BLD-05-0783~oF T~pl, City of Yelm
r9 `~ Community Develo
a K
Building Division
Phone: (360) 458-840
YELM Fax: (360) 458-3144
Applicant:
Name: Universal Building, Inc.
Address: 8300 61st Ave. NE
Property Information:
Site Address: 607 Rhoton Rd. NW
Assessor Parcel No. 22719240202
Contractor Information:
Name: applicant
Address:
Contractor License No:
Project Information:
Project: Yelm Church of Christ
Description of Work: Fire Restoration
pment Department
7
City: Olympia
Subdivision:
Contact:
City:
Expires:
Sq. Ft. per floor: (1st) 0 (2nd) 0 (3rd) 0
Heat Type (Electric, Gas, Other): 07HER
Permit No: BLD-05-0783-YL
Issue Date: 12/0412006
(Work must be started within 180 days)
Receipt No: 44880
Phone: 459-1646
State: WA Zip 98516
Lot:
Phone:
State: Zip:
Business License:
Garage 0 Basement 0
Fees:
Item Item Fee Base Amt Unit Fee Unit Rate No. Units Unit Desc
__-- -----_-____ _W_--- ----___. ~W_A ________ _,____~_--
Building Permit -Other 195.25 0.00 0.00 0.0000 0.0000 $1,000
TOTAL FEES: $195.25
Applicant's Affadavit:
I certify that I have read and examined the information contained within the application and know the same ~ OFFICIAL USE ONLY
to be true and correct. t also certify that the proposed structure is in conformity with all applicable City of ~ # Sets of Prints:
Yelm regulatio luding thos verning zoning and land subdivision, and in addition, all covenants,
easement nd restr lions of a rd. If applying as a contractor, I futher certify that I am currently
register in the St o hington. (~ Final In
Signal IJ,~t~, ~S Date - Z - 4 _ ~ te: -
Ciry of Yelm
- 105 Yelm Avenue West
P.O. Boz 479
Y E L6Ma~oN Yelm, Washington 98597
December 1, ?006 (360) 458-3244
Universal Building Inc.
8300 61S` Ave. NE
Olympia, WA 98516-914?
Attn: Randy Johnson
RE: Yelm Church of Christ
Rand}.
I am responding to your request for clarification on the issues we discussed on
Wednesda~~:
Both leafs of the double door at the entr}~ probabl}~ lied panic hardware based on
your obsen~ation. Though panic hardware ma}' not be required, each leaf is required to
be opened with a single operation. Meeting this requirement and compl}•ing with ADA is
probably best achieved by panic hardware.
A new building with electric heat would be requires to have R-30 insulation in the
Hoar over an unconditioned space. It makes no sense to put ball insulation in the walls
and blown insulation in the attic space and not complete the job by installing insulation in
the crawl space.
I hope this clarifies our conversation. I1' I can be of further assistance please give me a
call.
Sincerely
-t
Gary Carlson ~„ ~. ~~~~
Building Ot~icial ,
The City o~Yehn is an Equal Opt~onc~nitU Provider
i ty o f Ye l m 3~ Ra~~
JY
Community Development
Department
COMMERCIAL BUILDING
PERMIT APPLICATION
APPLICATION EXPIRES 180 DAYS AFTER DATE OF SUBMITTAL.
TO EXPEDITE PROCESSING, PLEASE VERIFY ALL DOCUMENTATION FOR ACCURACY.
ALL CONTRACTORS ARE RE(~UIRED TO PROVIDE A COPY OF THEIR CONTRACTOR'S
REGISTRATION CARD AND PROOF OF A CURRENT CITY OF YELM BUSINESS LICENSE.
IN ORDER TO PROVIDE PROMPT AND EFFICIENT SERVICE, WE NEED THE FOLLOWING
DOCUMENTS SUBMITTED WITH PERMIT APPLICATIONS:
• Identification and description of the work to be covered by the permit for which application is
being made.
• Description of the land on which the proposed work is to be done by legal description, street
address or similar description that will readily identify and definitely locate the proposed building
or work.
• Description of the use or occupancy for which the proposed work is intended.
• Five complete sets of plans, diagrams, computations and specifications. (See attached list for
specfics. )
• Stated valuation of any new building or structures or any addition, remodeling or alteration to an
existing building.
• Signature of the applicant, or the applicant's authorized agent.
• Energy calculations.
• Civil plans and specifications, if applicable.
• Any additional data and information as may be required by the building official.
• Copy of mitigation agreement with school district, if applicable.
THE FOLLOWING ITEMS ARE NEEDED WHEN SUBMITTING AN APPLICATION FOR A SIGN
PERMIT:
• The name, address and signature of the owner of the sign.
• The street address or location of the property on which the sign is to be located and the name
and address of the owner of that property.
• The type of sign or sign structure.
• A site plan showing the proposed location of the sign relative to the boundary lines of the property
where it will be situated, the locations and square footage areas of all existing signs on the same
premises, and the location of all abutting public rights-0f--way, building and other structures on the
premises.
• Specifications and Scale drawings showing the materials, designs, dimensions, structural
supports, and electrical components of the proposed sign.
105 Yelm Avenue Weat (360) 458-3835
PO i{3oz 479 (360) 458-3144 FAX
Yelm, WA 98597 www.ci.yeim.ma.ua
CITY OF YELM
//'' C' VIERCIAL BUILDIN~G~.QPE~R~ MIT APPLICP' V FORM
Project Address: l~ ~ ~ ~ ~~"`I t`"°"''" ~arcel #: .~ a' 7 J ~~ ~ Ui'i~ z-
Zoning; Current Use: Proposed Use: ~ ^~
. ,. ~,, d
u New Construction ~e-Model / Re-Roof /Tenant Improvement ~Q ~ ~ o L006
Plumbing u Mechanical u Fire Prevent/Suppress/Alarm u they
Project Description/Scope of Wortc:
Project Value: 29 ~ (
Building Area (sq. ft) Parking Garage 1'~ Floor 2nd Floor 3rd Floor
Building Height
Are there any environmentally sensitive areas located on the parcel? If yes, a
completed environmental checklist must accompany permit application.
~` BUILDING OWNERlTENANT NAME:
ADDRESS EMAIL
CITY STATE ZIP TELEPHONE ~ 7 7
GENERAL CONTRACTOR s TELEPHONE
ADDRESS S3AO (o~St~ N ~= EMAIL
CITY STATE~1.1~ ZIP FAX
CONTRACTO S LICENSE # Ja+-y~-cmS+titFEXP DATEd/ CITY LICENSE #
PLUMBING CONTRACTOR TELEPHONE
ADDRESS EMAIL
CITY STATE ZIP FAX
CONTRACTORS LICENSE # EXP DATE CITY LICENSE #
Copy of Clty Mklgation documentation (TFC).
~rmatlon Is correct and that the construction on, and the occupancy and fhe use of the
In accordance wHh the laws, rules and nrgulatlons of the Stale of Washington and the
-~ ~ 0
Da
Agent /Contractor's Agent /Tenant (Please circle one.)
All permits are non-transferable and will expire if work authorized by such permit is not begun
within 180 days of issuance, or if work is suspended or abandoned for a period of 180 days
r X79
WA 98597
(360) 458-3111 FAX
u~uu~.ci.yelm.wa.w
DEC-O1-2006 03:41 Yelm :I:'C~
City of Yelm
Community Development Department
Building Divlslon
Phons:(J60)488-8407
Fex:(380)458-3144
Applicant:
Name Unlvorasl Building, Inc.
