL SWALEI
NEW SWALE 2
REC LOT1
INL 99
CHA 100, 344, 342, 344.5, 341
HOL SWALE2
NEW SWALE 3
SEE L0T2
INL 99
CHA 159, 346, 344.5, 343.13, 341.54
HOL SWALE3
NEW INFILTRATION POND
REC SWALEI
REC SWALE2
REC SWALE3
RED (0/2.15/11559/2.15
RES 343, 341, 343, OVER
END
C:\HYDRA\CMD\ HYDRA Version 5.65
j wma Page 1
C:\HYDRA,CMD\03148.CMD 10:53 11-Nov-104
CPS
CHRISTENSEN DEVEOLPMENT
PARCEL 3 SOBBASIN A Pipe Design
Invert Depth Min San Sto Vel Design Estimated
Link Long Diem Slope Up/Dn Up/D. Cover Inf Mis d/D CFS Cost
1 53 4 0.0340 341.14 2.36 2.00 0.0 0.2 4.90 0.25 0
339.34 2.36 0.0 0.0 0.55
- -
Lateral length= 53 Upstream length- 53
PARCEL 3 SUBBASIN B Pipe Design
Invert Depth Min San Sto Vel Design Estimated
Link Long Diam Slope Up/Dn Up/Du Cover Inf MIS d/D CFS Cost
2 54 6 0.0026 339.06 2.54 2.00 0.0 0.4 2.1R 0.41 0
338.9^ 3.OB 0.0 0.0 0.89
-
Lateral length- 54 Upstream length- ln7
PARCEL 3 SUBBASIN C Pipe Design
Invert Depth Min San Sto Vol Design Estimated
Link Lang Diam Slope Up/Dn Up/En Cover In£ His d/D CFS Cost
3 72 6 0.0064 338.92 3.08 2.00 0.0 0.5 3.28 0.53 0
338.46 2.54 0.0 0.0 U.77
Lateral length- 72 Upstream length- 179
FRONTAGE IMPROVEMENTS Pipe Design
Invert Depth Min an Sto Vel Design Estimated
Link Long Diam Slope Up/Dn Up/Dn Cover Inf Mis d/D CFS Cost
4 193 4 0.0036 342.14 2-36 2.00 0.0 0.1 1.63 0.09 u
341.44 2.36 0.0 0.0 0.51
-
Lateral length- 193 Upstream length= 193
LOT 4 Channei
Long Invert Surf FreBrd Width Shape San Ste Flow Estimated
Link Slope Up/Dn Up/Dn Up/Dn Depth L/C/R In£ Mis Vol Cost
5 251 351.00 351.14 -0.1 8.82 3.000 O.OU 0.31 0.31 0
0.0199 346.OU 346.14 -0.1 0.14 8.00 n.00 0.00 0.27
3.000 Fronde Number - 0.13
Lateral length- 251 Upstream length= 251
C:\HYDRA\CMD\ HYDRA Version 5,85
jwma Page 2
_ - _
C:\HYDRA\CMD\03148.CMD 10:53 11-Nov-104
CFS
CHRISTENSEN DEVEOLPMENT
x+. SOUTH AND WEST ROADWAY Pipe Design
Invert Depth Min San Sto Vel Design F.9timated
Link Long Diam Slope Up/Dn Up/Dn Cover Inf MIS d/D CFS Cost
6 20 4 0.1400 341.44 2.36 2.00 010 0.4 9.14 0.37 0
338.64 2.36 0,0 0.0 0.0
Lateral length= 20 Upstream length= 464
NORTH AND EAST ROADWAY Pipe Design
Invert Depth Min San Sto Vel Design Estimated
Link Long Dian Slope Up/Dn Up/Du Cover Inf MIS d/D CFS Cost
1 7D 8 0.0010 338.64 5.12 2.21 O.G 0.5 1.56 0.45 0
338.57 ...73 0.0 0.0 0.76
Lateral length- 70 Upstream Length= 534
LOT 1 Channel
Long Invert Surf FreHrd Width Shape an Stu Flow Estimated
Link Slope Up/Dn Up/Dn Up/Dn Depth L/C/R Inf Mis Vet (:ust
8 426 347.00 347.17 -0.2 9.03 3.000 0.00 0.27 0.27 0
0.0070 344.00 144.17 -0.2 0.17 8.00 O.On 0.00 0.19
3.000 Fronde Number 0.08
Lateral length- 426 Upstream length- 426
LOT 2 Channel
Long Invert Surf FreBrd Width Shape San Ste Fluw Estimated
Link Slope Up/Dn Up;Dn Up/Dn Depth L/C/R lnf Mis Vol Cast
9 251 351.00 351,22 0.2 9.34 3.000 0.00 0.71 0.71 0
0.0199 346.00 346.22 -0.2 U.22 6.00 0.00 0.00 0.37
3.000 Fronde Number = n,14
Lateral length= 251 Upstream length- 2,51
*x* SWALE 1 Channel
Long Invert Surf Fre0rd Width Shape San Ste Flow Estimated
Link Slope Up/Dn Up/Dn Up/Dn Depth L/C/R Int mi. Vel Cost
10 100 343.13 343.40 2.6 9.63 3.000 0.00 0.98 0.98 0
0.0200 341.13 341.40 3.1 0.27 8.01) 0.00 0.00 0.41
3.000 Froude Number = 0.15
C:\HYDRA\CMD\ HYDRA Version 5.85
jwma Page 3
-
C:\HYDRA\CMD\03148.CMD 10:53 11-Nov-104
CFS
CHRISTENSEN DEVEOLPMENT
Lateral length- 1.00 Upstream length= 813
SWALE 2 Channel
Long Invert eur£ FreBrd Width Shape San Ste Flow Estimated
Link Slop- Up/Dn Up/Dn Up/Dn Depth L/C/R Inf Mis Vol Cost
11 100 344.50 344.61 -0.6 8.64 3.000 0.00 0.27 0.27 0
0.0350 341.00 341.11 0.9 0.11 8.00 0.00 0.00 0.31
3.000 Fronde Number - 0.17
-
Lateral length- 100 Upstream length- 526
SWALE 3 Channel
Long Invert Surt FreBrd Width Shape San Sto Flnw Estimated
Link Slope Up/Dn Up/Dr, Up/Dn Depth L/C/R Int Mis Vel Cost
12 159 343.13 343.40 2.6 9.64 3.000 U.00 0.71 0.71 0
0.0I00 341.54 341.61 2.7 0.27 8.U0 0.00 0.00 0.29
3.000 Froude Number - 0.10
-
Lateral length= 154 Upstream length- 410
-
Lateral length= 0 Upstream length= 0
INFILTRATION POND Reservoir
Cost Invert Maximum Flow Values
Link Exfil Up/Dn/Ovr San Inf Sto Mis Design
14 0 343.00 InCOminq 0.00 0.00 1.35 O.uu 1.35
0 341.00 Discharge 2.00 0.00 1.35 0.0n 1.35
343.00 Overflow 0.00 0.00 0.00 0.00 0.00
Stored 0 0 0 0 0
Lateral length- 0 Upstream length= 1749
Q \HYDRA\CMD\ HYDRA Version 5.85
wma Page 1
- - _
C:\HYDRA\CMD\03148,CMD 10:53 11-Nov-104
NONE
Status of DEFAULTS at start of run.
I
I Command file : C:\HYDRA\CMD\03148.CMD
I Input units are read as USA
I Warnings are turned OFF
1 Output sent to display Brief
I Output sent to printer off
I Output sent to file Detailed
Paper width in inches 8,000
String to reset printer NOT SET
String to set printer to compressed NOT SET
String to set printer to 8 Lines/inch NOT SET
Name of printer NIT SET
1 Print heading at tup of page ON
Number of steps in hydrograph 96
Step length in minutes 15
Significant flow in hydrograph 0.010
Infiltration Diurnalization Factor 0,980
I Maximum plot value Selected by HYDRA
I Typ P. of hydrographic plot Compact
i
Sanitazy flow by Diurnal Curve
Delay to start of actual storm 0.00
I Rational Method computations OFF
SCS computations Santa harbor.
