8286 punchlist comments 032204The Utility Easement (corporate form) needs to be submitted. See development guidelines for form. This needs to be signed by school district.
The Step Sewer Easement (corporate form) needs to be submitted. See development guidelines for form. This needs to be signed by school district.
A commercial agreement to maintain stormwater facilities needs to be submitted and approved. See the Thurston County DDECM for the form. Remove the appendix maintenance paged that
do not apply.
A revised “FINAL” stormwater report needs to be submitted and reviewed for approval. All changes and revisions to the stormwater system need to be reflected in the report. Submit 2
copies. Report OK need a second copy.
An asbuilt set of drawings needs to be submitted for review and approval. Please x or line out the old and show the new or revised information. This will include elevations, revisions
etc. Submit 4 sets of hardcopy and the electronic files. Asbuilts ok, need a mylar set.
If you have any additional question please do not hesitate to call me at 360-458-8438.
Respectfully,
Community Development Department
James Gibson
Development Review Engineer
Cc letter send via email