Address 800 81st Ave. NE
Project Informatlcn:
Proled: Yelm Church of Chrlat
Deacrlpllon of Work: Flrs Reatoretivn
Slte Addreaa 807 Rhoton Rd, NW
Fees.
Item Acct Code
Bu~klrng Perml! -•Othe- 032 001.322.10-00
TOTAL FEES:
Cily. Olympia
360 458 3144 P.02
Permit Fees Schedule
Permit No i3L0.OS-0783-YL
Phone 4se-teae
State. WA Zlp 98618
Assessor Parcel No. 22719240202
Item Fee Baae Amt Unrl Fee Unit Rete No Unlts Unn Desc
19525 0.00 0 00 0.0000 0.0000 51,000
5195.26
~uui
~~~~~~~~
NO V ~ • G10N C[,C j~;,~
.fit. ~~~~ ~ \
O ~ l,~,y
9 c
'~qp ~•
a ~y "•V •;
pry •~ _~,,,.
Notifc~tioi~ of demolition 1Pee-rtait
It is unlnwfut fur nny ttcramt to a:ntse or' nllmv the demolition (or toajnr renovatirnt) nl~;uty struclurc unless all ashc•stos-
cont;tininK materials breve been remnvrd From the nrea ro be tletnMisl-e<I. Worle shall not cn,nntence 4n an ;ubestvs projeef
or deut,tlition unless the owner ur oprrnlor h;ts nbhtined written approvnl frn,n ORCAA. A written at,plicntion for n
demolition shall include n certificntiun that there is nn lutown ncbestos-conl;tinrnK «<atert;ti4 remaining in the Wren of thr
ctruchrre. (~
f rO~e~[ SiIC AddfeSS: _~( ~ ~ O / 1J i, I
City: --O`-V - -C~ntrrtty:_
'~~ Stale:__~,q• Zip:9 g 59'7
Starting Date: ^ `.-l.~ O (.~ ~~_~_~ - -
Completion pate: _ t Zf t~'~ p (,~, -
"(TherC is a 10 wurkiug day ndvr,nce notiric;rtion rind from recci t ~ ~` -
I. f of pCrnut ;,pttliCrttinn)
Property Uwner:_ E~~ (~ r,,;v 2.«., ~({.t{,t,~ele hone: 3GD
-~-- ~ -~¢-5?G7 r-~r~:
fvfailin~ A~idress {n~'7 2,et!_~.,-r,~. ,n ~ ~ ,, - --~-,-_
-- ~>_~-.-.-.Z i n ~_ -
Demolition Contractor:
IV ~f?'t~~l`t'?-• ~~ ~-p,~/~C.Stale t.icensc #:_ C9N I. VC
Msl,lmg Ad(h•ess: - -•~3+ ~oos~f
City: •^~ 3®[~ ~~ St- ~-~ __~ ~ ..- ^..-
YCS NO~~~~ ~J`--~~t'~ ~ _ l~elcphune: 3001{"59 ~ l ~o ~•Lo _I'~lx: 3(00 ~ j
~~ -- -.__ 49 l ~ 99
_.• ~ ~_ Demolition by V~~rccl<ing or i in ~ ~
~~ (.~~SAO fee) eheclc #_ ttonrefundrtbtc
Training fire Demolition's (fycs, attach fre deparhrtcnt request for training fire)
__ Renovation, /llteration, Remodelin ~, Mnintwiftnce, or other Cun.elructivn'/
~- . _.~ Asbestos found ur suspected
;~An OttC,~.•1 "Notice of Inturl to ltru,pre or Lneap.,ut~Ue '~Sllecf0.t•' Inrm and df1l,iOpnnfC rcC tltUSl VC Suttl111[led tb'iar IJ uny AYhCSWs
rentovnl work AsUestns rrmnva- ~rojrcrs u„~olvn,r demolition nurse br prelonneJ by •, C¢n,licrl n,r,esto~ Crnnrncto, and ull liinble nr
t~olrnriafly Rinhl~ ;ul,rstu, rurrsr he renu,~•cd hrl~re nny dcmr>IiUon bcgurz. Rrfcr ~„ (1RCAA Rct;ulntion I ~rucle I~ Inr addnional
iequirrntcnts Thar may nhp1~,,
G t`t~'~
Olympic Region CIr
2940-8 Limited LanE
Olympia, WA 98502
(360) 586-1044 or 1
Fax: (360) 491-6308
Asbestos Survey Completed by
AH1?RA Certii7cri Insncctor ~ ~Q ~~ I_ 1 ~~.. , .d ~ . -.
Certitication #
-- Z
This 2pproved pc,~rmil must Cnclo.cc S25
he <rvail,tble et the job site ('ertific;,uor~ rf tfrc Asheslos Survey inusl
Yrnces.cing Fce accoutpany !his form
/~~4-7Z-- _ -
>.
P:ICQMMAN\Fnrntslanc~stu~IDc,nnPermiLAoc _`C~ -
Rtv tp/12/02 .~
1i ' r~
CKTTIV4...~. ~''f 7 ~..
LQ1 ~ •-~i~~~
CITY CAF
YELM
Q.o. ~~x n~~,
3f0 ~15R SA0:3
RECEIPT No. 4 ,/~ g 8
RECEIVED i - _ k.-lidF HU?i['F:E:~ ~~ ! ~" rc ~,.; ~ -.c f• 1.7T'~•
f3fCEIVED FROM DATE REC NO. AMOUNI REF. NO
Ur3I~,~Eii::;AL BUILLIING IC:~:' ! _'.':):~.~:?r~ ~~,~~~~~ ~-~~5.:'~ CHFCi' S4-i 3
f?L~r+c''~: PiA ~? :SJ.' Fttf[;1:,_,~„A~'i
E:LGL~ ['~f~~fIT Ici~D-<.,c,-c~~~~:
CITY OF
YELM
PO B~~r. 4~ 9
Yefln.'vVA 9S5y7
3ro-n~8 8nn3
RECEIVED
'~"'THIRTI I,~V^
RECEfVED FROM
U~`~IVF:~:3Ai~ i_•.iL=l .IN~~ IAI~.'.
C~LYtiPTA t-1 P. •~85I~:~
11. _'Hc~LL~;
DATE REG. N(7
IJ i.J t ~ ~ `l~ r 1~ ~Y
RECEIPT No. 4 ,/~ $ g 1
AMOUNT REF,NO
Irzc;~~,LL>:
c::L;NF;r ~L c~r~r:TE:~;TC~F:
G i ~-d
J
~y ~~V~
ENVIRONMENTAL INC.
