BLD-05-0645op*"e City of Yelm Permit No: BLD-OS-0645-YL
n~ Community Development Departrnent Issue Date: 07/19!2006
L (Work must be startetl within 180 tlays)
Building Division
Phone: (360) 458-640] R6ceipl N0: 42802
Y£LM Faz: (360)458.3144
Applicant:
Name: Lubbesmeyer Construc9on, Inc. Phone: 25353]-63]0
Atltlmss: 1151712th St City: Tacoma State: WA Zip 88445
Property Informaton:
Site Atltlress: 14969 ML View Ct. SE
Assessor Parcel No. 42990000100 Subdivision: Country Vlsta Lot: 1
Contractor Information:
Name: Lubbesmeyer COnstruc0on, Inc. CantacL Lubbesmeyer, Paul Phone: 253-537-6370
Atltlress: 1151112th Bt. City: Tacoma State: WA Zip: 98445
Contractor License No: LUBBECI710DM Expires: 03/21/0881 Business License'
Project Information: ~
Protect Country Visfa
Description of Work: 2034 SPR-Lott
Sq. Ft. per BOOr (15Q 828 (2ntl) 1206 (3rd) 0 Garage 440 Basement 0
Heat Type (Electric, Gas, Other): GAS
Fees: ~
Item Item Fee Base Amt Unit Fee Unit Rate No. Units Unit Desc
Builtling Permit 100-500k 1,500. 55 993.]5 506.80 5.6000 90.5000 $1,000
Builtling Plan Review 975. 35 0.00 0.00 0.0000 0.0000
Mechanical Permit 76. 25 0.00 0.00 0.0000 0.0000
Plumbing Permit 125. 00 20.00 105.00 ].0000 15.0000 Fixture
SewerERU 5,569. 00 0.00 5,569.00 5,569.0000 1.0000 ERU
Sewer Inspection 145. 00 0.00 145.00 145.0000 1.0000 ERU
Water ERU 1,500. 00 0.00 1,500.00 1,500.0000 1.0000 ERU
Water Meter (SFD) 300. 00 300.00 0.00 0.0000 0.0000
Water Deposit 40. 00 40.00 0.00 0.0000 0.0000
TraKc Facilities Charge 75]. 50 0.00 757.50 ]50.0000 1.0100 Peak PM Trip
Sewer Deposit 50. 00 50.00 0.00 0.0000 0.0000
State Builtling Fee 4. 50 4.50 0.00 0.0000 0.0000
Fire District Impact Fee 534. 38 0.00 534.38 0.2160 2474,0000 square foot
iO7AL FEES: $11,5]8. 53
I certify that I have reatl antl examinetl the information containetl within the application antl know the same
to be true and correct. I also certify that the proposed structure is in conformity with all applicable City of
Yelm regulations inclutling those governing zoning and land subdivision, and in addition, all covenants,
easements and r~ Victicns of recortl If applying as a cyntr~ctor, I futher certify that I am currently
registeretl in th~51a}~, o;W,~shingtOF). // //_ - r,®
Firm
# Sets of Prints:
Final ln6peMi n:.
Date
By:
y~C®®u~nt~~ry ®y/i@~s~frya yy pa
i_an~si-~a~es 8V®GtIIVV~st9 I91'V.
i_ ~- - -- ~
N ,Oh
Lot No.
Scale:
of 16 ~,•=20'
Drawn By: Dote: Job Number
KL 5/15/06 2754
N
W E'
S
ll ~ E ~
1a'
~ _ ~
a~
h
_~ ,ah N ~
°'
i
,s£ ~ ( APPROVED
a.'
i
~° `"` CITY OF ~
YELM
vam°.w~A"sess~ RECEIPTNO.4Z~HO~
360-458-8403
RECEIVED
••""ELEVEN THOUSAND FIVE HUNDRED SEVENTY NINB DOLLARS 6 53 CENTS
RECEIVED FROM DATE REC. NO. AMOUN7 REF NO.
LUEBSHEYER CONST. IBC 07/18/06 42802 11,579.53 CHECK 4234
1151 112TH ST
TACOMA NA: 98445 BUDGETARY
BLD-05-0645-YL
PERM1500.55,PL975.35MECH78.25,PLUM125.SERU5569.SINSP195,NEAU1500.WMET300.
