04-0043 Civil Review 2 0090804
City of Yelm
Community Development Department
105 Yelm Avenue West
P.O. Box 479
Yelm, WA 98597
September 8, 2004
Bob Holcomb
SCA Consulting Group
4200 6th Ave SE Suite 301
Lacey, Washington 98509
RE: Civil Engineering Review No. 2
YCOMM Networks Video Facility
City of Yelm Project No. CIV-04-0043-YL
Dear Mr. Holcomb:
I have reviewed the plans submitted on August 26, 2004. The following are comments from the above referenced plans and need to be addressed on the future submittal. I have organized
these comments by page number.
Sheet C1:
The approval block should have the Development Review Engineer as the signatory.
Sheet C3:
The infiltration gallery shows 2 pipes and calls out 6 pipes for the installation. Please check and revise one of the callouts.
The catchbasin oil water separator does not need to have a flow restrictor. Please remove the inverted elbows from the tee.
Sheet L1.1:
Landscape plans have not been submitted. Please submit the plans for approval.
Please review and revise your engineering drawings. These corrections may be made and reviewed by submitting a fax showing the changes. After this has been completed you can submit
the final information. This would be:
One set of mylar drawings for approval – city set
One set of drawings for approval – applicants set
One set of half size drawings – city set
One CD with the AutoCAD drawings on it – city set
If you have any questions or comments, please call me at (360) 458-8438 and I will be happy to further assist you.
Respectfully
City of Yelm Community Development
Jim Gibson
Development Review Engineer
Cc: Ken Beckman
Grant Beck, City of Yelm
Tim Peterson, City of Yelm