Asbestos Survey Report
November 17, 2006
Prepared By: Todd L. Venable
Cert. # 06-2460
Exp. 10/13/2007
Located At:
607 Rhoton Road
Yelm, WA 98597
Prepared For:
Universal Building
Randy Johnson
8300 61st Avenue NE
Olympia, WA 98516
3620 49th Avenue SW Phone: 360-357-5666
Olympia, Washington 98512 Fax: 360-357-5665
ADVANCE
Asbestos
607 Rhoton Rd.
Table of Contents
1.0 INTRODUCTION ............................................................................. .................................1
1.1 Purpose ................................................................................ ...............................1
1.2 General .................................................................................. ..............................1
1.3 Building Description ............................................................... ..............................1
2.0 SAMPLING ...................................................................................... .................................2
2.1 Sampling Protocol .................................................................. ..............................2
2.2 Sampling Procedure .............................................................. ..............................2
2.3 Laboratory Analysis ............................................................... ..............................3
2.4 Sample Analysis .................................................................... ..............................3
3.0 SURVEY RESULTS ........................................................................ .................................3
3.1 Quantification Table ............................................................... ..............................4
Material ............................................................................................ ..............................4
4.0 CONCLUSIONS AND RECOMMENDATIONS ................................. ................................4
5.0 LIMITS OF SURVEY ........................................................................ ................................5
APPENDIXES ............................................................................................. ................................6
Appendix A: Laboratory Results/ Documentation ....................................... ................................7
Appendix B: Floor Plan and Sample Locations ............................ .........................8
3620 49th Avenue SW Phone: 360-357-5666
Olympia, Washington 98512 Fax: 360-357-5665
ADVANCE ENVIRONMENTAL /NC. Asbestos Survey Report
Project # 06-284
607 Rhoton Rd. Yelm, WA 98597
1.0 INTRODUCTION
1.1 Purpose
This good-faith asbestos survey was performed as part of pre renovation activities to
identify the presence, location and quantity of any asbestos-containing materials (ACM)
within the demolition area. The intent of this asbestos survey is to comply with
governing asbestos regulations required by Federal Standards and with the Washington
State guidelines. Currently, the State of Washington requires a "good faith inspection"
for the identification of asbestos-containing materials prior to any remodeling or
demolition work. The survey is required to be performed in accordance with 40 CFR
763.86 and WAC 196-62-07721. These federal and State standards require inspections
to be conducted by an EPA Accredited Building Inspector with analysis to be provided
by an asbestos laboratory certified by the National Bureau of Standards. All survey
work was conducted in compliance with the standards mentioned above.
1.2 General
On November 10, 2006, Todd L. Venable, AHERA accredited building Inspector of
Advance Environmental Inc., conducted an inspection for suspect-ACM at 607 Rhoton
Road in Yelm, WA. The structure located at the above referenced property is
scheduled for an interior demolition.
The site inspection included all accessible areas within the projected construction area.
1.3 Building Description
The structure located at 607 Rhoton Road in Yelm, WA is a church. The structure is
scheduled for an interior demolition. The structure is approximately 1600 square feet
in size, it has wood siding and a metal roof. The building currently contains two
bathrooms, a sanctuary, baptism room, and a storage area. The storage area has
been damaged due to a fire.
3620 49th Avenue SW Phone: 360-357-5666
Olympia, Washington 98512 Fax: 360-357-5665
ADVANCE ENVIRONMENTAL /NC. Asbestos Survey Report
Project # 06-284
607 Rhoton Rd. Yelm, WA 98597
2.0 SAMPLING
The sampling objective was to determine the quantity and location(s) of asbestos
containing materials. There were seven (7) suspected ACM or presumed ACM in or on
the structure at the above referenced property and seven samples were collected.
Sample C-1 was collected from the bathroom vinyl, C-2 was collected from the right
bathroom drywall, C-3 and C-4 was collected from the sanctuary drywall, C-5 was
collected from the baptism room wall board, C-6 was collected from the storage area
wall insulation, and C-7 was collected from the storage area ceiling insulation.
2.1 Sampling Protocol
This asbestos building survey was adapted from the Asbestos Hazard Emergency
Response Act (AHERA) protocol outlined under 40 CFR 763. The protocol is as follows:
2.2 Sampling Procedure
• Spread the plastic drop cloth (if needed) and set up the other equipment, e.g.,
ladder.
• Put on protective equipment (respirator and protective equipment if needed).
• Label sample container with its identification number and recording number.
Record sample location, and type of material sampled on a sampling data form.
• Moisten area where the sample is to be extracted (spray immediate area with
water).
• Extract sample using a clean knife, drill capsule, or cork-boring tool, to cutout or
scrape off approximately one tablespoon of the material. Penetrate all layers of
the material.
• Place sample into a container and quickly seal it.
• Wipe the exterior of the container with a wet wipe or remove any material, which
may have adhered to it during sampling.
• Clean tools with wet wipes and wet-mop or vacuum area with a HEPA vacuum to
clean all debris.
• Seal the sampling location with caulking compound, spackle, or duct tape.
• Discard protective clothing, wet wipes and rags, cartridge filters, and drop cloths
into a labeled plastic waste bag.
3620 49th Avenue SW Phone: 360-357-5666
Olympia, Washington 98512 2 Fax: 360-357-5665
ADVANCE ENV/RONMENtAL INC. Asbestos Survey Report
Project # 06-284
607 Rhoton Rd. Yelm, WA 98597
2.3 Laboratory Analysis
The bulk ACM samples are analyzed at Global Industrial Corp., 6515 E. Main St., Suite
#128, Mesa, Arizona 85205, using polarized light microscopy (PLM) with dispersing
staining in accordance with U.S. EPA method 600/R-93-166 as specified in 40 CFR
Chapter I (7-1-93 edition) Part 763, Subpart F, Appendix A, pages 499-504. Polarizing
light microscopy quantifies asbestos concentrations at between 100°1° - 1°t° detection
levels. Level below 1°!o can be stated as "ND".
For samples containing more than one separable layer of materials, the report will
include findings for each layer (labeled -1 for layer one, and -2 for layer two, etc.) and a
total percentage for the entire sample. The asbestos concentration is determined by
visual estimation.
For those samples with asbestos concentrations between one and ten percent based
on visual estimation, the EPA recommends a procedure known as point counting
(NESHAPS, 40 CFR Part 61). Point counting is a statistically more accurate means of
quantification for samples with low concentrations of asbestos. Point counting will only
be performed at the owner or owner's agent request.
2.4 Sample Analysis
Sample
Number Material Location of
Samples Condition Friable
Yes/No Asbestos
Content
C-1 Vinyl Bathroom Good N.D.
C-2 Drywall Bathroom Good N.D.
C-3 Drywall Sanctuary Good N.D.
C-4 Drywall Sanctuary Good N.D.
C-5 Wall board Baptism room Good N. D.
C-6 Wall insulation Storage area Poor N.D.
C-7 Ceiling insulation Storage area Poor N.D.
3.0 SURVEY RESULTS
The structure located at 607 Rhoton Road in Yelm, WA had seven (7) suspected ACMs
on or in building materials.
Samples C-1 through C-7 all tested Negative for Asbestos Content.
No samples tested Positive for Asbestos Content.
3620 49th Avenue SW 3 Phone: 360-357-5666
Olympia, Washington 98512 Fax: 360-357-5665
ADVANCE ENVIRONMENTAL INC. Asbestos Survey Report
Project # 06-284
607 Rhoton Rd. Yelm, WA 98597
3.1 Quanti~ca>~ion Table
The following table indicates the approximate quantity of asbestos containing material
identified in the structure.
Sample Number Material Location of Samples Approximate Quantity
4.0 CONCLUSIONS AND
A copy of this report must be provided to any employee or contractor conducting
renovation or demolition activities at the subject property.
Regulated ACM are required to be handled in accordance with Washington State
Regulations prior to any demolition, renovation, or remodeling that would disturb these
materials. Washington State Department of Labor and Industries require that the
abatement be performed using Certified Asbestos Workers under the direct on site
supervision of an AHERA Supervisor. The only exemption of this is for residential
owners performing removal of asbestos materials other than furnace interiors, or direct
applied mudded asbestos insulation. The requirements for handling, packaging, and
disposing of asbestos-containing materials can be found in WAC Chapter 296-62,
Volume I, Part I-1.
ACM with less then the regulated level of one percent asbestos is not required to be
abated by certified asbestos workers or abatement contactors. However, ACM with less
than one percent asbestos does require all workers to have Asbestos Awareness
Training prior to handling or abatement work.