WDEP40.TRAFF757.50 SDEP50.ST40.50,PIRE534.38
City of Yelm
Community Development Department
Builtling Division
Phone: 1360)658-840]
Fax: 1360)668-3144
Applicant:
Name: Lubbesmeyer Construction, Inc.
Address: 1161 112th SL
Project Information:
Project: Country Vista
Descri0lion of Work: 2034 SFR-LOt1
Site Atldress'. U9fi9 ML View CL 6E
Fees
Item Acct Code
Building Permit 100-SOOk 032001-322-10-00
Building Plan Review 100 001-345-83-00
Mechanical Permit 032001-322-t0-00
Plumbing Permit 032001.322-10-00
Sewer ERU 802412-343-50-01
hewer Inspection 805412-343-80-00
Water ERU 715401-343-80-02
Water Meter (SFD) 712401-303-BD-01
Water D¢DOSa 740402-389-00-00
TratOC Facilitres Charge 420 t20-345-85-00
Sewer Deposit 742 402-399-Ot-00
State Building Fee 160001-386-00-00
Fire Disniq Impact Fee 105 001-345-65-00
TOTAL FEES:
City: Tacoma
Permit Fees Schedule
Permit No: BLD-05-0645-VL
Phone: 253537.6370
State: WA Zip 96045
Assessor Parcel No. d2990000100
Item Fee Base Amt Unit Fee Unil Rata No. Unila Unil Desc
1.500.55 993.75 506 80 5.6000 90.5000 81 p00
975.35 0.00 0.00 D.DOOD o.DOOo
7e.zs D.oo o.oo D.DDOO 0.0000
125.00 20.00 105.00 7.0000 15.0000 Fltlure
5,569.00 O.W 5,569.00 S,Sfi9.D000 1.0000 ERU
145.00 D.DD 14500 145.0000 1.0000 ERU
1500.00 0.00 1,500.00 1,500.0000 1.0000 ERU
300.00 300.00 0.00 0.0000 0.0000
ao.DO- 40.00 0.00 o.oaoo D.DDOD
79.50 0.00 757.50 750.0000 1.0100 Peak PM Trip
50.00 50.00 0.00 0.0000 0.0000
4.50 4.50 0.00 0.0000 0.0000.
534.38 0.00 534.38 0.21602 .47d.0000 square fool
f11,99.5]
YELM COMMUNITY SCHOOLS
PO BOl( 476
YELN, Mp 96597
Clerk: Croy
Terminal: 1
Recei t: 23773
Manua Receipt:
NLUBBESMEYER
NCONSTRUCTION
LUBBESMEYER, CONSTRUCTION -~
7/18/2006 1:28 PM
~;' Oty Item Price
II 1 CPF2900 13375.00
~ COUNTRY VISTAO~T06~013 - LOTS 1,2,3,4,5
Subtotal: 13375.00
Tax: 0.00
Total: 13315.00
Check 13315.00
4233
Change Due: 0.00
TfNKK YW
Jui 17 06 09: 04a LUBBESMEYER 253 °97 9163 p.l
LANDSHAPES NW, INC.
FACSIMH.E TRAM SMITTAL SHEET
ATTN T0: FROM:
Gary CaAson Melissa
COMPANY: PHONE NUMBER:.
CC: DATE:
7/47A6
FAX NUMBER: TOTAL NO. OF PAGES INCLUDING COVER:
360-45&3144 2
RE:
^U AGENT OFOR REVIEW OPLEM1SE COMMEFT OPLEM1SE REPLY
NOTES/COM.MFSIIS:
This leder is for Ne new plan in Country Vista Hyou have any questions please call MaAc at 253!27&6374.
Thardcs.
Mefasa
1151E 112 T" ST, TACOMA, WASHINGTON 96445
PH 253 537-6370 FAX 253 537-9163
' Jul' 17 06 09: 04a LUn_BESMEYER 253 °~7 9I63 p.2
,iV,--17-2006 08:04 F'RCR1:N0. MES FI~OERSON C425] 820-4117 1~'~1~ ~~S~s
City of Yelm
Community Development Depertrnent HASH JONES
PO Box 479 ANDERSON
Yehn, WA 98593
JuN t7, 2006
Re: Lubbesmeyer Construction
Plan 2034 "Concord 11'
To Whom It May Concern:
Nchdech & Plonners
Regarding Detail 1 on Sheet L1, !he'/.' anchor bolt is acceptable as specifietl on
the plan.
