notes on project manual - final drawings 001
Notes on the Project Manual and Final Construction Drawings
Need an electronic copy of the manual, plans, and call for bids for publication on the web
site.
Clarify project management duties.
What about asbestos?
F.E. cabinet in 109 should be moved to wall next to door 102
F.E. cabinet needs to be insulated behind if sound is still a concern or isolated from wall
outlets if in the same cavity.
Detail 15/A6.01 does not give bracing spacing as referenced in the specs.
Bid proposal - page 2: one-hundred and twenty (210), .4
9250.3.50 (metal studs) refers to section 7200 (wall insulation) which does not exist.
Section 01100 - page 1: 1.4 What about reused items?
Section 01100 - page 3: 1.9 Clarify schedule with proposal page 2.
Section 01100 - page 3: 1.11.6 Change to 7 AM (City standard)
Section 01310 - page 3: 1.4 Progress meetings with City or Architect?
Section 01500 - page 4: 1 10 protect School residents? 1-,"
There is a duplicate Section 01600.
Section 08710 - page 6: Hardware Groups, check with notes on door schedule
Sheet A1.01 -
Floor plan demo note 1 - only in library portion of building.
Floor plan demo note 4 -there is asbestos in the adhesive.
Floor plan demo note 5 - reused
Floor plan demo note 6 - wood
Floor plan demo note 12 - protect for break room fixtures.
Floor plan demo note 13 - water heater shown as being relocated.
reflected ceiling note 6 should say motion detectors rather than security cameras