Loading...
BLD-05-0783~oF T~pl, City of Yelm r9 `~ Community Develo a K Building Division Phone: (360) 458-840 YELM Fax: (360) 458-3144 Applicant: Name: Universal Building, Inc. Address: 8300 61st Ave. NE Property Information: Site Address: 607 Rhoton Rd. NW Assessor Parcel No. 22719240202 Contractor Information: Name: applicant Address: Contractor License No: Project Information: Project: Yelm Church of Christ Description of Work: Fire Restoration pment Department 7 City: Olympia Subdivision: Contact: City: Expires: Sq. Ft. per floor: (1st) 0 (2nd) 0 (3rd) 0 Heat Type (Electric, Gas, Other): 07HER Permit No: BLD-05-0783-YL Issue Date: 12/0412006 (Work must be started within 180 days) Receipt No: 44880 Phone: 459-1646 State: WA Zip 98516 Lot: Phone: State: Zip: Business License: Garage 0 Basement 0 Fees: Item Item Fee Base Amt Unit Fee Unit Rate No. Units Unit Desc __-- -----_-____ _W_--- ----___. ~W_A ________ _,____~_-- Building Permit -Other 195.25 0.00 0.00 0.0000 0.0000 $1,000 TOTAL FEES: $195.25 Applicant's Affadavit: I certify that I have read and examined the information contained within the application and know the same ~ OFFICIAL USE ONLY to be true and correct. t also certify that the proposed structure is in conformity with all applicable City of ~ # Sets of Prints: Yelm regulatio luding thos verning zoning and land subdivision, and in addition, all covenants, easement nd restr lions of a rd. If applying as a contractor, I futher certify that I am currently register in the St o hington. (~ Final In Signal IJ,~t~, ~S Date - Z - 4 _ ~ te: - Ciry of Yelm - 105 Yelm Avenue West P.O. Boz 479 Y E L6Ma~oN Yelm, Washington 98597 December 1, ?006 (360) 458-3244 Universal Building Inc. 8300 61S` Ave. NE Olympia, WA 98516-914? Attn: Randy Johnson RE: Yelm Church of Christ Rand}. I am responding to your request for clarification on the issues we discussed on Wednesda~~: Both leafs of the double door at the entr}~ probabl}~ lied panic hardware based on your obsen~ation. Though panic hardware ma}' not be required, each leaf is required to be opened with a single operation. Meeting this requirement and compl}•ing with ADA is probably best achieved by panic hardware. A new building with electric heat would be requires to have R-30 insulation in the Hoar over an unconditioned space. It makes no sense to put ball insulation in the walls and blown insulation in the attic space and not complete the job by installing insulation in the crawl space. I hope this clarifies our conversation. I1' I can be of further assistance please give me a call. Sincerely -t Gary Carlson ~„ ~. ~~~~ Building Ot~icial , The City o~Yehn is an Equal Opt~onc~nitU Provider i ty o f Ye l m 3~ Ra~~ JY Community Development Department COMMERCIAL BUILDING PERMIT APPLICATION APPLICATION EXPIRES 180 DAYS AFTER DATE OF SUBMITTAL. TO EXPEDITE PROCESSING, PLEASE VERIFY ALL DOCUMENTATION FOR ACCURACY. ALL CONTRACTORS ARE RE(~UIRED TO PROVIDE A COPY OF THEIR CONTRACTOR'S REGISTRATION CARD AND PROOF OF A CURRENT CITY OF YELM BUSINESS LICENSE. IN ORDER TO PROVIDE PROMPT AND EFFICIENT SERVICE, WE NEED THE FOLLOWING DOCUMENTS SUBMITTED WITH PERMIT APPLICATIONS: • Identification and description of the work to be covered by the permit for which application is being made. • Description of the land on which the proposed work is to be done by legal description, street address or similar description that will readily identify and definitely locate the proposed building or work. • Description of the use or occupancy for which the proposed work is intended. • Five complete sets of plans, diagrams, computations and specifications. (See attached list for specfics. ) • Stated valuation of any new building or structures or any addition, remodeling or alteration to an existing building. • Signature of the applicant, or the applicant's authorized agent. • Energy calculations. • Civil plans and specifications, if applicable. • Any additional data and information as may be required by the building official. • Copy of mitigation agreement with school district, if applicable. THE FOLLOWING ITEMS ARE NEEDED WHEN SUBMITTING AN APPLICATION FOR A SIGN PERMIT: • The name, address and signature of the owner of the sign. • The street address or location of the property on which the sign is to be located and the name and address of the owner of that property. • The type of sign or sign structure. • A site plan showing the proposed location of the sign relative to the boundary lines of the property where it will be situated, the locations and square footage areas of all existing signs on the same premises, and the location of all abutting public rights-0f--way, building and other structures on the premises. • Specifications and Scale drawings showing the materials, designs, dimensions, structural supports, and electrical components of the proposed sign. 105 Yelm Avenue Weat (360) 458-3835 PO i{3oz 479 (360) 458-3144 FAX Yelm, WA 98597 www.ci.yeim.ma.ua CITY OF YELM //'' C' VIERCIAL BUILDIN~G~.QPE~R~ MIT APPLICP' V FORM Project Address: l~ ~ ~ ~ ~~"`I t`"°"''" ~arcel #: .