SinceralY, 2512
REGISTfRfO
/ ARCNITCCT
-''////^L%%~ ~ GARY THOMAS HASH
Qf STATE Or WASHINGTON
Gary Nash
11644 N.E. 80m St. IGrklantl. WA 98033 (425( 628-4117 FAX (425( 822-1918
8101 3.W. Nyberg Rd Tualatin, OR 97062 (503) 692-8127 FAX (503) 691-0517
CITY OF YELM Received
1I11((ii RESIDEEINTIAL /Bn~U~`ILCD~I7N-G PERMIT APPLI~CA~T~IION FORM ~~~J
Project Address:IY`1~Q ~Y}.n~~~IT S parcel#:~ I IJ3~OZf1i7N `L'9 2006
Subdivision:~~}Af1tV'iT~ Lot#_~ Zoning;
pf New Construction .u Re-Model / Re-Roof /Addition LI Home Occupation Sign
u Plumbing a Mechanical u Mobile /Manufactured Home Placement a Other
Projec[Description/Scope of Work: Ilr.ll~ ~ ~P.-'f(1XYl~l~j Pal(~P.
Project Value: 0~ n~ I ~ 17
Building Area (sq. ft) 1"Floor D~~O 2n0 Floor 2~yD Garage ~}~ Deck
Basement Carport Patio
# Bedrooms # Bathrooms 2.5 Heating: AS/ 7HER or ELECTRIC (Circle One)
Are there any environmentally sensitive areas locatetl on the parcel? N fl If yes, a
completetl environmental checklist must aaompany permit application.
GENERAL ONTRACTOR TELEPHONE ' -
ADDRESS E EMAIL '
CITY'TGGd na L\ STATE {t. ZIP JFAX Z.> ri -1~ /4~.
CONTRACTOR'S LICENSE #i.i.i _ _!9'.Tlit)D EXP DATE C7 Y LICENSE # _
PLUMBING QQONT ACTOR TELEPHONE' j }y T - l"110
ADDRESS r ( ZJ° EMAIL
CITY UY'fl Z'1(A e'Yl STATE ZIP FAX
CONTRACTOR'S LICENSE # 1;>5 EXP DATE CITY LICENSE #
_)% Copy of mitigation agreement wdh Yelm Community Schools, i(applicable
I hereby ceHify [hal roe above inbnnallon is eorted and that the construction on, and the occupanry and the use of the
above described property will be in accortlance with the laws, rule and reauladons pRhe Stele of Washiilaton and Ue
City of Yelm. \
Appllcent's Signature Date ~
Owner /Contractor /Owner's Agent /Contractor's Agent (Please circle one.)
All permits are non-transferable and will expire if work authorized by such permit is not begun
wdhin.180 days of issuance, or if work is suspended or abandoned for a period of 180 days
105 Yefm quenue Weal (380) 45&.4885
l'O dox 478 '
Yefm, WA 98599 ~ y380)4u^^B-3Id4 FAX
mmm ei.yetm.wo.ua
~ IUBBESM~,YEIZ
~ CONSTRUCT][®N, INC.
1151 East 112th Street ~ Tacoma, WA 98446 ~ (253) 537-8370 ~ Fax'. (253) 637-9163
To Whom It May Concern:
In the plat of Country Vista, infiltration as designed on the engineered plat shall be
located in the rear yard of each lot.
Paul Lubbesmeyer ~~ "OY
Vice President
cce Coo
4vc ' O~
PIERCE COUNTY
DEVELO(~PMENT CENTER
LU~J~)~~ ~Ons+-• .Application F
PLEASE COMPLETE THE FOLLOWING:
2002 WA. STATE ENERGY
CODE INFORMATION
Glazing area calculation: Heat syystem sizjng calculation:
'
"
'
sf + 2~ sf = % LU
~-I
~-1 x 20 = ~ ~yvl) b[u's
W indow area + Heated floor area = % of glazing Heated Boor area x btu per sq. ft. =total system output
Reftrto the sable below to detemtine your compliance path Divide We system vulpm by We equipmeaf eflicinpry mling to detennhle
the total Btu N ut allowed.