I Continuous simulation computations ON
I
( Maximum d/D for pipe design/analysis 0.900
1 Match point position on pipe O.00 or Invert
Number of allowable diem drops 999
Mimimum drop thin manhole 0.000
Mann log's n Variable
Routing technique quick
I
I Calculate sanitary flows ON
Calculate infiltration flows IN
I Calculate misc flows ON
Listing of acceptable diameters (Changed by the PCO command):
4 6 8 10 12 15 18 21 24 27 30
33 36 39 42 45 48 54 60 66 72 78
84 90 96 102 108 114 120 132
1: JOB CHRISTENSEN DF.VEOLPMENT
REM STORMWATER DESIGN 6 MONTH 24-HOUR
3: REM EVENT FOR TREATMENT SIZING
4:
5: TOT 1.79
Total rainfall 1.79 Inches
C:\HYDRA\CMD\ HYDRA Version 5.85
j wma Page
C:\HYDRA\CMD\03148.CMD 1U:53 11-Nov-104
CHRISTENSEN DEVEOLPMENT
6: FIL C:\HYDRA\HYE\6.TC.INC
------START OF SUB-FILE------
1: EYE 15 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010
0.020 +
2:0.020 0.020 0.030 0.040 0.040 0.040 0.050 0.050 0.050 +
3:0.060 0.060 0.060 0.060 0.060 0.080 0.08U 0.080 0.150 +
4:0.080 0.200 0.290 0.160 0.060 0.180 0.180 0.130 0.130 +
5: 0.190 0.150 0.110 0.090 0.150 0.110 0.120 0.090
0.090 +
6: 0.090 0.090 0.080 0.080 0.080 n.080 0.100 0.100
0.100 +
7: 0.100 0.100 0.090 O.u8n 0.08U 0.080 0.060 0.060
0.06n +
8: 0.060 0.060 0.060 0.060 0.050 0.050 0.040 0.040
n.04u +
9: 0.040 0.040 0.040 0.040 0.040 0.040 0.040 0.040
0.040 +
In: 0.040 0.040 U.040 0.040 0.040 0.n4n 0.040 0.040
0.040 +
11: 0.040 n.040 0.040 0.040 0.040 0.040
12: PET
Step time 15.00 Minutes
Total in original hye.tograph 1.79 Inches
Total volume rain in production hyetograph 1.79 Inches
Maximum intensity 0.76 Tnches/Hr
END OF SOB-FILE
7: NEW PARKING LOT STORMWATER
8.
9: REM C:\HYDRA\CMD\CHRIST6.CMD
10:
11: REM THIS FILE CREATES STORMWATER RUNOFF FLOWS GENERATED
12: REM DURING THE 6 MONTH 24 HOUR EVENT FOR TREATMENT FOR THE
13: REM CHRISTENSEN DEVELOPMENT STORMWATER IMPROVEMENT.
14: REM THE METHODOLOGY IS CONSISTANT WITH THE 1992 STORMWATER
15: REM MANUAL FOR THE PUGET SOUND BASIN
16: REM THE DESIGN PIPE IS A 12 INCH PVC PIPE WITH
17: REM A MANNINGS n OF O.n09 (CIVIL ENGINEERING REFERNFCE,
18: REM SEVENTH EDITION, LTNDBURG), MINIMUM COVER OF 2 FEET,
19: REM MINIMUM DEPTH OF 2 FEET, MINIMUM VELOCI'T'Y OF 0.01
20: REM FT/SEC, MINIMUM SLOPE OF 0.001 AND d/D OF 0.9.
21:
22: DPD 0.009, 4, 2, 2, 0.01, 0.001, 0.9
Maunings n 0.00900
Minimum diameter 4.00 Inches
Minimum depLh 2.00 Feet
minimum cover 2.00 Feet
Minimum velocity 0.0100 Feet/Sec
Minimum slope 0.0010n
D/d n.900n
Maximum diameter 132.00 Inches
C:\HYDRA\CMD\ HYDRA Version 5.85
jwma Page 3
_ - -r_ _
C:\HYDRA\CMD\03148.CMD 10:51 11-Nov 104
CHRISTENSEN DEVEOLPMENT
23: CHD 6, 0.3, 0.20, 3, 8, 3, 1, 0, 0, 0,
24:
25: REM PARCEL 4, FRONTAGE AND ONSITE ROADWAY ARE DISRECTED TO THE SWALEI
PARCELS
26: REM 1 f 2 ARE DISRECTED TO THE SWALE2.
27: REM BUILDING ROOF RUNOFF WILL BE COLLECTED AND CONVEYED TO INDIVIDUAL
28: REM INFILTRATION GALLERIES FOR DISPOSAI.
29:
30: REM PARCEL f IS SEPARATED LNTO 3 :'tBBASINS
31: NEW PARCEL 3 SUBBASIN A
32: SCS 058, 0.40, 98, 90, 20. U.02, 69
Computed concentration time 0.52 Minutes
Total Time of Concentration 0.52 Minutes
Petal rainfall falling on impervious 1507.47 Cu Ft
Tmpervious runoff 1318.89 Cu Ft
Portion off impervious 87.49 E
Peak CIE rainfall fallinq on impervious 0.18 CuFt/Sec
Peak CFS runoff from impervious 0.15 Cu Ft/Sec.
Equivalent "C" off impervious 0.87
Total rainfall falling on pervious 2261.20 C.Pt
Pervious runoff 1158.68 Cu Ft
Portion off pervious ;1.24 R
Peak CPS rainfall falling on pervious 0.27 Cu Ft/Sec
Peak CIE runoft from pervious 0.0951 CuFt/Sec
Equivalant "C" Off pervious 0.36
Total rainfall falling on segment 3768.67 CuFt
Total segment runoff 2477.58 Cu Ft
Portion off segment 65.14 6
Peak CFS rainfall falling on segment ".44 Cu Ft/Sec
Peak CFS runoff from segment 0.25 CvPt/Sec
Equivalent "r" off segment 0.56
33: INL 99
34: DPI 5i, 343.50, 341.70
Length 53.UO Feet
Ground elevation up 343.50 Feet
hound elevation down 941.70 Feet
Minimum diameter 4.00 Inches
Lump sum cost n.oo Dollars
Manning3N 0.00900
MinSlope 0.0010"
Link number 1
@Adding Stn into Event
@Adding Diurnal into Design
@Adding Event into Design
Average Design Flow D.nO Cu Ft/Sec
Storm flow (no SF) 0.249 Cuft/Sec
C:\HYDRA\CMD\ HYDRA Version 5.85
j was Page 4
- - - ---v
C \HYDRA\CMD\03148.CMD 10:53 11-Nov-104
CHRISTENSEN DEVEOLPMENT
Design flow includinq SF 0.249 Cuft/Sec
Combined IF 1.000
Design diameter 4.00 Inches
Invert elev up 341.14 Feet
Invert elev down 339.34 Feet
Slope 0.0340
Depth of fluid in pipe .20 Inches
d/D 0.550
Partial flow velocity 4.904 Feet/Sec
35: HOL PARCEL3A
Tag PARCEL3A
Link 1
From line 35
In file C:\HYDRA\CMD\0314H
Sent to Hold[1]
36:
37: NEW PARCEL 3 SUBBASIN B
SR: SCS 0.37, 0.40, 98, 90, 20, 0.02, 75
Computed concentration time 0.44 Minutes
Total Time of Concentration 0.44 Minutes
Total rainfall falling on impervious 961.66 Cu Ft
Impervious runoff 841.39 Cu Ft
Portion off impervious 87.49 %
Peak CFS rainfall falling on impervious 0.11 CuFt/Sec
Peak CFS runoff from impervious 0.0987 CuFt/Sec
Equivalant "r" off impervious 0.87
Total rainfall falling on pervious 1442.49 CuFt
Pervious runoff 739.20 CuFt
Portion off pervious 51.24 8
Peak CFS raintall falling on pervious 0.17 CuFt/Sec
Peak ITS runoff from pervious O.u611 C'uFt/Sec
Equivalant "r" off pervious 0.36
Total rainfall falling on segment 2404.15 CuFt
Total segment runoff 1580.59 Cu Ft
Portion ott segment 65.74 t
Peak CPS rainfall falling on segment 0.28 CuFt/Sec
Peak CPS runoff from segment 0.16 Cu Ft/Sec
Equivalant "C" off segment 0.56
39: REC PARCEL3A
Hold[Num] 1
Looking up reocr,l number
C \HYDRA\CMD\ HYDRA Version 5.85
j wmo Page 5
- __c
C:\HYDRA\CMD\03148.CMD 10:53 11-Nov-104
CHRISTENSEN DEVEOLPMENT
40: INL 99
41: DPI 54, 341.60, 342.00
Length 54.00 Feet
Ground elevation up 341.60 Feet
Ground elevation down 342.00 Feet
Minimum diameter 4.00 Inches
Lump sum cost 0.00 Dollars
ManningsN 0.00900
MinSlope 0.0010D
Link number
@Adding Ste into Event
@Adding Diurnal into Design
@Adding Event into Design
Average Design Flow 0.00 Cu Ft/Sec
Storm flow (no SF) 0.408 Cuft/Sec
Design flow including SF 0.408 Cuf.t,Sec
Combined SF 1.000
Design diameter 6.00 Inches
Invert elev up 339.06 Feet
Invert elev down 338.92 Feet
slope 0.00258
Depth of fluid in pipe 5.34 Inches
d/D 0.890
Partial flow velocitY 2.179 Feet/Sec
42: HOL PARCEL3B
Tag PARCEL38
Link 2
From line 42
In file C:\HYDRA\CMD\03148
Sent to Hold[1]
43:
44: NEW PARCEL 3 SOBBASIN r
45: SCS 0.29, 0.40, 98, 90, 20, 0.02, 110
Computed concentration time 0.65 Minutes
Total Time of Concentration 0.65 Minutes
Total rainfall falling or, impervi.nus 753.73 CuFt
Impervious runoff 659.41 CuFt
Portion off impervious 87.49 %
Peak CFS rainfall falling nn impervious 0.0888 CuFt/Sec
Peak CPS runoff from impervious 0.0761 Cu Ft/Sec
Equivalant "C" off impervious 0.86
Total rainfall falling on pervious 1130.60 Curt
Pervious runoff 579.30 CuFt
Portion off pervious 51.24 8
Peak CFS rainfall falling on pervious 0.13 Cu Ft/Sec
Peak CFS runoff from pervious 0.0470 CuFt/Sec
Equivalant "C" off pervious 0.35
C:\HYDRA\CMD\ HYDRA Version 5.85
jwma Page 6
- _z -
C:\HYDRA\CMD\03148.CM0 10:53 11-Nov-104
CHRISTENSEN DEVEOLPMENT
Total rainfall Calling on segment 1884.33 Cu Ft
Total segment runoff 1238.71 Cu Ft
Portion off segment 65.74 %
Peak CPS rainfall falling on segment 0.22 Cu Ft/Sec
Peak CPS runoff from segment 0.12 CuFt/Sec
Equivalent "C" cif segment 0.55
46: REC PARCEL3B
Hold[Nut] 1
Looking up record number 2
47: INL 99
48: DPI 72, 342.00, 341.00
Length 72.00 Feet
Ground elevation up 342.00 Feet
Ground elevation down 341.00 Feet
Minimum diameter 4.00 Inches
Lump sum cost 0.00 Dollars
ManningsN O.U0900
MinSlope 0.00100
Link number 3
@Addi.ng Ste into Event
@Adding Diurnal into Design
@Adding Event into Design
Average Design Flow 0.00 Cuet/Sec
Storm flow (no SF) 0.532 Cuft/Sec
Design flaw including OF 0.532 Cuft/Sec
Combined SF 1.000
De.tgn diameter : 6.00 Inches
Invert elev up 338.92 Feet
Invert elev down 338.46 Feet
slope 0.00640
Depth of fluid in pipe 4.62 Inches
d/D 0.77n
Partial flow velocity 3.283 Feet/Sec
49: HOL PARCEL3C
Tay PARCEL3C
Link .
