Loading...
04-0043 Civil Review Approval 100404 City of Yelm Community Development Department 105 Yelm Avenue West P.O. Box 479 Yelm, WA 98597   September 8, 2004 Bob Holcomb SCA Consulting Group 4200 6th Ave SE Suite 301 Lacey, Washington 98509 RE: Civil Engineering Review No. 2 YCOMM Networks Video Facility City of Yelm Project No. CIV-04-0043-YL Dear Mr. Holcomb: I have reviewed the plans submitted on August 26, 2004. The following are comments from the above referenced plans and need to be addressed on the future submittal. I have organized these comments by page number. Sheet C1: The approval block should have the Development Review Engineer as the signatory. Sheet C3: The infiltration gallery shows 2 pipes and calls out 6 pipes for the installation. Please check and revise one of the callouts. The catchbasin oil water separator does not need to have a flow restrictor. Please remove the inverted elbows from the tee. Sheet L1.1: Landscape plans have not been submitted. Please submit the plans for approval. Please review and revise your engineering drawings. These corrections may be made and reviewed by submitting a fax showing the changes. After this has been completed you can submit the final information. This would be: One set of mylar drawings for approval – city set One set of drawings for approval – applicants set One set of half size drawings – city set One CD with the AutoCAD drawings on it – city set If you have any questions or comments, please call me at (360) 458-8438 and I will be happy to further assist you. Respectfully City of Yelm Community Development Jim Gibson Development Review Engineer Cc: Ken Beckman Grant Beck, City of Yelm Tim Peterson, City of Yelm