Washington State Labor and Industries regulations regards ACM material with less than
one percent asbestos as a health hazard because it is possible that total exposure
levels for workers will exceed the Permissible Exposure Limit (PEL). Personal air
sampling is a requirement for the first day of the abatement project to ensure that the
exposure levels are below the PEL. Precautions should be taken to ensure worker
protection and abatement procedure should include engineering controls to limit
workers exposure concentration (i.e. wet techniques, half-face respirator, protective
clothing).
3620 49th Avenue SW Phone: 360-357-5666
Olympia, Washington 98512 4 Fax: 360-357-5665
ADVANCE ENVIRONMENTAL /NC. Asbestos Survey Report
Project # 06-284
607 Rhoton Rd. Yelm, WA 98597
5.0 LIMITS OF SURVEY
Asbestos surveys are non-comprehensive by nature and subject to many limitations as
described below. Our assessment has considered risks pertaining to asbestos;
however, this survey is limited to only those locations sampled. This survey was not
designated to identify all potential concerns or eliminate all risk associated with potential
asbestos containing materials (PACMs).
Evaluation of other risks, such as toxic and hazardous substances in (or in contact with)
soil and ground water, structural, electrical, mechanical, radon gas, slope stability,
building settlement, moisture, or site-drainage/flooding, have not been included. No
warranty, expressed or implied, is made.
The site visit consisted of a through visual walk-through of the subject area for the
purpose of viewing and sampling PACMs. Advance Environmental Inc. is not
responsible for materials, which require destructive means to access, or materials that
are hidden from sight, those materials hidden behind walls or materials, which cannot
be found with reasonable diligence.
Advance Environmental Inc. performed this survey in accordance with the generally
accepted standards of care in the sampling profession in Washington State at the time
of this study. This asbestos survey was performed in preparation for a demolition of the
subject structure.
Advance Environmental lnc.
Todd L. Venable
Advance Environmental Inc.
AHERA No: 06-2460
Expiration Date: October 13, 2007
3620 49th Avenue SW cJ Phone: 360-357-5666
Olympia, Washington 98512 Fax: 360-357-5665
kEGISTERF;D AS PROVIDEL:. aY "L.'-~4~7 ' Aa
CONST CONT GENERAL
REGIST. # EXF. DATE
CCO1~ UNIVEBI005MF 07/01/2007
.EFFECTIVE DATE 07/06/2000
JNIVERSAL.BUILDING INC
~i300 61ST AVE NE
OLYMr.""~~ A ~ 98516-914 ~~
' ~, ~
I~.~~~~~I I~~ I ~I.I' \I: I `~fl `; I ~I I \I,~ ~i: :\~I ~ I'~I ~I'\ I I:II.ti
~~
Universal Building, Inc.
8300 61st Ave NS
Olympia, Wa. 98516
360-459-1646
UNIVEBI005MF
10/04/2006
Client: Yelm Church Of Christ
Address: 607 Rhoton Rd
Yelm, WA 98597
~~'~~~"~
Estimate: 795
Universal Building, Inc
Yelm Church Of Christ
Room: Kitchen
LxWxH:
24'6" x 10/04/2006Page:2
8~0" x 8~0"
Sheathing - plywood - 3/4" - 196 SF Verify
tongue and groove - subfloor
Building paper - between 196 SF .0. 28 54. 88
subfloor and underlayment
Underlayment - 1/2" particle 196 SF 1. 74 341. 04
board
Floor preparation for sheet 196 SF 0. 71 139. 16
goods
Vinyl floor covering (sheet 225.4 SF 3. 03 682. 96
goods )
Baseboard - 2 1/4" stain grade 65 LF 2. 74 178. 10
Stain & finish baseboard 65 LF 0. 86 55. 90
Stud wall - 2" x 4" x 8' - 42.5 LF 13. 68 581. 40
16" oc (int = lw burned +
remove bapistry & ext = 8+10)
Seal stud wall for odor 180 SF 0. 51 91. 80
contxol
Batt insulation - 4" - R13 324 SF 0. 63 204. 12
5/8" drywall - hung, taped, 716 SF 1. 75 1,253. 00
floated, ready for paint
Seal then paint the walls & 716 SF 0. 69 494 .04
ceiling (2 coats)
Aluminum window, horiz. 1 EA 238. 59 238 .59
slider 3-11 sf (2 pane
w/thermal)
Add for colored frame (i.e., 9 SF 1. 47 13 .23
bronze or white)
Urethane foam sealant 12 LF 1 .13 13 .56
Window trim set - stain grade 12 LF 5. 30 63 .60
(casing & jamb)
Stain & finish trim 24 LF 0, 86 20. 64
Exterior door - solid core 1 EA 374. 18 374. 18
lauan / mahogany or birch
flush
Casing - stain grade 17 LF 2. 25 38 .25
Stain & finish door slab only 2 EA 32. 22 64 .44
(per side)
Stain & finish door & jamb 2 EA 22. 60 45 .20
(per side)
Door lockset - exterior 1 EA 41. 64 41 .64
Baseboard electric heater - 6' 1 EA 115. 23 115 .23
Baseboard electric heater - 4' 1 EA 90 .36 90 .36
Thermostat - electric heat 2 EA 46 .66 93 .32
Cabinetry - lower (base) 5.33 LF 100 .48 535 .56
units - Standard grade
Universal
Yelm Church Of Christ
Continued Building,
- Kitchen Inc.
10/04/2006Page:3
Countertop - post formed 5.33 LF 39. 81 212. 19
plastic laminate
Sink - double 1 EA 286, 08 286. 08
Sink faucet 1 EA 117, 78 117. 78
Angle stop and supply line 2 EA 26, 55 53. 10
Water heater - 40 gallon - 1 EA 544. 32 544. 32
Electric
Foam blocking for water heater 1 EA 36. 55 36. 55
Earthquake strap - Code 2 EA 32. 51 65. 02
requirement
Water heater expansion tank - 1 EA 85. 36 85. 36
Code requirement
Relief line - run to exterior 1 EA 103. 73 103. 73
Plumbing repair - at heat 1 EA 317. 40 317. 40
damage behind water heater
Wire shelving 4 LF 10. 84 43. 36
Light fixture 2 EA 44. 00 88. 00
Fire extinguisher 1 EA 63. 72 63. 72
Room: Right Side Bapistry Formula: TRP:7~3 ~4,9~8
Sheathing - plywood - 3/4" - 24 SF Verify
tongue and groove - subfloor
Building paper - between 24 SF 0 .28 6. 72
subfloor and underlayment
Underlayment - 1/2" particle 24 SF 1 .74 41. 76
board
Floor preparation for sheet
24
SF
0
.71
17.
04
goods
Vinyl floor covering (sheet
27.6
SF
3.
03
83.
63
goods )
Baseboard - 2 1/4" stain grade 21 LF 2 .74 57. 54
Stain & finish baseboard 21 LF 0 .86 18. 06
Seal stud wall for odor 168 SF 0 .51 85. 68
control
Batt insulation - 4" - R13
24
SF
0
.63
15.
12
5/8" drywall - hung, taped, 192 SF 1 .75 336 .00
floated, ready for paint
Seal then paint the walls & 192 SF 0 .69 132 .48
ceiling (2 coats)
Interior door unit 1 EA 171 .92 171 .92
Stain & finish door slab only 2 EA 32 .22 64. 44
(per side)
Stain & finish door & jamb
2
EA
22
.60
45
.20
(per side)
Door lockset - interior
1
EA
38
.07
38
.07
Light fixture 1 EA 44 .00 44 .00
Universal
Yelm Church Of Christ
ROOm: Babistry Building,
LxWxH: Inc.