From line 49
in file C:\HYDRA\CMD\03148
Sent to Hold[I]
50:
51: REM THE FRONTAGE IMPROVEMENTS STORMWATER IS COLLECTED IN A CATCH HASI
N AT
52: REM THE NW CORNER OF THE NEW ROADWAY INTERSECTION WITH SR 507. THE ST
ORMWATER
53: REM THEN IS PIPED TO THE CATCH HASIN AT THE SOUTHWEST CnRNER OF THE N
EW
C:\RYDRA\CMD\ HYDRA Version 5.85
j wma Page 7
C:\HYDRA\CMD\03148.CMD 10:53 11-Nov-104
CHRISTENSEN DEVEOLPMENT
54: REM ROADWAY. THE CATCH BASIN ALSO COLLECTS THE SOUTH AND WEST SIDE OF
THE NEW
55: REM ROADWAY STORMWATER. THE SOUTHWEST CATCH BASIN DISCHARGES TO THE
56: REM NORTHEAST CATCH BASIN WHICH COLLECTS THE EAST AND NORTH SIDE OF
57: REM THE NEW ROADWAY STORMWATER. THE NORTHEAST CATCH BASIN DISCHARGES
58: REM INTO THE SWALE BETWEEN PARCELS 2 AND 3 AND INTO THE POND.
59:
60: NEW FRONTAGE IMPROVEMENTS
61: SCS 0.15, 0.84, 98, 9n, 20, 0.02, 210
Computed concentration time 1.24 Minutes
Total Time of Concentration 1.24 Minutes
Total rainfall falling on impervious 818.71 Cu Ft
Impervious runoff 710.08 CuFt
Portion off impervious 87.46
Peak CFS rainfall falling on impervious 0.0964 Cu Ft/Sec
Peak CPS runoff from impervious 0.0793 CuFt/Sec
Equivalant "C" off impervious 0.82
Total rainfall felling on pervious 155.94 Cu Ft
Pervious runoff 79.87 CuFt
Portion off pervious 51.22 3
Peak CPS rainfall falling on pervious 0.0184 cuFt/Sec
Peak CFS runoff from pervious 0.00619 ruFt/Sec
Equivalant "C" off pervious 0.34
Total rainfall falling on segment 974.66 Cu Ft
Total segment runoff 795.95 Cu Ft
Portion off segment 81.67 £
Peak CPS rainfall falling on segment 0.11. Cu Ft/Sec
Peak CFS runoff from segment 0.0855 CuFt/Sec
Equivalant "r" off segment 0.74
62: TNL 99
63: DPI 193, 344.50, 343.80
Length 193.00 Feet
Ground elevation up 344.50 Feet
Ground elevation down 343.80 Feet
Minimum diameter 4.00 Inches
Lump sum cost 0.00 Dollars
ManningsN 0,00900
MinSlope 0.00100
Link number 4
@Adding Ste into Event
@Adding Diurnal into Design
@Adding Event into Design
Average Design Flow 0.00 CuFt/Sec
Storm flow (no Sri 0.0855 Cuft/Sec
Design flow including SF 0.0855 Cuft/Sec
Combined SF 1.n00
Design diameter 4.00 Inches
C:\HYDRA\CMD\ HYDRA Version 5.85
jwma Page 8
- _
C:\HYDRA\CMD\03148.CMD 10:53 11-Nov-104
CHRISTENSEN DEVEOLPMENT
Invert elev up 342.14 Feet
Invert elev down 341.44 Feet
Slope 0.00363
Depth of fluid in pipe 2.28 Inches
d/D : 0.,7D
Partial flow velocity 1.635 Feet/Sec
64: HOL FRONTAGE
Tag FRONTAGE
Link 4
From line 64
In file C:\HYDRA\CMD\03148
Sent to HOld]2]
65:
66: NEW LOT 4
67: SCS 0.74, 0.66, 98, 78, 20, 0.024, 2S1
Computed concentration time 1.35 Minutes
Total Time of Concentration 1.35 Minutes
Total rainfall falling on impervious 3173.48 Cu Ft
Impervious runoff 2775.53 Crier
Portion off impervious 87.46 S
Peak CE'S rainfall falling on impervious 0.37 CuFt/Sec
Peak CFS runoff from impervious 0.31 CuFt/Sec
Equivalant "C" if impervious 0.82
Total rainfall falling on pervious 1634.82 Cu Ft
Pervious runoff 338.78 Cu Ft
Portion off pervious 20.72 B
Peak CPS rainfall falling on pervious 0.19 CuFt/Sec
Peak CFS runoff from pervious 0.00930 CuFt/Sec
Equivalant "C" off pervious 0.0483
Tot.,l rainfall falling on segment 4R08.30 Cu Ft
Total segment runoff 3714.30 CuFt
Portion off segment 64.77 F
Peak CFS rainfall falling on segment 0.57 CnFt/Sec:
Peak CFO runoff from segment 0,91 ruFt/Sec
Egnivalant "r" off segment 0.54
68: INL 99
65: CHA 251, 351, 346, 351, 346
Length 251.00 Feet
GrUp 351.00 Feet
GrDn 34b.00 Feet
InvUp 351.00 Feet
TbvDo 346.00 Feet
Link number 5
@Adding Sto into Event
@Adding Diurnal into Design
@Adding Event into Design
C:\HYDRA\CMD\ HYDRA Version 5.85
wma Page 9
- -
C:\HYDRA\CMD\03148.CMD 10:53 11-Nov-104
CHRISTENSEN DEVEOLPMENT
Average Design Flow O.OU Cu Ft/Sec
Storm flow (no SF) 0.306 Cuft/Sec
Design flow including SF 0.306 Cuft/Sec
Combined SF 1.00D
CHD Maximum velocity 6.0000 FPS
CHD Minimum velocity 0.3000 FPS
CHD Mannings "n" 0.2000
CHD Left side slope 3.0000
CHD Bottom width 8.00 Feet
CHD Right side slope 3.0000
CHD Minimum freebnard 1.0000 Feet
CHD Exfiltratinn 0.0000 IPH
Channel Slope 0.0199
Design flow 0.31 Cuft/Sec
Depth of flow 1.63 Inches
0.14 Feet
Velocity 0.27 Ft/Sea
Travel rime 15.58 Minutes
Width of surface 8.82 Feet
70: HOL LOT4
Tag LOTH
Link 5
From line 70
In file C:\HYDRA\CMD\03148
Sent to HOld[31
71:
72: NEW SOUTH AND WEST ROADWAY
73: SCS 0.22, 0.80, 98, 90, 20, 0.008, 156
Computed concentration time 1.45 Minutes
Total Time of Concentration 1.45 Minutes
Total rainfall falling on impervious 1143.60 OuFt
Impervious runoff 1000.15 CuFt
Portion oft impervious B7.46 5
Peak CPS rainfall felling on impervious 0.13 CuFt/Sec
Peak CFS runoff from impervious 0.11 CuFt;Sec
Equivalent "C" off impervious 0.81
Total rainfall falling on pervious 285.90 CuFt
Pervious runoff 146.42 CuFt
Portion off pervious 51.21 &
Peak CPS rainfall falling on pervious 0.0337 Cu Ft/Sec
Peak DES runoff from pervious 0.011.2 CuFt/Sec
Equivalent "C" off pervious 0.33
Total rainfall falling on segment 1429.49 Cu Ft
Total segment runoff 1146.56 ru Ft
Portion off segment 80.21 8
C:\HYDRA\CMD\ HYDRA Version 5.85
j wma Page 10
- - -
C:\HYDRA\CMD\03148.CMD 10:53 11-Nov-104
CHRISTENSEN DEVEOLPMENT
Peak CFS rainfall falling on segment 0.17 Cu Ft/Sec
Peak CFS runoff from segment 0.12 Cu Ft/Sec
Equivalent "c" oft segment 0.72
74: REC FRONTAGE
H,dd[N.) .
