change order proposal #1 2-17-04 001
City of Yelm,>>
PO Box 479,105 Yehn Ave W
Yelm Washington 98S97
360-458-3244
360-458-4348 fax
~t
www.ci.velm.wa.us
CHANGE ORDER PROPOSAL
Date: February 17, 2004 Pagel of 3 Pages
(includes attached proposal from A.M. James Co.)
Project Title: City Hall Improvements - Phase 1
Change Order Number 1
Prime Contractor A.M. James Company, Inc.
X Requested by City under the terms of Section 7 01 of the Standard
Specifications
? Change proposed by Contractor
Endorsed by Cdntractor
Date
Original Contract Amount: $ 172 582.00 + WSST
Current Contract Amount: $ 172 582.00 + WSST
Net Change This Order $ 2,799.00 + WSST
Contract Total After Change: $ 175 381.00 + WSST
O Approval Recom en ed
l% a-1I-n{
Project 118er - Date
proved
City Admini r for Date
CHANGE ORDER #1 Page 2 of 3
Project: City Hall Improvements - Phase 1
Change Order Number: 1
Change Order Date: February 17, 2004
To: Jim Wright, A.M. James Company, Inc.
P.O. Box 815
Gig Harbor, WA 98335
All work, materials, and measurements to be in accordance with the provisions of
the Standard specifications and Special Provisions for the type of construction
involved.
This contract is APPROVED to be revised as follows:
In Phase 1, install blown-in R-38 fiberglass insulation AND install R-21 bait
insulation in knee wall areas.
Payment:
Upon completion.
• • Page No. of Pages
:e.
rr.
PaorosAL elemental TO PHONE DATE
I
SIPFET IOB NAME
Jh
-
BITV STATE antl 21PCOBE JOB LOCATION
Amp]TECT ANTE OF PLANS J06 PX(1NE
We hereby submit specl4callons and estimates [or
We Propose hereby to furnish material and labor - complete in accordance with above specifications, for the sum of:
dollars
Payment to be matle as follows:
All -level 11 blo aulmd to be as ,allied All on, to be completed in a emenlike Authorized
manner CeNmA to All racLCes. Any allembon or deneion from above arbitration, V
involving p coil he a mbeel only upon written orrlum, antl all became n extra Signature
-
A g v d b r 1 All 1 1 1 upon k accidents or
delays beyond control . ow t ry tire to 1 tl the Our Not. The pre,coal may, be our norece are fully covered by Worman a Compensator anx Withdrawn by on if not accepted within days.
Acceptance of Proposal The all r,,., speeifleatlpna
and condner,Am initial and are hereby accepted. You are authorized to do the Signature
work a: specifiall Pnymam wlll be made a. outlined above.
Date of Acceptance: Signature
• • Page No. at Pages
A.M. JAMES COMPANY, INC.
P.O. BOX 815
IUL GIG HARBOR, WA 98335
(253) 851.5564
vBOPasAL sllBal To PHONE iOAre
City of Yelm Feb. 9 2009
sres, JOB N.
P. 0. Box 479 City Hall Improvements
GIN. STATEc 41PCODE JOB LOCATION
Yelm WA 98597
JOB PHONE
APCHITECT OATS Or PLANS INSULATION
We hereby yebrat spetlfica mbe and eshmalae as
Blow the addition attic with R-38 fiberglass
Batt knee wall areas with R-21 fiberglass.
~r tl ~T n l
'A ~~I~,~~s X acs
p2Z
~~(~x~t P I~ vX q _5
Ql7904- -
We Propose hereby to furnish material and labor - complete in accordance with above specifications, for the sum of
2,799.00 l
Twenty-seven hundred ninety-nine and 00/100 - - - - - donors is
Paymenl to be made as allows.