14'0"
10/04/2006Page:4
x 4'6" X 8'0"
Building pager - between 30 SF 0. 28 8. 40
subfloor and underlayment
Underlayment - 1/2" particle 30 SF 1. 74 52. 20
board
Glue down carpet 30 SF 2. 47 74. 10
Carpet - metal transition 14 LF 1. 55 21. 70
strip
Trim board - 1" x 4" - 28 LF 2. 68 75. 04
installed
Trim board - 1" x 3" - 26 LF 2. 44 63. 44
installed - window - both
sides
Casing - stain grade 27 LF 2. 25 60. 75
Stain & finish trim 81 LF 0. 86 69. 66
Reglaze 1/4" laminated glass 20 SF 11. 71 234. 20
- 40 sf maximum
Seal stud wall for odor 184 SF 0. 51 93. 84
control
Batt insulation - 4" - R13 24 SF 0. 63 15. 12
5/8" drywall - hung, taped, 359 SF 1. 75 628. 25
floated, ready for paint
Seal then paint the walls & 359 SF 0. 69 247 .71
ceiling (2 coats)
Interior door unit 2 EA 171. 92 343 .84
Stain & finish door slab only 4 EA 32. 22 128 .88
(per side)
Stain & finish door & jamb 4 EA 22. 60 90. 40
(per side)
Door lockset - interior 2 EA 38. 07 76 .14
Recessed light fixture - 1 EA 141. 37 141 .37
water proof
Whole house fan - add for 1 EA 109. 59 109 .59
code requirement
Vent whole house fan 1 EA 99. 77 99 .77
Bapistry 1 EA 3,545. 70 3,545 .70
Sink faucet 2 EA 117. 78 235 .56
Drain and ovezflow 1 EA 148. 05 148 .05
In line pump & heater - 2 EA 375. 00 750 .00
electrical and plumbing
hookup
Framing repair at new bapistry 1 EA 225. 50 225 .50
Universal Building, Inc.
Yelm Church Of Christ
Room: Left Side Bapistry
Foraatla: 10/04/2006Page:5
TRP:7~3~4,9~8
Sheathing - plywood - 3/4" - 24 SF Veri fy
tongue and groove - subfloor
Building paper - between 24 SF 0. 28 6. 72
subfloor and underlayment
Underlayment - 1/2" particle 24 SF 1. 74 41. 76
board
Floor preparation for sheet 24 SF 0. 71 17. 04
goods
Vinyl floor covering (sheet 27.6 SF 3. 03 83. 63
goods )
Baseboard - 2 1/4" stain grade 21 LF 2. 74 57. 54
Stain & finish baseboard 21 LF 0. 86 18. 06
Seal stud wall for odor 168 SF 0. 51 85. 68
control
Batt insulation - 4" - R13 24 SF 0. 63 15. 12
5/8" drywall - hung, taped, 192 SF 1. 75 336. 00
floated, ready for paint
Seal then paint the walls & 192 SF 0. 69 132 .48
ceiling (2 coats)
Interior door unit 1 EA 171. 92 171 .92
Stain & finish door slab only 2 EA 32. 22 64 .44
(per side)
Stain & finish door & jamb 2 EA 22. 60 45 .20
(per side)
Door lockset - interior 1 EA 38. 07 38 .07
Light fixture 1 EA 44. 00 44 .00
Room: Sanctuary LxWxH: 44'0" x 24' 7" x 8'0"
Subroom 1: Pulpit LxWxH: 14'2" x 3'0" x 8'0"
Building paper - between 1,125 SF 0. 28 315 .00
subfloor and underlayment
Underlayment - 1/2" particle 1,125 SF 1. 74 1,957 .50
board
Sheathing - plywood - 3/4" - 85 SF 2. 56 217 .60
tongue and groove - at pulpit
Glue down carpet 1,293.75 SF 2. 47 3,195 .56
Step charge for carpet 1 EA 45. 80 45 .80
installation
Baseboard - 2 1/4" stain grade 145 LF 2. 74 397 .30
Stain & finish baseboard 145 LF 0. 86 124 .70
Seal stud wall for odor 1,147 SF 0. 51 584 .97
control
Batt insulation - 4" - R13 704 SF 0. 63 443 .52
5/8" drywall - hung, taped, 2,272 SF 1. 75 3,976 .00
floated, ready for paint
Universal
Yelm Church Of Christ
Continued Building,
- Sanctuary Inc.
10/04/2006Page:6
Seal then paint the walls & 2,272 SF 0. 69 1,567. 68
ceiling (2 coats)
Aluminum window, 6 EA 205. 51 1,233. 06
picture/fixed 3-11 sf (2
pane w/thermal)
Aluminum window, single hung 2 EA 256. 33 512. 66
4-8 sf (2 pane w/thermal)
Add for colored frame (i.e., 64 SF 1. 47 94. 08
bronze or white)
Add for colored glass 64 SF 3. 44 220. 16
Urethane foam sealant 96 LF 1. 13 108. 48
Window trim set - stain grade 100 LF 5. 30 530. 00
(casing & jamb)
Stain & finish trim 200 LF 0. 86 172. 00
Curtain rod 1 EA 22. 79 22 .79
Exterior door - solid core 2 EA 374. 18 748. 36
lauan / mahogany or birch
flush
Casing - stain grade 34 LF 2. 25 76. 50
Stain & finish door slab only 4 EA 32. 22 128 .88
(per side)
Stain & finish door & jamb 4 EA 22. 60 90 .40
(per side)
Door lockset - exterior 2 EA 41. 64 83 .28
Deadbolt 2 EA 45. 71 91 .42
Baseboard electric heater - 8' 4 EA 136 .44 545 .76
Thermostat - electric heat 4 EA 46 .66 186 .64
Trim board - 1" x 3" - 32 LF 2 .44 78 .08
installed - pulpit
Stain & finish trim 32 LF 0. 86 27 .52
Dry erase board 1 EA 189. 99 189 .99
Trim board - 1" x 4" - 40 LF 2 .68 107 .20
installed
Stain & finish trim
40
LF
0
.86
34
.40
Recessed light fixture 3 EA 94 .87 284 .61
Fluorescent - two tube - 4' - 6 EA 74 .92 449 .52
fixture w/lens
Ceiling fan without light 2 EA 189 .43 378 .86
Interior double door - solid 1 EA 574 .33 574 .33
core lauan / mahogany
Trim board - 1" x 4" - 40 LF 2 .68 107 .20
installed
Stain & finish door slab only 4 EA 32 .22 128 .88
(per side)
Paint door trim & jamb (per 2 EA 17 .33 34 .66
side}
Self closing hinges 6 EA 39 .55 237 .30
Universal Building, Inc.