Looking up record number 4
75: REC LOT4
Hold[Nund 3
Looking up record number 5
76: INL 99
77: DPI 20, 343.80, 341.00
Length 20.00 Feet
Ground elevation up 343.80 Feet
Ground elevation down 341.00 Feet
Minimum diameter 4.00 Inches
Lump sum cost O.nO Dollars
ManningsN 0.0090()
MinSlope 0.(10100
Link number 6
@Adding Ste into Event
@Adding Diurnal into Design
@Adding Event into Design
Average Design Flow 0.00 CuFt/Sec
Storm flow (nu SF) 0.374 Cuft/Sec
Design flow including SF 0.373 Cuft/Sec
Combined OF 1.000
Design diameter 4.00 Inches
Invert elev up 341.44 Feet
Invert .Iev down 336.64 Feet
Slope 0.1400
Depth of fluid in pipe 1.88 Inches
d/D 0.470
Partial flow velocity 9.139 Feet/Sec
78: HOL SWROADWAY
Tay SWROADWAY
Link 6
From line 78
In file C:\HYDRA\CMD\03148
Sent to Hold[2]
79:
80: NEW NORTH AND EAST ROADWAY
R1: SCS 0.22, 0.80, 98, 90, 20, 0.008, 156
Computed concentration time 1.45 Minutes
Total Time of Concentration 1.45 Minutes
Total rainfall fallinq on impervious 1143.60 CuFt
Impervious runoff 1000.15 CuFt
Portion off impervious R7.46
C:\HYDRA\CMD\ HYDRA Version 5.85
jwma Page 11
C:\HYDRA\CMD\0314R.CMD 10:53 11-Nov-104
CHRISTE11SEN DEVEOLPMENT
Peak CFS rainfall falling on impervious 0.13 Cu Ft/Sec
Peak CFS runoff from impervious 0.11 Cu Ft/Sec
Equivalant "C" off impervious 0.81
Total rainfall falling on pervious 285.90 CuFt
Pervious runoff 146.42 CuFt
Portion off pervious 51.21 %
Peak CFS rainfall falling on pervious 0.0337 r_u Ft/Sec
Peak CFS runoff from pervious 0.0112 Cu Ft/Sec
Equivalant "C" otf pervious 0.33
Total rainfall falling on segment 1429.49 Cu Ft
Total segment runoff 1146.56 lift
Portion off segment 80.21 %
Peak CPS rainfall falling on segment 0.17 CuFt/SeC
Peak CFS runoff from v,gment 0.12 CuFt/Sec
Equivalent "C" off segment 0.72
82: REC SWROADWAY
Hold[Num] 2
Looking up record number 6
83: INL 99
64: UPI 70, 343.76, -141.50
Length 70.00 Feet
Ground elevation up 343.76 Feet
Ground elevation down 341.50 Feet
Minimum diameter 4.00 Inches
Lump sum cost 0.00 Dollars
ManningsN 0.00900
MinSlope 0.00100
Link number 7
@Adding Sic into Event
@Adding Diurnal into Design
@Adding Event into Design
Average Design Flow 0.00 Cu Ft/Sec
Storm flow (.n, SF) 0.451 Cutt/SeC
Design flow including SF : 0.451 Cutt/Sec
Combined SF 1.000
Design diameter 8.00 Inches
Tuvert elev up 338.64 Feet
invert elev down 338.57 Feet
Slope 0.00100
Depth of fluid in pipe 6.08 inches
d/D 0.760
Partial flow velocity 1.564 Feet/Sec
85: HOL NEROADWAY
Tag NEROADWAY
Link
From line 85
In file C:\HYDRA\CMD\03148
C:\HYDRA\CMD\ HYDRA Version 5.85
jwma Page 12
C:\HYDRA\CM0\03148.CMD 10:53 11-Nov-104
CHRISTENSEN DEVEOLPMENT
Sent to Hold[21
86:
87: NEW LOT 1
88: SCS 0.86, 0.58, 98, 78, 20, 0.007, 426
Computed concentration time 4.24 Minutes
Total Time of Concentration 4.24 Minutes
Total rainfall falling on impervious 3241.05 CuFt
Impervious runoff 2831.18 CuFt
Portion off impervious 87.35 8
Peak CFS rainfall falling on impervious 0.38 Cu Ft/Sec
Peak CFS runoff from impervious 0.27 Cu Ft/Sec
Equivalant "C" off impervious 0.71
Total rainfall falling on pervious 2346.97 Cu Ft
Pervious runoff 485.06 Cu Ft
Portion off pervious 20.67 %
Peak CPS rainfall falling on pervious 0.28 Cu Ft/Sec
Peak CFS runoff from pervious 0.0133 CuFt/Sec
Equivalant "C" off pervious 0.0483
Total rainfall falling on segment 5588.02 Cu Ft.
Total segment runoff 3316.24 CuFt
Portion off segment 59.35 %
Peak CFS rainfall failing on segment 0.66 Cu Ft/See,
Peak CPS runoff from segment 0.27 Cu Ft/Sec
Equivalant "C" off segment 0.41
89: INC 99
90:' CHA 426, 347, 344, 347, 344
Length 426.00 Feet
Crop 347.00 Feet
OrDn 344.00 Feet
Invop 347.00 Feet
InvDn 344.00 Fe,t
Link number 8
@Adding Ste into Event
@Adding Diurnal into Design
@Adding Event into Design
Average Design Flow 0.n0 CuFt/Sec
Storm flow (no SF) 0.270 Cuft/Sec
Design flow includinq SE' 0.270 Cufti Ser_
Combined SF 1.000
CHD Maximum velocity 6.0000 FPS
CHD Minimum velocity 0.3000 FPS
CHD Mannings "n" 0.2000
CHD Lelt side slope 3.0000
CHD Bottom width 8.00 Feet
CHI Right side slope 3.0000
CHD Minimum freeboard 1.0000 Peet
C:\HYDRA\CMD\ HYDRA Version 5.85
jwma Page 13
- -
C:\HYDRA\CMD\03148.CM0 10:53 11-Nov-104
CHRISTENSEN DEVEOLPMENT
CHD Exfiltration 0.0000 IPH
Channel Slope 0.00704
Design flow 0.2'7 Cutt/Sec
Depth of flow 2.06 Inches
0.17 Feet
Velocity 0.19 Ft/Sec
Travel time 38.35 Minutes
Width of surface 9.03 Peet
91: HOL LOT1
fag LOT1
Link 8
From line 91
In file r:\HYDRA\CMD\03148
Sent to Hold [31
92:
93: NEW LOT 2
94: SCS 1.95, 0.58, 98, 78, 20, 0.024, 251.