~ a' 7 J ~~ ~ Ui'i~ z- Zoning; Current Use: Proposed Use: ~ ^~ . ,. ~,, d u New Construction ~e-Model / Re-Roof /Tenant Improvement ~Q ~ ~ o L006 Plumbing u Mechanical u Fire Prevent/Suppress/Alarm u they Project Description/Scope of Wortc: Project Value: 29 ~ ( Building Area (sq. ft) Parking Garage 1'~ Floor 2nd Floor 3rd Floor Building Height Are there any environmentally sensitive areas located on the parcel? If yes, a completed environmental checklist must accompany permit application. ~` BUILDING OWNERlTENANT NAME: ADDRESS EMAIL CITY STATE ZIP TELEPHONE ~ 7 7 GENERAL CONTRACTOR s TELEPHONE ADDRESS S3AO (o~St~ N ~= EMAIL CITY STATE~1.1~ ZIP FAX CONTRACTO S LICENSE # Ja+-y~-cmS+titFEXP DATEd/ CITY LICENSE # PLUMBING CONTRACTOR TELEPHONE ADDRESS EMAIL CITY STATE ZIP FAX CONTRACTORS LICENSE # EXP DATE CITY LICENSE # Copy of Clty Mklgation documentation (TFC). ~rmatlon Is correct and that the construction on, and the occupancy and fhe use of the In accordance wHh the laws, rules and nrgulatlons of the Stale of Washington and the -~ ~ 0 Da Agent /Contractor's Agent /Tenant (Please circle one.) All permits are non-transferable and will expire if work authorized by such permit is not begun within 180 days of issuance, or if work is suspended or abandoned for a period of 180 days r X79 WA 98597 (360) 458-3111 FAX u~uu~.ci.yelm.wa.w DEC-O1-2006 03:41 Yelm :I:'C~ City of Yelm Community Development Department Building Divlslon Phons:(J60)488-8407 Fex:(380)458-3144 Applicant: Name Unlvorasl Building, Inc. Address 800 81st Ave. NE Project Informatlcn: Proled: Yelm Church of Chrlat Deacrlpllon of Work: Flrs Reatoretivn Slte Addreaa 807 Rhoton Rd, NW Fees. Item Acct Code Bu~klrng Perml! -•Othe- 032 001.322.10-00 TOTAL FEES: Cily. Olympia 360 458 3144 P.02 Permit Fees Schedule Permit No i3L0.OS-0783-YL Phone 4se-teae State. WA Zlp 98618 Assessor Parcel No. 22719240202 Item Fee Baae Amt Unrl Fee Unit Rete No Unlts Unn Desc 19525 0.00 0 00 0.0000 0.0000 51,000 5195.26 ~uui ~~~~~~~~ NO V ~ • G10N C[,C j~;,~ .fit. ~~~~ ~ \ O ~ l,~,y 9 c '~qp ~• a ~y "•V •; pry •~ _~,,,. Notifc~tioi~ of demolition 1Pee-rtait It is unlnwfut fur nny ttcramt to a:ntse or' nllmv the demolition (or toajnr renovatirnt) nl~;uty struclurc unless all ashc•stos- cont;tininK materials breve been remnvrd From the nrea ro be tletnMisl-e<I. Worle shall not cn,nntence 4n an ;ubestvs projeef or deut,tlition unless the owner ur oprrnlor h;ts nbhtined written approvnl frn,n ORCAA. A written at,plicntion for n demolition shall include n certificntiun that there is nn lutown ncbestos-conl;tinrnK «<atert;ti4 remaining in the Wren of thr ctruchrre. (~ f rO~e~[ SiIC AddfeSS: _~( ~ ~ O / 1J i, I City: --O`-V - -C~ntrrtty:_ '~~ Stale:__~,q• Zip:9 g 59'7 Starting Date: ^ `.-l.~ O (.~ ~~_~_~ - - Completion pate: _ t Zf t~'~ p (,~, - "(TherC is a 10 wurkiug day ndvr,nce notiric;rtion rind from recci t ~ ~` - I. f of pCrnut ;,pttliCrttinn) Property Uwner:_ E~~ (~ r,,;v 2.«., ~({.t{,t,~ele hone: 3GD -~-- ~ -~¢-5?G7 r-~r~: fvfailin~ A~idress {n~'7 2,et!_~.,-r,~. ,n ~ ~ ,, - --~-,-_ -- ~>_~-.-.-.Z i n ~_ - Demolition Contractor: IV ~f?'t~~l`t'?-• ~~ ~-p,~/~C.Stale t.icensc #:_ C9N I. VC Msl,lmg Ad(h•ess: - -•~3+ ~oos~f City: •^~ 3®[~ ~~ St- ~-~ __~ ~ ..- ^..- YCS NO~~~~ ~J`--~~t'~ ~ _ l~elcphune: 3001{"59 ~ l ~o ~•Lo _I'~lx: 3(00 ~ j ~~ -- -.__ 49 l ~ 99 _.• ~ ~_ Demolition by V~~rccl<ing or i in ~ ~ ~~ (.~~SAO fee) eheclc #_ ttonrefundrtbtc Training fire Demolition's (fycs, attach fre deparhrtcnt request for training fire) __ Renovation, /llteration, Remodelin ~, Mnintwiftnce, or other Cun.elructivn'/ ~- . _.~ Asbestos found ur suspected ;~An OttC,~.•1 "Notice of Inturl to ltru,pre or Lneap.,ut~Ue '~Sllecf0.t•' Inrm and df1l,iOpnnfC rcC tltUSl VC Suttl111[led tb'iar IJ uny AYhCSWs rentovnl work AsUestns rrmnva- ~rojrcrs u„~olvn,r demolition nurse br prelonneJ by •, C¢n,licrl n,r,esto~ Crnnrncto, and ull liinble nr t~olrnriafly Rinhl~ ;ul,rstu, rurrsr he renu,~•cd hrl~re nny dcmr>IiUon bcgurz. Rrfcr ~„ (1RCAA Rct;ulntion I ~rucle I~ Inr addnional iequirrntcnts Thar may nhp1~,, G t`t~'~ Olympic Region CIr 2940-8 Limited LanE Olympia, WA 98502 (360) 586-1044 or 1 Fax: (360) 491-6308 Asbestos Survey Completed by AH1?RA Certii7cri Insncctor ~ ~Q ~~ I_ 1 ~~.. , .d ~ . -. Certitication # -- Z This 2pproved pc,~rmil must Cnclo.cc S25 he <rvail,tble et the job site ('ertific;,uor~ rf tfrc Asheslos Survey inusl Yrnces.cing Fce accoutpany !his form /~~4-7Z-- _ - >. P:ICQMMAN\Fnrntslanc~stu~IDc,nnPermiLAoc _`C~ - Rtv tp/12/02 .~ 1i ' r~ CKTTIV4...~. ~''f 7 ~.. LQ1 ~ •-~i~~~ CITY CAF YELM Q.o. ~~x n~~, 3f0 ~15R SA0:3 RECEIPT No. 4 ,/~ g 8 RECEIVED i - _ k.-lidF HU?i['F:E:~ ~~ ! ~" rc ~,.; ~ -.c f• 1.7T'~• f3fCEIVED FROM DATE REC NO. AMOUNI REF. NO Ur3I~,~Eii::;AL BUILLIING IC:~:' ! _'.':):~.~:?r~ ~~,~~~~~ ~-~~5.:'~ CHFCi' S4-i 3 f?L~r+c''~: PiA ~? :SJ.' Fttf[;1:,_,~„A~'i E:LGL~ ['~f~~fIT Ici~D-<.,c,-c~~~~: CITY OF YELM PO B~~r. 4~ 9 Yefln.'vVA 9S5y7 3ro-n~8 8nn3 RECEIVED '~"'THIRTI I,~V^ RECEfVED FROM U~`~IVF:~:3Ai~ i_•.iL=l .IN~~ IAI~.'. C~LYtiPTA t-1 P. •~85I~:~ 11. _'Hc~LL~; DATE REG. N(7 IJ i.J t ~ ~ `l~ r 1~ ~Y RECEIPT No. 4 ,/~ $ g 1 AMOUNT REF,NO Irzc;~~,LL>: c::L;NF;r ~L c~r~r:TE:~;TC~F: G i ~-d J ~y ~~V~ ENVIRONMENTAL INC. Asbestos Survey Report November 17, 2006 Prepared By: Todd L. Venable Cert. # 06-2460 Exp. 10/13/2007 Located At: 607 Rhoton Road Yelm, WA 98597 Prepared For: Universal Building Randy Johnson 8300 61st Avenue NE Olympia, WA 98516 3620 49th Avenue SW Phone: 360-357-5666 Olympia, Washington 98512 Fax: 360-357-5665 ADVANCE Asbestos 607 Rhoton Rd. Table of Contents 1.0 INTRODUCTION ............................................................................. .................................1 1.1 Purpose ................................................................................ ...............................1 1.2 General .................................................................................. ..............................1 1.3 Building Description ............................................................... ..............................1 2.0 SAMPLING ...................................................................................... .................................2 2.1 Sampling Protocol .................................................................. ..............................2 2.2 Sampling Procedure .............................................................. ..............................2 2.3 Laboratory Analysis ............................................................... ..............................3 2.4 Sample Analysis .................................................................... ..............................3 3.0 SURVEY RESULTS ........................................................................ .................................3 3.1 Quantification Table ............................................................... ..............................4 Material ............................................................................................ ..............................4 4.0 CONCLUSIONS AND RECOMMENDATIONS ................................. ................................4 5.0 LIMITS OF SURVEY ........................................................................ ................................5 APPENDIXES ............................................................................................. ................................6 Appendix A: Laboratory Results/ Documentation ....................................... ................................7 Appendix B: Floor Plan and Sample Locations ............................ .........................8 3620 49th Avenue SW Phone: 360-357-5666 Olympia, Washington 98512 Fax: 360-357-5665 ADVANCE ENVIRONMENTAL /NC. Asbestos Survey Report Project # 06-284 607 Rhoton Rd. Yelm, WA 98597 1.0 INTRODUCTION 1.1 Purpose This good-faith asbestos survey was performed as part of pre renovation activities to identify the presence, location and quantity of any asbestos-containing materials (ACM) within the demolition area. The intent of this asbestos survey is to comply with governing asbestos regulations required by Federal Standards and with the Washington State guidelines. Currently, the State of Washington requires a "good faith inspection" for the identification of asbestos-containing materials prior to any remodeling or demolition work. The survey is required to be performed in accordance with 40 CFR 763.86 and WAC 196-62-07721. These federal and State standards require inspections to be conducted by an EPA Accredited Building Inspector with analysis to be provided by an asbestos laboratory certified by the National Bureau of Standards. All survey work was conducted in compliance with the standards mentioned above. 1.2 General On November 10, 2006, Todd L. Venable, AHERA accredited building Inspector of Advance Environmental Inc., conducted an inspection for suspect-ACM at 607 Rhoton Road in Yelm, WA. The structure located at the above referenced property is scheduled for an interior demolition. The site inspection included all accessible areas within the projected construction area. 1.3 Building Description The structure located at 607 Rhoton Road in Yelm, WA is a church. The structure is scheduled for an interior demolition. The structure is approximately 1600 square feet in size, it has wood siding and a metal roof. The building currently contains two bathrooms, a sanctuary, baptism room, and a storage area. The storage area has been damaged due to a fire. 3620 49th Avenue SW Phone: 360-357-5666 Olympia, Washington 98512 Fax: 360-357-5665 ADVANCE ENVIRONMENTAL /NC. Asbestos Survey Report Project # 06-284 607 Rhoton Rd. Yelm, WA 98597 2.0 SAMPLING The sampling objective was to determine the quantity and location(s) of asbestos containing materials. There were seven (7) suspected ACM or presumed ACM in or on the structure at the above referenced property and seven samples were collected. Sample C-1 was collected from the bathroom vinyl, C-2 was collected from the right bathroom drywall, C-3 and C-4 was collected from the sanctuary drywall, C-5 was collected from the baptism room wall board, C-6 was collected from the storage area wall insulation, and C-7 was collected from the storage area ceiling insulation. 2.1 Sampling Protocol This asbestos building survey was adapted from the Asbestos Hazard Emergency Response Act (AHERA) protocol outlined under 40 CFR 763. The protocol is as follows: 2.2 Sampling Procedure • Spread the plastic drop cloth (if needed) and set up the other equipment, e.g., ladder. • Put on protective equipment (respirator and protective equipment if needed). • Label sample container with its identification number and recording number. Record sample location, and type of material sampled on a sampling data form. • Moisten area where the sample is to be extracted (spray immediate area with water). • Extract sample using a clean knife, drill capsule, or cork-boring tool, to cutout or scrape off approximately one tablespoon of the material. Penetrate all layers of the material. • Place sample into a container and quickly seal it. • Wipe the exterior of the container with a wet wipe or remove any material, which may have adhered to it during sampling. • Clean tools with wet wipes and wet-mop or vacuum area with a HEPA vacuum to clean all debris. • Seal the sampling location with caulking compound, spackle, or duct tape. • Discard protective clothing, wet wipes and rags, cartridge filters, and drop cloths into a labeled plastic waste bag. 3620 49th Avenue SW Phone: 360-357-5666 Olympia, Washington 98512 2 Fax: 360-357-5665 ADVANCE ENV/RONMENtAL INC. Asbestos Survey Report Project # 06-284 607 Rhoton Rd. Yelm, WA 98597 2.3 Laboratory Analysis The bulk ACM samples are analyzed at Global Industrial Corp., 6515 E. Main St., Suite #128, Mesa, Arizona 85205, using polarized light microscopy (PLM) with dispersing staining in accordance with U.S. EPA method 600/R-93-166 as specified in 40 CFR Chapter I (7-1-93 edition) Part 763, Subpart F, Appendix A, pages 499-504. Polarizing light microscopy quantifies asbestos concentrations at between 100°1° - 1°t° detection levels. Level below 1°!o can be stated as "ND". For samples containing more than one separable layer of materials, the report will include findings for each layer (labeled -1 for layer one, and -2 for layer two, etc.) and a total percentage for the entire sample. The asbestos concentration is determined by visual estimation. For those samples with asbestos concentrations between one and ten percent based on visual estimation, the EPA recommends a procedure known as point counting (NESHAPS, 40 CFR Part 61). Point counting is a statistically more accurate means of quantification for samples with low concentrations of asbestos. Point counting will only be performed at the owner or owner's agent request. 