JOB TYPE: OCCUPANCY: COMPLIANCE PATH: HEAT SYSTEM SIZE:
[Sd New
[ ]Remodel [Single Family
[ ]Multi-family [~ Pres tive Ch. 6 (circle one)
7 I
II~ III Btu inputrj~
~~°
ff
i
i
\ jo
ic
ency rat
n
[ ]Addition [ ] Com~bnen[ Performance Ch. 5 [ ] WATTS
[ ]System analysis Ch. 4 HSPF rating
FUEL TYPE: HEAT TYPE: ELEC. UTILITY PROVIDER:
[ ]Electric ~ Forced Air Furnace [ ]Tacoma City Light
[>Q Na[. Gas [ ]Heat Pump [ ]Puget Sound Energy
[ ]Propane [ ]Radiant Hea[ System (baseboard, wall cadet [ ]peninsula Power
[ ]Oil, wood [ ] Hydronics system ~J Other
[ ]Gas or Wood Stove
VENTILATION INDOOR AIR QUALITY (VIAQ) INFORMATION (check one)
Ventilation Opti on: pq A [ ] B [ ] C [ ] D [ ] AAHX
System Size: 100 cBn [ Intermittently operating [ ]Continuous operating
PRESCRIPTIVE REQUIl2EMENTS°'' FOR GROUP R OCCUPANCY
CLIMATE ZONE I-ALL FUEL TYPES
Olition GlazinQ
f0 Glavng U-factor Doof° Ceil
iag- Veu11W Wa6 a
Wall, int. <
Wall
cat s
floor
slob
Arta
%ofnoor U-value aJings Aboveu Ixlow ,
,
blow grade Pn°
gradE gmtle prade
Ni:nicvl Ovcrhmd
1. 12% 035 058 0.20 R-38 R-3o R-15 R-IS R-10 R-l0 R-10
^.' IiY. 040 0.58 0.20 R-38 Rd0 R-21 Rai A-10 R-10 R-10
III. UnlimileJ DYO O.SA 020 Rd8 R-30 IL+21 It21 R-10 1t-3V R-10
Group R-3
Occupanry
ONy
Re&re rreCaxe
0. Nominal A-values are tar wood frame assemblies only or assemblies builtmoceordunce witM1 Section GVLI
I. Minimum requirements foreach option IISIN. For rwmplq if a proposed design has a gluzmg ratio to the conditioncJ n«v area of 13%, if shill comply witM1 all
aamplb~ncerby Chagers 4 or S•orNe W.5 E Cur higl¢r). Ropnsed dezignc wNCM1 rnmiol meet Ne specif<requuemen¢ of a IinM option above nay rvlculain
2. Ikquvemm~ aPgio m all ceitinga evicept single maer arjoirt vauhW ceilings.
1. Requiramnt applicablemoNy fo single after orjpisf vaalmd ceilings.
Y. oelow glade xalb shall be insulated either on Ne exterior foes minvnum level of R-IV, or onthe inferiormthe same level as w;dls above grade. Exterior
insulation installed on blow p~ade walls shell be a wafer resismnl nmmris4 manufaewred for ifs intended asq and i~mmlled according m Ne mvnuGcmrers
sped!®fiom.
5. Floors overcmxi spaces or exposW mambiem av cotNitions.
6. ftequved slab perimeter insulation shall beawetu «sismm makrial, manufa<flaredfor im intended uu, antl wmlletl according to manufacturtrS Speciliearionn.
Z Int Mnoto standtM (reining I6 iMho on enter wiN headers insulaN wiN a mirtimum of R-5 wuletion.
9. Doors, ioduding al me doors, shall be assigned Oeluuh U-faNOrs from Table 10.LL.
10. Wberea maumum glazing area is l¢IeQ Nemtal6luing area lntmbinM vertical plus overheaJl asapercent ofgross wnditioned flour wca sball Mless than ur
equal m Nat valuc.OVerhmd glazing wish a U-facor °fU~ Y0 or less u not Nclode0 H glazing area limitations.
II. OveeM1ead glavng shall hour U-facforsdetesmi tlin aecortlance wiW NFRC'IW OrazspecifiM in Section 502.1.5.
12. Log entl mlW (holier walls wiNe minimum eveng<logthickrress afl.5 inclw are exemq from thu imulation rryuirtmun
... ~
After recordine return to:
Yelm Community Schools District No. 2
P. O. Box 476
Yelm, WA 98597
Attn: Erling M. Birkland
MITIGATION AGREEMENT
Reference No: SUB-06-0096-YL
Grantor: 1. Landshapes Northwest, Inc.