Computed concentration time 1.35 Minutes
Total Time of Concentration 1.35 Minutes
Total rainfall falling on impervious 7348.90 CuFt
Impervious runoff 6427.35 Cu Ft
Portion off impervious 87.46 Y,
Peak CFS rainfall falling on impervious 0.87 Cu Ft/Sec
Peak CPS runoff from impervious 0.71 Cu Ft/Sec
Equivalant "C" off impervious 0.82
Total rainfall falling on pervious 5321.62 CuFt
Pervious runoff 1102.78 Cu Ft
Portion off pervious 20.72 T
Peak CFS rainfall falling on pervious 0.63 Cu Ft/Sec
Peak CFS runoff from pervious 0.0303 Cu Ft/Sec
Equivalant "C" off pervious 0.0483
Total rainfall falling on segment 12670.52 CuFt
Total segment runoff 7530.13 CuFt
Portion off segment 59.43 t
Peak CIS cainiall tilling on segment 1.49 CuFt,Se,
Peak C~IFD runoff from segment 0.71 CuFt/Sec
Equivalent "C" off segment 0.48
95: INL 99
96: CHA 251, 351, 346, 351, 346
Length 251,00 Feet
Grllp 351.00 Feet
GrDn 346.00 Feet
InvDp 351.00 Feet
lnvDn 346.00 Feet
C:\HYDRA\CMD\ HYDRA Version 5.85
j wma Page 14
_
C:\HYDRA\CMD\03148.CMD 10:53 11-Nov-104
CHRISTENSEN DEVEOLPMENT
Link number 9
@Adding Ste into Event
@Adding Diurnal into Design
@Adding Event into Design
Average Design Flow 0.00 Cu Ft/Sec
Storm flow (no SF) 0.709 Cuft/Sea
Design flow including SF 0.709 Cuft/Sec
Combined SF 1.000
CHD Maximum velocity 6.0000 FPS
CHD Minimum velocity 0.3000 FPS
CHD Mannings "n" 0.2000
CHD Lett side slope 3.0000
CHD Bottom width 8.00 Feet
CHD Right side slope 3.0000
CHD Minimum freeboard 1.000U Feet
CHD Exfiltration 0.0000 IRE
Channel Slope 0.0199
Design flow 0.71 Cuft/Sec
Depth of flow 2.69 Inches
0.22 Feet
Velocity 0.37 Ft/Sec
Travel time 11.40 Minutes
Width of surface 9.34 Feet
97: HOL LOT2
Tag L0T2
Link
From line 97
In file C:\HYDRA\CMD\03148
Sent to HoId[4]
98:
99: REM SWALE 3 TREATS THE STORMWATER FROM THE FRONTAGE, ROADWAY AND PARC
EL3
100: REM FRONTAGE ROADWAY WHICH DISCHARGE INTO AND FLOW BETWEEN PARCELS 2
AND 3
101: REM AND INTO THE INFILTRATION POND. SWALE 2 TREATS THE STORMWATER FRO
M THE PARCEL 1 WHICH DISCHARGES INTO A CB. SWALE 3 TREATS THE
STORMWATER FROM THE PARCEL 2 WHICH DISCHARGE INTO A rB AND IS COMBINED WITH FLOW
FROM SWALE RAND FLOW NORTH OR PARCEL 2 INT
102:
103: NEW SWALE..
104: REC PARCEL3c
Hold[Num] 1
Looking up record number
105: REC NEROADWAY
Hold[Nnm]
Looking up record number 7
1U6: INL 99
107: SEA 100, 346, 344.5, 343.13, 341.13
Length 100.00 Feet
GrUp 346.00 Feet
GrDu 344.50 Feet
C:\HYDRA\CMD\ HYDRA Version 5.85
jwma Page 15
--_.c_
C:\HYDRA\CMD\03148.CMD 10:53 11 Nov-104
CHRISTENSEN DEVEOLPMENT
Invup 343.13 Feet
InVDn 341.13 Feet
Link number 10
@Adding Ste into Event
@Adding Diurnal into Design
@Adding Event into Design
Average Design Flow 0.00 Cu Ft/Sec
Storm flow (no SF) 0.983 Cuft/Sec
Design flow including SF 0.983 Cuft/Sec
Combined SF 1.000
CHD Maximum velocity 6.0000 FPS
CHD Minimum velocity 0.3000 FPS
CHD Manniugs "n" 0.2000
CHD Left side slope 3.0000
CHD Bottom width 8.00 Feet
CHD Right side slope 3.0000
CHD Minimum freeboard 1.0000 Feet
CHD Exfiltratiou 0.0000 !PH
Channel Slope 0.0200
Design flow 0.98 Cutt/Ser.
Depth of flow 3.25 Inches
0.27 Feet
Velocity 0.41 Ft/Sec
Travel time 4.03 Minutes
Width of surface 9.63 Feet
108: Hot SWALEI
Tag SWALEI.
Link 10
From line 108
In file r:\HYDRA\CMD\03148
Sent to Hold[1]
109:
110: NEW SWALE 2
111: REC LOT1
Hold[Nn.] 3
LOnkinq up cerord number fl
112: INL 99
113: CHA 10U, 344, 342, 344.5, 341
Length 100.00 Feet
GrDp 344.00 Feet
GrDn 342.00 Feet
Inv Op 344.50 Feet
InvDn 341.00 Feet
Link number '_1
@Adding Sto into Event
@Adding Diurnal into Design
@Adding Event into Design
Average Design Flow 0.00 CuFt/Sec
Storm flow (no SF) 0.270 ruff/Sec
Design flow including SF 0.270 Cuft/Sec
C:\HYDRA\CMD\ HYDRA Version 5.85
jwma Page 16
C:\HYDRA\CMD\03148.CMD 10:53 11-NO,,-104
CHRISTENSEN DEVEOLPMENT
Combined SF 1.000
CHD Maximum velocity 6.0000 FPS
CND Minimum velocity 0.3000 FPS
CHD Manninq_s "n" 0.2000
CHD Left side slope 3.0000
CND Bottom width 8.00 Feet
CHD Right side slope 3.0000
CHD Minimum freeboard 1.0000 Feet
CHD Exfiltration 0.0000 IRS
Channel Slope 0.0350
Design flow 0.27 CutVSec
Depth of flow 1.28 Inches
0.11 Feet
vciocity 0.31 Ft/Sec
Travel time 5.46 Minutes
Width of surface 6.64 Feet
114: HOL SWALE2
Taq SWALE2
Link 11
From line 114
In file C:\HYDRA\CMD\03148
Sent to Hold[23
115:
116: NEW SWALE 3
117: REC LOT'
Hold[Nu.] 4
Looking up record number 9
11B: 1NL 99
119: CHA 159, 346, 344.5, 343.13, 341.54
Length 159.00 Feet
GrOp 346.00 Feet
Ginn 344.50 Feet
TnvOp 343.13 Feet
Inv Dn 341.54 Feet
Link number 12
@Addi.ng Sto into Event
@Addinq Diurnal into Desiqn
@Adding Event into Design
Average Design Flow 0.00 CuFt/Sec
Storm flow (r, SF) 0.709 Cuft/Sec
Design flow including SF 0.709 Cuft/Sec
Combined SF 1.000
CHD Maximum velocity 6.0000 FPS
CHD Minimum velocity 0.3000 FPS
DES Mannings "n" 0.2000
CHD Left side slope 3.0000
CHD Bottom width 8.00 Feet
CHD Right side slope 3.OOOD
CHD Minimum freeboard 1.0000 Feet
C:\HYDRA\CMD\ HYDRA Version 5.85
jwma Page 17
- ' -
C:\HYDRA\CMD\03148.CMD 10:53 11-Nov-104
CHRISTENSEN DEVEOLPMENT
CHD Exfiltrati.on 0.0000 IPH
Channel Slope 0.01000
Design flow 0.71 Cuft/Sec
Depth if flow 3.29 Inches
0.27 Feet
Velocity 0.29 Ft/Sec
Trevel time 9.00 Minutes
Width of surface 9.64 Fe@t
120: HOL SWALE3
Tag SWALE3
Link 12
From line 120
In file G \HYDRA\CMD\03148
Sent to Hold[3]
121:
122: NEW INFILTRATION POND
i23: RED SWALEI
Hold[Nnm] 1
Looking up record number In
124: REC SWALE2
Hold[Num] 2
Looking up record number 11
125: REC SWALE3
Hold[Num] 3
Looking up record number 12
126: RED (0/2.15/11559/2.15
127: RES 343, 341, 343, OVER
Number of points on Volume/Discharge curve 2
Maximum rapacity of reservoir INFINITE
Inlet elevation 343.00 Feet
Vutlet elevation : 341.00 Pont
Link number 13
@Adding Sto into Event
@Adding Diurnal into Design
@Adding Event into Design
Average Design Flow 0.00 CuFt/Sec
Storm flow (no SF) 1.346 Cuft/Sec
Design flow including IF 1.346 Cuft/Sec
Combined SF 1.000
128: END
C:\HYDRA\CMD\ HYDRA Version 5.85
jw a Page 18
C:\HYDRA\CMD\03148.CMD 10:53 11 Nov-104
CHRISTENSEN DEVEOLPMENT
S U M M A R Y O F A N A L Y S I S------
Run number on command file 9
Number of links 14
Number of hydrographs 61
Total sanitary population 0
Total sanitary area 0.00 Acres
Total storm area 5.38 Acres
Number of pumps 0
Number if reservoirs i
Ni=ber of diversion .structures 0
Number of inlets 12
Length of new pipe 462.00 Feet
Length nt existing pipe 0.00 Feet
Length of channel 1287.00 Feet
Lenqth of gutter 0.00 Feet
Length of transport units 0.00 Feet
Length of pressure pipe 0.00 Feet
Closing DBF and NDX Files
APPENDIX C
Commercial Stormwater Facilities
Maintenance Agreement
COMMERCIAL/INDUSTRIAL
AGREEMENT TO MAINTAIN
STORMWATER FACILITIES AND TO IMPLEMENT A
POLLUTION SOURCE CONTROL PLAN
BY AND BETWEEN
RICK CHRISTENSEN
ITS HEIRS, SUCCESSORS, OR ASSIGNS
(HEREINAFTER "OWNER")
AND CITY OF YELM
(HEREINAFTER "JURISDICTION-)
The upkeep and maintenance of stormwater facilities and the implementation of pollution
source control best management practices (BMPs) is essential to the protection of water
resources. All property owners are expected to conduct business in a manner that
promotes environmental protection. This Agreement contains specific provisions with
respect to maintenance of stormwater facilities and use of pollution source control BMPs.
LEGAL DESCRIPTION:
Parcel number 64303400501, in the City of Yelm.