2.4 Sample Analysis Sample Number Material Location of Samples Condition Friable Yes/No Asbestos Content C-1 Vinyl Bathroom Good N.D. C-2 Drywall Bathroom Good N.D. C-3 Drywall Sanctuary Good N.D. C-4 Drywall Sanctuary Good N.D. C-5 Wall board Baptism room Good N. D. C-6 Wall insulation Storage area Poor N.D. C-7 Ceiling insulation Storage area Poor N.D. 3.0 SURVEY RESULTS The structure located at 607 Rhoton Road in Yelm, WA had seven (7) suspected ACMs on or in building materials. Samples C-1 through C-7 all tested Negative for Asbestos Content. No samples tested Positive for Asbestos Content. 3620 49th Avenue SW 3 Phone: 360-357-5666 Olympia, Washington 98512 Fax: 360-357-5665 ADVANCE ENVIRONMENTAL INC. Asbestos Survey Report Project # 06-284 607 Rhoton Rd. Yelm, WA 98597 3.1 Quanti~ca>~ion Table The following table indicates the approximate quantity of asbestos containing material identified in the structure. Sample Number Material Location of Samples Approximate Quantity 4.0 CONCLUSIONS AND A copy of this report must be provided to any employee or contractor conducting renovation or demolition activities at the subject property. Regulated ACM are required to be handled in accordance with Washington State Regulations prior to any demolition, renovation, or remodeling that would disturb these materials. Washington State Department of Labor and Industries require that the abatement be performed using Certified Asbestos Workers under the direct on site supervision of an AHERA Supervisor. The only exemption of this is for residential owners performing removal of asbestos materials other than furnace interiors, or direct applied mudded asbestos insulation. The requirements for handling, packaging, and disposing of asbestos-containing materials can be found in WAC Chapter 296-62, Volume I, Part I-1. ACM with less then the regulated level of one percent asbestos is not required to be abated by certified asbestos workers or abatement contactors. However, ACM with less than one percent asbestos does require all workers to have Asbestos Awareness Training prior to handling or abatement work. Washington State Labor and Industries regulations regards ACM material with less than one percent asbestos as a health hazard because it is possible that total exposure levels for workers will exceed the Permissible Exposure Limit (PEL). Personal air sampling is a requirement for the first day of the abatement project to ensure that the exposure levels are below the PEL. Precautions should be taken to ensure worker protection and abatement procedure should include engineering controls to limit workers exposure concentration (i.e. wet techniques, half-face respirator, protective clothing). 3620 49th Avenue SW Phone: 360-357-5666 Olympia, Washington 98512 4 Fax: 360-357-5665 ADVANCE ENVIRONMENTAL /NC. Asbestos Survey Report Project # 06-284 607 Rhoton Rd. Yelm, WA 98597 5.0 LIMITS OF SURVEY Asbestos surveys are non-comprehensive by nature and subject to many limitations as described below. Our assessment has considered risks pertaining to asbestos; however, this survey is limited to only those locations sampled. This survey was not designated to identify all potential concerns or eliminate all risk associated with potential asbestos containing materials (PACMs). Evaluation of other risks, such as toxic and hazardous substances in (or in contact with) soil and ground water, structural, electrical, mechanical, radon gas, slope stability, building settlement, moisture, or site-drainage/flooding, have not been included. No warranty, expressed or implied, is made. The site visit consisted of a through visual walk-through of the subject area for the purpose of viewing and sampling PACMs. Advance Environmental Inc. is not responsible for materials, which require destructive means to access, or materials that are hidden from sight, those materials hidden behind walls or materials, which cannot be found with reasonable diligence. Advance Environmental Inc. performed this survey in accordance with the generally accepted standards of care in the sampling profession in Washington State at the time of this study. This asbestos survey was performed in preparation for a demolition of the subject structure. Advance Environmental lnc. Todd L. Venable Advance Environmental Inc. AHERA No: 06-2460 Expiration Date: October 13, 2007 3620 49th Avenue SW cJ Phone: 360-357-5666 Olympia, Washington 98512 Fax: 360-357-5665 kEGISTERF;D AS PROVIDEL:. aY "L.'-~4~7 ' Aa CONST CONT GENERAL REGIST. # EXF. DATE CCO1~ UNIVEBI005MF 07/01/2007 .EFFECTIVE DATE 07/06/2000 JNIVERSAL.BUILDING INC ~i300 61ST AVE NE OLYMr.""~~ A ~ 98516-914 ~~ ' ~, ~ I~.~~~~~I I~~ I ~I.I' \I: I `~fl `; I ~I I \I,~ ~i: :\~I ~ I'~I ~I'\ I I:II.ti ~~ Universal Building, Inc. 8300 61st Ave NS Olympia, Wa. 98516 360-459-1646 UNIVEBI005MF 10/04/2006 Client: Yelm Church Of Christ Address: 607 Rhoton Rd Yelm, WA 98597 ~~'~~~"~ Estimate: 795 Universal Building, Inc Yelm Church Of Christ Room: Kitchen LxWxH: 24'6" x 10/04/2006Page:2 8~0" x 8~0" Sheathing - plywood - 3/4" - 196 SF Verify tongue and groove - subfloor Building paper - between 196 SF .0. 28 54. 88 subfloor and underlayment Underlayment - 1/2" particle 196 SF 1. 74 341. 04 board Floor preparation for sheet 196 SF 0. 71 139. 16 goods Vinyl floor covering (sheet 225.4 SF 3. 03 682. 96 goods ) Baseboard - 2 1/4" stain grade 65 LF 2. 74 178. 10 Stain & finish baseboard 65 LF 0. 86 55. 90 Stud wall - 2" x 4" x 8' - 42.5 LF 13. 68 581. 40 16" oc (int = lw burned + remove bapistry & ext = 8+10) Seal stud wall for odor 180 SF 0. 51 91. 80 contxol Batt insulation - 4" - R13 324 SF 0. 63 204. 