Yelm Church Of Christ 10/04/2006Page:7
Continued - Sanctuary
Door push plate, 4" x 16" 2 EA 33. 60 67. 20
Door pull plate, 4" x 16" 2 EA 54. 26 108. 52
Door stop 1 EA 19. 80 19. 80
Pews - 20eax8' 1 EA 15,210. 00 15,210. 00
Room: Bntry LxWxIi: 9'10" x 9' 6" x 8'0"
Building paper - between
subfloor and underlayment
Underlayment - 1/2" particle
board
Glue down carpet
Baseboard - 2 1/4" stain grade
Stain & finish baseboard
Seal stud wall for odor
control
Batt insulation - 4" - R13
5/8" drywall - hung, taped,
floated, ready for paint
Seal then paint the walls &
ceiling (2 coats)
Exterior double door - solid
core lauan / mahogany or
birch flush
Casing - stain grade
Stain & finish door slab only
(per side)
Stain & finish door & jamb
(per side)
Flush bolts (set of 2)
Door stop
Handle set
Deadbolt
Door closer - Commercial grade
Panic hardware with external
vertical rods
Panic hardware - rim series
(bar and latch, no rods)
Door threshold
Fluorescent - two tube - 4' -
fixture w/lens
Drinking fountain
94 SF 0. 28 26.32
94 SF 1. 74 163.56
108.1 SF 2. 47 267.01
39 LF 2. 74 106.86
39 LF 0. 86 33.54
310 SF 0. 51 158.10
39 SF 0. 63 24.57
404 SF 1 .75 707.00
404 SF 0 .69 278.76
1 EA 674 .55 674.55
20 LF 2.25 45.00
4 EA 32.22 128.88
4 EA 22.60 90.40
1 EA 50.01 50.01
1 EA 19.80 19.80
1 EA 77.50 77.50
1 EA 45.71 45.71
1 EA 143.01 143.01
1 EA 792.50 792.50
1 EA 405.79 405.79
1 EA 33.89 33.89
1 EA 74.92 74.92
1 EA 358.92 358.92
Universal Building, Inc.
Yelm Church Of Christ 10/04/2006Page:8
Room: Women' s Restroom LxWxH: 7'2" x
Subroom 1: Shower LxWxH: 3'1" x
Subroom 2: Offset LxWxH: 4'3" x
6'3" x 8'0"
2'8" x 8'0"
2'8" x 8'0"
Building paper - between 66 SF 0. 28
subfloor and underlayment
Underlayment - 1/2" particle 66 SF 1. 74
board
Floor preparation for sheet 66 SF 0. 71
goods
Vinyl floor covering (sheet 75.9 SF 6. 10
goods) - with cove wrap
Seal stud wall for odor 300 SF 0. 51
control
Batt insulation - 4" - R13 125 SF 0. 63
5/8" drywall - hung, taped, 366 SF 1. 75
floated, ready for paint
Seal then paint the walls & 366 SF 0. 69
ceiling (2 coats)
Aluminum window, horiz. 1 EA 238. 59
slider 3-11 sf (2 pane
w/thermal)
Add for colored frame (i.e., 4 SF 1. 47
bronze or white)
Urethane foam sealant 8 LF 1. 13
Window trim set - stain grade 9 LF 5. 30
(casing & jamb)
Stain & finish trim 18 LF 0 .86
Interior door unit 1 EA 171 .92
Stain & finish door slab only 2 EA 32 .22
(per side)
Stain & finish door & jamb 2 EA 22. 60
(per side)
Door lockset - interior 1 EA 38. 07
Door signage 1 EA 14 .30
Door stop 1 EA 19 .80
Light fixture 1 EA 44 .00
Baseboard electric heater - 2' 1 EA 86 .78
Thermostat - electric heat 1 EA 46 .66
Bath accessory 2 EA 20 .90
Toilet 1 EA 262 .76
Toilet seat 1 EA 38 .23
Sink - single 1 EA 161 .29
Sink faucet 1 EA 117 .78
Angle stop and supply line 3 EA 26 .55
Mirx'or - 2 ea 8.2 SF 10 .62
Handicap hand rail 1 EA 254 .49
Universal Building, Inc.
Yelm Church Of Christ 10/04/2006Page:9
Continued - Women's Restroom
Plastic laminate - walls - 1 EA 567. 87 567.87
per restroom
Wire shelving 6 LF 10. 84 65.04
Shower faucet 1 EA 120. 49 120.49
Shower handle 1 EA Verify
Fiberglass shower unit 1 EA 533. 99 533.99
Stud wall - 2" x 4" x 8' - 3 LF 13. 68 41.04
16" oc - to R&R shower
Room: Men's Restroom LxWxH: 9'4" x 6' 3" x 8'0"
Building paper - between 59 SF 0.28
subfloor and underlayment
Underlayment - 1/2" particle 59 SF 1.74
board
Floor preparation for sheet 59 SF 0.71
goods
Vinyl floor covering (sheet 67.85 SF 6.10
goods) - with cove wrap
Seal stud wall for odor 250 SF 0.51
control
Batt insulation - 4" - R13 125 SF 0.63
5/8" drywall - hung, taped, 309 SF 1.75
floated, ready for paint
Seal then paint the walls & 309 SF 0.69
ceiling (2 coats)
Aluminum window, horiz. 1 EA 238.59
slider 3-11 sf (2 pane
w/thermal)
Add for colored frame (i.e., 4 SF 1.47
bronze or white)
Urethane foam sealant 8 LF 1.13
Window trim set - stain grade 9 LF 5.30
(casing & jamb)
Stain & finish trim 18 LF 0.86
Interior door unit 1 EA 171.92
Stain & finish door slab only 2 EA 32.22
(per side)
Stain & finish door & jamb 2 EA 22.60
(per side)
Door lockset - interior 1 EA 38.07
Door signage 1 EA 14.30
Door stop 1 EA 19.80
Light fixture 1 EA 44.00
Baseboard electric heater - 2' 1 EA 86.78
Thermostat - electric heat 1 EA 46.66
Bath accessory 2 EA 20.90
Universal
Yelm Church Of Christ
Continued Building, Inc.
- Men's Restroom
10/04/2006Page:10
Toilet 1 EA 262.76 262. 76
Toilet seat 1 EA 38.23 38. 23
Sink - single 1 EA 1.61.29 161. 29
Sink faucet 1 EA 117.78 117. 78
Angle stop and supply line 3 EA 26.55 79. 65
Mirror 2.66 SF 10.62 28. 25
Handicap hand rail 1 EA 254.49 254. 49
Plastic laminate - walls - 1 EA 567.87 567. 87
per restroom~
Roafn: Structure
Attic vent - gable end - vinyl 1 EA 85.44 85. 44
Exterior light fixture - 1 EA 197 .93 197. 93
Premium grade
Siding - T1-11 plywood -
216
SF
2
.68
578.
88
stain grade
Trim board - 1" x 4" -
46
LF
2
.68
123.
28
installed
Truss - 4/12 slope -
1
EA
950
.00
950.
00
engineered truss repair -
prepared by Sargent Eng.
EA
Op
en
Engineering
Shore ceiling to replace end 1
1 EA 518 .03 518.03
wall and gable wall
i
10
HR
45
.00
450
.00
ng
Add for additional fram
time to work "under" 2-9~~
existing trusses
ROOm: Attic LXWxH: 70'6" X 25 '4" X 8'0"
Seal attic framing to matt 1,786 SF 0 .87 1,553 .82
white finish
Blown-in insulation - 12"
1,786
SF
1
.04
1,857
.44
depth - R38
70
LF
0
.89
62
.30
Baffle vent
Room: Front Blevation Forcmila: BL:25,4~9~ 6,6
Clean with pressure/chemical 311 SF 0 .38 118 .18
spray
Exterior - paint two coats
311
SF
0
.73
227
.03
Seal & paint trim 20 LF 0 .96 19 .20
Mask and prep for paint 29 LF 0 .77 22 .33
Prime & paint exterior fascia 50 LF 1 .37 68 .50
- wood, 4"- 6" wide
4
116
SF
1
.53
178
.09
Paint overhang .
Universal Building, Inc.