Whereas, OWNER has constructed improvements, including but not limited to, buildings,
pavement, utilities and stormwater facilities on the property described above. In order to
further the goals of the JURISDICTION and to ensure the protection and enhancement of
water resources, the JURISDICTION and OWNER hereby enter into this Agreement.
The responsibilities of each party to this Agreement are identified below.
OWNER SHALL:
(1) Implement the stormwater facility maintenance program included herein as
Attachment "A".
(2) Implement the pollution source control program included herein as Attachment
"B"
(3) Maintain a record (in the form of a log book) of steps taken to implement the
programs referenced in (1) and (2) above. The log book shall be available for
inspection by Jurisdiction staff at the proposed site during normal business hours.
The log book shall catalog the action taken, who took it, when it was done, how it
was done, and any problems encountered or follow-on actions recommended.
Maintenance items ("problems") listed in Attachment "A" shall be inspected on a
monthly or more frequent basis as necessary. OWNER is encouraged to
photocopy the individual checklists in Attachment "A" and use them to complete
its inspections. These completed checklists would then, in combination, comprise
the monthly log book.
(4) Submit an annual report to the JURISDICTION regarding implementation of the
programs referenced in (1) and (2) above. The report must be submitted on or
before May 15 of each calendar year and shall contain, at a minimum, the
following:
(a) Name, address and telephone number of the businesses, the persons, or the
firms responsible for plan implementation, and the person completing the
report.
(b) Time period covered by the report.
(c) A chronological summary of activities conducted to implement the
programs referenced in (1) and (2) above. A photocopy of the applicable
sections of the log book, with any additional explanation needed, shall
normally suffice. For any activities conducted by paid parties not
affiliated with OWNER, include a copy of the invoice for services.
(d) An outline of planned activities for the next year.
THE JURISDICTION SHALL:
(1) Provide technical assistance to OWNER in support of its operation and
maintenance activities conducted pursuant to its maintenance and source control
programs. Said assistance shall be provided upon request, and as Jurisdiction
time and resources permit, at no charge to OWNER.
(2) Review the annual report and conduct a minimum of one (1) site visit per year to
discuss performance and problems with OWNER.
(3) Review this agreement with OWNER and modify it as necessary at least once
every three (3) years.
REMEDIES:
(1) If the JURISDICTION determines that maintenance or repair work is required to
be done to the stormwater facilities existing on OWNER, property, the
JURISDICTION shall give the owner of the property within which the drainage
facility is located, and the person or agent in control of said property, notice of the
specific maintenance and/or repair required. The JURISDICTION shall set a
reasonable time in which such work is to be completed by the persons who were
given notice. If the above required maintenance and/or repair is not completed
within the time set by the JURISDICTION, written notice will be sent to the
persons who were given notice stating the JURISDICTION'S intention to perform
such maintenance and bill the owner for all incurred expenses. The Jurisdiction
may also revoke stormwater utility rate credits for the quality component or
invoke surcharges to the quantity component of OWNER bill if required
maintenance is not performed.
(2) If at any time the JURISDICTION determines that the existing system creates any
imminent threat to public health or welfare, the JURISDICTION may take
immediate measures to remedy said threat. No notice to the persons listed in
Remedies (1), above, shall be required under such circumstances.
(3) The owner grants unrestricted authority to the JURISDICTION for access to any
and all stormwater system features for the purpose of performing maintenance or
repair as may become necessary ander Remedies 1 and/or 2.
(4) The persons listed in (1), above, shall assume all responsibility for the cost of any
maintenance and for repairs to the stormwater facility. Such responsibility shall
include reimbursement to the JURISDICTION within 30 days of the receipt of the
invoice for any such work performed. Overdue payments will require payment of
interest at the current legal rate for liquidated judgments. If legal action ensues,
any cost or fees incurred by the JURISDICTION will be home by the parties
responsible for said reimbursements.
(5) The owner hereby grants to the JURISDICTION a lien against the above-
described property in an amount equal to the cost incurred by the JURISDICTION
to perform the maintenance or repair work described herein.
This Agreement is intended to protect the value and desirability of the real property described
above and to benefit all the citizens of the Jurisdiction. It shall run with the land and be binding
on all parties having or acquiring from OWNER or their successors any rights, title, or interest in
the property or any part thereof, as well as their title, or interest in the property or any part
thereof, as well as their heirs, successors, and assigns. They shall more to the benefit of each
present or future successor in interest of said property or any part thereof, or interest therein, and
to the benefit of all citizens of the JURISDICTION.
Owner
Owner
STATE OF WASHINGTON )
)SS
COUNTY OF THURSTON )
On this day and year personally appeared before me, and
known to be the individual(s) described, and who executed
the foregoing instrument and acknowledge the said instrument to be the free and voluntary act
and deed for the uses and purposes therein mentioned.
Given under my hand and official seal this day of , 200
Notary Public in and for the State of
Washington, residing in
Dated at , Washington, this day of , 200_.
STATE OF WASHINGTON )
)SS
COUNTY OF THURSTON )
On this day and year personally appeared before me,
who executed the foregoing instrument and acknowledge the
said instrument to be the free and voluntary act and deed of said Municipal Corporation for the
uses and purposes therein mentioned and on oath states he is authorized to execute the said
instrument.
Given under my hand and official seal this day of , 200
Notary Public in and for the State of
Washington, residing in
APPROVED AS TO FORM:
INSTRUCTIONS FOR PERSON MAINTAINING
STORMWATER SYSTEM
The following pages describe the maintenance needs of the stormwater conveyance,
storage and disposal components of the system designed for this site. This maintenance
effort shall be the responsibility of the RICK CHRISTENSEN or his assigned
representative. In general, system components should be inspected in accordance with
the Maintenance Checklists included as Attachment "A" at the rear of this document.
Use the suggested frequency indicated on the left side of the Checklist Forms:
(1) Monthly (M) from November through April
(2) Annually (A), once in late summer (preferably September)
(3) After major storm events (Sp] inch in 24 hours.
Inspection findings should be recorded on photocopies of Maintenance Checklist forms.
Checkoff the problems you looked for each time an inspection was performed.
Maintenance should be undertaken to correct deficiencies found and comments on
problems found and actions taken entered on the forms.
Completed Checklist Forms should be filed and incorporated in the annual report to be
issued in May of each year.
If you have specific questions or require technical assistance, contact the responsible
jurisdiction. Please do not hesitate to call, especially if you are unsure whether a situation
you have discovered may be a problem.
ATTACHMENT "A": MAINTENANCE PROGRAM
COVER SHEET
Inspection Period:
Number of Sheets Attached:
Date Inspected:
Name of Inspector:
Inspector's Signature:
ATTACHMENT "A": MAIWENANCE PROGRAM
Maintenance Checklist W Cmvgance Systems (Pines, OitUea and Swabs)
Drainage
System
rM Feature Pmaient Carraftes. a drack W CondAiona Met ShOWd Exist
Sesdmem& Addumubted Sediment met exceeds
Pipes 0ebris 2" of the diameter of the arse. Pipe cleaned oiag sedmantaM rleCna.
Vegetation that reduees free All vagabond, removed an ware, flows freely
Vegeretk, movement of water through pave Mdd.'h Pips.
Damaged, Pmtecdve coating is damaged rust is
rusted, bell using more Man 50% redecoration
cmabats. W any part of the pipe. Pipe is repaired or replaced
Any dent Mat significantly Impedes
flaw (b, decreases the cross seniors
area W pipe by more then 20%). Pipe repaired or repacetl.
Dumping of and waztes such as
grass Oman, and bromm s imo
basin, Unsighthy accumulation of
nondegradable matenals such as Remove trash and debate and dispose M as
Open glass, plastic, metal, foam and cmted described by Clfy Weste Management
M S ditches Tresh & Oebns pa r Section.
Sediment Accompaist.eminent that exceeds Dark carped of a Sediment and debrisx
M buildup 20% of t. Mpulln depth. that it matches deapn.
Vegetation (peg., -for'sMUbe w
message) that reduces free Water Kowa freely Mbugh dltohes. Gnasy
VIIII n mends of water through decks. vin samon should be aft Wane
Em.lan
demageto
M $lope. See Panda Cneacker t See Ponds Checklist.
Rock An' out
a place or
umg (if Maintenance Person can sea native
appllwNe) soil beneath the rack lining. Metal. rocks to design standard
ebb
ease Maine See Catkin Basins cheddast See Catch Basin. ch.1,11.
M S Swedes n0pbD~hos
bris bad above for Dncnes Sea above fop Michas.
& vegeation may need to be repanted after
M See above ear Ditches. boasts g.
Aerate... and resell and mukk bare
areas. Mideast g.a. height at a mmlmum
not Goa. rover Is aperse and weeay or fi inches fo, best sbmmvater treatmera
ined a- ..,-a with woody Remove woody growth, narrator, and
M vegetation
reseed as necessary
MS See Ponds Chords[ Sae ponds Checklist.