12 5/8" drywall - hung, taped, 716 SF 1. 75 1,253. 00 floated, ready for paint Seal then paint the walls & 716 SF 0. 69 494 .04 ceiling (2 coats) Aluminum window, horiz. 1 EA 238. 59 238 .59 slider 3-11 sf (2 pane w/thermal) Add for colored frame (i.e., 9 SF 1. 47 13 .23 bronze or white) Urethane foam sealant 12 LF 1 .13 13 .56 Window trim set - stain grade 12 LF 5. 30 63 .60 (casing & jamb) Stain & finish trim 24 LF 0, 86 20. 64 Exterior door - solid core 1 EA 374. 18 374. 18 lauan / mahogany or birch flush Casing - stain grade 17 LF 2. 25 38 .25 Stain & finish door slab only 2 EA 32. 22 64 .44 (per side) Stain & finish door & jamb 2 EA 22. 60 45 .20 (per side) Door lockset - exterior 1 EA 41. 64 41 .64 Baseboard electric heater - 6' 1 EA 115. 23 115 .23 Baseboard electric heater - 4' 1 EA 90 .36 90 .36 Thermostat - electric heat 2 EA 46 .66 93 .32 Cabinetry - lower (base) 5.33 LF 100 .48 535 .56 units - Standard grade Universal Yelm Church Of Christ Continued Building, - Kitchen Inc. 10/04/2006Page:3 Countertop - post formed 5.33 LF 39. 81 212. 19 plastic laminate Sink - double 1 EA 286, 08 286. 08 Sink faucet 1 EA 117, 78 117. 78 Angle stop and supply line 2 EA 26, 55 53. 10 Water heater - 40 gallon - 1 EA 544. 32 544. 32 Electric Foam blocking for water heater 1 EA 36. 55 36. 55 Earthquake strap - Code 2 EA 32. 51 65. 02 requirement Water heater expansion tank - 1 EA 85. 36 85. 36 Code requirement Relief line - run to exterior 1 EA 103. 73 103. 73 Plumbing repair - at heat 1 EA 317. 40 317. 40 damage behind water heater Wire shelving 4 LF 10. 84 43. 36 Light fixture 2 EA 44. 00 88. 00 Fire extinguisher 1 EA 63. 72 63. 72 Room: Right Side Bapistry Formula: TRP:7~3 ~4,9~8 Sheathing - plywood - 3/4" - 24 SF Verify tongue and groove - subfloor Building paper - between 24 SF 0 .28 6. 72 subfloor and underlayment Underlayment - 1/2" particle 24 SF 1 .74 41. 76 board Floor preparation for sheet 24 SF 0 .71 17. 04 goods Vinyl floor covering (sheet 27.6 SF 3. 03 83. 63 goods ) Baseboard - 2 1/4" stain grade 21 LF 2 .74 57. 54 Stain & finish baseboard 21 LF 0 .86 18. 06 Seal stud wall for odor 168 SF 0 .51 85. 68 control Batt insulation - 4" - R13 24 SF 0 .63 15. 12 5/8" drywall - hung, taped, 192 SF 1 .75 336 .00 floated, ready for paint Seal then paint the walls & 192 SF 0 .69 132 .48 ceiling (2 coats) Interior door unit 1 EA 171 .92 171 .92 Stain & finish door slab only 2 EA 32 .22 64. 44 (per side) Stain & finish door & jamb 2 EA 22 .60 45 .20 (per side) Door lockset - interior 1 EA 38 .07 38 .07 Light fixture 1 EA 44 .00 44 .00 Universal Yelm Church Of Christ ROOm: Babistry Building, LxWxH: Inc. 14'0" 10/04/2006Page:4 x 4'6" X 8'0" Building pager - between 30 SF 0. 28 8. 40 subfloor and underlayment Underlayment - 1/2" particle 30 SF 1. 74 52. 20 board Glue down carpet 30 SF 2. 47 74. 10 Carpet - metal transition 14 LF 1. 55 21. 70 strip Trim board - 1" x 4" - 28 LF 2. 68 75. 04 installed Trim board - 1" x 3" - 26 LF 2. 44 63. 44 installed - window - both sides Casing - stain grade 27 LF 2. 25 60. 75 Stain & finish trim 81 LF 0. 86 69. 66 Reglaze 1/4" laminated glass 20 SF 11. 71 234. 20 - 40 sf maximum Seal stud wall for odor 184 SF 0. 51 93. 84 control Batt insulation - 4" - R13 24 SF 0. 63 15. 12 5/8" drywall - hung, taped, 359 SF 1. 75 628. 25 floated, ready for paint Seal then paint the walls & 359 SF 0. 69 247 .71 ceiling (2 coats) Interior door unit 2 EA 171. 92 343 .84 Stain & finish door slab only 4 EA 32. 22 128 .88 (per side) Stain & finish door & jamb 4 EA 22. 60 90. 40 (per side) Door lockset - interior 2 EA 38. 07 76 .14 Recessed light fixture - 1 EA 141. 37 141 .37 water proof Whole house fan - add for 1 EA 109. 59 109 .59 code requirement Vent whole house fan 1 EA 99. 77 99 .77 Bapistry 1 EA 3,545. 70 3,545 .70 Sink faucet 2 EA 117. 78 235 .56 Drain and ovezflow 1 EA 148. 05 148 .05 In line pump & heater - 2 EA 375. 00 750 .00 electrical and plumbing hookup Framing repair at new bapistry 1 EA 225. 50 225 .50 Universal Building, Inc. Yelm Church Of Christ Room: Left Side Bapistry Foraatla: 10/04/2006Page:5 TRP:7~3~4,9~8 Sheathing - plywood - 3/4" - 24 SF Veri fy tongue and groove - subfloor Building paper - between 24 SF 0. 28 6. 72 subfloor and underlayment Underlayment - 1/2" particle 24 SF 1. 74 41. 76 board Floor preparation for sheet 24 SF 0. 71 17. 04 goods Vinyl floor covering (sheet 27.6 SF 3. 03 83. 63 goods ) Baseboard - 2 1/4" stain grade 21 LF 2. 74 57. 54 Stain & finish baseboard 21 LF 0. 86 18. 06 Seal stud wall for odor 168 SF 0. 51 85. 68 control Batt insulation - 4" - R13 24 SF 0. 63 15. 12 5/8" drywall - hung, taped, 192 SF 1. 75 336. 00 floated, ready for paint Seal then paint the walls & 192 SF 0. 69 132 .48 ceiling (2 coats) Interior door unit 1 EA 171. 92 171 .92 Stain & finish door slab only 2 EA 32. 22 64 .44 (per side) Stain & finish door & jamb 2 EA 22. 60 45 .20 (per side) Door lockset - interior 1 EA 38. 07 38 .07 Light fixture 1 EA 44. 00 44 .00 Room: Sanctuary LxWxH: 44'0" x 24' 7" x 8'0" Subroom 1: Pulpit LxWxH: 14'2" x 3'0" x 8'0" Building paper - between 1,125 SF 0. 28 315 .00 subfloor and underlayment Underlayment - 1/2" particle 1,125 SF 1. 74 1,957 .50 board Sheathing - plywood - 3/4" - 85 SF 2. 56 217 .60 tongue and groove - at pulpit Glue down carpet 1,293.75 SF 2. 47 3,195 .56 Step charge for carpet 1 EA 45. 80 45 .80 installation Baseboard - 2 1/4" stain grade 145 LF 2. 74 397 .30 Stain & finish baseboard 145 LF 0. 86 124 .70 Seal stud wall for odor 1,147 SF 0. 51 584 .97 control Batt insulation - 4" - R13 704 SF 0. 63 443 .52 5/8" drywall - hung, taped, 2,272 SF 1. 75 3,976 .00 floated, ready for paint Universal Yelm Church Of Christ Continued Building, - Sanctuary Inc. 10/04/2006Page:6 Seal then paint the walls & 2,272 SF 0. 69 1,567. 68 ceiling (2 coats) Aluminum window, 6 EA 205. 51 1,233. 06 picture/fixed 3-11 sf (2 pane w/thermal) Aluminum window, single hung 2 EA 256. 