I have reviewed the plans submitted on August 5, 2004. The following are comments from the above referenced plans and need to be addressed on the future submittal. I have organized
these comments by page number.
Sheet C2:
The keynotes appear to be numbered in error. Please check that all notes are shown on the plan view.
Sheet C3:
The frontage improvements need more detail. If Washington St. is comprised of chip seal driving surface only, this project will be required to sawcut the exiting asphalt at the centerline
of right of way and rebuild the roadway from centerline to the proposed curb location.
The stormwater that is going to flow from the curb line into lot 12 and lot 11 where is it going to go? A stormwater design in not allowed to discharge water to the adjoining properties.
The thickness of the asphalt, crushed rock and base need to be shown on the plans. Also show sawcut line on the plans.
Sheet L1.1:
The existing water meter will be used for irrigation purposes only. The water service will be required to have a DDCV and be tested before the irrigation system is connected to it.
Please add a note to the plans stating this.
Please review and revise your engineering drawings. When you resubmit please send 4 revised sets of plans, 2 drainage reports and a letter stating how you have address the review comments.
If you have any questions or comments, please call me at (360) 458-8438 and I will be happy to further assist you.
Respectfully
City of Yelm Community Development
Jim Gibson
Development Review Engineer
Cc: Ken Beckman
Grant Beck, City of Yelm
Tim Peterson, City of Yelm