Conversion W If
pxalde speak vaM homeowner and
homeowner to repaint that.waW eraa he reabred. Contact
raimpetbb Svab has been flged in or beached by Cdy b tapper, praWem an on rettiI
M that, vmWplb, shrubbery, etc valuntaddy.
use A survey' may be ceases to check grades.
Grades need to he in 1-5% range d possible.
vale does Water abnds'm. 1. or flaw vNOCity Made is leas Men 1%undimmams may
A not drsdn is vary slow Stagnation accus. need to be deterred.
It you are unsure adather a pmbbm avdss, pease conduct Me Jurisdiction and ask for bchnical assistance.
Com.
dab
A = Annual lMamh or April prof nor)
M = Monthly )tee schedule)
5-After maprs.
ATTACHMENT "A" (CONTINUED)
Maintenance Checklist for Energy Ellmipators
a n
System
em
Frequenq Feature J Problem Conditions to check for Contlitions that SM1OUItl Exist
only one layer of rock exists above
Missing or the natural soil in area 5 square
moved feet or larger, or any exposure to
A Rock d rock native sail. Replace rocks to design standards.
Rock-filled
trench for Missing or
discharge moved large rock (30 It. Each) so that rock is
A from nd. rock Trench is not full of rack, visible above edge of trench.
Pipe
plugged
Dipersion with Accumulated sediment that
M trench sedemm exceeds 20% of the design deth, Pi cleanedlfiushed
Perforation Over 10 of perforations in pipe are
M s plugged plugged with debris and sediment Clean or replace perfiouata,! pipe
Usual evitlence of water
discharging at concentrated points
Not along much normal condition is a
dischargin'sheet flOW' of water along trench) Trench must be redesigned or or rebuil
g water Intent is to prevent erosion to starMard. Elevation of lip of trench
M,S property damage . should be the same flat at all points.
Water
flows out Maintenance person observes
top of water flowing out during any storm
'distributer Is" than design stem) or it is Facility must be rebuilt or redesigned t
' catch causing or appears likely to cause standards. Pipe is probably plugged or
M, S basin damage . damaged and needs replacement
Receiving
area Water in receiving area is causing Stabilize slope with grass or other
oversatura or has potential of rousing vegetation, or rock if condition is
M,S ted landslide severe
.
If you are unsure whether a problem exists, passe contact me Jurisdiction and ask for technical assistance
Comments,
A = Annual (March or April preferetl)
M = Monthly (see schedule)
5 =After After major storms
ATTACHMENT "A" (CONTINUED)
Maintenance Checklist for Infiltration Systems
2lnage
System
Frequency Fe.lure d Problem Conditions to check for Conditions that Should Exist
JTrash B domes
bufdup in See Maintenace Checklist for
M, S General and Ponds, See Maintenance Checklist for Pontls.
Poisonous See Maintenace Checklist for
M I'lastalson ponds See Maintenance Checklist for Pontls.
Fire hazard or See Maintenace Checklist for
M, S ollugon Ponds. $ee Maintenance Checklist for Pontla.
Vegetation not
growing or is See Maintenace Checklist for
M overgrown Pontls. See Maintenance Checklist for Points.
See Maintenace Cheekfst for
M Rodent holes Ponds. Sae Maintenance Checklist for Ponds.
See Maintenace Checklist for
M Insects Ponds. See Maintenance Checklist for Ponds.
Sediment is removedantllor facility is
Asa) torture test indicates cleared so that inffiratlon system
Sediment facility is not working at its works according to design. A sediment
Storage buildup in designed capabilities or was trapping area is installed to reduce,
A area s !em incorrect) tles ru.N. sediment bans at info rt~filtmtion area.
Additional volume is added through
Storage area excavation to provide nestled storage
drains slowly A sail texture test beicates So)!!s aerated and retofilled to improve
(mare than 48 facility is not working at its drainage. Contact the City for
hours) or desgned capabilities or was information on its requirements
A overflows inconectl des' med. ushandog excavation.
Any sediment and debris filing
area to 10% of depth from
sump bottom to bottom of outlet
Sediment pipe or obstructing flow into the
Fm trapping area connector e. Clean outsum to desi ntle N
Add a imppirp area by comb T, a
Sediment sump for angling of solids. Segregate
trapping area Stormwater enters inf&alion settling area from rest of facility
.
One Time not sent area drcectt wfhout treatment Contact G {ar u)dance.
FA visua inspection I e or no
Sediment and water frays through filter during
M Rock fitters dsbes heavy role storms. Replace gravel el N rock finer.
11youare unswe wtrether a problem exists, please contact the Jurisdiction alt ask for technical assistance.
Comments'
Key
A , Annual (March or April prefaced)
M = Monthly (see schedule)
S : After major storms
Accumulafed aedaneto that
exceeds 10% of the
designed pond depth.
Buried a partially bused
Sediment octet structure probably Sediment donned out to designed pond
Storage buildup in indicates significant shape and depth; pond reseeded if
M area sediment Oe ts. necaramr, to control emosion
part of dike afincl which has
t
led 4 inches lower than Dike should be built back to the design
A Pond dikes des eievaban. elevatam.
y one layer of rock
ts above native soil in
Emergenry 5 square feet a larger,
overflowny exposure to native
A s II
Re lace rocks to desi n standards.
mergency a pan as no area
overflow I large rocks to haddle
One Time spillway rgency overflows. Carried City for guidance
If you are unsure whether a problem elders, please contact Me Jurisdiction and ask for technical assistance.
Comments:
Key
A = Annual (March or Apol preferred)
M = Monthly (see schedule)
S - After major storms
ATrACHMENT "A" (CONTINUED)
Maintenance Checklist for Ponds
uraga
System
Frequency Feature J Problem Conditions to check for Conditions that Should Exist
Durtrpxg al yard wastes
such as grass clipping such
as grass clippings and
branches into basin.
Unsightly accumulation of
Trash $ nondegradable materials
de ins such as glass, plastic Remove trash and Ponds and dispose as
buildup in metal, foam, and coated prescribed by City Waste management
M, S General and paper, Section.
fresh rack Bar screen over outlet more Replace screen. Remove trash and debts
plugged or than 25% covered by debris and dispose as Prescribed by City Waste
M,S missing or missing. management Section
Remove poisonous vegetation Do not spray
Any poisonous vegetation chemicals on vegetation without obtaining
Poisonous which may constitute a guidance from the Cooperative Extension
M vegetation hazaN to the antic Service and approval from the City.
Presence of chemicals such
as natural gas, oil and Find sources of pollution and eliminate them.
Fire hazard gasoline, obnoxious color, Water is free from noticeable color, odor, or
M S or pollution odor, or sludge noted, contamination.
For dressy ponds, selectively thatch, aerate,
and reseetl p.MS. Grass cutting
unnecessary unless digsted by aesthetic.
For wetland ponds, hand plant nursery -grown
For greasy ponds. grass wetland plants in here areas. Contact the
cover a sparse and weedy Cooperative Extension Service for direction
Vegetation or is overgrown. For on invasive species such as purple
not growing watland ponds, plants are loosestrife and reed canary grass. Pond
or is sparse or invasive species bottoms should have uniform dense
M overgrown are resent. covers a of desired plant species,
Any evidence of rodent
hales if f b, h y is acting as a
dam or bent, or any
evidence of water piping Rodents destroyed and dam or bens
Rodent through dam or berm via repaired. Conrad the Thurston County
M holes rodent holes Health Department for guidance
.
When leads surd as wasps
and hornets interfere with
maintenance activities, or Inserts destroyed or removed from site.
when mosquitos become a Contact Cooperative Edension Service for
M Insects nuisance. uitlance.
Tree growth does not allow
maintenance access or
interferes with maintenance
activity fl.e., slope mowing,
silt removal, or equipment
movements). If trees are Trees do not hinder maintejadivibes
es.
not interfering with accessSelectively cultivate trees s
for
A Tree rowin leave Uses alonefirewood.
Chek around inlets and
outlets for signs of erosion.
Check banns for signs of
sliding or settling Action is
needed where enoded Fintl causes of enosion aM m.
tlamage tlamage over 2 Then slopes should be stabg
Erosion on inches deep and where appropriate erosion contral eg.,
Sde shwas Deems or at there is potential for rock reinforcement, planting M of pond entrancelexil continued enosion, whi action.
ATTACHMENT "A" (CONTINUED)
Maintenance Checklist for Catch Basins and Inlets
image
System Conditions that Should
Frequency Feature J Problem Conditions to check for Exist
No mash or debris located
immediately in front of
Trash, debris Tmah or debris in front of the catch basin catch basin opening.
and sediment opening is blocking capacity by more than Grate is kept dean and
_MS General m or on basin 10%. allows water to enter.
Sediment or debris (in the basin) that
exceeds 113 the depth from the bottom of No sediment or tlebris in
basin to invert of the lowest pipe into or out the catch basin Catch
M the basin basin du out and clean.
Trash or debris in any inlet or pipe blacking Inlet and outlet pipes free
M'S more than 113 of its height of trash or debns.
Structural
damage to Comer of frame extender more than 314
frame and/or inch past curb face into the street (if
M to slab applicable), Frame is even with cut.