33 512. 66 4-8 sf (2 pane w/thermal) Add for colored frame (i.e., 64 SF 1. 47 94. 08 bronze or white) Add for colored glass 64 SF 3. 44 220. 16 Urethane foam sealant 96 LF 1. 13 108. 48 Window trim set - stain grade 100 LF 5. 30 530. 00 (casing & jamb) Stain & finish trim 200 LF 0. 86 172. 00 Curtain rod 1 EA 22. 79 22 .79 Exterior door - solid core 2 EA 374. 18 748. 36 lauan / mahogany or birch flush Casing - stain grade 34 LF 2. 25 76. 50 Stain & finish door slab only 4 EA 32. 22 128 .88 (per side) Stain & finish door & jamb 4 EA 22. 60 90 .40 (per side) Door lockset - exterior 2 EA 41. 64 83 .28 Deadbolt 2 EA 45. 71 91 .42 Baseboard electric heater - 8' 4 EA 136 .44 545 .76 Thermostat - electric heat 4 EA 46 .66 186 .64 Trim board - 1" x 3" - 32 LF 2 .44 78 .08 installed - pulpit Stain & finish trim 32 LF 0. 86 27 .52 Dry erase board 1 EA 189. 99 189 .99 Trim board - 1" x 4" - 40 LF 2 .68 107 .20 installed Stain & finish trim 40 LF 0 .86 34 .40 Recessed light fixture 3 EA 94 .87 284 .61 Fluorescent - two tube - 4' - 6 EA 74 .92 449 .52 fixture w/lens Ceiling fan without light 2 EA 189 .43 378 .86 Interior double door - solid 1 EA 574 .33 574 .33 core lauan / mahogany Trim board - 1" x 4" - 40 LF 2 .68 107 .20 installed Stain & finish door slab only 4 EA 32 .22 128 .88 (per side) Paint door trim & jamb (per 2 EA 17 .33 34 .66 side} Self closing hinges 6 EA 39 .55 237 .30 Universal Building, Inc. Yelm Church Of Christ 10/04/2006Page:7 Continued - Sanctuary Door push plate, 4" x 16" 2 EA 33. 60 67. 20 Door pull plate, 4" x 16" 2 EA 54. 26 108. 52 Door stop 1 EA 19. 80 19. 80 Pews - 20eax8' 1 EA 15,210. 00 15,210. 00 Room: Bntry LxWxIi: 9'10" x 9' 6" x 8'0" Building paper - between subfloor and underlayment Underlayment - 1/2" particle board Glue down carpet Baseboard - 2 1/4" stain grade Stain & finish baseboard Seal stud wall for odor control Batt insulation - 4" - R13 5/8" drywall - hung, taped, floated, ready for paint Seal then paint the walls & ceiling (2 coats) Exterior double door - solid core lauan / mahogany or birch flush Casing - stain grade Stain & finish door slab only (per side) Stain & finish door & jamb (per side) Flush bolts (set of 2) Door stop Handle set Deadbolt Door closer - Commercial grade Panic hardware with external vertical rods Panic hardware - rim series (bar and latch, no rods) Door threshold Fluorescent - two tube - 4' - fixture w/lens Drinking fountain 94 SF 0. 28 26.32 94 SF 1. 74 163.56 108.1 SF 2. 47 267.01 39 LF 2. 74 106.86 39 LF 0. 86 33.54 310 SF 0. 51 158.10 39 SF 0. 63 24.57 404 SF 1 .75 707.00 404 SF 0 .69 278.76 1 EA 674 .55 674.55 20 LF 2.25 45.00 4 EA 32.22 128.88 4 EA 22.60 90.40 1 EA 50.01 50.01 1 EA 19.80 19.80 1 EA 77.50 77.50 1 EA 45.71 45.71 1 EA 143.01 143.01 1 EA 792.50 792.50 1 EA 405.79 405.79 1 EA 33.89 33.89 1 EA 74.92 74.92 1 EA 358.92 358.92 Universal Building, Inc. Yelm Church Of Christ 10/04/2006Page:8 Room: Women' s Restroom LxWxH: 7'2" x Subroom 1: Shower LxWxH: 3'1" x Subroom 2: Offset LxWxH: 4'3" x 6'3" x 8'0" 2'8" x 8'0" 2'8" x 8'0" Building paper - between 66 SF 0. 28 subfloor and underlayment Underlayment - 1/2" particle 66 SF 1. 74 board Floor preparation for sheet 66 SF 0. 71 goods Vinyl floor covering (sheet 75.9 SF 6. 10 goods) - with cove wrap Seal stud wall for odor 300 SF 0. 51 control Batt insulation - 4" - R13 125 SF 0. 63 5/8" drywall - hung, taped, 366 SF 1. 75 floated, ready for paint Seal then paint the walls & 366 SF 0. 69 ceiling (2 coats) Aluminum window, horiz. 1 EA 238. 59 slider 3-11 sf (2 pane w/thermal) Add for colored frame (i.e., 4 SF 1. 47 bronze or white) Urethane foam sealant 8 LF 1. 13 Window trim set - stain grade 9 LF 5. 30 (casing & jamb) Stain & finish trim 18 LF 0 .86 Interior door unit 1 EA 171 .92 Stain & finish door slab only 2 EA 32 .22 (per side) Stain & finish door & jamb 2 EA 22. 60 (per side) Door lockset - interior 1 EA 38. 07 Door signage 1 EA 14 .30 Door stop 1 EA 19 .80 Light fixture 1 EA 44 .00 Baseboard electric heater - 2' 1 EA 86 .78 Thermostat - electric heat 1 EA 46 .66 Bath accessory 2 EA 20 .90 Toilet 1 EA 262 .76 Toilet seat 1 EA 38 .23 Sink - single 1 EA 161 .29 Sink faucet 1 EA 117 .78 Angle stop and supply line 3 EA 26 .55 Mirx'or - 2 ea 8.2 SF 10 .62 Handicap hand rail 1 EA 254 .49 Universal Building, Inc. Yelm Church Of Christ 10/04/2006Page:9 Continued - Women's Restroom Plastic laminate - walls - 1 EA 567. 87 567.87 per restroom Wire shelving 6 LF 10. 84 65.04 Shower faucet 1 EA 120. 49 120.49 Shower handle 1 EA Verify Fiberglass shower unit 1 EA 533. 99 533.99 Stud wall - 2" x 4" x 8' - 3 LF 13. 68 41.04 16" oc - to R&R shower Room: Men's Restroom LxWxH: 9'4" x 6' 3" x 8'0" Building paper - between 59 SF 0.28 subfloor and underlayment Underlayment - 1/2" particle 59 SF 1.74 board Floor preparation for sheet 59 SF 0.71 goods Vinyl floor covering (sheet 67.85 SF 6.10 goods) - with cove wrap Seal stud wall for odor 250 SF 0.51 control Batt insulation - 4" - R13 125 SF 0.63 5/8" drywall - hung, taped, 309 SF 1.75 floated, ready for paint Seal then paint the walls & 309 SF 0.69 ceiling (2 coats) Aluminum window, horiz. 1 EA 238.59 slider 3-11 sf (2 pane w/thermal) Add for colored frame (i.e., 4 SF 1.47 bronze or white) Urethane foam sealant 8 LF 1.13 Window trim set - stain grade 9 LF 5.30 (casing & jamb) Stain & finish trim 18 LF 0.86 Interior door unit 1 EA 171.92 Stain & finish door slab only 2 EA 32.22 (per side) Stain & finish door & jamb 2 EA 22.60 (per side) Door lockset - interior 1 EA 38.07 Door signage 1 EA 14.30 Door stop 1 EA 19.80 Light fixture 1 EA 44.00 Baseboard electric heater - 2' 1 EA 86.78 Thermostat - electric heat 1 EA 46.66 Bath accessory 2 EA 20.90 Universal Yelm Church Of Christ Continued Building, Inc. - Men's Restroom 10/04/2006Page:10 Toilet 1 EA 262.76 262. 76 Toilet seat 1 EA 38.23 38. 23 Sink - single 1 EA 1.61.29 161. 29 Sink faucet 1 EA 117.78 117. 