1151 E. 112'" Street
Tacoma, WA 98445
Grantee: 1. Yelm Community Schools Dist. 2
Legal Description: Sec 13, T17N, RIE; Mm. View Road & Yehn Avenue West
Assessor's Property Tax Parcel Number/Account Number; 21713310200
N
THIS MITIGATION AGREEMENT A reement" ~
(" g ) is made this2 of I' III 2006,
between the YELM COMMUNITY SCHOOLS DISTRICT NO. 2, Yelm, Washington (the "District")
and Landshapes Northwest, Inc. (the "Developer")
RECITALS ts+y ~F ~s~ y
A. The Developer has submitted an application to T~turstot+~eunty for the constmetion of a
16 lot subdivision, "Country Vista" near Yelm, Wash. (the "Project"). The Project is located on property
that lies within District boundaries, more particularly described on Exhibit A, attached hereto and
incorporated herein by reference.
B. The Stata Environmental Policy Act, Chapter 43.21C RCW ("SEPA"), provides
processes and procedures whereby major actions by state and local agencies, including, but no[ limited
to, plat or PUD approval or the issuance of building permits, may be reviewed to determine [he nature
and extent of their impact on the environment. Impacts on public services, including schools, are
environmental impacts for the purposes of SEPA. SEPA requires dte mitigation of adverse
environmental impacts.
C. The District's s[udon[ population and growth projections indioate that the Project will
have an impact on [he District, when cumulative impacts of other projects aze considered.
D. RCW 82.02.020 authorizes the District to enter into a voluntary agreement with the
Developer for payment to mitigate the impact of the Developer's Project.
IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIII P8955IDe6f6a4;W
E. Pursuant to Resolution No. 12-16-93-05, i[ is the policy oCthe District to recommend [ha[
the direct impact of development 6e voluntarily mitigated by the payment of fees and/or o[hec mitigation
measures where appropriate.
F. The Developer has agreed to mitigate, on a voluntary basis, [he adverse impact of [he
Project on the District.
AGREEMENT
NOW, THEREFORE, in consideration of the above recitals and [he mutual promises and
covenants below, the District and the Developer agree as follows:
1. The Developer acknowledges and agrees that [here is a dirge[ impaot on [he District as a
result of [he Developers Project and that this Agreement is necessary as a result of that impact.
2. The Developer acknowledges and agrees that in order to mitigate the direct impact of [he
Project, [he Developer has offered to pay the District [he following sum of money: Two Thousand Six
Hundred Seventy-Five Dollars and 00/100 ($2,675.00) far each lo[ in the subdivision or the total sum of
Forty-Two Thousand Eight Hundred Dollars and 00/l00 ($42,800.00) (the "Mitigation Payment") for the
16 lots of the subdivision. The amount referenced by [his paragraph is subject to change pursuant to
paragraph 4 below.
3. Any extension, renewal, modification or amendment to the Project that results in an
adjustment in the number of lots shall result in a corresponding pro rata adjustment in the Mitigation
Payment.
4. The Developer agrees that the payment of the~full Mitigation Payment (in the amount of
Two Thousand Six Hundred Seventy-Five Dollars and 00/100 ($2,675.00) per dwelling unit or Forty-
Two Thousand Eight Hundred Dollars and 00/!00 ($42,800.00)) for the project, shall be a condition of
building petmit issuance for each single family dwelling in the project. If building permit issuance does
not occur within Five (5) years from the date of this Agreement, the amount due for mitigation, as stated
in paragraph 2 above, shall be modified to the amount reflected in the then most recent mitigation
agreement to which the District is a party. A copy of such agreement shall be made available m
Developer upon request.
5. The District agrees to record [his Agreement after i[ has been executed by the parties.
6. The Developer acknowledges and agrees that [he Mitigation Payment is authorized to be
used for capital improvements to the following facilities: Fort Stevens Elementary School, Prairie
Elementary School, Lackamas Elementary School, Sou[fiworth Elementary School, Mill Pond
Intermediate School, Yelm Middte School, and/or Yehn High School and/or any other facilities that may
be affected by the Project and/or the purchase of portable facilities and/or school buses.
7. The Developer agrees that the District has five (5) years from the payment date to spend
the Mitigation Payment for the capital improvements or expenditures described in paragraph 6. In the
event that the Mitigation Payment is not expended within [hose five years, the moneys will be refunded
with interest at the rate applied to judgments to the property owners of record at the time of refund;
however, if the Mitigation Payment is not expended within five years due [o delay which is attributable
[o the Developer, the Payment shall be refunded without interest.