Yelm Church Of Christ 10/04/2006Page:11
Continued - Front Elevation
Paint signage 1 EA 25. 80 25.80
Seal & paint wood beam 15 SF 1. 08 16 .20
Paint/finish - post - wood 2 EA 14. 84 29 .68
Clean gutter/downspout 40 LF 0. 24 9 .60
Exterior light fixture 1 EA 57. 45 57 .45
Clean with pressure/chemical 304 SF 0. 38 115 .52
spray - concrete
Room: Right 8levation Formula: BL:70. 5~9~0
Clean with pressure/chemical 545 SF 0. 38 207. 10
spray
Exterior - paint two coats
635
SF
0.
73
463.
55
Trim board - 1" x 4" - 69 LF 2. 68 184. 92
installed
Seal & paint trim 69 LF 0. 96 66. 24
Mask and prep for paint 71 LF 0. 77 54. 67
Prime & paint exterior fascia 76 LF 1. 37 104. 12
- wood, 4"- 6" wide
Paint overhang 274 SF 1 .53 419. 22
Detach & Reset Exterior light 1 EA 39 .85 39. 85
fixture
Clean light fixture 1 EA 6 .39 6. 39
Clean with pressure/chemical 300 SF 0 .38 114. 00
spray - concrete
Clean concrete step 3 EA 2 .90 8. 70
Trim bushes to paint 1 EA 12. 40 12. 40
Room: Rear Blevation Formula: BL: 25,4~9~6,6
Clean with pressure/chemical 200 SF 0 .38 76. 00
spray
Exterior - paint two coats
311
SF
0
.73
227
.03
Trim board - 1" x 4" - 10 LF 2 .68 26 .80
installed
Seal & paint trim 27 LF 0 .96 25 .92
Mask and prep for paint 29 LF 0 .77 22 .33
Prime & paint exterior fascia 36 LF 1 .37 49 .32
- wood, 4"- 6" wide
Paint overhang 126 SF 1 .53 192 .78
Exterior light fixture 1 EA 57 .45 57 .45
Clean with pressure/chemical 118 SF 0 .38 44 .84
spray - concrete
Clean concrete step 3 EA 2 .90 8 .70
Trim bushes to paint 1 EA 25 .50 25 .50
Universal Building, Inc.
Yelm Church Of Christ 10/05/2006Page:12
Room: Left Side Elevation Formula: $L:70. 5~9~0
Clean with pressure/chemical 635 SF 0. 38 241. 30
spray
Exterior - paint two coats 635 SF 0. 73 463. 55
Trim board - 1" x 4" - 69 LF 2. 68 184. 92
installed
Seal & paint trim 69 LF 0. 96 66. 24
Mask and prep for paint 71 LF 0 .77 54. 67
Prime & paint exterior fascia 76 LF 1 .37 104. 12
- wood, 4"- 6" wide
Paint overhang 274 SF 1 .53 419 .22
Detach & Reset Exterior light 1 EA 39 .85 39 .85
fixture
Clean light fixture 1 EA 6 .39 6 .39
Clean with pressure/chemical 300 SF 0 .38 114 .00
spray - concrete
Clean concrete step 3 EA 2 .90 8 .70
Trim bushes to paint 1 EA 25 .50 25 .50
Room: Subcontractors
Rewire complete (with EMT, MC 1 EA 10,054 .00 10,054 .00
cable & flexible aluminum
conduit)
Bathroom fans ( one of which 1 EA 203 .50 203. 50
would be a whole house fan)
Code requirement
Vent fan 2 EA 100 .37 200. 74
Ground fault interrupter 2 EA 93 .50 187 .00
(GFI) outlet - waterproof
front & rear Code requirement
Wall-mnt lights (& switches 1 EA 160 .00 160 .00
for them) outside the 2
non-main doors. Code
requirement
Smoke detector & wiring. Code 3 EA 79 .00 237 .00
requirement
Phone / low voltage copper 100 LF 1 .40 140 .00
wiring
Phone outlet
1
EA
45
.50
45
.50
Demolition, tear out, haul to 1 EA 14,950 .00 14,950 .00
landfill, dump fees (with
out roof)
Universal Building, Inc.
Yelm Church Of Christ 10/05/2006Page:13
Room: General Conditions
Temporary power usage (per 3 EA 134 .55 403 .65
month>
R&R Temporary power - 1 EA 611 .18 611 .18
meterbase with receptacles,
pole, instal
Temporary heat 1 EA 459 .00 459 .00
Temporary toilet delivery and 1 EA 101 .37 101 .37
pickup
Temporary toilet (per month) 3 EA 102 .77 308 .31
Asbestos test fee 1 EA 625 .50 625 .50
Permit - Puget Sound Clean 1 EA 150 .00 150 .00
Air Agency - required for
demolition permit with or
without asbestos removal
project
Asbestos removal 1 EA Verify
Supervision and project 40 HR 66. 75 2,670. 00
coordination
Daily clean and construction 1 EA 568. 00 568. 00
debris removal
Final clean 1 EA 535. 20 535. 20
Plans 1 EA 300. 00 300. 00
Submit and pickup building 4 HR 86. 70 346. 80
permits
Liability insurance 1 EA 1,493. 00 1,493. 00
Key box 1 EA 70, 30 70. 30
Energy caulking 1 EA 134, 50 134. 50
Caulk penitrations thru top 1 EA 96. 55 96. 55
and bottom plates at wires
and
Adjustments for Minimum 96. 60
Universal Building, Inc.
Yelm Church Of Christ 10/05/2006Page:14
Total Line Items
Overhead @
Profit @
Sales Tax @
Grand Total
Su~nary
116,400.88
10$ x 116,304.28 11,630.43
10~ x 116,304.28 11,630.43
8.4~ x 139,681.06 11,733.21
$151,394.95
G~~
STRUCTURAL CALCULATIONS
FOR
Yelm Church of Christ
Yelm, WA
Client: Northwest Catastrophe
Sargent Engineers Project Number A06140.00
BY: A.L.Packard
Apri12006
EXTENT OF ANALYSIS: The structural calculations and sketches provided with
this submittal have been prepared exclusively for the above referenced project.
5/aRGEM
Sargent Engineers, Inc. 320 Ronlee Ln NW Olympia, WA 98502 • Tel 360 867.9284 • Fax 360 867-9318
DESIGN CRITERIA
FOR:
Yelm, Church of Christ
Design Code: 2003 International Building Code
Live Loads: Roof = 25 psf (snow)
Dead Loads: Roof = I5 psf
Construction Materials: Sawn Timber: Douglas Fir Larch, No.2
M A`! 1 {~ 200~i
E Project: Subject:
Sargent Engln~ers, Ine. G~ ~~.J' ~ ~+y ~i'~`r` r
320 Ronlee Ln NW F~,,C ~ ~(J,~ - ~' /+'r
Olympia, WA 98502 ~]
Tei 360 867.9284 Fax 360 867-9318 By: /'tL ~ Date: ~///~(j;,
(s . SCJ /
~R~
~y> ~ G . 3 s ~ . zs. yz ,
T ~~
Wp ~ ~s ~S~
r ~~ ,
~A °'~q = ~ = 7~3
7~ ~ ~b
SAY ~ ~, zaas
D
Project: ~ Subject:
Sargent Engineers, Inc.