78 Angle stop and supply line 3 EA 26.55 79. 65 Mirror 2.66 SF 10.62 28. 25 Handicap hand rail 1 EA 254.49 254. 49 Plastic laminate - walls - 1 EA 567.87 567. 87 per restroom~ Roafn: Structure Attic vent - gable end - vinyl 1 EA 85.44 85. 44 Exterior light fixture - 1 EA 197 .93 197. 93 Premium grade Siding - T1-11 plywood - 216 SF 2 .68 578. 88 stain grade Trim board - 1" x 4" - 46 LF 2 .68 123. 28 installed Truss - 4/12 slope - 1 EA 950 .00 950. 00 engineered truss repair - prepared by Sargent Eng. EA Op en Engineering Shore ceiling to replace end 1 1 EA 518 .03 518.03 wall and gable wall i 10 HR 45 .00 450 .00 ng Add for additional fram time to work "under" 2-9~~ existing trusses ROOm: Attic LXWxH: 70'6" X 25 '4" X 8'0" Seal attic framing to matt 1,786 SF 0 .87 1,553 .82 white finish Blown-in insulation - 12" 1,786 SF 1 .04 1,857 .44 depth - R38 70 LF 0 .89 62 .30 Baffle vent Room: Front Blevation Forcmila: BL:25,4~9~ 6,6 Clean with pressure/chemical 311 SF 0 .38 118 .18 spray Exterior - paint two coats 311 SF 0 .73 227 .03 Seal & paint trim 20 LF 0 .96 19 .20 Mask and prep for paint 29 LF 0 .77 22 .33 Prime & paint exterior fascia 50 LF 1 .37 68 .50 - wood, 4"- 6" wide 4 116 SF 1 .53 178 .09 Paint overhang . Universal Building, Inc. Yelm Church Of Christ 10/04/2006Page:11 Continued - Front Elevation Paint signage 1 EA 25. 80 25.80 Seal & paint wood beam 15 SF 1. 08 16 .20 Paint/finish - post - wood 2 EA 14. 84 29 .68 Clean gutter/downspout 40 LF 0. 24 9 .60 Exterior light fixture 1 EA 57. 45 57 .45 Clean with pressure/chemical 304 SF 0. 38 115 .52 spray - concrete Room: Right 8levation Formula: BL:70. 5~9~0 Clean with pressure/chemical 545 SF 0. 38 207. 10 spray Exterior - paint two coats 635 SF 0. 73 463. 55 Trim board - 1" x 4" - 69 LF 2. 68 184. 92 installed Seal & paint trim 69 LF 0. 96 66. 24 Mask and prep for paint 71 LF 0. 77 54. 67 Prime & paint exterior fascia 76 LF 1. 37 104. 12 - wood, 4"- 6" wide Paint overhang 274 SF 1 .53 419. 22 Detach & Reset Exterior light 1 EA 39 .85 39. 85 fixture Clean light fixture 1 EA 6 .39 6. 39 Clean with pressure/chemical 300 SF 0 .38 114. 00 spray - concrete Clean concrete step 3 EA 2 .90 8. 70 Trim bushes to paint 1 EA 12. 40 12. 40 Room: Rear Blevation Formula: BL: 25,4~9~6,6 Clean with pressure/chemical 200 SF 0 .38 76. 00 spray Exterior - paint two coats 311 SF 0 .73 227 .03 Trim board - 1" x 4" - 10 LF 2 .68 26 .80 installed Seal & paint trim 27 LF 0 .96 25 .92 Mask and prep for paint 29 LF 0 .77 22 .33 Prime & paint exterior fascia 36 LF 1 .37 49 .32 - wood, 4"- 6" wide Paint overhang 126 SF 1 .53 192 .78 Exterior light fixture 1 EA 57 .45 57 .45 Clean with pressure/chemical 118 SF 0 .38 44 .84 spray - concrete Clean concrete step 3 EA 2 .90 8 .70 Trim bushes to paint 1 EA 25 .50 25 .50 Universal Building, Inc. Yelm Church Of Christ 10/05/2006Page:12 Room: Left Side Elevation Formula: $L:70. 5~9~0 Clean with pressure/chemical 635 SF 0. 38 241. 30 spray Exterior - paint two coats 635 SF 0. 73 463. 55 Trim board - 1" x 4" - 69 LF 2. 68 184. 92 installed Seal & paint trim 69 LF 0. 96 66. 24 Mask and prep for paint 71 LF 0 .77 54. 67 Prime & paint exterior fascia 76 LF 1 .37 104. 12 - wood, 4"- 6" wide Paint overhang 274 SF 1 .53 419 .22 Detach & Reset Exterior light 1 EA 39 .85 39 .85 fixture Clean light fixture 1 EA 6 .39 6 .39 Clean with pressure/chemical 300 SF 0 .38 114 .00 spray - concrete Clean concrete step 3 EA 2 .90 8 .70 Trim bushes to paint 1 EA 25 .50 25 .50 Room: Subcontractors Rewire complete (with EMT, MC 1 EA 10,054 .00 10,054 .00 cable & flexible aluminum conduit) Bathroom fans ( one of which 1 EA 203 .50 203. 50 would be a whole house fan) Code requirement Vent fan 2 EA 100 .37 200. 74 Ground fault interrupter 2 EA 93 .50 187 .00 (GFI) outlet - waterproof front & rear Code requirement Wall-mnt lights (& switches 1 EA 160 .00 160 .00 for them) outside the 2 non-main doors. Code requirement Smoke detector & wiring. Code 3 EA 79 .00 237 .00 requirement Phone / low voltage copper 100 LF 1 .40 140 .00 wiring Phone outlet 1 EA 45 .50 45 .50 Demolition, tear out, haul to 1 EA 14,950 .00 14,950 .00 landfill, dump fees (with out roof) Universal Building, Inc. Yelm Church Of Christ 10/05/2006Page:13 Room: General Conditions Temporary power usage (per 3 EA 134 .55 403 .65 month> R&R Temporary power - 1 EA 611 .18 611 .18 meterbase with receptacles, pole, instal Temporary heat 1 EA 459 .00 459 .00 Temporary toilet delivery and 1 EA 101 .37 101 .37 pickup Temporary toilet (per month) 3 EA 102 .77 308 .31 Asbestos test fee 1 EA 625 .50 625 .50 Permit - Puget Sound Clean 1 EA 150 .00 150 .00 Air Agency - required for demolition permit with or without asbestos removal project Asbestos removal 1 EA Verify Supervision and project 40 HR 66. 75 2,670. 00 coordination Daily clean and construction 1 EA 568. 00 568. 00 debris removal Final clean 1 EA 535. 20 535. 20 Plans 1 EA 300. 00 300. 00 Submit and pickup building 4 HR 86. 70 346. 80 permits Liability insurance 1 EA 1,493. 00 1,493. 00 Key box 1 EA 70, 30 70. 30 Energy caulking 1 EA 134, 50 134. 50 Caulk penitrations thru top 1 EA 96. 55 96. 55 and bottom plates at wires and Adjustments for Minimum 96. 60 Universal Building, Inc. Yelm Church Of Christ 10/05/2006Page:14 Total Line Items Overhead @ Profit @ Sales Tax @ Grand Total Su~nary 116,400.88 10$ x 116,304.28 11,630.43 10~ x 116,304.28 11,630.43 8.4~ x 139,681.06 11,733.21 $151,394.95 G~~ STRUCTURAL CALCULATIONS FOR Yelm Church of Christ Yelm, WA Client: Northwest Catastrophe Sargent Engineers Project Number A06140.00 BY: A.L.Packard Apri12006 EXTENT OF ANALYSIS: The structural calculations and sketches provided with this submittal have been prepared exclusively for the above referenced project. 5/aRGEM Sargent Engineers, Inc. 320 Ronlee Ln NW Olympia, WA 98502 • Tel 360 867.9284 • Fax 360 867-9318 DESIGN CRITERIA FOR: Yelm, Church of Christ Design Code: 2003 International Building Code Live Loads: Roof = 25 psf (snow) Dead Loads: Roof = I5 psf Construction Materials: Sawn Timber: Douglas Fir Larch, No.2 M A`! 