8. The Developer waives and relinquishes its right to protest or challenge [he payment of
the Mitigation Payment pursuant to this Agreement and hereby covenants mtd undertakes that it forever
refrains and desists from instituting, asserting, filing or bringing any lawsuit, litigation, claim, or
challenge or proceeding [o challenge this Agreement, claim any repayment or reimbursement of funds,
performance or improvements provided far therein, or any of its terms and conditions, on any ground or
basis whatsoever.
9. The District hereby waives any objection to the Project as presently proposed.
10. The District and the Developer agree that the Mitigation Payment will be full and
complete mitigation for the impact of the Projeot as presently proposed on the Distriot.
IIIIIII VIII IIIIIIIVIIIIIIIIIIIIIVIIIIIIVIIIIIIIIIII p89550o5OO43W
11. This Agreement shall be binding upon and inure to the benefit of the heirs, executors,
administrators, successors, and assigns of both of the Developer and [he Disfrict.
12. If an action must be brought to enforce the terms of this Agreement, such action shall be
brought in Thurston County Superior Court. The prevailing party shall be entitled to payment of its costs
and reasonable attorneys' fees.
13. This Agreement constitutes the entice agreement between the parties and any other
agreement either written or oral shall be null and void.
EXHIBIT A
LEGAL DESCRIPTION
Location: Mtn. View Road & Yelm Avenue West
13 Townships Range lE
Area: 3.01 acres
Tax Parcel Nwnber: 21713310200
YELM COMMCJNITY SCHOO~LIS DISTRICT NO. 2
DATED: ~I~n ~ / Ov ~ `~ ~`-W/~ a.wt.-ate
/ By: Alan Burke
Its Superintendent
STATE OF WASHINGTON )
)SS
COUNTY OF'fHURSTON )
I certify [hat 7 know or have satisfactory evidence that Alan Burke is the person who appeared
before me, and said person acknowledged that he signed [his instrument, on oath stated that he was
authorized to execute the instrument and acknowledged it as the Superintendent of [he Yelm Community
Schools District No. 2 to be the free and voluntary act of such party for the uses and purposes mentioned
in the instrument.
GIVEN under my hand and official seal this da of 2006
,P SSENSgC~ pss BLIC m and f r e Slate of
==4i.:' M~IfPir~•,.,9 sir Washington, residing at
tPpV sit' : i My Commission Expires:
~:
i~ ~ .0 ~' Z
;O;
';,a,''tV pUBv?G ~ + ~
o~'/ _
2=
p E OF ~ vase: a ee a
rrssssrsr'9T q t~Pys IIIIIII VIII IIIIIII VIIIIIIII(IIIIIIIIIIII~Iilll III c83snoos rr,3ae
""„"""` VEL11 CONnaNITV SCHOOLS nGR $35.00 Thurston Co. Wa.
DATED: J Z D
STATE OF WASHINGTON )
)SS
COUNTY OF
ay:
Its: Developer
1 certify [hat I know or have satisfactory evidence that ~U\ l1lSrM~uYOg>js the person who
appeared before me, and said person acknowledged that he signed [his instrument n oath stated that he
was authorized to exeoute the instrument and acknowledged it as fhe applicant for Phis subdivision to be
[he free and voluntary act of such party for the uses and purposes mentioned in the instrument.
GIVEN under my hand and official seal this ~ day of pt , 2006.
~~ a ~-14a19.n
MEIJSSA A. BEYER NOTARY PUBLIC in d for the State of
NOTARY PUBLlC Mashington, residing at~pVlQlly
STATE OF WASHINGTON My Commission Expires: I-q-O"i
COMMISSION EXPIRES
JANUAflY 9, 2007
II II II I III I III II II I I II O58/~i5Ree6 fH436R
YELM COMMENITV SCHOOLS RGR $35.00 TM1wstan Co. Wa.
~-
DF.PARTMENTOF LABOR AND INDUSTRIES
,. : `.-.
• ~~yREGISTERED AS PROVIDED BY LAW AS
~ - CONST CONT GENERAL
s<': ~ .