320 Ronlee Ln NW
Olympia, WA 98502
Tel 360 867-9284 Fax 360 867.9318 By: Date:
jZ ~ Si v wl l r-~ ~ o"rTUrYt G t~ 0~2- ~J ~ F 7YZ c..`SS
~ma - 7~3-ti ~ `.35'~ -j- 7~~ (I~ uS~) - ~~ ~ZS yZ'~ = v
+~
~P~ = 76 3 t ~b
Z~.31~ h
e~
~` C
~G3
Q
f r~ =~ + ~t.3 - ~b 5l~ Z7 35 ° ~ G h = I (~S~ K C
`) l 5-f'~ ~L 1..,+. A M ~ ~.J "1Tt-~-S~ ~l L t-}-c~ O
~c>~ t2o 13•o>c o~ s„v,k~.- ~ = 10~1.t2` IbS/ titR~t_
4,z ~ s / i o q ll sl ~ jam, -~ k«5
~,t.
- Q`C ~ r.,t F pQ C ~ (3v-~ tar- C r~ ~~ !3 `1 P AG ~ r.l
-rte ~ Ac. F` F -~G~ o F f X ~ ~~-~ I ,.,1 Cr "(~'_ ~- 5S
-- ~xT~~tD f ~t-~ h..l~ ,~ L~~I P m ~~imu~ C>
y' i3 ~ ; ~~o -rr ~ ~ -~frt A G ~o s ~ c-~r ~ tic
5 ~N ~ L=td lZ d n.1 htLS a7 `-I ~/ ~ ~ C.
0
MAY 1 t} 2006
~i ~ Z X y pF~ -~°~Z
titer S~S~t,~- Z ~ l5
p fK~S'T~n~c,
Nail Connection
Single Shear Wood-To-Wood
Connection
NDS Section 12.3.1
D :=0.135 Nail Diameter (in) 12D Sinker
K D ;= 2.2 For D < 0.17"
F em :=4650 Dowel Bearing Strength of Main Member (psi)
FeS :=4650 Dowel Bearing Strength of Side Member (psi)
p :=1.5 Penetration into Main Member (in)
t :=1.5
s Thickness of Side Member (in)
F Yb :=100000 Bending Yield Strength of Nail (psi)
G :=0.50 Specific Gravity of Wood
FE := 16600•G~•$~ Fe =4.637.103
Fem
R ;=
e Re=1
Fes
R ~ Ps
Re+2.Re2 11+Rt+R~2/+Rt`+Re3-Re•~1+Rr~t
l1tRe~
2•Fyb•~1+2•Re)•D~
k2:=-1+ 2•~1+Re~+ ~ k2=1.085
3 •F em'p~
2•~1 + R e\ 2•F Yb./2 + R e1•Dz
k :=-1+ )+ l /J k3=1.085
3 z
Re 3•Fem•~s
... i •• 7 ts..:
SAY 1 (~ 2006
U
D•p •F es
Z IM '= Z IM = 428.011
KD
D•t s'F es
Z IS := Z IS = 428.011
KD
k 1 'D ~~ s'F es
ZII := ZII =214.006
KD
k 2'D'p'F em
Z IIIM '- K D. (1 + 2 •R e~ Z IIIM ° 154.837
k 3 •D•t s•F em Z 154.837
ZIIIS'-KD•(2+Ite) IIIS=
DZ 2'F em'F yb
Z IV ~_- Z IV = 103.136 <--- Controls
KD 3•~1+Re~
C m := 1 wet sevice factor
C D :=1.15 Load duration factor
C r ~= 1 Temperature factor
C dl '= p C d 1 = 0.926 -Penetration depth factor (Cannot be greater than 1.0)
12 •D
Cd:=if~Cd1>1,1,Cd1) Cd=0.926
C eg := 1.0 End grain factor, if nailed into end grain = 0.67
C di ;= 1 diaphragm factor, if a diaphragm = 1.1
C to := 1 toe-nail factor, if tonailed = 0.83
Box Nail Capacity:
Z m ~=Z IV'C m'C D'C ~'C d'C eg'C di'C to
Z m = 109.821 Ibs
~lAY ~ 1) 2DD~
~..- ~. ,
MAY 1 i) ?_QQQ
MAY 1 (.~ 2D06
T'i~~~~~~ ~~y~~~r~~`
MAY 1 (? 2006
~r~r~r~r~r~r~r~r~rn~rirarr - - - -
r'ii ii
CITY OF YELM -BUILDING DEPARTMENT
CERTIFICATE OF OCCUPANCY
Building Address 607 Rhoton Rd. NW Fire Zone
Yelm, WA 98597 Occupancy Group
Owner Name Yelm Church of Christ Use Zone
Owner Address 607 Rhoton Rd. NW Type of Construction
Yelm, WA 98597
Building Permit Number BLD-05-0783 Plan Number
Has been inspected and the following occupancy thereof is hereby authorized:
Floors
Occupancies Area under
This Certificate
S uare Feet Maximum
Occupant
Load Maximum Allowable
Floor Loads
Lbs. er S . Ft.
~ 1820 '100
Remarks: C of O continues from fire restoration
Areas
Special Conditions: None
Is Building Sprinklered? YES X NO
Building Official: G. Carlson Date: Ma 3 .
POSTING: The Certificate of Occupancy shall be posted in a conspicuous place
on the premises and shall not be removed except by the Building Official.
nnnnnnnnr~r~r~r~r~r~r~r-ir~r~r~r~r~r~r~r~
City of Yelm
Community Development Department
Building Division
Phone: (360)458-8407
Fax: (360)458-3144
Applicant:
Name. Universal Building, Inc.
Address: 8300 61st Ave. NE
City: Olympia
Project Information:
Project: Yelm Church of Christ
Description of Work: Fire Restoration
Site Address: 607 Rhoton Rd. NW
Fees:
Item Acct Code
Building Permit -Other 032 001-322-10-00
TOTAL FEES:
Permit Fees Schedule
Permit No: BLD-05-0783-YL
Phone: 459-1646
State, WA Lp 98516
Assessor Parcel No. 22719240202
Item Fee Base Amt Unit Fee Unit Rate No. Units Unit Desc
195.25 0.00 0.00 0.0000 0.0000 51,000
5195.25
Ciry of Yelm
105 Yelm Avenue West
P•O• Box 479
YELM
WABMINOTON Yelm, Washington 98597
December 1, 2006 (360) 458-3244
Universal Building Inc.
8300 61 S` Ave. NE
Olympia, WA 98516-9142
Attn: Randy Johnson
RE: Yelm Church of Christ
Randy,
I am responding to your request for clarification on the issues we discussed on
Wednesday:
Both leafs of the double door at the entry probably had panic hardware based on
your observation. Though panic hardware may not be required, each leaf is required to
be opened with a single operation. Meeting this requirement and complying with ADA is
probably best achieved by panic hardware.
A new building with electric heat would be requires to have R-30 insulation in the
floor over an unconditioned space. It makes no sense to ptit haft insulation in the walls
and blown insulation in the attic space and not complete the job by installing insulation in
the crawl space.
1 hope this clarifies our conversation. If~ I can be of~ further assistance please give me a
call.
Sincerely
~_
Gary Carlson
Building Official
The City of Yelm is an Equal Opportunity Provider
City of Yelm -Building Department
CORRECTION NOTICE
I have this day inspected this structure and these premises
and have found the following violations of the City of Yelm
and/or State laws governing same: PERMIT NO.
,ILA-~-t
rJ ~ I L N i GL''" `~- S s' l-it 5 f H K~'~ ~ (* i~ D L
z.) ~ ~,.~
~k ~
Z~ h5~ J~^uSf
1
/~S ~ e1~
You are hereby notified that no more work shall be covered upon these premises until the abo~e violations are
corrected. When corrections have been made, call for re-inspecto at 458-8407
DO NOT REMOVE THIS TAG DATE o
INSPECTOR FOR BUII.DING DEPARTMENT