Tap slab has holes larger than 2 square
inches or cracks wider than 114 inch (intent
is to make sum all material is running into Top slab is free of holes
M the basin and cracks.
Frame not sitting flush on top slab. I.e.,
separation of more than 314 inch of the Frame is sitting gush on
M frame from the to slab. top slab.
Cracks wider than 112 inch and longer than
3 feet any evidence of soil particles Basin replaced or repaired
Cracks in entering catch basin through cracks, or to tlesgn standards.
basin maintenance person judges that structure is Contact a professional
A walls/botom unsound, en mser for evaluation.
Cracks wider than 112 inch and longer than
1 foot at the joint of any mlehioutlet pipe or No cracks more bran 1/4
any evidence of soil particles entering catch inch wide at the joint of
A basin through cracks. inleVoutlet .
Basin replaced or repaired
Basin has sell ed mare than 1 inch or has to design standards.
SedlemenVm rotated more than 2 inches out of Contact a professional
A iseli nment alignment . en Ineer for evaluation,
ssenca a chemicals su as na ura or
r ar re , or s u 9e
or other gas , oil, and gasoline. Obnoxious color, Basin isrdug out and
M. S pollution odor, or sludge noted. clean.
Outlet pipe is Vegetation or roots growing in inleVoutlet
dogged with pipe joints that is more than six inches tall No vegetation or root
M. S vegetation and less than six inches aped. growth present
If you are unsure whether a problem exists, please contact the Jurisdiction and ask for technical assistance.
Comments:
A = Annual (Mares or April pretered)
M =Monthly (see schedule)
S = ARer major storms
ATTACHMENT "B"
POLLUTION SOURCE CONTROL PROGRAM
Pollution source controls are actions taken be a person or business to reduce the amount
of pollution reaching surface water and groundwater. A conscious control program is of
significant importance to the RICK CHRISTENSEN, as runoff will be directed to a
constructed wetland and infiltration disposal facility that will ultimately introduce the
collected runoff into the shallow groundwater system. Many pollutants generated on
commercial sites can not be removed from the runoff by conventional treatment and may
eventually enter the shallow groundwater system. Hence, it is of great importance to limit
the development of these pollutants in the generated stormwater runoff.
The subject controls are also known as "Best Management Practices" (BMP's), include:
• Minimizing vegetation/groundcover disturbance.
• Stabilizing existing exposed soil surfaces through fertilizing and seeding, and
mulching with chopped hay during the wet season (15 October through 15
March).
• Maintaining roof, sidewalk and paved driveway areas free of debris accumulation;
refraining from using soaps and detergents in washing these exterior surfaces; and
carefully controlling activities in these areas so as to preclude hazardous materials
spills (i.e. chemical storage, vehicle maintenance, etc.).
• Substitute non-toxic products for toxic materials, recycle used oil and antifreeze
immediately.
• Refrain from storing hazardous or toxic chemicals or other substances. Where it
is imperative to store such materials, enclose them in a lockable cabinet.
• Limit the use of fertilizers and pesticides to the precise amount recommended by
professionals working the area.
Pollution source controls are needed because of the contamination found in runoff from
commercial areas and the effect of this contamination on aquatic life and human health.
Research on urban runoff in the Puget Sound area and elsewhere has found oil and grease,
nutrients, organic substances, toxic metals, bacteria, viruses, and sediments at
unacceptable levels. Effects of contaminated runoff include closure of shellfish
harvesting areas and swimming areas, mortality of young fish and other aquatic
organisms, tumors on fish and impairment of fish reproduction.
APPENDIX D
Thurston Region
Stormwater Facilities Summary
THURSTON REGION
FACILITY SUMMARY FORM
PROPONENT'S FACILITY IDENTIFIER: Rick Christensen
NAME OF ROAD TO ACCESS FACILITY: 106th Avenue W.
HEARINGS EXAMINER CASE NUMBER:
DEVELOPMENT REVIEW PROJECT NO.:
BUILDING SITE APPLICATION NO.:
PARCEL NUMBER(S) 64303400501
To be completed by Utility Staff:
Utility Facility Number:
Project Number:
Parcel Number Status:
Basin & Subbasin:
Responsible Jurisdiction:
PART I - Project Name & Proponent
Project Name: Christensen Commercial Center
Project Owner: Rick Christensen
Project Contact: Rick Christensen
Address: P.O. Box 189, Eatonville, WA 98328
Telephone: (360) 832-3621
Project Proponent: Rick Christensen
Christensen t
Facilities Summary Report
JWM&A#03!48
Address: P.O. Box 189, Eatonville, WA 98328
Telephone: (360) 832-3621
Project Engineer: Robert F. Tauscher, P.E.
Firm: J.W. Morrissette & Associates Inc., P.S.
Telephone: (360) 352-9456
Fax: (360) 352-9990
PART 2 - Project Location
Section: 29
Township: 17N
Range: 2E
PART 3 - Type of Permit Application
Type of Permit: Administrative Site Plan Review
Other Permits: Shoreline
Site Plan Review
Grading
Other:
Other Agencies that have had or will review this Drainage & Erosion Control Plan:
None
PART 4 - Proposed Project Description
What stream basin is this project within: Nisqually River
Zoning: Commercial, Industrial
Onsite:
Number of Lots: 4
Christensen 2
Facilities Summary Report
JWM&A N 03149
Avg. Lot Size: N/A
Building Permit/Commercial Plat:
Proposed Buildings Footprint (Acres): 0.04
Parking Lot and Sidewalk(Acres): 1.60
Gravel Surface (Acres): 0
Lattice Block Paving (Acres): 0
Public Roads, On and Off site
(incl. gravel shoulder) (Acres): 0.36
Private Roads (incl. gravel shoulder) (Acres): 0
Onsite Impervious Surface Total (Acres): 2.79
PART 5 - Pre-Developed Project Site Characteristics
Stream Through Site N
Steep Slopes 10%) N
Erosion Hazard N
100-Year Flood Plain Y
Wetlands N
Seeps/Springs N
High Groundwater Table N
Aquifer Sensitive Area N
Other
Christensen 3
Facilities Summary Report
JWM&A 0 03148
PART 6 - Facility Description - On Site
Area Tributary to Facility Including Offshe (Acres): 6.53 Acres
Total Onsite Area Tributary to Facility (Acres): 6.08 Acres
Design Impervious Area Tributary to Facility (Acres): 2.79 Acres
Design Undisturbed Area Tributary to Facility (Acres): 0.00 Acres
Design Open Space Area Not Tributary to Facility (Acres): 1.18 Acres
Design Landscaped Area Tributary to Facility (Acres): 3.29 Acres
Design Total Tributary Area to Facility (Acres): 4.90 Acres
Enter a check mark and number, i.e., one (1), for the type of facility:
Wet Pond Detention 0
Wet pond water surface area, acres 0
Dry Pond Detention 1
Underground Detention: 0
Infiltration Trench: 0
Dry Well Infiltration: 0
Other: Infiltration Gallery: 0
Outlet Type (Enter a check mark and number, i.e., one (1), for each type present):
Filter: 0
Oil/Water Separator: 0
Single Orifice: 0
Multiple Orifice: 0
Weir: 0
Spillway: 0
Pump(s): 0
Other:
PART 7 - Release to Groundwater
Design Percolation Rate to Groundwater: 10 in/hr
PART 8A - Release to Surface Water
All stormwater from this site is infiltrated on site with no release to any surface waters.
Christensen 4
Facilities Summary Report
]WM&A # 03148
APPENDIX E
Site Plan
APPENDIX F
ENGINEERS CONSTRUCTION
INSPECTION REPORT FORM
APPENDIX F
ENGINEER'S CONSTRUCTION INSPECTION REPORT FORM
Project Name:
Project Number:
Location (address, or other):
Pond Information:
1. Type: -
2(a). After pond construction, have infiltration tests and/or soil logs been completed?
2(b). Indicate test results and compare with design criteria (pre-construction soils
information). Do the post-construction values indicate a need to modify system
design? Explain.
3. Outlet Type
Filter,
Oil Water Separator, Single orifice,
Oil Water Separator, Multiple orifice,
slot,
V-notch,
Other
Page F - I
4, Outlet works at correct elevation(s), filter fabric installed properly (if needed), etc.
5. Spillway at correct elevation, slope, adequately armored, etc.
Conveyances:
1. Channels properly graded, sloped, planted, etc.
2. Sewers at prop,, grade, inleis as designed, trenches as designed, pipe bedding proper',
prepared, backfilling procedures correct, materials as specified, etc.
Roof Leaders:
1. Do roof leaders drain to infiltration trenches or as shown on the approved plans.
Erosion Control:
1. Erosion facilities in place at the specified time relative to other construction.
2. Construction entrance pad as specified.
Page F - 2
3. Did facilities keep sediment, mud etc, out of water bodies, wetlands, and from
crossing the property boundary.
4. Are permanent erosion control measures in place and as designed.
Signature and Seal:
1 or someone under my direct supervision have adequately inspected the project during
construction and to the best of my knowledge the project was built according to the approved
plans and specifications except as noted above.
Signature/Date
Page F - 3