~ , ~i nr E ,~REGI STaTr#t EXP.k^DATE
C,CO~ ;'„LUBBECIII.ODM `03/2•L/2008'
EFFECTIVE-DATE ^~~ ~ 03/14/1989
- ~LUBBESMEYER CONSTRUCTION INC
1LS1~E. 112TH
- TACOMA WA 98445
Dewcn n„d o~rPmy ee,er<o~ .. - .
REGISTERED AS PROVIDED BY LAW AS
CONST CONT GENERAL
- Please Remove
~ REGIST. #
' EXP. DATE And Si
n
CC01.-
°~LUBBECIll ODM 03 /21/20D$ g
EFFECTIVE DATE 03/14/1989 Identification
~' , ' :' „' ~ ` -.-° Cazd Before
LUBBESMEYER CONSTRUCTION-INC (~-' Placing In
llsl E.132TH- - "
TACOMA WA 98445 Billfold
Signature
Issued by DEPARTMENT OF LABOR AND INDUSIRIFS J
P625USb(Nq (8/9'n
YEAR ~~~H ®r Y ~L~
`a~6 CLERK -TREASURER'S OFFICE
I~~J~gI~~~ ILg~CIEl~T~lE
NOT VALID UNTIL FEE IS PAID
LUBREJMEY ER, -0HUCI<
15 HEREBV LICENSED i04iPERA1'E -
LUREESf~IEYER CONSTRUCTION, INC
ttbl E 112TH ST E
TACOMA WA -98`64-`'
AT 7_ OUT CF TOWfV
ihls Llaense muaf be postetl In o cpnsplcuous p~oce a1 the Uus!ness bcailon
mg-ln0179~.~
Jun 29 06 02: 32p LU99ESHEYER 253 ""7 9163 p.l
LANDSHAPES NW, INC.
FACSIMILE TRANSMI71'AL SHEET
ATTN T0:
Gary Godson FROM:
Melissa
COMPANY: PHONE NUMBER:
2531537-6370
CC: DATE:
629106
FAX NUMBER:
?50-458-3144 TOTAL N0. OF PAGES INCLUDING COVER:
2
RE:
^U RGENT 0_EOR REVIEW ^PLEASE COMMENT OPLEASE REPLY
DOTES/COMA~NIS:
This is for the 2034 Plan that Mark dropped off to you Uhday. ff you have any questions please ca11 me al
2531537-6370.
Thanks.
Mefssa
1151 E ll2'" 5T, TACOMA, WASHINGTON 98445
PH 253 537-6370 FAX 253 537-9163
JUN-25-2007 16:15 City of Yetrn Public Works 360 458 8417 P.02
City of Yelm
Public Works Department
901 Rho[on Road
P.O. Bos 479
1'elm, NA 98597
(360) 458-8406 Fax: (.360) 458841 i
NEW HOME FINAL
DATE: ZS
DEVELOPMENT: ~ ~
BUILDER'S NAME: _L1 ~ 1 ly`g`Jt~
LOTn: ~ ADDRESS: _I J IC~JIJ~ C (~
COMMENTS:
INSPECTED BY: (chick onz)
John Ivey
Edward Smith
FROM :YELM SEWER DEPT. FqX N0. :360-458-E3166 Sun. 26 2007 07: 16gM P1
FAX TRANSMISSION
CITY OF YELM
P.O. BOX 479 - 931 NP ROAD NE
YELM, WA 98597
360-458-8411
FAX 360-458-8 ] 66
TO: (~ (zC--1c,Nf tiJ
FAX#:
From: IRgniD `+~
RECErVED
JUN 2r,' 2U07
DATE; G% ,3.6 - o ~
PAGES: ! ,including this
Cover sheet
Subject: J-~p~ugt= ~i.n>gL COU,~-~u ~~3rA-
/f1HomA ~RRA
COMMENTS: ~,~--
L E T 9~ I oo.~o ~EZRA c i. 5.~,.
•* 11' you do nol receive el I copies or any copy is not legible, please cell (360) 458-841 1
as voon as possiUlc.
CITY OF YELM -BUILDING DEPARTMENT
RESIDENTIAL CERTIFICATE OF OCCUPANCY
Building Address
Owner Name
Owner Atldress
Building Permit Number BLD-OS-0645-YL Plan Number
Areas
Special
Building Official: G. Carlson Date. June 26. 2007
This structure is in compliance with the International Residential Code (Chapter
51-51 WAC) as adopted by the Washington State Building Cotle Council pursuant
to Chapters 19.27 and 70.92 RCW, effective July i, 2004