1 {~ 200~i E Project: Subject: Sargent Engln~ers, Ine. G~ ~~.J' ~ ~+y ~i'~`r` r 320 Ronlee Ln NW F~,,C ~ ~(J,~ - ~' /+'r Olympia, WA 98502 ~] Tei 360 867.9284 Fax 360 867-9318 By: /'tL ~ Date: ~///~(j;, (s . SCJ / ~R~ ~y> ~ G . 3 s ~ . zs. yz , T ~~ Wp ~ ~s ~S~ r ~~ , ~A °'~q = ~ = 7~3 7~ ~ ~b SAY ~ ~, zaas D Project: ~ Subject: Sargent Engineers, Inc. 320 Ronlee Ln NW Olympia, WA 98502 Tel 360 867-9284 Fax 360 867.9318 By: Date: jZ ~ Si v wl l r-~ ~ o"rTUrYt G t~ 0~2- ~J ~ F 7YZ c..`SS ~ma - 7~3-ti ~ `.35'~ -j- 7~~ (I~ uS~) - ~~ ~ZS yZ'~ = v +~ ~P~ = 76 3 t ~b Z~.31~ h e~ ~` C ~G3 Q f r~ =~ + ~t.3 - ~b 5l~ Z7 35 ° ~ G h = I (~S~ K C `) l 5-f'~ ~L 1..,+. A M ~ ~.J "1Tt-~-S~ ~l L t-}-c~ O ~c>~ t2o 13•o>c o~ s„v,k~.- ~ = 10~1.t2` IbS/ titR~t_ 4,z ~ s / i o q ll sl ~ jam, -~ k«5 ~,t. - Q`C ~ r.,t F pQ C ~ (3v-~ tar- C r~ ~~ !3 `1 P AG ~ r.l -rte ~ Ac. F` F -~G~ o F f X ~ ~~-~ I ,.,1 Cr "(~'_ ~- 5S -- ~xT~~tD f ~t-~ h..l~ ,~ L~~I P m ~~imu~ C> y' i3 ~ ; ~~o -rr ~ ~ -~frt A G ~o s ~ c-~r ~ tic 5 ~N ~ L=td lZ d n.1 htLS a7 `-I ~/ ~ ~ C. 0 MAY 1 t} 2006 ~i ~ Z X y pF~ -~°~Z titer S~S~t,~- Z ~ l5 p fK~S'T~n~c, Nail Connection Single Shear Wood-To-Wood Connection NDS Section 12.3.1 D :=0.135 Nail Diameter (in) 12D Sinker K D ;= 2.2 For D < 0.17" F em :=4650 Dowel Bearing Strength of Main Member (psi) FeS :=4650 Dowel Bearing Strength of Side Member (psi) p :=1.5 Penetration into Main Member (in) t :=1.5 s Thickness of Side Member (in) F Yb :=100000 Bending Yield Strength of Nail (psi) G :=0.50 Specific Gravity of Wood FE := 16600•G~•$~ Fe =4.637.103 Fem R ;= e Re=1 Fes R ~ Ps Re+2.Re2 11+Rt+R~2/+Rt`+Re3-Re•~1+Rr~t l1tRe~ 2•Fyb•~1+2•Re)•D~ k2:=-1+ 2•~1+Re~+ ~ k2=1.085 3 •F em'p~ 2•~1 + R e\ 2•F Yb./2 + R e1•Dz k :=-1+ )+ l /J k3=1.085 3 z Re 3•Fem•~s ... i •• 7 ts..: SAY 1 (~ 2006 U D•p •F es Z IM '= Z IM = 428.011 KD D•t s'F es Z IS := Z IS = 428.011 KD k 1 'D ~~ s'F es ZII := ZII =214.006 KD k 2'D'p'F em Z IIIM '- K D. (1 + 2 •R e~ Z IIIM ° 154.837 k 3 •D•t s•F em Z 154.837 ZIIIS'-KD•(2+Ite) IIIS= DZ 2'F em'F yb Z IV ~_- Z IV = 103.136 <--- Controls KD 3•~1+Re~ C m := 1 wet sevice factor C D :=1.15 Load duration factor C r ~= 1 Temperature factor C dl '= p C d 1 = 0.926 -Penetration depth factor (Cannot be greater than 1.0) 12 •D Cd:=if~Cd1>1,1,Cd1) Cd=0.926 C eg := 1.0 End grain factor, if nailed into end grain = 0.67 C di ;= 1 diaphragm factor, if a diaphragm = 1.1 C to := 1 toe-nail factor, if tonailed = 0.83 Box Nail Capacity: Z m ~=Z IV'C m'C D'C ~'C d'C eg'C di'C to Z m = 109.821 Ibs ~lAY ~ 1) 2DD~ ~..- ~. , MAY 1 i) ?_QQQ MAY 1 (.~ 2D06 T'i~~~~~~ ~~y~~~r~~` MAY 1 (? 2006 ~r~r~r~r~r~r~r~r~rn~rirarr - - - - r'ii ii CITY OF YELM -BUILDING DEPARTMENT CERTIFICATE OF OCCUPANCY Building Address 607 Rhoton Rd. NW Fire Zone Yelm, WA 98597 Occupancy Group Owner Name Yelm Church of Christ Use Zone Owner Address 607 Rhoton Rd. NW Type of Construction Yelm, WA 98597 Building Permit Number BLD-05-0783 Plan Number Has been inspected and the following occupancy thereof is hereby authorized: Floors Occupancies Area under This Certificate S uare Feet Maximum Occupant Load Maximum Allowable Floor Loads Lbs. er S . Ft. ~ 1820 '100 Remarks: C of O continues from fire restoration Areas Special Conditions: None Is Building Sprinklered? YES X NO Building Official: G. Carlson Date: Ma 3 . POSTING: The Certificate of Occupancy shall be posted in a conspicuous place on the premises and shall not be removed except by the Building Official. nnnnnnnnr~r~r~r~r~r~r~r-ir~r~r~r~r~r~r~r~ City of Yelm Community Development Department Building Division Phone: (360)458-8407 Fax: (360)458-3144 Applicant: Name. Universal Building, Inc. Address: 8300 61st Ave. NE City: Olympia Project Information: Project: Yelm Church of Christ Description of Work: Fire Restoration Site Address: 607 Rhoton Rd. NW Fees: Item Acct Code Building Permit -Other 032 001-322-10-00 TOTAL FEES: Permit Fees Schedule Permit No: BLD-05-0783-YL Phone: 459-1646 State, WA Lp 98516 Assessor Parcel No. 22719240202 Item Fee Base Amt Unit Fee Unit Rate No. Units Unit Desc 195.25 0.00 0.00 0.0000 0.0000 51,000 5195.25 Ciry of Yelm 105 Yelm Avenue West P•O• Box 479 YELM WABMINOTON Yelm, Washington 98597 December 1, 2006 (360) 458-3244 Universal Building Inc. 8300 61 S` Ave. NE Olympia, WA 98516-9142 Attn: Randy Johnson RE: Yelm Church of Christ Randy, I am responding to your request for clarification on the issues we discussed on Wednesday: Both leafs of the double door at the entry probably had panic hardware based on your observation. Though panic hardware may not be required, each leaf is required to be opened with a single operation. Meeting this requirement and complying with ADA is probably best achieved by panic hardware. A new building with electric heat would be requires to have R-30 insulation in the floor over an unconditioned space. It makes no sense to ptit haft insulation in the walls and blown insulation in the attic space and not complete the job by installing insulation in the crawl space. 1 hope this clarifies our conversation. If~ I can be of~ further assistance please give me a call. Sincerely ~_ Gary Carlson Building Official The City of Yelm is an Equal Opportunity Provider City of Yelm -Building Department CORRECTION NOTICE I have this day inspected this structure and these premises and have found the following violations of the City of Yelm and/or State laws governing same: PERMIT NO. ,ILA-~-t rJ ~ I L N i GL''" `~- S s' l-it 5 f H K~'~ ~ (* i~ D L z.) ~ ~,.~ ~k ~ Z~ h5~ J~^uSf 1 /~S ~ e1~ You are hereby notified that no more work shall be covered upon these premises until the abo~e violations are corrected. When corrections have been made, call for re-inspecto at 458-8407 DO NOT REMOVE THIS TAG DATE o INSPECTOR FOR BUII.DING DEPARTMENT