Plus WSST -
All maleral is guarameetl a be as ybeissed. An -lb m be lee l se a wovmanlae a Authorized
x.as, to slwasad sesbass. Ary aM1erall or al 11.... spear alms
nvpNeag gals cosh wal as e.ecuraa pal, upon seen nree', and Null becoma an sea Authorize
-
mage wer ad aboye Ibe esbaral All agreemenls wnungenl upon sakes, yoAdm1A ar
tleaYS beya our m~~llml. Ouror to ra~ry fire, mnal aM WM, recessary ins r- Qs bell This pmposa may be
waxers are bby mmml by woamam cmgensalm reseal withrlmwn by us it not ameMea wchin days.
A nnn..tn nnn of Dsnnncni
Feb 11 04 00:42a ,
? JOB PROPOSAL STATECONW.CfORSREG NO BO111T104116
0 1 1 O McornA....._...... ~62y-mm
Y L SF/~Mp~................... l2xgal l6%
INSULATION co., INC MUM .1 OL MM...._..._ 00788 16%
11200113"M ...................(3601273.1776
2301 East Q 50eet tBSN)F WA 1.804422.7m
Tecgne, WA 98421 FAX (251) 272.0"1
TO: 1N JOB LOCATION
,A-,771,S~o~S CJ
ADDRESS 3 , x fsl c ~,~1 d2L41 L qr kD A ul
cfTr~iiL N~tv~ U~
LItil
WE PROPOSE TO:
U R t o W A
i? J "1~ Pf21G.> I~ t .w2 ~~~i7
All the obese, excluding options, to be completed In workmanlike manner far she sann of $ Z 7 , plus fox,
lfpayment 4 received by W wNt.in 1 o d%S ft am dok of in"ke, you may ly{q
All prlcm. ore subject to change after 90,k,ya from the dote of this quo~yltlI PP ppS +/n`~ pies tax.
Reeper-w9y Submitted: Date 1 - G L- "N By
agree to have boulton Insulation do the at ova Proposed work.
By
V2301 0~ O~ EAST Q STREET - TACOMA, WA 98421
TACOMA 253-627-1654 insulation nc
SEATTLE 253-838-'1654 co, 7
OLYMPIA 360-786-1654 CONTRACTOR'S LICENSE NUMBER
or 1-800-422-7923 223-01 B0-UL-TI 30486
FAX TRANSMITTAL FORM
Date: 3-~-nq Fax# ~~o-~{Z58
FROM:
RE:
Page of
FAX 253-272-0701
or 360-786-1654
• Page No. of Pages
A.M. JAMES COMPANY, INC.
P.O. BOX 815
~L GIG HARBOR, WA 98335
(253) 8515564
PROPg5AL 5UBM MTO PHONE City of Yelm Feb. 9 2004
STREET JOB Ni
n'
P. 0. Box 479 City Hall Improvements 9h SP
Oll STATE and MR CODE JOBLOCATION
Yelm WA 98597
ARCHITECT DATE OE PLAINS
JOB PHONE
INSULATION
We hereby submit specilirations and estimates for
Blow the addition attic with R-38 fiberglass.
Batt knee wall areas with R-21 fiberglass.
We Propose hereby to furnish material and labor - complete in accordance with above specifications, for the sum of:
Twenty-seven hundred ninety-nine and 00/100 - - - dollars f5 2,799.00 I
Payment to be made as follows.
Plus WSST
Ali ma. I C be IS b. A A 0 t tl L L In a Nng o andi nIts Aid a. n Ib b pi JAI A thorbatl
vlng ,,It 1, cd ly d~5. art ll' a , S ]n d[H P
o
h-. n J -bb_ All g g d.t,
n y d 01 le - v t d and _ y m tF tlrawn b m hnol rdpda l maybIn do, ad,or -na o la 1, wra by .to ,men, e r,n a o Ir, anrn
Acceptance of Proposal - ,hc adovsnra.., a r,b.,tnn
and -radmo .:abald.brrv anb are hordby ,I nevtm. Yrlll ,r, , I , ns:nn a, Hill s~ur~emn